draft site-specific quality assurance (qa) plan for …revi ew of the task work plan is re quired b...
TRANSCRIPT
![Page 1: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/1.jpg)
DRAFT..,~.'
NUS CORPORATION 6
§ 3
~ SITE- SPECIRC QUAUTY ASSURANCE PLAN 1> "'
FOR THE < BEACON HEIGHTS LANDFILL SITE "'
"' "' c " :0 0
LOCATED IN BEACON FALLS, NEW HAVEN COUNTY,
CONNECTICUT
'·. Ill Ill,.
EPA WORK ASSIGNMENT NUMBER 55-1LZ5
0 0NUS PROJECT NUMBER 0787..111 ...
MAY 1984
![Page 2: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/2.jpg)
DRAFT 1.0 INTRODUCTION
This Quality Assurence Project Plan hiS been prepared tor the United States
Envlronmantal Protection Agency (EPA) prior to commencement of work at the
Beacon Heights landfill Sita In Sateen Falls, Connecticut.
The quality 1ssurance program employed in this Remedial Investigation Is basad on
protocols and procedures detailed In the NUS Corporetlon's Superfund Division 11 ~
Ou1tity Assurance Manual. Guidance contained In the manual is applied u required H(D
by site-specific charlcterlstlcs. The entire quality tssuranca
to the work to be ptrformed. This site-specific plan mty
collected during t he Remedial lnvtstlgatlon.
zm H]>manual is applicable -<0be modlfltd by deta "'" :oz l> -<:I:H"'CH
I "'"' This program complies with t he EPA quality usuranca requirements rei1ted to :0-<
monitoring 1nd meuurement ICtivities end, in 1ddition, 1ncompuses 111 project "'"' 0 " :0ectivity thlt m1y lffect t he qul lity of work. At a minimum this progr1m complies 0
with thl guidatlnu pruented in thl EPA document •Interim Gu idelines and
0 Spec ificat ions for Preptrlng Ou11lty Assuranca Plans• (QAM-005/ 80).
I 2.0 PROJECT DESCRIPTION
This projtct includes pt rformt nc• of 1 Rt medil i lnvtstlgt t lon and Feasibili ty
Study rei1ted t o t he Beacon Heights L1ndflli Site in B11con Fa lls, Connecticut.
The 83- acra property
Act ivities at the site
minimum cover lt ndflll
r wutew1ter tr11tment
hu b11n an active landfill for 1pproxim1W1iy 60 y11rs.
havil Included open- burning wute disposal; non-burning
dlspoul; well-covered, cell - lift ..quence operation; t nd
sludge disposal. The specific tuks that comprise the
project are detailed In Table 2-1.
r 3.0 PROJECT ORGANIZATION
The project man1ger, Ms. Linda P1ut. will be responsible for all project ICtivities.
Key project disciplines are Identified In the Work Plan. A Remedial Planning
Office quality assuranc1 representative will provide day-to-day quality nsurance
1,.)
I
![Page 3: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/3.jpg)
TABlE 2-1
BEACON HEIGHTS lANDFILl SITE RI/FS TASKS
I. INIT1Al ACTMTlES
TASK 1 RI/FS WORK PLAN PREPARATION TASK 2 PROJECT MANAGEMENT TASK 3 COORDINATION AND COMMUNITY RELATIONS TASK 4 HEALTH, SAFETY, AND GENERAL SITE RECONNAISSANCE TASK 5 EXISTING DATA COLLECTION AND EVALUATION TASK 6 SITE-SPECIFIC HEALTH AND SAFETY REQUIREMENTS TASK 7 SITE-SPECIFIC QUALITY ASSURANCE REQUIREMENTS TASK 8 SITE OPERATIONS PLAN TASK 9 PERMITS, RIGHTS OF ENTRY, AND OTHER AUTHORIZATIONS TASK 10 SUBCONTRACTOR PROCUREMENT TASK 11 TOPOGRAPHIC MAP TASK 12 FIELD EQUIPMENT MOBILIZATION
II. REMEDLAl INYESJtGADON
TASK 13 GROUND SURVEY TASK 14 DOMESTIC WEll SAMPLING AND ANALYSIS TASK 15 SURFACE WATER/SEDIMENT AND LEACHATE SAMPLING AND
ANALYSIS TASK 16 SOILS INVESTIGATION AND SLUDGE SAMPLING AND ANALYSIS
I TASK 17 GEOPHYSICAL SURVEY TASK 18 GROUNDWATER INVESTIOAnON TASK 19 IDENTIFY PRELIMINARY REMEDIAL TECHNOLOGIES
I TASK 20 DATA EVALUATION AND REMEDIAL INVESTIGATION REPORT
Ill. fEASIB!lJD' STUDY
r TASK 21 OBJECTIVES AND CRITERIA FOR ALTERNATIVE EVALUATION TASK 22 IDENTIFICATION OF ALTERNATIVES AND INITIAL SCREENING TASK 23 LABORATORY STUDY WORK PLAN TASK 24 EVALUATION OF ALTERNATIVES AND PRELIMINARY FEASIBILITY
REPORT TASK 25 CONCEPTUAL DESIGN
r TASK 26 FINAL REPORT
~
• = 8...
