dredging projects and the environment: u.s. army corps of
TRANSCRIPT
![Page 1: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/1.jpg)
US Army Corps
of Engineers New York District
The World of Dredging and Dredges
Dredging Projects and the Environment:
U.S. Army Corps of Engineers Navigation Projects, Business
Processes, and Real World Issues
John F. Tavolaro US Army Corps of Engineers, New York District
![Page 2: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/2.jpg)
US Army Corps
of Engineers New York District
What You Will Learn
Why the U.S. Army Corps of Engineers is involved in dredging projects The process we follow to build and maintain navigation projects Environmental considerations and how they affect the project “Nuts and bolts” of construction contracts
![Page 3: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/3.jpg)
US Army Corps
of Engineers New York District
Overview
Background and History Projects and Project Management
Phases of a Corps of Engineers Project Regulatory / Environmental Considerations Construction Contracts
Video Clip
![Page 4: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/4.jpg)
US Army Corps
of Engineers New York District
Background and History
![Page 5: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/5.jpg)
US Army Corps
of Engineers New York District
Background and History
Brief History: June 1775 - Continental Congress Establishes “Chief of Engineers” Rufus Putnam – First Chief of Engineers 1802 – West Point – First US Engineering School 1780 to 1820 – Roads and Railroads 1824 – First Navigation Project – Dredging and De-Snagging on Ohio and Mississippi Rivers 1834 – Improvements of Navigation on Hudson River
![Page 6: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/6.jpg)
US Army Corps
of Engineers New York District
Corps Of Engineers Divisions and Districts
![Page 7: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/7.jpg)
“I am firmly convinced that but for the existence of the
Corps of Engineers’ peacetime organization and
its resources of men, methods, training and
supply, and its close association with the military
through the years, the history of the Pacific area in
World War II would have been written more in blood
than in achievement.”
General Dwight Eisenhower, Chief of Staff, in the Hearing Before the Committee on Armed
Services on H.R. 3830, 80th Cong., 1st session (Washington, DC: GPO, 1947).
Support to the Warfighter Leveraging the Regiment
![Page 8: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/8.jpg)
US Army Corps
of Engineers New York District
Types of Dredges
![Page 9: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/9.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
Six Phases of a Corps of Engineers Project: 1. Enthusiasm 2. Disillusionment 3. Panic 4. Search for the Guilty 5. Punishment of the Innocent 6. Praise and Honors for Those Who Did Nothing Well, NOT REALLY………
![Page 10: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/10.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
Five (Real) Phases of a Corps of Engineers Project: 1. Authorization by Congress 2. Planning 3. Engineering and Design 4. Construction 5. Operations and Maintenance (O&M)
![Page 11: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/11.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
Authorization by Congress
Water Resources Development Act (WRDA) Formerly called “Rivers and Harbors Act” Called WRDA since 1986 Passed every two years Authorizes studies and construction
Annual Appropriations Bills (the cash)
![Page 12: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/12.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
From The Water Resources Development Act of 1996: “SEC.424. PORT OF NEW YORK - NEW JERSEY NAVIGATION STUDY. The Secretary shall conduct a comprehensive study of navigation needs at the Port of New York – New Jersey (including the South Brooklyn Marine and Red Hook Container Terminals, Staten Island, and adjacent areas) to address improvements, including deepening of existing channels to depths of 50 feet or greater, that are required to provide economically efficient and environmentally sound navigation to meet current and future requirements.”
![Page 13: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/13.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
Corps of Engineers Planning Phase
1. WRDA Authorization 2. Reconnaissance Study 3. Feasibility Cost Sharing Agreement
(FCSA) 4. Feasibility Study
![Page 14: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/14.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
Reconnaissance Study
Determines “Federal Interest” Identifies Potential Local Sponsors Fully Funded by Federal Government Normally no more than 12 Months to Complete
![Page 15: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/15.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
Feasibility Cost Sharing Agreement (FCSA)
Project Sponsor Identified State and/or Local Government & Agencies Bi-State Agencies / Authorities
Project Sponsor Responsibilities Provides Cash or In-kind Services (incl. Disposal Sites) Provides LERR During Construction Hold and Save US Free from Damages during Construction and O&M
![Page 16: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/16.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
Feasibility Study
Identifies Problems and Opportunities Forecast “Without Plan” Conditions Develops Alternative Plans
“Net Economic Development” (NED) Benefits Evaluates Effects Compares Alternative Plans Selects “Recommended Plan”
B/C Ratio > 1.00
![Page 17: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/17.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
Project Design Phase
Pre-Construction Engineering & Design (PED) PED Project Cooperation Agreement General Design Memorandum (GDM)
Final Project Design Cost-sharing Considerations Environmental Requirements (EIS, etc.)
