draft - plan subject to change€¦ · future first tee ch first tee course future first tee ch ......

7
Scale Date A-00 Unnamed No. Description Date G-2.0 ROUTING PLAN - 100% City Park Golf Course Parks and Drainage Improvements Design-Build Project August 15, 2018 1” = 200’ SCALE: 1” = 200’ 0’ 100’ 200’ 400’ All construcon per City Park Golf Course Parks and Drainage Improvements Design-Build Technical Specificaons Cook St. Madison St. Monroe St. Garfield St. Jackson St. 1 2 3 4 4 2 3 4 1 1 4 3 2 6 5 4 3 2 1 5 4 3 2 5 2 1 3 2 4 6 10 11 12 13 14 15 16 17 18 7 5 8 9 1 3 DR PPG CG Albatross Bogey’s Bendelow Hole Yards Par 448 4 222 3 335 4 370 4 208 3 597 5 TOT 2,180 23 Hole Yards Par 371 4 465 4 156 3 473 5 405 4 TOT 1,870 20 Hole Yards Par 429 4 220 3 565 5 502 4 376 4 TOT 2,092 20 1 5 4 3 2 1 6 5 4 3 2 1 5 4 3 2 Denver Zoo Comfort Staon (serves 4 & 7) Comfort Staon (serves 13 & 17) A: Irrigaon Pond (2.64 M gal.) 1.50 AC -12.5’ Deep (9.5’ usable) (tot. cut 13.5’) B: Waste Bunker 0.20 AC: -6.0’ Deep A Clubhouse Maintenance Facility Integrated Detenon Area (11, 12, 13, 14, 15, 16) Clubhouse Entry Forebay (1.15 AC) York St. Josephine St. Columbine St. Elizabeth St. Save B 12’ Wide Service Rd. Crossing York St. Colorado Blvd. 23rd Ave. Waste-Bunker (Water Quality) Range Dispenser Future First Tee CH First Tee Course Future First Tee CH Clayton St. Fillmore St. Milwaukee St. St. Paul St. Steele St. Adams St. Irwin Tee DRAFT - Plan Subject to Change 1 2 3 4 Range Mats 78 yds. 50 yds. SCALE: 1” = 100’ 0’ 50’ 100’ 200’ First Tee Room 50 yds. *FIRST TEE COURSE (3 Acres): Hole Yards Par Green Tee (SF) (SF) 72 3 4,000 1,000 52 3 3,500 1,000 64 3 5,000 1,000 66 3 3,500 1,000 Total 254 12 *Hole lengths and feature sizes subject to change 50 yds. 71 yds. 70 yds. PPG 25 yds. #2 52 yds. 3,500 SF Gr. #1 64 yds. 5,000SF Gr. #2 52 yds. 3,500 SF Gr. #1 72 yds. 4,000SF Gr. #4 66 yds. 3,500 SF Gr. 1 #3 64 yds. 5,000 SF Gr. 2 3 4

Upload: others

Post on 20-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DRAFT - Plan Subject to Change€¦ · future first tee ch first tee course future first tee ch ... level 1 floor plan - clubhouse a01.01 08/06/17 1/8" = 1'-0" 1 level 1 - clubhouse

Scale

Date

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

A-00

Unnamed

City Park Golf CourseParks and Drainage

Improvments

May 12, 2017

No. Description Date

G-2.0

ROUTING PLAN - 100%

City Park Golf CourseParks and Drainage

ImprovementsDesign-Build Project

August 15, 2018

1” = 200’

SCALE: 1” = 200’

0’ 100’ 200’ 400’

All construction per City Park Golf Course Parks and Drainage

Improvements Design-Build Technical Specifications

Cook

St.

Mad

ison

St.

Mon

roe

St.

Garfi

eld

St.

Jack

son

St.

