DRAFT FY 2018-2021 S T I P Virginia provides many opportunities for the public to provide input on transportation projects and priorities as part of the continuing transportation planning process for the development of the SYIP and STIP. These opportunities include: federally required public involvement for each MPO’s TIP, participation in Fall Transportation Meetings, and participation in public meetings on the SYIP held each spring. What is the STIP? The Statewide Transportation Improvement Program, or STIP, is Virginia’s federally required, four- year transportation improvement program that identifies those transit and highway construction and maintenance projects that will utilize federal funding, or for which federal approval will be required. The STIP includes: all federally funded and all “regionally significant” transportation projects multimodal projects (highway, passenger rail, freight, public transit, bicycle and pedestrian), and projects on roadways in Virginia’s National Parks, and National Forests. The STIP must include all projects in a MPO TIP (Metropolitan Planning Organization Transportation Improvement Program). The STIP must also include all projects in non-MPO areas. Federal regulations require each state to produce a STIP at least once every four years and must: demonstrate financial constraint – to show that a state is not scheduling more transportation projects for construction than it has funding to support; and certify that a state’s transportation program conforms to federal air quality regulations. Virginia’s STIP is updated at least every four years and is based upon the state-required Six-Year Improvement Program, or SYIP, which is updated annually and must be approved by the Commonwealth Transportation Board. All projects in the SYIP that are eligible for federal funding are included in the STIP. What is Underway? MPOs are currently developing their Draft TIPs and moving through their public participation processes. MPO Draft TIPs are expected to be finalized during April and May and will be incorporated without change into Virginia’s Draft STIP along with non-MPO projects. The non-MPO area project lists are provided here for review; the Draft STIP will be made available on VDOT’s website for a minimum of 30 days. STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENT

Upload: dinhduong

Post on 01-Sep-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

DRAFTFY 2018-2021 S T I P

Virginia provides many opportunities for the public to provide input on transportation projects and priorities as part of the continuing transportation planning process for the development of the SYIP and STIP. These opportunities include: federally required public involvement for each MPO’s TIP, participation in Fall Transportation Meetings, and participation in public meetings on the SYIP held each spring.

What is the STIP?The Statewide Transportation Improvement Program, or STIP, is Virginia’s federally required, four-

year transportation improvement program that identifies those transit and highway construction and maintenance projects that will utilize federal funding, or for which federal approval will be required.

The STIP includes:

� all federally funded and all “regionally significant” transportation projects

� multimodal projects (highway, passenger rail, freight, public transit, bicycle and pedestrian), and

� projects on roadways in Virginia’s National Parks, and National Forests.

The STIP must include all projects in a MPO TIP (Metropolitan Planning Organization Transportation Improvement Program).

The STIP must also include all projects in non-MPO areas.

Federal regulations require each state to produce a STIP at least once every four years and must:

� demonstrate financial constraint – to show that a state is not scheduling more transportation projects for construction than it has funding to support; and

� certify that a state’s transportation program conforms to federal air quality regulations.

Virginia’s STIP is updated at least every four years and is based upon the state-required Six-Year Improvement Program, or SYIP, which is updated annually and must be approved by the Commonwealth Transportation Board. All projects in the SYIP that are eligible for federal funding are included in the STIP.

What is Underway?MPOs are currently developing their Draft TIPs and moving through their public participation

processes. MPO Draft TIPs are expected to be finalized during April and May and will be incorporated without change into Virginia’s Draft STIP along with non-MPO projects.

The non-MPO area project lists are provided here for review; the Draft STIP will be made available on VDOT’s website for a minimum of 30 days.

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

DEVELOPMENT

The Project Grouping section of the STIP report lists NonMPO groupings by district followed by MPO groupings for the

MPOs that fall under a district. For each grouping, the report provides the total cost and the amount and source of planned

obligation by phase.

The Project section of the STIP report provides the project description and the amount and source of planned obligations by

phase for each project that cannot be grouped for environmental reasons or by request of an MPO.

MATCH is the required state and other

matching funds that correspond to

planned federal obligations.

PLANNED OBLIGATIONS are listed by

by fund source for each phase.

See Appendix B for a complete

list of groupings with definitions.

GLOSSARY OF TERMS

MPO Metropolitan planning area where a project

resides; NonMPO indicates a project is outside

of a MPO area; Multiple MPO indicates a

project crosses MPO boundaries

UPC NO Universal Project Code – a unique number

assigned to each project

SCOPE Brief narrative of type of work

SYSTEM Road system or mode of transportation (e.g.

