draft vermont state rail planvtrans.vermont.gov/sites/aot/files/rail/vt srp... · 2016. 7. 6. ·...

56
1 Draft Vermont State Rail Plan Public Meeting July 13, 2015 – 6:30 PM Village Offices, Essex Junction 1 Costa Pappis, Planning Section Vermont Agency of Transportation

Upload: others

Post on 16-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

1

Draft Vermont State Rail PlanPublic Meeting

July 13, 2015 – 6:30 PMVillage Offices, Essex Junction

1

Costa Pappis, Planning SectionVermont Agency of Transportation

Page 2: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

2

Vermont State Rail Plan

Agenda

• Introductions• Plan Purpose• Freight and Passenger Rail Systems• Rail Issues and Opportunities• Proposed Capital Plan• Measuring Performance

Page 3: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

3

Vermont State Rail Plan

Purpose of the State Rail Plan

• Provides a framework for future rail investments– State funds– Federal grants 

• Meets state and federal requirements for rail planning– State Planning Statute– Passenger Rail Investment & Improvement Act (PRIIA)

Page 4: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

4

Vermont State Rail Plan

Why is Vermont Involved in Rail?

• Vermont owns 305 miles of active rail– Abandonment threats of the 1960s– Needs of resource‐extraction industries

• The State operates two intercity passenger rail services – Ethan Allen Express and the Vermonter.

Page 5: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

5

Freight Rail

5

Page 6: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

6

Vermont State Rail Plan

Page 7: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

7

Vermont State Rail Plan

Freight Movements

14%

5%

12%

69%

InboundIntrastateOutboundThrough

6.7 Million Tons Carried Annually 

Page 8: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

8

Vermont State Rail Plan

Top Freight Commodities

17%

16%

12%

12%

9%

8%

7%

5%

4%

2% 2% 2% 1%

3%

Pulp, Paper, or Allied ProductsClay, Concrete, Glass or Stone ProductsLumber or Wood Products, exc FurnitureChemicals or Alllied ProductsCoalPetroleum or Coal ProductsFood or Kindred ProductsNon-metalic MineralsFreight All KindTransportation EquipmentPrimary Metal ProductsFarm ProductsWaste or Scrap MaterialsOther

Page 9: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

9

Vermont State Rail Plan

Our Rail Freight Trading Partners

Tonnage

Page 10: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

10

Vermont State Rail Plan

Trends in Freight Rail

• Rail freight shipments have declined– 10 million tons in 2006 to 6.7 million in 2011 – Changes in carload standards– Vermont’s changing economy

• Rail has a major economic impact for its shippers– 130 railroad employees and 3,700 jobs in businesses that use state‐owned rail lines

Page 11: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

11

Passenger Rail

11

Page 12: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

12

Vermont State Rail Plan

Page 13: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

13

Vermont State Rail Plan

Ridership Trends

57,121

107,688

0

20,000

40,000

60,000

80,000

100,000

120,000

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

Rail Ridership at Vermont Stations, 2005‐2014

Rail was a big beneficiary of earmarks and federal grants during the 2000s which totaled over $100 million.

Page 14: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

14

Vermont State Rail Plan

Station Usage

Page 15: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

15

Vermont State Rail Plan

Where Passengers Travel To

NY42%

CT15%

DC12%

PA10%MA

8%NJ5%

MD5%

DE2%

FL0%

RI0%

Other1%

Vermonter

NY84%

PA4%

DC4%

MD2%IL

1%

FL1%

VA1%

NJ1%

DE1%

GA0%

Other1%

Ethan Allen Express

Page 16: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

16

Vermont State Rail Plan

What Will Passenger Ridership Look Like in 2035 Under Current Trends?

101,126

146,400

193,600

295,600

400,000

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

FY13 2035 Forecast 1.7%Growth

2035 Forecast 3%Growth

2035 Forecast 5%Growth

Energy Plan Goal

Page 17: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

17

Issues and Challenges

17

Page 18: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

1818

Issues: Deferred Maintenance

• Underinvestment in State‐Owned Rail Lines‐ Very little investment from 1960s to 1990s‐ System conditions threaten both freight 

and passenger systems‐ Intercity passenger rail can only function 

with an active rail freight operator

Page 19: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

1919

Issues: Bridge Conditions

2128

76

40

49

0

10

20

30

40

50

60

70

80

Less than263K

Good for263K

Good for286K

Not Rated VRSResponsible

Load Rating of 214 Rail Bridges as of April 2015

Page 20: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

2020

Issues: Bridge Capital Needs

Line Long Term Cost Estimate

Cost of Bringing Bridge Superstructures to 286K 

VTR Northern $18,473,725 

VTR B&R $28,958,565 

VTR Hoosick $5,618,000 

GMRC $46,211,420 

WACR CRL $60,112,270 

WACR M&B $4,310,000 Total $163,683,980 Repairs to Substructures $40,000,000Total Superstructures and Substructures Approx. $203,683,980