![Page 18: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/18.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
Construction Phase
WRDA Authorization Project Cooperation Agreement (PCA) for Construction Preparation of Plans & Specifications Award and Manage Construction Contracts
![Page 19: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/19.jpg)
US Army Corps
of Engineers New York District
Projects and Project Management
Operations & Maintenance Phase
Project Condition Surveys Programming and Budgeting / Priorities Engineering & Design
Environmental Permits Plans & Specifications
Construction Contracts Publication of Controlling Depths
![Page 20: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/20.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Environmental Laws &
Environmental Issues
![Page 21: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/21.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Key Environmental Laws
Rivers and Harbors Act 1899 National Environmental Policy Act (NEPA) Clean Water Act Ocean Dumping Act Coastal Zone Management Act Endangered Species Act Magnuson–Stevens Fishery Conservation and Management Act Fish and Wildlife Coordination Act
![Page 22: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/22.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Rivers and Harbors Act 1899 Applies to Navigable Waters Section 10 Prohibits: Unauthorized Obstruction or Alterations Unauthorized Construction of Structures
Authorization = Corps Permit
![Page 23: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/23.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
National Environmental Policy Act (NEPA) 1969
National Policy = “Productive and enjoyable harmony” with Environment Federal Agencies must give “appropriate consideration” to Environment
Environmental Assessments Environmental Impact Statements
![Page 24: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/24.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Clean Water Act 1977 Section 404:
Discharges of Dredged or Fill Material into Waters of U.S. Secretary of Army Can Issue Permits EPA Administrator has “veto power”
Section 401:
Applies to Section 404 Actions State Certification – Discharge Meets State WQ Standards
![Page 25: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/25.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Ocean Dumping Act 1972
No dumping anything in the Ocean Except as Authorized by Permit Permitting Agencies: USEPA (Sect. 102) and USACE (Sect. 103) Exclusions: Fish Waste Artificial Fishing Reefs Vessel Propulsion and Fixed Structures Emergency to Safeguard Life at Sea
![Page 26: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/26.jpg)
US Army Corps
of Engineers New York District
Ocean Dumping Ban Act of 1988 Amends the Ocean Dumping Act Makes it unlawful for any person to dump sewage sludge or industrial waste into ocean waters after December 31, 1991; United States Public Vessel Medical Waste Anti-Dumping Act of 1988 Prohibits, 6 months after enactment, disposal of potentially infectious medical waste into ocean waters by a "public vessel". Also adds medical wastes to the list of materials prohibited under the Ocean Dumping Act
What’s Left? ----- Dredged Materials!