I
![Page 4: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/4.jpg)
DRAFT suppon. All quality usurenct activities will be reviewed end monitored by the
Manager of Quality Assurance and Security in the Zone Project Management
Office.
In carrying out their duties, the quality assurance personnel shell have access to all
work areas. They shall have the freedom to Identify quality problems; initiate,
recommend, or provide solutions to quality problems through das lgnatad channels; ~
verity lmpltmtntltion of solutions; tnd ensure that funher processing or action is 3
controlled until proper disposition of unsaUsfectory conditions hn occurred. H'"zm Hl>
Quality assurance personnel shall have access to NUS corporate management at all -<0 ""' :oz levels as required to resolve problems or coordinate quality concerns. ]>
-<J:Hm<H
4.0 QUALITY ASSURANCE OBJECTMS """ , J: .... "' n "'
The objectives of this Quality Assurance Project Plan are as follows: :0 0
I 0
To mainta in the evidentlarv value of the dati produced.
? To ensure the Integrity of the results of the site investigations. and
technical reports.
To provide usurance that remedial designs and assessments are properly
prepared and reviewed.
I To control the activitY of subcontractors, consultants, and support
agencies or organizations to ensure that they maintain the ssme quality
standards applied to the NUS activities.
To produce a product (report) that is uniform and of acceptable quality to
achieve the purpose of the project.
1,)
I
![Page 5: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/5.jpg)
DRAFT 5.0 OUAUTY ASSURANCE TRAINING
As outlined In the Quality Assurance Manual {ClAP 2.3), training wm be provided to
all project personnel responsible for activit ies that may affect the quality of the
project work. This training will be Implemented In ltcordance with the proc t dure
described In Secllon 6 of ClAP 2.3.
I 6.0 STANDARD OPERATlNG PROCEDURES
I. Activities rtqulring procedures for use In the field which require definition and/or
QA oversight are listed In Table 6-1 . Where applicable, all field tnd laboratory
procedurtl will be referenced to standard procedures utablished by USEPA. ASTM,
or equipment manufacturers. Where published standards are not used, standird
NUS proctdures are outlined or referenced.
6.1 Ptoltct Wortt pt•n
I.
QAP 2.5 lltlblishes controls for the preparation and use of the project Work Plan
and ttsts the elements (Attachment A. Page A-4) to be addressed by the QA. plan.
Elements appticeble to the B11con Heights landfill Site ClA plan Include: {1)
umpling procedure~; {2) 11mple custody; (3) calibration procedures, Including
frequency; {4) analvtical procedures; {5) data acquisition; {6) date reduction.
validation and reporting; {7) pertormence 1nd system audits; (8) internal quality ·
control checks, Including frequency; (9) preventive m1intenance: (10) data
precision, ICCUfiCY and completeness; (11) corrective ectlon; and (12) qu1llty
usurance reports to m1n1gement.
A slte·speclflc health and safety plan Is required as an integral element of the
project Wort. Plan.
