drill log 5 jd

Upload: subhan-arif

Post on 14-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Drill Log 5 Jd

    1/17

    Borehole : DW-25 Start (Date/Time) : 30-4-2011

    Location : Pengaron (Desa-7) Finish (Date/Time) : 1-5-2011/

    Coordinate : 279756.615 Machine : Power Ri

    : 9643257.856 Driller : jali

    Elevation : 24.11 m Wellsite : YudhaTotal Dept 52.65 m

    Remark : -

    From To

    0.00 7.50 7.50 Top soil

    7.50 17.65 10.15 Sandstone

    17.65 17.85 0.20 coal

    17.85 30.15 12.30 Sandstone

    30.15 31.45 1.30 coal

    31.45 34.50 3.05 Sandstone

    34.50 38.10 3.60 coal

    38.10 52.65 14.55 Sandstone

    Yellowish, so

    DRILL LOG

    Depth (m)Thick (m) Lithology

    Black,brown streak,brittle, b

    Whitish grey, Tekstur; very fine sand t

    Black,brown streak,brittle, bright

  • 7/30/2019 Drill Log 5 Jd

    2/17

    /14:30

    14:51

    05

    t, muddy, base on cutting

    Description

    right

  • 7/30/2019 Drill Log 5 Jd

    3/17

    Borehole : ST-02/IMM-447

    Location : Pengaron (Desa-7)

    Coordinate :

    ElevationTotal Depth :21.15

    Remark : -

    Depth (m) Thick (m) Lithology

    From To

    0 5 5 Soil

    5 9 4 Mudstone

    9 15.95 6.95 Mudstone

    15.95 16.8 0.85 Coal

    16.8 21.65 4.85 Mudstone

  • 7/30/2019 Drill Log 5 Jd

    4/17

    Start (Date/Time)

    Finish (Date/Time)

    Machine :power rig:05

    Driller :jali

    Wellsite :YUDha

    Description

    Yellowish,soft,medium plasticiti,organic metter,high penetration by wing bit,base on cutting