1

2

3 4

4

23 4

1

1

4

3 2

6

5

4

3

2

1

54

3

2

5

2

1

3

2

4

6

1011

12

13

14

15

16

17

18

7

5

8

9

1

3

DR

PPG

CG

AlbatrossBogey’s BendelowHole Yards Par

448 4

222 3

335 4

370 4

208 3

597 5

TOT 2,180 23

Hole Yards Par

371 4

465 4

156 3

473 5

405 4

TOT 1,870 20

Hole Yards Par

429 4

220 3

565 5

502 4

376 4

TOT 2,092 20

1

5

4

3

2

1

6

5

4

3

2

1

5

4

3

2

Denver Zoo

Comfort Station (serves 4 & 7)

Comfort Station

(serves 13 & 17)

A: Irrigation Pond(2.64 M gal.)

1.50 AC -12.5’ Deep (9.5’ usable)(tot. cut 13.5’)

B: Waste Bunker 0.20 AC: -6.0’ Deep

A

Clubhouse

MaintenanceFacility

Integrated Detention Area

(11, 12, 13, 14, 15, 16)

ClubhouseEntry

Forebay(1.15 AC)

York

St.

Jose

phin

e St

.

Colu

mbi

ne S

t.

Eliza

beth

St.

Save

B

12’ Wide Service Rd.

Crossing

York

St. Co

lora

do B

lvd.

23rd Ave.

Waste-Bunker(Water Quality)

Range Dispenser

Future First Tee CH

First Tee Course

Future First Tee CH

Clay

ton

St.

Fillm

ore

St.

Milw

auke

e St

.

St. P

aul S

t.

Stee

le S

t.

Adam

s St.

Irwin Tee

DRAFT - Plan Subject to Change

1

2

3

4

Range Mats

78 y

ds.

50 y

ds.

SCALE: 1” = 100’

0’ 50’ 100’ 200’

First TeeRoom

50 yds.

*FIRST TEE COURSE (3 Acres):

Hole Yards Par Green Tee (SF) (SF) 72 3 4,000 1,000

52 3 3,500 1,000

64 3 5,000 1,000

66 3 3,500 1,000

Total 254 12

*Hole lengths and feature sizes subject to change

50 yds.71 y

ds.

70 y

ds.

PPG25 yds.

#2 52 yds.3,500 SF Gr.

#1 64 yds.5,000SF Gr.

#2 52 yds.3,500 SF Gr.

#1 72 yds.4,000SF Gr.

#4 66 yds.3,500 SF Gr.

1

#3 64 yds.5,000 SF Gr.

2

3

4

Page 2: DRAFT - Plan Subject to Change€¦ · future first tee ch first tee course future first tee ch ... level 1 floor plan - clubhouse a01.01 08/06/17 1/8" = 1'-0" 1 level 1 - clubhouse

COPYRIGHT BY JOHNSON NATHAN STROHE (JNS). ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE MODIFIED, DUPLICATED, DISCLOSED, USED FOR ANOTHER PROJECT, OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT AND INDEMNIFICATION OF JNS

SHEET TITLE

SHEET NUMBER

C:\R

evit

Loca

l Pro

ject

s\C

ity p

ark

golf

Clu

bhou

se_

A18

_Sin

dhur

i@jn

s.de

sign

.rvt

10/6

/201

7 11

:15:

59 A

M

PROJECT #1703

CIT

Y P

AR

K G

OLF

CO

UR

SE

CLU

BH

OU

SE

DE

NV

ER

, CO

LOR

AD

OC

ITY

OF

DE

NV

ER

PERSPECTIVES

A03.0210/06/2017

EAST ELEVATION PERSPECTIVE

SOUTHEAST ELEVATION PERSPECTIVE

Page 3: DRAFT - Plan Subject to Change€¦ · future first tee ch first tee course future first tee ch ... level 1 floor plan - clubhouse a01.01 08/06/17 1/8" = 1'-0" 1 level 1 - clubhouse