Review and approval {Internal) procedures for the Work Plan are det1lled In ClAP
2.5, Section 6.5 (P1ge 3).
I ~
![Page 6: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/6.jpg)
DRAFT TABLE 6-1
UST OF ACTMTIES REQUIRING OA PROCEDURES AND/OR OA OVERSITE
Actlvi
Project Man1gement
Project Work Plln
Tuk Wort Pltns
Dahl Acquisition:
Site Inspections
Field Dati Collection
Land Surveying (Ground Control and Boring locltlons)
Aerie! Surveying (Topographic Mep)
Electromagnetic Conductivity Survey
Soli Borings/Well lnsttllttlon
Pump/Permeeblllty Tests
Preptrttlon of Water Table Maps
I Determination of Groundwater Network
Wlter Level Meuuremantsr Ambient Air Sampl ing
Sampling:
Surface Weter S1mpllng
Tap Water Stms:~Ung (Residentlel Wells)
Groundwater Sampling (Monitoring Wells)
Soii/ Sidiment Sampling
I Sampl1 Packaging and Preservation
Sample Documentation and Tagging
~
Applicable OA Procedure
CAP 2.5 (Sections 6.3-6.5)
ClAP 2.5
OAR 11.0, OAP 11.1 and 11.2
CAP 4.1
s.. Procurement Sptclfications
OG 4.20
00 4.9
OG 4.11 , 4.12
OG 4.14
OG 4.14
OG 4.10
OG 4.29 (Section 4.4.1)
OG 4.29 (Section 4.4.1)
OG 4.8
OG 4.7
OG 4.29 (Section 4.4.1)
QAR 13.0, OAP 13.1, OG 4.19
QAR 13.0, QAP 13.1, OG 4.29 (S1ction 4.5)
• = 8..
![Page 7: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/7.jpg)
TABLE 6- 1 LIST OF ACTIVITIES REQUIRING QA PROCEDURES AND/ OR QA' OVERSITE PAGE lWO
I
Activit
Sampll Chain of Custody Requir1ments
Stmplt Shipping
Field Analys is
Laboratorv Analyses:
Analytical Proc1dure1
Data Reduction. Validation and Reporting
Hutth and Safety Monitoring:
Ambient Air Monitoring (OVA. HNu. Explosimeter, and 02 Oeticit ncy)
Decontamlnttlon Proceduru;;)
Product Oulltty Auurance:
Rtmedial lnvtstlgatlon Report
Illustrations and Drawings
Photos and Reprc-ductions
OOC!Jmlnt Control
Subcontractor Requirements:
Procurament Document Cont rol
Preparation of Procurament Documents
Subcontractor QA Requirements
Selection or Subcontractors
Aopllcable QA Procedure
OG 4.18
004.19
OG 4.40, 4.41
OAR 1 0.0. ClAP 10.1
OG 4.2. 4.1
OG 4.29 (Section 4.4.1), 5.4, 5.5
OG 5.3
CAP 7.4
OAR 7.0. ClAP 7.1, ClAP 1.2
OAR 5.0, QAP 5.1
ClAP 5.1
ClAP 5.2
QAP 8.2
OARs (Quality Assuranct Requ irements) and ClAPs (Quality Assurance Procedures) appear in thl NUS Quality Assuranct Manual OGs (Operating Guidllines) app11r In the NUS Operating Guidtiines Manual
6
![Page 8: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/8.jpg)
. l
I I I I
I I ~
I. I I r
6.1.1 Task Wort. Plans
Individual task Work Plans wltl be written for each of t he f ield tasks listed In the
project Work Plan. The task Work Plan will Include: (l) objective of the task; (2)
background of the site 11 It aft ecu t he plrtlcular tiSk; (3) methodology for
accomplishing the objective; (4) a sc:hedute of the activities associated with the
particular tuk; {5) personnel tsslgned to each of the tctlvltles; (6) equipment end
supply requirements; (7) constraints which must be met for the tuk to be
Implemented, e.g.. 11fety monitoring equipment evtllabilltv, umple laboratory
ISslgned, etc.; and {8) task·speclflc healt h and safety plan.