Regulatory / Environmental Considerations
![Page 27: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/27.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Coastal Zone Management Act 1972 States Can Develop Coastal Zone Management (CZM) Plans CZM Plans Approved by Secretary of Commerce Section 307:
Requires Federal Agencies to Comply with CZM Plan to “Maximum Extent Practicable” Permit Applicants Must Comply or No Permit Can Be Issued
![Page 28: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/28.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Endangered Species Act 1973
Intent Of Congress = Conserve Threatened & Endangered Species and Habitats For Federal Actions Agencies Must:
Consult with USF&W and/or NMFS Carry Out Programs for Species Conservation Ensure Their Actions Won’t Likely Jeopardize Species Continued Existence Federal Action = Authorized, Funded, or Carried Out
![Page 29: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/29.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Magnuson–Stevens Fishery Conservation and Management Act Amendments 1996
Governs U.S. Marine Fisheries Management NMFS Establishes “Essential Fish Habitat” Agencies Evaluate their Actions – Consult with NMFS NMFS Provides “Conservation Recommendations” Agencies Respond
Conservation Recommendation are not binding
![Page 30: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/30.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Fish and Wildlife Coordination Act 1956 Intent of Congress = Protect Quality of Aquatic Environment Concerning Fish and Wildlife Resources Agencies must consult with USF&W and/or NMFS on their Actions
![Page 31: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/31.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Key Environmental Issues Seasonal Dredging Windows Endangered Species Protection Water Quality Protection Habitat Protection Dredged Material Disposal
![Page 32: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/32.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Seasonal Dredging Windows Windows of Time When Dredging is Allowed Wildlife Protection
Fish / Shellfish Migration and Spawning Fish / Shellfish Overwintering Bird Nesting and Foraging Endangered Species Protection
Water Quality Protection Dissolved Oxygen Turbidity
![Page 33: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/33.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Endangered Species Protection Key Species:
Piping Plover and Least Tern Sea Turtles Shortnose Sturgeon
Primary Protective Measures:
Seasonal Windows Endangered Species Inspectors Relocations
Sea Beach Amaranth Whales Bald Eagles
![Page 34: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/34.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Water Quality Protection Key Issues:
Dissolved Oxygen Turbidity Toxicity Bioaccumulation of Contaminants
Primary Protective Measures:
Seasonal Windows “Best Management Practices” Restrictions on Barge Overflow / Effluent Monitoring with Action Levels
![Page 35: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/35.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Habitat Protection Key Issues:
Spawning Areas Nesting Areas Overwintering Wetlands
Primary Protective Measures:
Seasonal Windows Avoidance “Best Management Practices”
![Page 36: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/36.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Dredged Material Disposal
Aquatic Placement Upland Placement
Corps of Engineers Policy: Least Cost, Environmentally Acceptable Beneficial Use of Dredged Material
![Page 37: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/37.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Aquatic Placement Open Water Placement Key Issues:
Toxicity Bioaccumulation Location
Beach Nourishment Key Issues:
Endangered Species Habitat
![Page 38: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/38.jpg)
US Army Corps
of Engineers New York District
Regulatory / Environmental Considerations
Upland Placement Key Issues:
Effluent Habitat Conflicting Land Use
Biggest Challenges:
Cost Land Availability
![Page 39: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/39.jpg)
US Army Corps
of Engineers New York District
Construction Contracts
Key Issues: Bid Guarantee Performance and Payment Bonds Competitive Prices Prevailing Wages (Davis-Bacon Act Wage Rates) Safety Environmental Compliance
![Page 40: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/40.jpg)
US Army Corps
of Engineers New York District
Construction Contracts
Key Contract Clauses for Dredging: Variation in Estimated Quantity – VEQ (+/- 15%) Differing Site Conditions Different Dredged Materials Weather or Sea Conditions Changes in Dredging or Disposal Site
Changes Clause
![Page 41: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/41.jpg)
US Army Corps
of Engineers New York District Port of New York and New Jersey
240 miles of federal channels 230,346 direct & indirect jobs $14 B in NJ & NY wages & taxes Serves 35 percent of America’s population
![Page 42: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/42.jpg)
US Army Corps
of Engineers New York District
Significance of the Port
Largest port on the East Coast
Largest petroleum products importing port & cocoa port in
the country.
$100.36 B in ocean-borne cargo
4 M containers (TEUs) annually
Largest vehicle import/export
handling port in the country (625 K)
Passenger Ship Terminal
Passengers: 397,340
![Page 43: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/43.jpg)
US Army Corps
of Engineers New York District Deepening the Port
Arthur Kill (40’-41’) $362 M Kill van Kull and Newark Bay (45’) $736 M Port Jersey (41’) $121 M
![Page 44: Dredging Projects and the Environment: U.S. Army Corps of](https://reader030.vdocuments.us/reader030/viewer/2022012514/618dd0a4688523663b4c47e4/html5/thumbnails/44.jpg)
US Army Corps
of Engineers New York District
Harbor Navigation Study
AMBROSE AND ANCHORAGE CHANNELS (45’)
BAY RIDGE, RED HOOK, AND BUTTERMILK CHANNELS (40’)
PORT JERSEY AND CLAREMONT TERMINAL CHANNELS (35’ & 28’, authorized to 41’ & 38’)
KILL VAN KULL (40’, auth 45’)
NEWARK BAY CHANNEL (40’, auth 45’)
ARTHUR KILL (35’, auth 41’)
Pathways to Existing Destinations and
Depths