Page 21: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

2121

Issues: Track Needs

Estimated Cost of Track Work for Freight Operations

Line Long Term Cost Estimate VTR Northern $12,000,000 VTR B&R $16,500,000 VTR Hoosick $4,800,000 GMRC $18,500,000 WACR CRL $22,500,000 WACR M&B $6,500,000 NECR Winooski $4,000,000 SLA Track and Bridge $3,300,000 CMQ Ties and Bridge $1,300,000 Total $89,400,000 

Page 22: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

2222

Issues: No Dedicated Federal Rail Funding

80% 80%90%

0%0%

20%

40%

60%

80%

100%

Highways Transit Aviation Rail

Typical Federal Cost‐Share for Capital Investments

Note: Funding for highways, transit, and aviation also includes other types of federal cost‐share 

Page 23: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

2323

Historical Rail Program Funding Levels

$0

$10,000,000

$20,000,000

$30,000,000

$40,000,000

$50,000,000

$60,000,000

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

Federal

State

We are highly dependent on federal funding to implement rail projects

Federal Funds

Grants Earmarks FEMA Disaster 

Funds

Page 24: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

2424

Issues: Freight Volumes Declined

• Declining rail freight places pressure on revenues‐ Rail operator has less to invest in 

maintenance‐ State collects less revenues from rail operator.

Page 25: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

2525

Issues: Changes in Federal Passenger Rail Funding 

• Escalating costs of passenger services.‐ PRIIA Sec 209 resulted in a two‐tiered intercity 

passenger rail system – national routes and state‐supported services.

‐ States must now pay full cost of state‐supported services.

‐ Vermont’s costs have increased from $4.5 million to over $8 million annually.

Page 26: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

26

Plan Focus Areas

26

Page 27: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

27

Vermont State Rail Plan

Rail System Goals Maintain the State’s Rail System in a State of Good Repair‐Maintain all bridges to the 263,000 lbs carload standard‐Maintain track to appropriate FRA track class‐ Remove slow orders – with priority along passenger rail routes‐ Upgrade rail to continuously welded rail along passenger routes ‐ Rehabilitate passenger rail stations 

Expand the Rail System’s Capacity to Accommodate Growth Objectives‐ Upgrade all bridges to the 286,000 lbs carload standard ‐ Upgrade to 115 lbs/yard rail‐ Eliminate vertical clearance obstacles ‐ Install platforms at new passenger stations

Page 28: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

28

Vermont State Rail Plan

Rail System Goals

Expand the Rail System’s Use‐ Increase the use of rail by shippers and receivers currently using rail‐ Attract new rail shippers and receivers to locate along rail lines‐ Preserve inactive rail corridors‐ Implement new intercity passenger rail service along western corridor (Burlington, Vergennes, Middlebury, Rutland, Manchester, Bennington) and extend Vermonter to Montreal‐ Exceed FRA Intercity Passenger Rail Performance and Service Quality indicators‐ Increase existing and planned passenger routes to a minimum of FRA Class 4 Track in order to allow operating speeds to 79MPH 

Page 29: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

29

Vermont State Rail Plan

Plan Goals

Provide a Rail System that is Financially Sustainable‐ Examine other passenger rail service providers in order to reduce operating subsidies ‐ Pursue federal grant opportunities to rehabilitate the rail network

Improve Intermodal Connectivity‐ Integrate rail stations with local and intercity bus transportation

Page 30: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

30

Vermont State Rail Plan

Rail System Goals

Improve the Rail System to Support Economic Development‐ Coordinate rail and economic development efforts‐ Provide incentives for new and existing businesses to use rail‐ Support the development of transload facilities

Enhance Safety of the Rail System‐ Reduce rail‐highway grade crossing collisions ‐ Participate in disaster planning with local, state, federal authorities

Page 31: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

31

Intercity Passenger Rail

31

Page 32: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

32

Vermont State Rail Plan

Intercity Passenger Rail 

Priorities

• Ethan Allen Express extension to Burlington

• Vermonter extension to Montreal

• New western corridor service through Bennington

• Additional frequency along the Vermonter

Page 33: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

33

Vermont State Rail Plan

Ethan Allen Extension to Burlington

• Work to upgrade track to FRA Track Class 3 (59 mph maximum) performed in stages

• $26.4 million capital cost estimate

• Incremental annual subsidy @ $350K ‐ $1 million/year

Page 34: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

34

Vermont State Rail Plan

Vermonter Extension to Montreal

• No capital costs to begin operating service (Class 3, 59 MPH track ready). 