Review of the task Work Plan is required by the Healt h and Safety Representative
and the Quality Assurence Represent ative.
62 Pet• Acquisition Actlvttl!l
There are 1 number of tuks to be performed for completion of thl Remedial
Investigation, which require the ecqulsition of data. All of these tasks must be
ctrrltd out with quality a11uranc1 In mind. Chronologically, they include: (1)
btckground data tcquisition: (2) site reconnaissance; (3) aerial surveying to
gentrate a topographic map; (4) land surveying for topographic map· ground control
and location of test borings and monitoring wells; (S) electromagnttlc conductivity
survey; (6) soli borings/monitoring well Installation; (7) pump/ perm11bllity tuts
and wtter i1v11 m..surement; and (8) preparation ot water tabll maps tnd
groundwater network defin ition.
6~1 Bactground Data Acquisition
Acquisit ion of background dati characttrizing the site Is requ ired and is described
in the Work Plan 11 Task S on Page 3-5.
Outllty usurance requirements relating to the acquisition of background data 1r1
contained In the NUS Outllty Assurance Manual, OAR 11 .0 - Inspections.
QAP 11.1, which describes the quality assurtnce protocol for offsitl
•,. 8...
![Page 9: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/9.jpg)
DRAFT reconnaissance, contains the relevant procedures rtgtrdlng: (l) Information
sources. Section 6.2; (2) review of the Information. Section 6.3; (3} protection of
evidentiary value of the background information, Section 6.4; (4) offslte sample
requlrtments, Section 6.5; (5) photographs, Section 6.6: (6) sketch maps,
Section 6.7; (7) exposed soli and rocks, Section 6.8; (8) final report Section 6.9; end
(9) records required, Section 7.0.
I; J:6.2.2 Site Reconnel11ance Ha> zm Hl> <t>n
The specific objactlves of this task are described In Task 4 on Page 3-3 of the Work -<0 :oz
Plan. Bulc quttlty assurance requirements and procedures tor the site l> -<J: Hf'l
reconntlsunce trt covered In t he NUS Quality Assurance Manutl under QAP 11.2 <H
(Onsltt Inspections) end QAP 4.1 (Field Data Collection). ,"''" J: ....
n "'"' 0 Heeith and Safety monitoring procedures are presented in NUS Opereting "'0
Guidelines Manu1i by the following OOs.
OG 4.23 Identification of test equipment requiring calibration
00 4.25 Monltorng, meuuring, and test equipment mainten1nce
00 4.29 (Section 4.4.1, Page 3) Air sampling
00 5.3 Decontaminltlon
All of the applicable sample collection, packaging, preservation, documentation,
tagging, and custody protocols are listed In Table 6-1 and presented if'l Sections 6.3
and 6.4 of this plan which refer to sampling 1nd analysis.
Dati reporting 1nd reduction is covered by the following OGs 1nd QAPs:
OAR 4.0, Data 1cqulsltion
CAP 7.0, Document control
00 4.2 Dati review, reduction, and reporting
An up-to-datt Sitt Operltions Plan will be developed based on the reported data.
![Page 10: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/10.jpg)
DRAFT 6.2.3 Aerial Surveying
Quality assurance requirements will Influence the production of the topographic
map called for In the work plan. A description of the final product and recognlud
sttndard is contll ned in Tuk 11 of the Work Plan on page 3-9. In addit ion, the
fottowlng OARs and QAPs are tppllcable to achieving the quality assurance
objectives rellting to this panicular tuk:
OAR 3.0, QAP 3.1 Design control {Map is considered a dulgn product)
OAR 4.0 Data acquisition
OAR 5.0, ClAP 5.1, ClAP 5.2, Procurement document control
OAP 7.2 Controlled documents
QAP 7,4 Technical reports
OAR 8.0 Control of purchased Items and services
11.2.4 Ground Surveying
Ground surveying Is required to provide ground control for the 18rlal survey and the
exact location of the test borings and monitoring wells established in the tilt
drilling program. General requirements tre d11crlbed in Wofk Pltn, Tuk 13 on
P1ge 3-12.
