SLAB
DONUT= NAMING NEAR DONUT
HATCH= SPLICE BAR AT DIFFERENT LEVELS
MARK BAR SPACING WHEREVER LENGTH CHANGES
BEAM
HATCH AT DIFFERENT LEVELS IF BEAM LEVEL IS DIFFERENT ALONG WITH
SLAB.
DOTTEN LINES SHOULD BE USED FOR MARKING BEAMS WHERE SLAB I
PRESENT, OR ELSE USE STRAIGHT LINE.
SHOW BEAM CUTTING AT INTERSECTION WITH SUNSHADE ONLY IF THERE
IS LEVEL DIFFERENCE.
SHOW DIMENSIONS FROM COLUMNS TO ALL THE BEAMS IN BEAM LAYOUT
FOR EASY IDENTIFICATION OF POSITION OF BEAM AT SITE.
SHOW CROSS MARK FOR DUCTS
WHERE SUNKEN SLAB IS PROVIDED , BEAM NEED NOT BE MARKED INDOTTED LINE,AS BEAM WILL BE ABOVE SLAB