  • 7/29/2019 DRAFT Indonesian Railway Standard Attachment Vol 1

    1/16

    A4

    Table 2 (Clause 29)

    Track

    Classification

    Annual passing

    tonnage (t/year)

    Maximum

    Train speed V

    max (km/h)

    Wheel axle

    P max

    (ton)

    Rail TypeType of sleeper

    Sleeper spacing (mm)

    Type of

    fastener

    Upper ballast

    thickness (cm)

    Ballast

    shoulder

    width (cm)

    1st

    2nd

    3rd

    4th

    4ths

    > 20.106

    10. 10620. 106

    5.10

    6 10. 10

    6

    2,5. 1065. 10

    6

    < 2,5. 106

    120

    110

    100

    90

    80

    18

    18

    18

    18

    18

    R.60 / R.54

    R.54 / R.50

    R.54/ R.50/ R.42

    R.54/ R.50/ R/42

    R.42

    600

    Concrete

    600

    oodenConcrete/w

    600

    ood/steelConcrete/w

    600

    ood/steelConcrete/w

    600

    Wood/steel

    EG

    EG

    EG

    EG/ET

    ET

    30

    30

    30

    25

    25

    50

    50

    40

    40

    35

    Note: ET: Single elastic EG: Double elastic

  • 7/29/2019 DRAFT Indonesian Railway Standard Attachment Vol 1

    2/16

    A5

    2.75m 2.75m

    2.75m2.75m

    Fig.1 (Clause 27(1))

    Width of formation level

    Earth Work Section

    a. Single Track Section

    LL

    b. Double Track Section

    L L

    Fig. 2 (Clause 27(3))

    Elevation Track Structure

    a. Single Track Section

    b. Double Track Section3.15 3.15

    3.153.15

  • 7/29/2019 DRAFT Indonesian Railway Standard Attachment Vol 1

    3/16

    A6

    Table3 (Clause 35)

    1. Sleeper Spacing

    (1) Ballast Section

    a. In the case of suspended joint methode section

    Length of rail

    25m 17m 13.7m

    Rate of Sleeper

    fixing (pcs)

    Sleeper Spacing (mm) Rate of Sleeper

    fixing (pcs)

    Sleeper Spacing (mm) Rate of Sleeper

    fixing (pcs)

    Sleeper Spacing (mm)

    A B C A B C A B C

    43

    (42)

    380

    (-)

    504

    (599)

    595

    (610) 30

    (29)

    380

    (-)

    504

    (599)

    608.5

    (608.5) 23

    (22)

    380

    (-)

    504

    (599)

    595

    (595)

    520

    (-)

    469

    (599)

    595

    (595)

    520

    (-)

    469

    (599)

    608.5

    (608.5)

    520

    (-)

    469

    (599)

    595

    (595)

    Note : ( ) of figure of sleeper spacing of after pull out one piece sleeper due to changed to long rail from standard rail.

    Jointed rail After change to long rail

    C B B A B B C C B B B B C

  • 7/29/2019 DRAFT Indonesian Railway Standard Attachment Vol 1

    4/16

    A7

    b. In the case of supported Joint method section

    Length of rail

    25m 17m 13.7m

    Rate of Sleeper

    fixing (pcs)

    Sleeper Spacing (mm) Rate of Sleeper

    fixing (pcs)

    Sleeper Spacing (mm) Rate of Sleeper

    fixing (pcs)

    Sleeper Spacing (mm)

    A B C A B C A B C

    43

    (42)

    473

    (-)

    484

    (576.4)

    598

    (598)

    30

    (29)

    473

    (-)

    425.5

    (529.7)

    598

    (598)

    23

    (22)

    473

    (-)

    484

    (576.4)

    598

    (598)

    Note : ( ) of figure of sleeper spacing of after pull out one piece sleeper due to changed to long rail from standard rail.