AppiiCibl• QA st1nd1rds for the IC:complishment of the 1bove work to provide the
required qulllty usurtnce are:
I r
OAR 4.0, ClAP 4. 1. QAP 4.2 Dltl acquisition
ClAP S.O, OAR 5.1, OAP 5.2 Procurement document control
OAR 7.0 Document control
OAR 8.0 Control of purch1sed items and servlc11
OAR 12.0. QAP 12.1. Control of measuring equipment
OAR 16.0 Quality usurence records
OG 4.23 Identification of equipment requiring callbrttion
Surveying
![Page 11: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/11.jpg)
bRAFT 8.2.5 Electrom1gnetlc Conductivity Survey
An electromagnetic (EM) conductivity survey of the site Is dllcrlbed In Work Plan
Task 17 on Page 3-20.
Relevant quality assurance aspects or the EM survey Include:
QAR 3.0 Remedial design control
OAR 4.0, QAP 4.1, QAP 4.2 Data acquisition
QAR 6.0 Instructions 1nd Procedures
OAR 7.0, OAP 7.1, OAP 7.2, OAP 7.4 Document control
QAP 12.0, CAP 12.1 Control or measuring equipment
OAR 16.0 Quality assurance records
OG 4.2 Dati review, reduction, and reporting
OG 4.23 ldentlrlcetlon of equipment requiring calibration
62.6 Son Borings and Monhoring Well o.....lopment
The drilling progrtm Ia described In Work Plan Task 18 starting on Page 3-20. The
technlcll IICtion of the drilling apeclticltiona provide gre1ter detlil of the actual
drilling program to be Implemented. It Is Included In the Site Operations Plan.
Following installation, sever11 hydraulic tests will be performed on the wells. All
or the av•llabll data will then be used In the preparation of thl necessary ·
underground maps.
Quality usurtnce aspects of this activity ere generally cov1red by thl following
OARs, QAPa and OGs:
QAR 4.0, OAP 4.1, QAP 4.2 Dati ICquisition
OAR 5.0, QAP 5.1 Procurement document preparation and control
QAP 5.2 Subcontractor qulllty assurance r~quirements
QAP 6.1 Instruction• and procedures
OAR 7.0, QAP 7.1. QAP 7.2 Document control
QAR 16.0 Quality assurance records
10
![Page 12: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/12.jpg)
DRAPT OG 4.2 Dati review, reduction, and reporting
OG 4.10 Groundwater level measurement
OG 4.11. 4.12 Pump/ permubillty tests
OG 4.14 Determination of groundwater flow and water table contour
mapping
OG 4.37 Subsurface sampling and test boring
6.3 Sampling Procedures ~ 3 HID zm H~
The umpllng and analyses plan Is described In the Work Plan. A summary of the -<0 "'" :ozu mpllng plan Is shown on the following page. ~ -<:J:Hm <:H
The Project Mtnager or Team l uder Is rtsponslble for determining that samples
I :1: "'"
are property collected, chain-of-custody is mainta ined, and ell sampling documents :0-<
n "'"' have been completed properly and are accounted tor. Samplers tre reaponslble for 0
I :0
collecting semples tnd Initiating chtln- of-custody, traffic reports, 1nd the 0
neceuary umple documents, as required.
~ The Contract Laboratory Prog ram will ba accessed through Mr. £d Taylor of the
Region I Sample Control Center (6 171861-6700). Mr Taylor w ill achedula ell
sampling and provide necessary traffic raports. Sample bottles and chain-of
custody forms will be requuted through Mr. Patrick Byrne of the Remedlll
Planning Office. The project manager is responsible for scheduling laboratory time
and requesting bottles well In adv•nce of the sampling date.
