7/30/2019 Drill Log 5 Jd
1/17
Borehole : DW-25 Start (Date/Time) : 30-4-2011
Location : Pengaron (Desa-7) Finish (Date/Time) : 1-5-2011/
Coordinate : 279756.615 Machine : Power Ri
: 9643257.856 Driller : jali
Elevation : 24.11 m Wellsite : YudhaTotal Dept 52.65 m
Remark : -
From To
0.00 7.50 7.50 Top soil
7.50 17.65 10.15 Sandstone
17.65 17.85 0.20 coal
17.85 30.15 12.30 Sandstone
30.15 31.45 1.30 coal
31.45 34.50 3.05 Sandstone
34.50 38.10 3.60 coal
38.10 52.65 14.55 Sandstone
Yellowish, so
DRILL LOG
Depth (m)Thick (m) Lithology
Black,brown streak,brittle, b
Whitish grey, Tekstur; very fine sand t
Black,brown streak,brittle, bright
-
7/30/2019 Drill Log 5 Jd
2/17
/14:30
14:51
05
t, muddy, base on cutting
Description
right
-
7/30/2019 Drill Log 5 Jd
3/17
Borehole : ST-02/IMM-447
Location : Pengaron (Desa-7)
Coordinate :
ElevationTotal Depth :21.15
Remark : -
Depth (m) Thick (m) Lithology
From To
0 5 5 Soil
5 9 4 Mudstone
9 15.95 6.95 Mudstone
15.95 16.8 0.85 Coal
16.8 21.65 4.85 Mudstone
-
7/30/2019 Drill Log 5 Jd
4/17
Start (Date/Time)
Finish (Date/Time)
Machine :power rig:05
Driller :jali
Wellsite :YUDha
Description
Yellowish,soft,medium plasticiti,organic metter,high penetration by wing bit,base on cutting
light Grey,firm,medium penetration by wing bit,base on cutting
dark grey,firm,medium penetration by wing bit,base on cutting
Black,brown streak,brittle,bright < 60%,subconcoidal,base on cutting
grey,firm,medium penetration by wing bit,base on cutting
DRILL LOG
-
7/30/2019 Drill Log 5 Jd
5/17
-
7/30/2019 Drill Log 5 Jd
6/17
Borehole : IMM - 463 Start (Date/Time) 05/05/2011/1
Location : Desa 7 Finish (Date/Time) 07/05/2011/1
Coordinate :0281209.507 : Power RIG
:9642753.527 : Jali
Elevation : yudha P/JhonTotal Depth 60 m
Remark : -
From To
0,00 4,00 4 Soil
4,00 7,00 3 Madstone
7,00 7,50 0,50 Coal
7,50 20,00 12,50 Madstone
20,00 21,50 1.5 Madstone
21,50 32,00 10,50 Madstone
32,00 33,40 1,40 Coal
33,40 42,00 8,60 Madstone
42,00 43,50 1,50 Sandstone
43,50 51,50 8,50 Madstone
51,50 54,50 3 Coal
54,40 60,75 6,35 Madstone
Yellowish,soft,medium plastici
dark grey, clay nodules,
Wellsite
DRILL LOG
Depth (m)Thick (m) Lithology
Machine
Driller
Black,brown streak,bri
grey, clay nodules, fi
dark grey, clay nodules,
Black,brown streak,bri
grey, clay nodules, fi
grey, clay nodules, fi
Black,brown streak,bri
grey, clay nodules, fi
dark grey, clay nodules,
grey, clay nodules, fi
-
7/30/2019 Drill Log 5 Jd
7/17
:13 wita
:53
altom
ti,organic metter,high penetration by wing bit,base on cutting
firm, medium penetration by wing bit, base on cutting
Description
ttle,bright < 60%,flatty - subconcoidal,base on cutting
m, medium penetration by wing bit, base on cutting
firm, medium penetration by wing bit, base on cutting
ttle,bright < 60%,flatty - subconcoidal,base on cutting
m, medium penetration by wing bit, base on cutting
m, medium penetration by wing bit, base on cutting
ttle,bright < 60%,flatty - subconcoidal,base on cutting
m, medium penetration by wing bit, base on cutting
firm, medium penetration by wing bit, base on cutting
m, medium penetration by wing bit, base on cutting
-
7/30/2019 Drill Log 5 Jd
8/17
Borehole : IMM - 465 Start (Date/Time) 8-Mei-2011
Location : Desa 7 Finish (Date/Time) 10-mei-11
Coordinate 281332.353 : Power RI
9642620 : Jali
Elevation 39.793 : yudha pTotal Depth 54.15
Remark : -
From To
0 4.65 Soil
4.65 8.9 Madstone
8.9 9.1 Coal
9.1 17.05 madstone
17.05 17.3 Coal
17.3 18.75 madstone
18.75 20.05 Coal
20.05 45.4 Madstone
45.4 45.8 Coal
45.8 48.5 madstone
48.5 50.25 Coal
50.25 54.15 Madstone dark grey, clay nodules, firm, me
Yellowish,soft,medium plasticiti,organic
dark grey, clay nodules, firm, me
Black,brown streak,brittle,brigh
dark grey, clay nodules, firm, me
Black,brown streak,brittle,brigh
dark grey, clay nodules, firm, me
Black,brown streak,brittle,brigh
dark grey, clay nodules, firm, me
