dr.d. y. patil institute of technology, pimpri, pune -18

15
DR.D. Y. PATIL INSTITUTE OF TECHNOLOGY, PIMPRI, PUNE -18 DEPARTMENT OF ELECTRICAL ENGINEERING Brief of strategy to be performed in the class Activity: Learning Extension Resources (LxT) Subject : EHVAC Sr.n o Execution step Description Time Required Remark 1. Step 1 Introduction Mechanical Consideration of Power Handling 20 mins 2 Step 2 Introduction about vibrations 10 mins Visualization of Videos 3 Step 3 Travelling wave equation 10 mins 4 Step 4 Visualization of Waves by doing with Rope activity 15 mins Activity based 5 Step 5 Reflections of transmission line by visulaization 5 mins 6 Step 6 Task: Discussion with students regarding attenuation of travelling waves 5 mins 7 Step 7 Questions and Answers 5 Mins Total time required 60 Mins

Upload: others

Post on 12-Dec-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

DR.D. Y. PATIL INSTITUTE OF TECHNOLOGY, PIMPRI, PUNE -18DEPARTMENT OF ELECTRICAL ENGINEERING

Brief of strategy to be performed in the class

Activity: Learning Extension Resources (LxT)Subject : EHVAC Sr.no

Execution step Description Time Required

Remark

1. Step 1 Introduction Mechanical Consideration of Power Handling

20 mins

2 Step 2 Introduction about vibrations

10 mins Visualization of Videos

3 Step 3 Travelling wave equation

10 mins

4 Step 4 Visualization of Waves by doing with Rope activity

15 mins Activity based

5 Step 5 Reflections of transmission line by visulaization

5 mins

6 Step 6 Task: Discussion with students regarding attenuation of travellingwaves

5 mins

7 Step 7 Questions and Answers 5 MinsTotal time required 60 Mins

Reflections of transmission line by visualization

DR.D. Y. PATIL INSTITUTE OF TECHNOLOGY, PIMPRI, PUNE -18DEPARTMENT OF ELECTRICAL ENGINEERING

Brief of strategy to be performed in the class

Activity: Learning Extension Resources (LxT)Subject : Material Science

Sr.no

Execution step Description Time Required

Remark

1. Step 1 Insulating material Class with tempt

20 mins

2 Step 2 Different material used in electrical machines

10 mins

3 Step 3 Cut section of machine shows insulating material

10 mins

4 Step 4 Varnish method explanation

15 mins Video based, activity based

5 Step 5 Importance of Insulation material

5 mins

6 Step 6 Application as per temprature

5 mins

7 Step 7 Questions and Answers 5 MinsTotal time required 60 Mins

Motor Cut section Shown for Insulating material used

Insulating Material shown to students

Insulating Material Class defined with temperature.

Activity: - Plan a Smart City

Sr. No.

ExecutionStep

Description Time Required

Remark

1 Step 1 (A City Plan is shown to student in previous lecture )

Task:- Student will list out all the structure a City need

2 mins

2 Step 2 (A City is Shown to them in form of Pictures)

Task:- Student will list out all the electrical requirement of a City

2 mins

3 Step 3 (A List of Governing bodies and Department will be available to student through PPT or Charts)

Task: - Student will list out all department or Governing Bodies of a City related to Electricity

3 mins Hints must be given

4 Step 4 Task: Draw a rough sketch of city with focusing on electrical departments and structure.

2 mins

5 Step 5 Task: Suggestion by students to Form a city according to them

4 mins

6 Step 6 Task: Discussion with students on which points to look for or which areas to concentrateon planning

1 min plus AfterClass Hours

7 Total Time required 15 mins

City Planning Overview

Student writing Electrical requirement of a City

Discussing Planning Steps

Suggestion given

by students

Activity: - Model based learning

Sr. No.

ExecutionStep

Description Time Required

Remark

1 Step 1 Introduction to Grid interconnection of multiple RES .

20 mins

2 Step 2 Types of Grid Interconnections for Smart grid 10 mins3 Step 3 Analysis of Electrical parameters from

hardware of 3 phase inverter. 10 mins Hints

must be given

4 Step 4 Visualization of Synchronising of Electrical parameters at PCC

15 mins

5 Step 5 Task: Switching status of contactors connectedswitching source

4 mins

6 Step 6 Task: Discussion with students on challenges in Grid interconnections with RES

10 min plus AfterClass Hours

7 Total Time required 59 mins

Introduction to Solar PV System for Gird Interconnection

Analysis of 3 phase inverter parameter

Validation of experimental setup for grid Interconnection of Three Phase a.c. with Multiple RES from Dr.

BATU, Lonere, BARC Mumbai and Govt. College of Engineering, Nagpur

Validation of experimental setup for grid Interconnection of Three Phase a.c. with Multiple RES from

College of Engineering (formerly COEP), Pune

Activity: Think- Pair -Share (TPS) Subject : FMA (Fundamental of Microcontroller and Application)Sr.no

Execution step Description Time Required

Remark

1. Step 1 Introduction to Microcontroller

10 min

2 Step 2 Task Given :Difference between Microprocessor and Microcontroller (Think)

15 min

3 Step 3 Students are divided into pairs of Four ( Pair)

10 min

4 Step 4 Mutual Discussion between students (share)

15 min

5 Step 5 Questions and Answers 10 MinsTotal time required 60 Mins

Task of giving problem statements to Students

Discussion with students

Activity: Learning by doing (LbD)Subject : Advance Microcontroller and Application (AMCA) Sr.no

Execution step Description Time Required

Remark

1. Step 1 Interfacing of LED with Arduino

20 mins

2 Step 2 Comparison between Microcontroller and Arduino

10 mins

3 Step 3 Hands on Practice for the above

20 mins

7 Step 7 Experimentation in the code for different result

10 Mins

Total time required 60 Mins

Introducing Arduino

Hands on Practice