Interstate, DRPT)

JURISDICTION County or city where project is located

OVERSIGHT Indicates a Project of Division Interest (PoDI)

where FHWA will conduct stewardship and

oversight activities; FO indicates FHWA

stewardship and oversight activities apply;

NFO indicates FHWA stewardship and

oversight activities do not apply

PROJECT Project name

ADMIN BY Indicates party responsible for administering

project (e.g. VDOT, DRPT, Locally)

DESCRIPTION Brief project narrative, sometimes including

termini

TOTAL COST Total estimated cost of all project phases

FUND SOURCE

AC Advance Construction

AC CONVERSION AC Converted

BR Bridge Replacement and Rehabilitation

CM Congestion Mitigation and Air Quality Improvement

Program

DEMO Federal Demonstration and Special Interest

HSIP Highway Safety Improvement Program

NHS/NHPP National Highway System/National Highway

Performance Program

NHFP National Highway Freight Program

OTHER Non-Federal

RSTP Regional Surface Transportation Program

SAFETEA-LU SAFETEA-LU Earmark Funds

STP/STBG Surface Transportation Program/Surface

Transportation Block Grant Program

TAP/F Transportation Alternative Program Flexible

TAP/RTAP Transportation Alternative Program Urbanized Areas

ST

IP G

UID

E

Project phase: Preliminary Engineering (PE), Right-of-way

(RW), Construction (CN)

Sum of all fund sources for the

phase.

Sum of all advanced construction

(AC) fund sources for the phase.

D R A

F T

UPC NO 11090 SCOPE Bridge Replacement w/o Added Capacity

SYSTEM Primary JURISDICTION Page County OVERSIGHT NFO

PROJECT RTE 340 - BRIDGE REPLACEMENT AT COMPTON CREEK ADMIN BY VDOT

DESCRIPTION FROM: 2.50 MILES SOUTH OF PAGE/WARREN CO. LINE TO: 1.07 MILES SOUTH OF PAGE/WARREN CO. LINE (1.0400 MI)

PROGRAM NOTE All funding obligated based on current estimates/allocations

ROUTE/STREET 0340 TOTAL COST $19,119,382

FUND SOURCE MATCH FY18 FY19 FY20 FY21

$0 $0 $0 $0 $0

UPC NO 11093 SCOPE Bridge Replacement w/o Added Capacity

SYSTEM Primary JURISDICTION Warren County OVERSIGHT NFO

PROJECT RTE 340 - NORTH APPROACH TO BRIDGE REPLACEMENT AT OVERALL CK

ADMIN BY VDOT

DESCRIPTION FROM: PAGE COUNTY LINE TO: 0.42 MILE NORTH PAGE COUNTY LINE (0.4000 MI)