The following are general QA procedures. applicable to all types of sampling:
OAR 9.0 Identification and control of laboratory umplu
OG 4.17 Administration and management of sampling and analysis
OG 4.18 Chain-of-custody
OG 4.19 Sample packaging and shipping
OG 4.29 Sampling
11
![Page 13: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/13.jpg)
I ')
DRAFT SAMPUNG PlAN SUMMARY
Sample Source
Domestic Wells
Newly developed monitoring wells
Surface wltlr/udiment
I Soil
I ;J Air
Analyses to be Performed
Hazardous substance list scan {except
pesticides) plus indlcttors
Hazardous substance list scan (IMctpt
pesticides) plus Indicators
Hazardous subst1nce list scan (eJCcept
pesticides) plus Indicators
Hazardous substance list sc1n (ucept
ptsticldes) plus Indicators
Haztrdous substance list volttllt orgtnlcs
Samples will be chemlctlly anelyztd by the following laboratories:
Stmplt S;)U rc t
I Air (llmpling tubes) ·
I Groundwattr
Surftce Wtter/ Sedlmant
Solis
Antlvtictl Rtsoyrets
EPA Contract Uborltory
EPA Contrlct labor~tory
EPA Contrltt laboratory
EPA Contract Llboratorv
I. Semple preservttlon tnd htndllng technlquu employed ere those outlined by the
Contrtct LlborltOry Progrtm (CLP) Users Guide•. A copy of the User's Guide 11
availtble tor conaultttion through tha project maneger.
I I ~lar Co.. August 1982, User's Guide to tht EPA Contrtct laboratory Program.
Prepared by Vlar Sample Mtntgement Office; Alextndrit, Vlrglnlt .
~ 12
• = 8..
![Page 14: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/14.jpg)
DRAFT 6.3.1 Groundweter
Groundwater samplu will be collected from residential wells at the tap nearest the
well pump and upstream of any water traatmtnt, either activated carbon or water
softening. Monitoring well groundwlter samples obtllned for analysis will be
collected using a dedicated b;:ller or 1 decontaminated aubmers lble pump.
Procedures for sample collection are pr"sented In the following OGs.
OG 4.8 Tap water sampling
OG 4.7 Groundwater sampling (monitoring wells)
I I
Fourteen surface water and founeen sediment umptu will be
course of the RI / FS. Specific tocetlons for the sampling points
Stmpllng end Analysis Plt n. The QA procedures eppllctble to
aurft ce w1ter samplet 1re described in OG 4.29 (Section 4.4.1).
~ 8.3.3 Soli S.mpllng
tlkln during the
ere listed In the
the collection of
A soli u mpllng program Is included in the Remed ial investigation, with surface and
subsurface samples to be collected. Specific details are described In t he Work
Pla n.
Quality assurance demands relat ing to soil sampling are covered by the following:
OG 4.29 Sampling {Section 4.4.1, pages 5.6)
QAR 13.0, QAP 13.1 Hazardous sample packaging and labeling
requirements
13
~ 3 ~CD zm ~]>
-<0 ""' :oz ]> -<I ~"' < ~
I "'" :0-<
n "'"' 0
i3
• = 8...
![Page 15: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/15.jpg)
DRAFT 6.4 laboratory Analvsts
All of the umples collected for analysis wilt be forwarded to the assigned
laboratorlis In the USEPA Contract laboratory Program (CLP).
6.4.1 Analytical Procedures
The current scope of the Work Pian does not include laboratory services pertormed
by NUS. When laboratory services are required, appropriate quality usunnce
requirements will ba Included.
Th e enalyticll procaduru employad are determined by the compounds to be
analyzed for. Standard operating procedures (SOP) era ganarally used In sample
analysis. Most have recaivad EPA approval as published In "Test Methods for
Evaluatin g Solid Waste, Physical/Chemical Methods: Additional suitable
refarence sources for anllytical procedures are :
Vlar & Co., Augu st 1982, ·uur Gu ide to the EPA Contrtct Ltborttory Progrtm•
Preptred by Stmple Mtntgement Office, Altx1ndrl1, Vlrglnil.
APHA 1981 •sttndt rd Methods for thl Extmlnttion of Water and Wuttwtttr:
15th Edition American Public Htslth Alloclttlon, Washington, D.C.