COPYRIGHT BY JOHNSON NATHAN STROHE (JNS). ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE MODIFIED, DUPLICATED, DISCLOSED, USED FOR ANOTHER PROJECT, OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT AND INDEMNIFICATION OF JNS

SHEET TITLE

SHEET NUMBER

C:\R

evit

Loca

l Pro

ject

s\C

ity p

ark

golf

Clu

bhou

se_

A18

_Sin

dhur

i@jn

s.de

sign

.rvt

10/6

/201

7 11

:16:

00 A

M

PROJECT #1703

CIT

Y P

AR

K G

OLF

CO

UR

SE

CLU

BH

OU

SE

DE

NV

ER

, CO

LOR

AD

OC

ITY

OF

DE

NV

ER

PERSPECTIVES

A03.0309/14/17

WEST ELEVATION PERSPECTIVE

SOUTHWEST ELEVATION PERSPECTIVE

Page 4: DRAFT - Plan Subject to Change€¦ · future first tee ch first tee course future first tee ch ... level 1 floor plan - clubhouse a01.01 08/06/17 1/8" = 1'-0" 1 level 1 - clubhouse

COPYRIGHT BY JOHNSON NATHAN STROHE (JNS). ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE MODIFIED, DUPLICATED, DISCLOSED, USED FOR ANOTHER PROJECT, OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT AND INDEMNIFICATION OF JNS

SHEET TITLE

SHEET NUMBER

C:\R

evit

Loca

l Pro

ject

s\C

ity p

ark

golf

Clu

bhou

se_

A18

_Sin

dhur

i@jn

s.de

sign

.rvt

10/6

/201

7 11

:16:

01 A

M

PROJECT #1703

CIT

Y P

AR

K G

OLF

CO

UR

SE

CLU

BH

OU

SE

DE

NV

ER

, CO

LOR

AD

OC

ITY

OF

DE

NV

ER

PERSPECTIVES

A03.0409/14/17

SOUTH ELEVATION PERSPECTIVE

NORTHEAST ELEVATION PERSPECTIVE

Page 5: DRAFT - Plan Subject to Change€¦ · future first tee ch first tee course future first tee ch ... level 1 floor plan - clubhouse a01.01 08/06/17 1/8" = 1'-0" 1 level 1 - clubhouse

UP

CAR

ST AT I O

N

HS

JACK (TYP.)

C

4"

1' -0"

C

C

SELECT.

FRONT

CE N

T ER

5"

S

CBUFFER

DN23

RD

AVE

NU

E

MATERIALS YARD

CART STAGING

AREA

EVENT LAWN

6,000 SF

MAINTENANCE AREA

EXISTING TREE TO BE PRESERVED

EXISTING TREES TO BE PRESERVED

EXISTING TREES TO BE PRESERVED

PARKING COUNT:164 STALLS PROVIDED26 OVERFLOW STALLS (GRASSCRETE)TOTAL: 190

19 MAINTENACE FACILITY

ACCESSIBLE PARKING SPACES:

183 TOTAL STALLS PROVIDED

151-200 PROVIDED SPACES = 6 ACCESSIBLE SPACES REQUIRED.

FIRST TEE DROP OFF

26.6

26.6 26.626.6

26.6

32.7

3.8

TYP.

3.5

32.1

32.1

32.1

10.24

17'-6

"23

'-0"

17'-6

"19

'-0"

15'-0

"16

'-0"

15'-0

"19

'-8"

17'-6

"23

'-0"

17'-6

"

TYP.9'-0"

32.11TYP.

TYP.