    Jointed rail After change to long rail

    C B B A B B CA C B B B B CB

  • 7/29/2019 DRAFT Indonesian Railway Standard Attachment Vol 1

    5/16

    A8

    (2) No ballast section

    Suspendeed joint method section ( reference)

    Length of rail

    25m

    Rate of sleeper

    fixing (pcs)

    Sleeper spacing (mm)

    A B C

    34 300 573 760

    37 300 453 700

    39 300 473 660

    41 300 478 625

    44 300 463 580

    46 300 528 550

    52 300 470.5 485

    54 300 369 470

    60 300 383 420

    63 300 353 40068 300 328 370

  • 7/29/2019 DRAFT Indonesian Railway Standard Attachment Vol 1

    6/16

    A9

    A

    A'

    Beginning edge of buffer stop

    Rail Face

    Screened gravel or crushed

    30

    1:1,5

    A A

    Rail Face

    1:1,5500mm

    Center line

    Beginning edge of buffer stop

    Fig. 3 (Clause 50)

    Buffer Stop

    (1)First Class Plan

    Vertical Section

    Cross Section

    (2) Second Class buffer stop (Side View)

    (3) Third Class Type-I Buffer Stop (Side View)

    4,5m

    Ballast

    + 1.00

    PLAT 12X65X240 mm

    BEUGEL 19 mm

    + 0.75

    0.70

    1.20 1.20

    0.70 0.70 0.70

    0.00

  • 7/29/2019 DRAFT Indonesian Railway Standard Attachment Vol 1

    7/16

    A10

    a a

    (4) Third Class Type-II Buffer Stop

    (Side View)

    Fig. 4 (Clause 51)

    Skelton on Scotch Block

    Cut off of Sleeper

    Fig. 5 (Clause 56.2)

    Distance Post

    (1)Km Post

    (2) Steel Made

    (1) Wooden Made

    05

    +0.00

    -0.52

    2.50

    0.03

    0.

    08

    0.1

    8

    0.2

    0

    0.30

    0.

    20

    0.10

    0.

    02

    1.2

    0

    0.10

  • 7/29/2019 DRAFT Indonesian Railway Standard Attachment Vol 1

    8/16

    A11

    (2)100 m Post

    (3)500m Post+0.00

    -0.52

    2.50

    0.03

    0.20

    0.

    10

    0.

    15

    0.

    20

    0.

    10

    0.10

    5

    +0.00

    -0.52

    2.50

    0.03

    0.20

    0.

    10

    0.

    15

    0.

    20

    0.

    10

    0.10

  • 7/29/2019 DRAFT Indonesian Railway Standard Attachment Vol 1

    9/16

    A12

    152

    152

    1

    25Near the

    Beginning pointBlack

    Gradual

    decrease post

    (Run off post)

    Cant diminishing

    distance

    I I

    CircularCurve

    Curve Post

    Type I

    Straigh

    III

    I

    Curve Post

    Type IICurve Post

    End of Transition

    Curve

    Gradual Decrease

    Post (Run off Post)

    Point of Compound

    Curve Contact

    Beginning of

    Transition CurveBeginning of

    Circular Curve

    End of Circular

    Curve

    Fig. 6 (Clause 56.3)

    Distance Indicating Post

    At distance changing point

    Back Front Side

    Fig. 7-1 (Clause 57 & 58)

    Method of erectional curve and

    Gradual decrease post

    (1) Simple Curve (Without transition curve)

    (2) Compound Curve

    Near the

    Ending point

  • 7/29/2019 DRAFT Indonesian Railway Standard Attachment Vol 1

    10/16

    A13

    I

    I

    Curve Post

    Type II Gradual TransitionPost

    (3) Simple Curve (With Transition Curve)

    Fig. 7-2 Curve Post (Type-I)

    Fig. 8 Run off Post (Clause 58)

    50

    50

    150

    700

    20203

    0

    Black50

    0.4

    74

    0.5

    2

    0.

    40

    0.1

    0

    0.60

    0.60

    60O

    R

    P