EPA. March 1979, •Methods for Cht mictl Antlysis of Wtter tnd Wutn.·
QA/QC documents which generally describe the qual ltv assurant:e aspects of r llbOrltOry ICtivitlts trt as follows:
OAR 9.0, QAP 9.2, OAP 9.1 Identification and control of ltboratory
Jtmples
OAR 10.0. OAP 10.0 Control of laborttory tntlysis processes
14
![Page 16: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/16.jpg)
I. DRAFT 00 4.1 Quality assurance review and validation of Inorganic analysis data
PICkages
OG 4.2 Dati review, reduction, and reporting
6.4.2 Internal Quality Control Chects
To maintain confidence In the results of tabor1tory analysis, quality control checks
will be employed. Thalr specific usage is dependant upon the substtncts involved.
All quality control checks employed 1r1 based upon nationally recognized
procedures. During the project, procedures outlined by the EPA will be employed
u tpplicable.
The CLP Uur's Guide ducrlbes all quality control procadures used In contract
laborltory operations. Th ese procedures Include the use of replicates. blanks,
spiked umplu. split samples, and surrogate samples.
The frequency of the qullity control checks v1ries In 1ccordance with the0I
•complexity of the meuurement technique Involved. Cuatomarily, the l1bor1tory
performs one metrix spike and one duplicate sample analysis on each cue of
samples racalved or per 20 umples, whichavar is more frequent.
Procedures for NUS QA review of analytical data have b..n prep1red and are
IVIIIIble tor use. 11 dascrlbed In the Operating Guidelines M1nual.
I NUS will verity thlt any subcontract laborltories employ 1 quality = program. Included In the llboratory quality assurance procedures will be ther 8
r specific routine procedures used to assess dltl precision, accuracy, and
completeness. They will be similar to the ebove discussed QUIIity usurance ... objectives and include techniques for data reduction and reporting, es well 11
lnternl l quality control checkS. r r
15
![Page 17: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/17.jpg)
DRAFT; 6.5 He•lth 1nd S1fetv Monhorfng
The emblent air at the site will be constantly monitored to Insure the health and
selety of the Remedial Investigation teams. This will be eccomplished using 1ny or
all of the following lnstrumenu: (1) Century Organic Vapor Analyzer (OVA); (2)
HNu Photolonlzation Analyur; (3) o 2 Meter; or (4) e)lplosimeter.
The lnitiel site reconnalsnnce will be used to establish the level of protection for
breathing air 1nd protective clothing based on OVA monitoring, exploslmeter
readings and oxygen content In ambient air. Air samples will al :::o be collected for
lnllysls to Identify any volatile organics present on site.
Quality 1ssurance requirements are generally described In the following OGs:
OG 4.23 ldentiflcttion of equipment requiring Clllbr1t1on
00 4.25 Monitoring, m..suring, 1nd test equipment m1lnten1nce
00 4.29 (Section 4.4.1. p1ge 3) Ambient air monitoring
00 5.3 Decontamlantion
8.8 Product Ou•lity Afsyrtnct
Since thl product ISSOCIItld with the Remedial lnvestlgltlon Is the report which
I Incorporates illuatrltlona 1nd drawings, photos end reproduction, som1 quality ·
essurence requirements are necessary. In edditlon, control of the doCuments Is an
I essential element of the development of 1 Remediel lnvestigltlon Report.
I The following documents provide quality essurance guidance In the production of
the Rtmedlll Investigation Report:
I QAP 3.1 Control of design activities
OAR 7.0 Document control
OAP 7.1 ldentlflcetlon of controlled evidentllry documents
QAP 7.2 lssurance and distribution of controlled documents
16
![Page 18: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/18.jpg)
DRAFT QAP 7.4 Technical repons
NUS Style Guide
6.7 Subcontractor Requirements
The topographic mapping, ground surveying, and monitoring well installation
required u part of the Remeditl Investigation at the Beacon Heights Landfill Site
are under consideration for subcontrlcting. Applicable OA documents Include:
OAR 5.0 Procurt ment document control
OAP 5.1 Preparation of procurement documents
QAP 5.2 Subcontrl ctor quality assurance requirements
OAR 8.0 Control ot purchutd Items and services
Q.AP 8.1 Control of procurement ICthlitles
CAP 8.2 Evlluation and selection of subcontractors
I A qutllty u surance program consistent with the requirements of the NUS qu1llty
auurance progrtm must be established end Implemented by ell subcontreetors~ whose ectlvltles cen effect the quellty of the project. The NUS OA progrem has
both menagamant objectives and data meuurement objectives. Managemtnt
objectlvtl are controls Intended to ensure the project Is conducted In an efficient
tnd effective manner while dltl meuurement objectives tre intended to ensure
the quellty of dlta generated by 11mpllng, monitoring systems, tnd laborttory
tntlysis. Subcontrtctor QA progrtms wltl be required to eddress both of thut
objectives.
