drilling mud waste water treatment using aop methods
TRANSCRIPT
![Page 1: Drilling Mud Waste Water Treatment Using AOP Methods](https://reader037.vdocuments.us/reader037/viewer/2022100304/5513db254a7959b1478b4795/html5/thumbnails/1.jpg)
Plasma Centre Indonesia Simplify process
Drilling Wastewater Treatment Unit
Plasma Centre IndonesiaWisma Bumi Putera lt. 15, Jln. Jendral Sudirman kavling 75,
Jakarta 12910
Plasma Centre Indonesia Simplify process
![Page 2: Drilling Mud Waste Water Treatment Using AOP Methods](https://reader037.vdocuments.us/reader037/viewer/2022100304/5513db254a7959b1478b4795/html5/thumbnails/2.jpg)
Plasma Centre Indonesia Simplify process
Drilling mud wastewater
wastewater
![Page 3: Drilling Mud Waste Water Treatment Using AOP Methods](https://reader037.vdocuments.us/reader037/viewer/2022100304/5513db254a7959b1478b4795/html5/thumbnails/3.jpg)
Plasma Centre Indonesia Simplify process
Basic Concept
Drilling wastewater pit Clean water
ECO-MOBILE is in-situ treatment process.
It was designed to treat wastewater which
generated from drilling process
in out
3
![Page 4: Drilling Mud Waste Water Treatment Using AOP Methods](https://reader037.vdocuments.us/reader037/viewer/2022100304/5513db254a7959b1478b4795/html5/thumbnails/4.jpg)
Plasma Centre Indonesia Simplify process
In-Direct plasma treatment concept
InletIn-DirectChamber
Filter
Ozone Generator
Water in
Water out
Plasma-UV
Ozone
Ozone generation using non-thermal plasma
Outlet
![Page 5: Drilling Mud Waste Water Treatment Using AOP Methods](https://reader037.vdocuments.us/reader037/viewer/2022100304/5513db254a7959b1478b4795/html5/thumbnails/5.jpg)
Plasma Centre Indonesia Simplify process
Treatment Concept
wastewater AOP Coag/sed filtration clearwater
Reduced organic and inorganic compounds
Reduced metals and solid particles
Reduced various micro particles
COD =100 (%) COD <10 (%) COD <1 (%) COD < 0.5 (%)
4
![Page 6: Drilling Mud Waste Water Treatment Using AOP Methods](https://reader037.vdocuments.us/reader037/viewer/2022100304/5513db254a7959b1478b4795/html5/thumbnails/6.jpg)
Plasma Centre Indonesia Simplify process
Drilling mud wastewater treatment
Drilling mud wastewater
Chemical
In-direct plasma
Treated water
Mud formation
Oil Industry
AC filter
COD removalDeodorizing
Neutralizing
Solid removal
In-situ drilling wastewater treatment
![Page 7: Drilling Mud Waste Water Treatment Using AOP Methods](https://reader037.vdocuments.us/reader037/viewer/2022100304/5513db254a7959b1478b4795/html5/thumbnails/7.jpg)
Plasma Centre Indonesia Simplify process
Treatment handling services
• Treatment Capacity : 1000 bbl/day• Wastewater type : Drilling mud• Inlet profile : various max COD 15.000 ppm• Outlet profile : COD 200 ppm (government
regulations)• Services cost : USD/IDR• Customer responsible : Drilling company
– Mob-deMob• PCI responsible :
– Electricity– Plasma Unit– Chemical– Operator
before after