9'-0"

17'-6"

32.5

11.611.7

32.12

32.5

32.5

32.5

COPYRIGHT BY JOHNSON NATHAN STROHE (JNS). ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE MODIFIED, DUPLICATED, DISCLOSED, USED FOR ANOTHER PROJECT, OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT AND INDEMNIFICATION OF JNS

SHEET TITLE

SHEET NUMBER

C:\R

evit

Loca

l Pro

ject

s\C

ity p

ark

golf

Clu

bhou

se_

A18

_Sin

dhur

i@jn

s.de

sign

.rvt

10/6

/201

7 11

:15:

50 A

M

PROJECT #1703

CIT

Y P

AR

K G

OLF

CO

UR

SE

CLU

BH

OU

SE

DE

NV

ER

, CO

LOR

AD

OC

ITY

OF

DE

NV

ER

SITE PLAN

A01.0008/06/17

1" = 30'-0"SITE PLAN1 NORTH

KEYNOTES

3.5 CAST-IN-PLACE CONCRETE RAMP3.8 CAST-IN-PLACE CONCRETE ROLL CURB10.24 FOCAL SCULPTURE / ART FEATURE11.6 HAZ MAT STORAGE LOCKER11.7 CHEMICAL STORAGE LOCKER26.6 POLE MOUNTED ELECTRIC CAR CHARGER32.1 ASPHALT PAVING32.5 DECORATIVE METAL FENCING AND GATES32.7 LANDSCAPE PLANTING; RE: LANDSCAPE32.11 PAINTED PARKING STRIPING32.12 GRASSCRETE PERMEABLE PAVERS

GOLF CART SCHEDULE (STAGED)

Parking Stall Golf Cart: 4x9 Staging 72

Page 6: DRAFT - Plan Subject to Change€¦ · future first tee ch first tee course future first tee ch ... level 1 floor plan - clubhouse a01.01 08/06/17 1/8" = 1'-0" 1 level 1 - clubhouse

DN

UP

CAR STA

TION

HS

JACK (TYP.)

C

4"

1'-0"

C

C

SELECT.

FRONT CENTER

5"

SC

BUFFER

DN

D

D

D

DD

FS

CHEM

E1E2

D

D D D

D

CO2CO2

D

G G

G

G G

GG G

36"

36"

GGDD

G

G

D

DD

DD

D

E1

E1

D DDD D

D

D

D

D D

DD

DD

6

6

STAFFOFFICE

5 & 6119

PRO'SOFFICE

109ASSISTANT

PRO'SOFFICE

110

PRO SHOP108

STORAGE107

B

B

E

E

H

H

G

G

5

5

3

3

FIRST TEEMEETING

122

MEETINGROOM - B

101

A

A

2

2

CAFE102

FIRST TEEPROGRAM

AREA113

DN

STAFFOFFICE

3 & 4117

MAINLOBBY

103

STAFFOFFICE

1 & 2118

MEETINGROOM - A

100

STORAGE111

I

I

MECH. EQUIPMENT

C

C

F

F

1

1

7

7

CHANGING126

CHANGING125

EQUIP.STORAGE

114

STAFFOFFICE

7 & 8123

DIRECTOR120

4

4

RECEPTION121

96'-4"

100'-2 1/2"

WOMENS127 MENS

124

STAIRS #1116

CORRIDOR115

8.4

D

D

10%

SUPERVISOR106

LIQUORSTORAGE

104

KITCHEN105

A03.01

4

A03.01

3

A03.01

2

A03.01

1

106A

104A

107A

126A

127A

124A

128A

125A

110A

109A

114A

119A

120A

118A

116A

122A

123A

111A

105A

LOADING ZONE

117A

116B

108A

11.5

22.20

22.20

11.5

10.25

A09.10

1

A09.10

1Sim

UP

15%

95'-4"

JAN128

A61

A61

A61

A2

A2

A2

A2

A61

A61

A61

STORAGE129

129A

COPYRIGHT BY JOHNSON NATHAN STROHE (JNS). ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE MODIFIED, DUPLICATED, DISCLOSED, USED FOR ANOTHER PROJECT, OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT AND INDEMNIFICATION OF JNS