• High‐Speed Rail &TIGER grants + railroad invested over $90 million along corridor. 

• Estimated incremental annual subsidy @ $2 million for existing single round trip per day.

Page 35: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

35

Vermont State Rail Plan

New Train between Albany and Burlington through N. Bennington and Manchester

• $88 million capital cost for the Vermont portion of the route.

• Requires parallel investments in New York

• Operating subsidy estimated at $4.1 million /year

35

Page 36: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

36

Vermont State Rail Plan

Summary of Proposed Service Build out Options On and Offs at Vermont Stations in Year 2035

59,80083,500

199,200

388,300

79,200110,300

263,500

513,400

120,700168,500

402,200

783,900

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

Ethan Allen Extension toBurlington

Western Corridor Serviceto Burlington

Vermonter extension toMontreal

Vermonter extension toMontreal ‐ TwoFrequencies

Ridership by 2035 @ 1.70% growth rate Ridership by 2035 @ 3% growth rate Ridership by 2035 @ 5% growth rate

Page 37: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

37

Vermont State Rail Plan

Long‐Term Objective – FRA Track Class 4 (up to 79 mph)

Short‐Term Passenger Needs• $114.4 million

Long‐Term Passenger Needs• $370.3 million

Extension to Burlington New Bennington Route 

All Passenger Rail Routes Class 4, 79 MPH speeds  

Page 38: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

38

Freight Rail

38

Page 39: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

39

Vermont State Rail Plan

286K Track Capacity Priorities 

Page 40: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

40

Vermont State Rail Plan

Freight Rail Needs/Priorities ‐ Bridges

2128

76

40

49

0

10

20

30

40

50

60

70

80

Less than263K

Good for263K

Good for286K

Not Rated VRSResponsible

Load Rating of 214 State‐Owned Bridges at April 2015

Page 41: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

41

Vermont State Rail Plan

Bridge Estimates for State‐Owned Lines

Line Long Term Cost Estimate

Cost of Bringing Bridge Superstructures to 286K 

VTR Northern $18,473,725 

VTR B&R $28,958,565 

VTR Hoosick $5,618,000 

GMRC $46,211,420 

WACR CRL $60,112,270 

WACR M&B $4,310,000 Total $163,683,980 Repairs to Substructures $40,000,000Total Superstructures and Substructures Approx. $203,683,980

Page 42: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

42

Vermont State Rail Plan

Estimated Cost of Track Work for Freight Operations

Line Long Term Cost Estimate VTR Northern $12,000,000 VTR B&R $16,500,000 VTR Hoosick $4,800,000 GMRC $18,500,000 WACR CRL $22,500,000 WACR M&B $6,500,000 NECR Winooski $4,000,000 SLA Track and Bridge $3,300,000 CMQ Ties and Bridge $1,300,000 Total $89,400,000 

Page 43: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

43

Vermont State Rail Plan

Freight Rail Needs/PrioritiesYards and Industrial Access

Yard ProjectsProject Cost

CMQ Newport $184,000

NECR White River Jct, St. Albans

$4,339,000

NECR/GMRC Interchange $4,003,000

NECR St. Albans Roundhouse $300,000

GMRC Yard Projects $800,000

VTR Yard Projects $800,000

WACR Conn River Yard Projects

$700,000

Industrial Access ProjectsProject Cost

Access to Franklin Industrial Park, former Goodyear Power Plant in Windsor

$260,000

GMRC Sidings $478,000

WACR Montpelier Sidings $1,584,000

VTR Sidings and Structures $1,675,000

WACR Conn River Sidings $1,927,000

GMRC Passing Sidings $1,155,000

VTR Passing Sidings $2,002,000

WACR Conn River Passing Sidings

$3,344,000

Page 44: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

44

Vermont State Rail Plan

Grade Crossing Needs

Year Fatalities Injuries Property Only Total

Freight Total 0 11 12 23

Passenger Total 2 2 6 10

10 Year Total 2 13 18 33

2004 – 2013 Public Crossing Accident Statistics

Public Crossings by Warning Device

Protection Type CountGates 71

Lights 151

Crossbuck/Sign 146

Other 1

None 12

Total 381

Page 45: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

45

Capital Plan

45

Page 46: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

46

Vermont State Rail Plan

• Maintaining State Rail Lines Operable

‐ Bridges and track which can cause system failures

• Economic Development Projects

‐ Encourage job growth

• Intercity Passenger Rail Priorities 

Capital Plan Focus

Page 47: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

47

Vermont State Rail Plan

Capital Plan Past Funding Levels

$0

$10,000,000

$20,000,000

$30,000,000

$40,000,000

$50,000,000

$60,000,000

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

Federal

State

Since 2002, Averaged $15M in Federal FundingMost State Funding Applied to Operating & Administration Budget, around $4M Capital Budget