Black,brown streak,brittle,brigh
dark grey, clay nodules, firm, me
Black,brown streak,brittle,brigh
DRILL LOG
Machine
Driller
Wellsite
Depth (m)Thick (m) Lithology
-
7/30/2019 Drill Log 5 Jd
9/17
dium penetration by wing bit, base on cutting
metter,high penetration by wing bit,base on cutting
dium penetration by wing bit, base on cutting
t < 60%,flatty - subconcoidal,base on cutting
dium penetration by wing bit, base on cutting
t < 60%,flatty - subconcoidal,base on cutting
dium penetration by wing bit, base on cutting
t < 60%,flatty - subconcoidal,base on cutting
dium penetration by wing bit, base on cutting
t < 60%,flatty - subconcoidal,base on cutting
dium penetration by wing bit, base on cutting
t < 60%,flatty - subconcoidal,base on cutting
Description
-
7/30/2019 Drill Log 5 Jd
10/17
Borehole : IMM-462 Start (Date/Time) : 11-5-2011
Location : Pengaron (Desa-7) Finish (Date/Time) : 11-5-2011
Coordinate : Machine : Power Ri
Driller : jali
Elevation Wellsite : YudhaTotal Dept :18.15
Remark : -
From To
0.00 4.50 4.50 Top soil
4.50 10.45 5.95 Sandstone
10.45 11.15 0.70 coal
11.15 15.85 4.70 madstone
15.85 16.25 0.40 coal
16.25 18.15 1.90 madstone
Yellowish,
DRILL LOG
Depth (m)Thick (m) Lithology
Whitish grey, Tekstur; very fine sand to coars
Black,brown streak,brittle, bright
-
7/30/2019 Drill Log 5 Jd
11/17
/08:10
/10:25
05
soft, muddy, base on cutting
Description
, Hardness; mediuam to hard.Fragmen, Qrtz
ncoidal, base on cutting
edium penetration by wing bit, base on cutting
ncoidal, base on cutting
edium penetration by wing bit, base on cutting
-
7/30/2019 Drill Log 5 Jd
12/17
Borehole : IMM-461 Start (Date/Time) : 11-5-2011
Location : Pengaron (Desa-7) Finish (Date/Time) : 12-5-2011
Coordinate : Machine : Power Ri
Driller : jali
Elevation Wellsite : YudhaTotal Dept :48.15
Remark : -
From To
0.00 4.50 4.50 Top soil
4.50 12.45 7.95 Mudstone
12.45 13.95 1.50 coal
13.95 20.00 6.05 madstone
20.00 48.15 28.15 sendstone
Yellowish, soft, mud
DRILL LOG
Depth (m)Thick (m) Lithology Descri
dark grey, clay nodules, firm, medium penetr
Black,brown streak,brittle, bright
-
7/30/2019 Drill Log 5 Jd
13/17
/14:58
/12:05
05
dy, base on cutting
tion
tion by wing bit, base on cutting
ncoidal, base on cutting
enetration by wing bit, base on cutting
ncoidal, base on cutting
-
7/30/2019 Drill Log 5 Jd
14/17
Borehole : IMM-460 Start (Date/Time)
Location : Pengaron (Desa-7) Finish (Date/Time)
Coordinate : Machine : Power Ri
Driller : jali
Elevation Wellsite : YudhaTotal Dept :33.15
Remark : -
From To
0.00 6.00 6.00 Top soil
6.00 22.80 16.80 Mudstone
22.80 23.15 0.35 coal
23.15 27.35 4.20 madstone
27.35 29.15 1.80 coal
29.15 33.15 4 mudstone
Yellowish, soft, m
DRILL LOG
Depth (m)Thick (m) Lithology Desc
dark grey, clay nodules, firm, medium penetr
Black,brown streak,brittle, bright
-
7/30/2019 Drill Log 5 Jd
15/17
05
ddy, base on cutting
ription
tion by wing bit, base on cutting
ncoidal, base on cutting
penetration by wing bit, base on cutting
ncoidal, base on cutting
penetration by wing bit, base on cutting
-
7/30/2019 Drill Log 5 Jd
16/17
Borehole : IMM-460 Start (Date/Time) : 14-5-11/1
Location : Pengaron (Desa-7) Finish (Date/Time) : 15-5-11/1
Coordinate : Machine : Power Ri
Driller : jali
Elevation WellsiteTotal Depth :45.15
Remark : -
From To
0.00 1.50 1.50 Top soil
1.50 7.15 5.65 Mudstone
7.15 7.65 0.50 coal
7.65 14.75 7.10 madstone
14.75 15.15 0.40 coal
15.15 26.65 11.5 mudstone
26.65 27.65 1.00 coal
27.65 45.15 17.5 mudstone dark grey, clay nodules, firm, medium
dark grey, clay nodules, firm, medium penetr
Black,brown streak,brittle, bright
-
7/30/2019 Drill Log 5 Jd
17/17
5:10
4:30
05
penetration by wing bit, base on cutting
tion by wing bit, base on cutting
ncoidal, base on cutting
penetration by wing bit, base on cutting
ncoidal, base on cutting
penetration by wing bit, base on cutting
ncoidal, base on cutting
ddy, base on cutting
ription