SHEET TITLE

SHEET NUMBER

C:\R

evit

Loca

l Pro

ject

s\C

ity p

ark

golf

Clu

bhou

se_

A18

_Sin

dhur

i@jn

s.de

sign

.rvt

10/6

/201

7 11

:15:

56 A

M

PROJECT #1703

CIT

Y P

AR

K G

OLF

CO

UR

SE

CLU

BH

OU

SE

DE

NV

ER

, CO

LOR

AD

OC

ITY

OF

DE

NV

ER

LEVEL 1 FLOOR PLAN -CLUBHOUSE

A01.0108/06/17

1/8" = 1'-0"LEVEL 1 - CLUBHOUSE1

NORTH

KEYNOTES

8.4 ALUMINUM-FRAMED CURTAIN WALLSYSTEM

10.25 GOLF CLUB STORAGE LOCKER11.5 UNDER-COUNTER REFRIGERATOR22.20 UNDERMOUNT KITCHEN SINK - 31" -

ACCESSIBLE, 6" MAX. DEPTH

Page 7: DRAFT - Plan Subject to Change€¦ · future first tee ch first tee course future first tee ch ... level 1 floor plan - clubhouse a01.01 08/06/17 1/8" = 1'-0" 1 level 1 - clubhouse

UP

CAR STA

TION

HS

JACK (TYP.)

C

4"

1'-0"

C

C

SELECT.

FRONT CENTER

5"

SC

BUFFER

6

6

MAINELECTRICAL

L109

MEPL101

DN

B

B

E

E

H

H

G

G

5

5

3

3A

A

2

2

FIRST TEESTORAGE

L104

ITL107

I

I

C

C

F

F

1

1

7

7

4

4

STORAGEL102

CLUBREPAIRAREAL103

TOILETL108

CARWASH/REPAIRAREAL106

88'-10"

10%

L102A

L101A

L107A

L110A

L103A

L105

A

L109A

L108A

L104A

STAIR #2L110

22.3

22.3

CARTPARKING

L111

22.31

D

D

15%

22.26

3.1

3.7 3.7

3.7

10.22

89'-10"3.2

3.7

3.7

4.1

3.2

10.22

STAIR #1?

A2

C83

C83 C83

A2

A2

A2

A2

COPYRIGHT BY JOHNSON NATHAN STROHE (JNS). ALL DRAWN AND WRITTEN INFORMATION APPEARING HEREIN SHALL NOT BE MODIFIED, DUPLICATED, DISCLOSED, USED FOR ANOTHER PROJECT, OR OTHERWISE USED WITHOUT THE WRITTEN CONSENT AND INDEMNIFICATION OF JNS

SHEET TITLE

SHEET NUMBER

C:\R

evit

Loca

l Pro

ject

s\C

ity p

ark

golf

Clu

bhou

se_

A18

_Sin

dhur

i@jn

s.de

sign

.rvt

10/6

/201

7 11

:15:

57 A

M

PROJECT #1703

CIT

Y P

AR

K G

OLF

CO

UR

SE

CLU

BH

OU

SE

DE

NV

ER

, CO

LOR

AD

OC

ITY

OF

DE

NV

ER

LOWER LEVEL FLOOR PLAN- CLUBHOUSE

A01.0208/07/17

1/8" = 1'-0"LOWER LEVEL - CLUBHOUSE1

NORTH

GOLF CART SCHEDULE

Parking Stall Golf Cart: 4x9 84

KEYNOTES

3.1 CAST-IN-PLACE CONCRETE WALL; RE:STRUCTURAL. REFER TO SPECIFICATIONFOR FINISH

3.2 CAST-IN-PLACE CONCRETE COLUMN3.7 SHOTCRETE FOUNDATION WALL4.1 4" CONCRETE MASONRY VENEER10.22 GOLF CART PARKING LANE, TYP.22.3 HOSE BIB22.26 EMERGENCY EYE WASH STATION22.31 TRENCH DRAIN