Federal Funds

Grants Earmarks FEMA Disaster 

Funds

Page 48: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

48

Vermont State Rail PlanComparison of All Needs and Available Funding over 20 Years 

Based on Past Funding LevelsAll Passenger & Freight Needs

$665,600,000 

$380,000,000

$0

$100,000,000

$200,000,000

$300,000,000

$400,000,000

$500,000,000

$600,000,000

$700,000,000

Needs Anticipated Funding (historical average)

Page 49: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

49

Vermont State Rail PlanComparison of All Needs and Available Funding over 20 Years 

Based on Past Funding LevelsAll Passenger & Freight Needs Except Upgrade to Class 4

$410,600,000 $380,000,000

$0

$50,000,000

$100,000,000

$150,000,000

$200,000,000

$250,000,000

$300,000,000

$350,000,000

$400,000,000

$450,000,000

Needs Anticipated Funding (historical average)

49

Page 50: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

50

Vermont State Rail Plan

Passenger RailProposed 20‐Year Capital Plan

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Ethan Allen to Burlington $26.4M

Vermonter Extension to Montreal $0 

Enhanced  79mph Vermonter Upgrades $177.3M

New Albany‐Bennington‐Manchester  Route $88M

Enhanced 79mph Western Corridor Upgrades $78.6M

Total: $370.3 million

50

Page 51: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

51

Vermont State Rail Plan

Freight Rail Proposed 20‐Year Capital Plan

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Bridge Upgrades on VTR and GMRC $123.5M

Bridge Upgrades on WACR $80.2M

Non Passenger Track Upgrades on GMRC, NECR Winooski, SLR, CMQ $27.1M

Non Passenger Track Upgrades on WACR $29M

Yard Improvements, Economic Dev. Passing Sidings, $19.5M

NECR Unrestricted Double Stack Clearance $5.7M

GMRC/CLP Double Stack$10.3M

Total: $295.3 million

51

Page 52: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

52

Vermont State Rail Plan

Measuring Performance

Page 53: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

53

Vermont State Rail Plan

Performance Measures and Targets:System Effectiveness

Performance Categories

Performance Measure

Associated Rail System Goal Existing Conditions

Target (annual)

System Effectiveness

Freight rail volumes originating or destined for Vermont

Expand rail system use; Provide a rail system that is financially sustainable; Support economic development

2 million tons

3 million tons

Recruitment of new rail businesses in Vermont

Expand the rail system’s use; Support economic development

1 2 businesses per railroad annually

Passenger rail trips in Vermont

Expand the rail system’s use 100,829 5% increase

FRA IPR Performance and Service Quality Indicators

Expand the rail system’s use variable Above national average in half or more reporting categories

Page 54: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

54

Vermont State Rail Plan

Performance Measures and Targets:System Effectiveness

Performance Categories

Performance Measure

Associated Rail System Goal

Existing Conditions

Target (annual)

System Condition

Bridges meeting 263,000 lbs. standard

State of good repair All bridges to be 263K

Bridges meeting 286,000 lbs. standard

Expand rail system capacity

85 of 106 rated

Improve 3 or more annually

Rehabilitate and upgrade grade crossings

State of good repair; Safety

Unknown Improve 3 or more annually

115lbs rail State of good repair 266 mi <115 lb

5 miles annually

Page 55: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

55

Vermont State Rail Plan

Performance Measures and Targets:System Effectiveness

Performance Categories

Performance Measure

Associated Rail System Goal

Existing Conditions

Target (annual)

System Condition

Bridges meeting 263,000 lbs. standard

State of good repair All bridges to be 263K

Bridges meeting 286,000 lbs. standard

Expand rail system capacity

85 of 106 rated

Improve 3 or more annually

Rehabilitate and upgrade grade crossings

State of good repair; Safety

Unknown Improve 3 or more annually

115lbs rail State of good repair 266 mi <115 lb

5 miles annually

Page 56: Draft Vermont State Rail Planvtrans.vermont.gov/sites/aot/files/rail/VT SRP... · 2016. 7. 6. · Top Freight Commodities 17% 16% 12% 12% 9% 8% 7% 5% 4% 2% 2% 2% 1% 3% Pulp, Paper,

56

Vermont State Rail Plan

Next Steps

• Where: VTrans website, review plan and reports http://rail.vermont.gov/about_us/reports_plans

• When: Will be taking comments until July 31, 2015• Submit comments to Costa Pappis of VTrans, [email protected]

• After comment period, – Plan modified per feedback– Submitted to FRA for comment– Finalize plan