r 7.0 DATA REDUCTION, VAUDATION, AND REPORTING
I Dltt entlysls will be based on logicel, systemetlc procedures using tcceptlble
engln11rlng methods end t he proper documentltion. Preliminary tntlysls or
ctlculatlons may be performed by one or more testers, tnd bectuse of theirr prellmintry neturt n11d only be reviewed by e supervisor. Atl prellmlntry tnalyses
or celculatlons must be Identified as such.
17
![Page 19: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/19.jpg)
DRAFT The source document status must be Identified In 1ny repon, study or calculation
In which it is being used 11 Input. Dati analysis will be legible and in a form
aulttble for reproduction and filing. Analyses will be sufficiently detailed and In a
formtt so that they may be reviewed or verified without recourse to the originator.
The tester, subject. date. and specific data used In the tnalyses will be identified.
Data analysis will be reviewed by a qutlified individual other than thOII performing
the tnalysis. The method of 1nelysts must review the consistency tnd defensibility
of all references. technical concepts, methods, nsumptlons. celeulltions, and
conclusions. Proper documentation of the review is required.
8.0 PERFORMANCE AND SYSTEMS AUDITS
The effect iveness of quality assurance techniques and their implementation can ·be
I evaluated through t ud lts. Project ICtlvltlu will be audited by the REMPO
I M1n1ger of Outllty Anur~nce 1nd Security. The overall qut lity tssuranct program
Is tudited periodlctlly by the NUS corportte OA repruentltlve.
;J Audits t re performed on the basis of written checkJists or lists of questions
preptred prior to the tudlt. During tn tudlt. each item on the list Is mtrktd I S to
sttlsfactory. unsttlsfactorv. not tppllctblt, or not audited.
Checklist s w ill Include such item s 11 t qu lpment ctllbrltlon and mtlntent nce.
documentltlon. record keeping, reponing, sttndtrd opertt lng procedures,
nonconformancu , tnd corrective ICt lons.
9.0 CORRECTM ACTION
Corrective tctions will be described for each tuk. purchased Item, service or
proctdure In the project for which non-conformances hive b..n reported. They
normtlly occur due to audit findings t nd must be documented In accordtnce with
the Project Quality Assurtnce Mtnutl.
18
![Page 20: DRAFT SITE-SPECIFIC QUALITY ASSURANCE (QA) PLAN FOR …Revi ew of the task Work Plan is re quired b y the H eal th and Safet pr sen ta ive and the Qua lity Ass urence Repre se nt at](https://reader033.vdocuments.us/reader033/viewer/2022041917/5e6a1b63e984f07f9c435046/html5/thumbnails/20.jpg)
DRAFt 10.0 QUALITY ASSURANCE REPORTS TO MANAGEMENT
Elch month. the project Outlltv Aasurtnct Representative shtll forward to tht
Project M1nager, tht Zone Deputy Project Manager, and tht Manager of Ou11ity
Assurtnct 1nd Security a report summerizlng the quality usurtnct tnd quality
control status for tht project 1nd any conditions adverll to quality. Topics to be
lncludtd In the monthly report trt u follows:
Assenmtnt of data accur1cy, prtclslon, 1nd compltttnus
Results of tnv performtnct t udlts
Results of syste m audits
Any nonconformt nc t initiated
Any algnlflctnt qu11ity tuUrtnct problems, togtJtltr with recommended
~ solutions.
I The monthly reports will be compiled Into quarterly tnd 1nnu11 reports.
I I r
19