    light Grey,firm,medium penetration by wing bit,base on cutting

    dark grey,firm,medium penetration by wing bit,base on cutting

    Black,brown streak,brittle,bright < 60%,subconcoidal,base on cutting

    grey,firm,medium penetration by wing bit,base on cutting

    DRILL LOG

  • 7/30/2019 Drill Log 5 Jd

    5/17

  • 7/30/2019 Drill Log 5 Jd

    6/17

    Borehole : IMM - 463 Start (Date/Time) 05/05/2011/1

    Location : Desa 7 Finish (Date/Time) 07/05/2011/1

    Coordinate :0281209.507 : Power RIG

    :9642753.527 : Jali

    Elevation : yudha P/JhonTotal Depth 60 m

    Remark : -

    From To

    0,00 4,00 4 Soil

    4,00 7,00 3 Madstone

    7,00 7,50 0,50 Coal

    7,50 20,00 12,50 Madstone

    20,00 21,50 1.5 Madstone

    21,50 32,00 10,50 Madstone

    32,00 33,40 1,40 Coal

    33,40 42,00 8,60 Madstone

    42,00 43,50 1,50 Sandstone

    43,50 51,50 8,50 Madstone

    51,50 54,50 3 Coal

    54,40 60,75 6,35 Madstone

    Yellowish,soft,medium plastici

    dark grey, clay nodules,

    Wellsite

    DRILL LOG

    Depth (m)Thick (m) Lithology

    Machine

    Driller

    Black,brown streak,bri

    grey, clay nodules, fi

    dark grey, clay nodules,

    Black,brown streak,bri

    grey, clay nodules, fi

    grey, clay nodules, fi

    Black,brown streak,bri

    grey, clay nodules, fi

    dark grey, clay nodules,

    grey, clay nodules, fi

  • 7/30/2019 Drill Log 5 Jd

    7/17

    :13 wita

    :53

    altom

    ti,organic metter,high penetration by wing bit,base on cutting

    firm, medium penetration by wing bit, base on cutting

    Description

    ttle,bright < 60%,flatty - subconcoidal,base on cutting

    m, medium penetration by wing bit, base on cutting

    firm, medium penetration by wing bit, base on cutting

    ttle,bright < 60%,flatty - subconcoidal,base on cutting

    m, medium penetration by wing bit, base on cutting

    m, medium penetration by wing bit, base on cutting

    ttle,bright < 60%,flatty - subconcoidal,base on cutting

    m, medium penetration by wing bit, base on cutting

    firm, medium penetration by wing bit, base on cutting

    m, medium penetration by wing bit, base on cutting

  • 7/30/2019 Drill Log 5 Jd

    8/17

    Borehole : IMM - 465 Start (Date/Time) 8-Mei-2011

    Location : Desa 7 Finish (Date/Time) 10-mei-11

    Coordinate 281332.353 : Power RI

    9642620 : Jali

    Elevation 39.793 : yudha pTotal Depth 54.15

    Remark : -

    From To

    0 4.65 Soil

    4.65 8.9 Madstone

    8.9 9.1 Coal

    9.1 17.05 madstone

    17.05 17.3 Coal

    17.3 18.75 madstone

    18.75 20.05 Coal

    20.05 45.4 Madstone

    45.4 45.8 Coal

    45.8 48.5 madstone

    48.5 50.25 Coal

    50.25 54.15 Madstone dark grey, clay nodules, firm, me

    Yellowish,soft,medium plasticiti,organic

    dark grey, clay nodules, firm, me

    Black,brown streak,brittle,brigh

    dark grey, clay nodules, firm, me

    Black,brown streak,brittle,brigh

    dark grey, clay nodules, firm, me

    Black,brown streak,brittle,brigh

    dark grey, clay nodules, firm, me

    Black,brown streak,brittle,brigh

    dark grey, clay nodules, firm, me

    Black,brown streak,brittle,brigh

    DRILL LOG

    Machine

    Driller

    Wellsite

    Depth (m)Thick (m) Lithology

  • 7/30/2019 Drill Log 5 Jd

    9/17

    dium penetration by wing bit, base on cutting

    metter,high penetration by wing bit,base on cutting

    dium penetration by wing bit, base on cutting

    t < 60%,flatty - subconcoidal,base on cutting

    dium penetration by wing bit, base on cutting

    t < 60%,flatty - subconcoidal,base on cutting

    dium penetration by wing bit, base on cutting

    t < 60%,flatty - subconcoidal,base on cutting

    dium penetration by wing bit, base on cutting

    t < 60%,flatty - subconcoidal,base on cutting

    dium penetration by wing bit, base on cutting

    t < 60%,flatty - subconcoidal,base on cutting

    Description

  • 7/30/2019 Drill Log 5 Jd

    10/17

    Borehole : IMM-462 Start (Date/Time) : 11-5-2011

    Location : Pengaron (Desa-7) Finish (Date/Time) : 11-5-2011

    Coordinate : Machine : Power Ri

    Driller : jali

    Elevation Wellsite : YudhaTotal Dept :18.15

    Remark : -

    From To

    0.00 4.50 4.50 Top soil

    4.50 10.45 5.95 Sandstone

    10.45 11.15 0.70 coal

    11.15 15.85 4.70 madstone

    15.85 16.25 0.40 coal

    16.25 18.15 1.90 madstone

    Yellowish,

    DRILL LOG

    Depth (m)Thick (m) Lithology

    Whitish grey, Tekstur; very fine sand to coars

    Black,brown streak,brittle, bright

  • 7/30/2019 Drill Log 5 Jd

    11/17

    /08:10

    /10:25

    05

    soft, muddy, base on cutting

    Description

    , Hardness; mediuam to hard.Fragmen, Qrtz

    ncoidal, base on cutting

    edium penetration by wing bit, base on cutting

    ncoidal, base on cutting

    edium penetration by wing bit, base on cutting

  • 7/30/2019 Drill Log 5 Jd

    12/17

    Borehole : IMM-461 Start (Date/Time) : 11-5-2011

    Location : Pengaron (Desa-7) Finish (Date/Time) : 12-5-2011

    Coordinate : Machine : Power Ri

    Driller : jali

    Elevation Wellsite : YudhaTotal Dept :48.15

    Remark : -

    From To

    0.00 4.50 4.50 Top soil

    4.50 12.45 7.95 Mudstone

    12.45 13.95 1.50 coal

    13.95 20.00 6.05 madstone

    20.00 48.15 28.15 sendstone

    Yellowish, soft, mud

    DRILL LOG

    Depth (m)Thick (m) Lithology Descri

    dark grey, clay nodules, firm, medium penetr

    Black,brown streak,brittle, bright

  • 7/30/2019 Drill Log 5 Jd

    13/17

    /14:58

    /12:05

    05

    dy, base on cutting

    tion

    tion by wing bit, base on cutting

    ncoidal, base on cutting

    enetration by wing bit, base on cutting

    ncoidal, base on cutting

  • 7/30/2019 Drill Log 5 Jd

    14/17

    Borehole : IMM-460 Start (Date/Time)

    Location : Pengaron (Desa-7) Finish (Date/Time)

    Coordinate : Machine : Power Ri

    Driller : jali

    Elevation Wellsite : YudhaTotal Dept :33.15

    Remark : -

    From To

    0.00 6.00 6.00 Top soil

    6.00 22.80 16.80 Mudstone

    22.80 23.15 0.35 coal

    23.15 27.35 4.20 madstone

    27.35 29.15 1.80 coal

    29.15 33.15 4 mudstone

    Yellowish, soft, m

    DRILL LOG

    Depth (m)Thick (m) Lithology Desc

    dark grey, clay nodules, firm, medium penetr

    Black,brown streak,brittle, bright

  • 7/30/2019 Drill Log 5 Jd

    15/17

    05

    ddy, base on cutting

    ription

    tion by wing bit, base on cutting

    ncoidal, base on cutting

    penetration by wing bit, base on cutting

    ncoidal, base on cutting

    penetration by wing bit, base on cutting

  • 7/30/2019 Drill Log 5 Jd

    16/17

    Borehole : IMM-460 Start (Date/Time) : 14-5-11/1

    Location : Pengaron (Desa-7) Finish (Date/Time) : 15-5-11/1

    Coordinate : Machine : Power Ri

    Driller : jali

    Elevation WellsiteTotal Depth :45.15

    Remark : -

    From To

    0.00 1.50 1.50 Top soil

    1.50 7.15 5.65 Mudstone

    7.15 7.65 0.50 coal

    7.65 14.75 7.10 madstone

    14.75 15.15 0.40 coal

    15.15 26.65 11.5 mudstone

    26.65 27.65 1.00 coal

    27.65 45.15 17.5 mudstone dark grey, clay nodules, firm, medium

    dark grey, clay nodules, firm, medium penetr

    Black,brown streak,brittle, bright

  • 7/30/2019 Drill Log 5 Jd

    17/17

    5:10

    4:30

    05

    penetration by wing bit, base on cutting

    tion by wing bit, base on cutting

    ncoidal, base on cutting

    penetration by wing bit, base on cutting

    ncoidal, base on cutting

    penetration by wing bit, base on cutting

    ncoidal, base on cutting

    ddy, base on cutting

    ription