PROGRAM NOTE All funding obligated based on current estimates/allocations

ROUTE/STREET 0340 TOTAL COST $6,679,463

FUND SOURCE MATCH FY18 FY19 FY20 FY21

CN Federal - BR ($101,068) ($404,270) $0 $0 $0

Primary Projects

NonMPO: Staunton

1

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

UPC NO 107228 SCOPE Bridge Replacement w/o Added Capacity

SYSTEM Urban JURISDICTION Front Royal OVERSIGHT NFO

PROJECT Criser Road Bridge Replacement - Front Royal ADMIN BY Locally

DESCRIPTION FROM: East Side of Bridge TO: West Side of Bridge

ROUTE/STREET CRISER ROAD (0002) TOTAL COST $450,000

FUND SOURCE MATCH FY18 FY19 FY20 FY21

CN AC

Federal - AC OTHER $0 $225,000 $0 $0 $0

Urban Projects

NonMPO: Staunton

2

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

UPC NO 103700 SCOPE Restoration and Rehabilitation

SYSTEM Miscellaneous JURISDICTION Staunton District-wide OVERSIGHT NFO

PROJECT ARRA-C Staunton District - Culverts ADMIN BY VDOT

DESCRIPTION FROM: Districtwide TO: Culvert Replacements

ROUTE/STREET BR08 TOTAL COST $85,082

FUND SOURCE MATCH FY18 FY19 FY20 FY21

CN AC

Federal - AC ($11,984) ($47,934) $0 $0 $0

Miscellaneous Projects

NonMPO: Staunton

3

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

GROUPING Construction : Bridge Rehabilitation/Replacement/Reconstruction

ROUTE/STREET TOTAL COST $329,554,771

FUND SOURCE MATCH FY18 FY19 FY20 FY21

PE Federal - AC CONVERSION $81,584 $261,764 $64,572 $0 $0

Federal - BR $44,223 $0 $0 $176,890 $0

PE TOTAL $125,807 $261,764 $64,572 $176,890 $0

PE AC Federal - AC OTHER $0 $0 $0 $382,492 $0

RW Federal - AC CONVERSION $115,685 $103,747 $185,428 $173,563 $0

Federal - BR $192,335 $179,951 $389,390 $200,000 $0

Federal - NHS/NHPP $36,305 $0 $145,220 $0 $0

RW TOTAL $344,325 $283,698 $720,038 $373,563 $0

RW AC

Federal - AC OTHER $0 $508,991 $59,807 $0 $0

CN Federal - AC CONVERSION $232,004 $3,000 $0 $925,017 $0

Federal - BR $3,303,670 $0 $2,185,067 $8,875,827 $2,153,784

Federal - NHS/NHPP $517,860 $0 $0 $2,071,438 $0

Federal - STP/STBG $11,878 $0 $47,512 $0 $0

CN TOTAL $4,065,411 $3,000 $2,232,579 $11,872,282 $2,153,784

CN AC

Federal - AC OTHER $0 $0 $4,017,873 $12,533,730 $12,565,158

GROUPING Construction : Forest Highway

ROUTE/STREET TOTAL COST $7,066,518

FUND SOURCE MATCH FY18 FY19 FY20 FY21

$0 $0 $0 $0 $0

GROUPING Construction : Rail

ROUTE/STREET TOTAL COST $700,779

FUND SOURCE MATCH FY18 FY19 FY20 FY21

$0 $0 $0 $0 $0

GROUPING Construction : Safety/ITS/Operational Improvements

ROUTE/STREET TOTAL COST $241,896,613

FUND SOURCE MATCH FY18 FY19 FY20 FY21

PE Federal - HSIP $23,333 $60,000 $0 $150,000 $0

RW Federal - STP/STBG $110,862 $0 $443,446 $0 $0

RW AC

Federal - AC OTHER $0 $0 $3,631,442 $0 $0

CN Federal - AC CONVERSION $354,195 $2,583,300 $500,000 $500,000 $833,479

Federal - HSIP $66,667 $0 $600,000 $0 $0

Federal - NHFP $12,014 $48,056 $0 $0 $0

Federal - NHS/NHPP $483,829 $0 $0 $1,935,317 $0

Federal - STP/STBG $430,367 $1,066,516 $654,951 $0 $0

CN TOTAL $1,347,071 $3,697,872 $1,754,951 $2,435,317 $833,479

CN AC

Federal - AC $551,292 $1,371,690 $0 $833,479 $0

Federal - AC OTHER $0 $4,353,958 $552,165 $0 $0

CN AC $551,292 $5,725,648 $552,165 $833,479 $0

Project Groupings

NonMPO: Staunton

4

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

GROUPING Construction : Transportation Enhancement/Byway/Non-Traditional

ROUTE/STREET TOTAL COST $23,663,535

FUND SOURCE MATCH FY18 FY19 FY20 FY21

CN Federal - TAP/F $268,218 $912,870 $160,000 $0 $0

CN AC

Federal - AC OTHER $0 $145,151 $670,000 $0 $0

GROUPING Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.

ROUTE/STREET TOTAL COST

FUND SOURCE MATCH FY18 FY19 FY20 FY21

CN Federal - STP/STBG $0 $6,880,463 $6,519,835 $8,257,719 $8,290,921

GROUPING Maintenance : Preventive Maintenance for Bridges

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.

ROUTE/STREET TOTAL COST

FUND SOURCE MATCH FY18 FY19 FY20 FY21

CN Federal - BR $0 $5,774,010 $5,471,375 $6,929,788 $6,957,651

GROUPING Maintenance : Traffic and Safety Operations

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.

ROUTE/STREET TOTAL COST

FUND SOURCE MATCH FY18 FY19 FY20 FY21

CN Federal - STP/STBG $0 $1,659,914 $1,572,912 $1,992,177 $2,000,187

5

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Bridge Rehabilitation/Replacement/Reconstruction

System UPC Jurisdiction / Name / Description Street(Route) Estimate

98287 Rockbridge County INTERSTATE 64 (0064) $17,485,000Interstate

Maintenance Rehab of Delta Frame Bridges (CN Only)

FROM: 3.64 TO Route 60 TO: 1.81 TO Route 11 (0.1600 MI)

18889 Rockbridge County 0081 $29,255,660Interstate

RTE 81 - NORTH & SOUTH BOUND APPRS & BRDGS OVR BUFFALO CREEK

FROM: 4.168 KILOMETERS NORTH ROUTE 11 (FANCY HILL) TO: 5.468 KILOMETERS NORTH ROUTE 11 (FANCY HILL) (1.3000 KM)

97636 Shenandoah County 0081 $11,351,588Interstate

I-81 Shen/Warren Co Bridge over Cedar Creek STR #18746

FROM: 0.75 Mile South Shen./Warren County Line TO: 0.75 Mile North Shen./Warren County Line (1.5000 MI)

T19149 Staunton District-wide 0000 $0Miscellaneous

BRIDGE REHABILITATION/REPLACEMENT

97111 Rockingham County 0011 $11,878,633Primary

#SGR Bridge Replacement Rte. 11 Over I-81 (FED ID 15753)

FROM: 0.280 Miles West of I-81 TO: 0.211 Miles East of I-81 (0.4600 MI)

90172 Shenandoah County RTE 11 (0011) $11,002,047Primary

Rte 11 over Cedar Ck Brg Repl, str # 1959 & # 1947 w/ 1 Str

FROM: 0.406 Mi. So. of Cedar Creek TO: 0.347 Mi. No. of Cedar Creek (0.7530 MI)

104182 Shenandoah County OLD VALLEY PIKE (0011) $5,144,428Primary

Bridge (Fed ID 16958) Rte 11 Over NF Shen River

FROM: 0.450 MILES N RTE 720 TO: 0.940 MILES N RTE 720 (0.4900 MI)

90188 Rockbridge County ROUTE 39 (0039) $7,473,032Primary

Rte 39 Over Maury River, VA Str. 1046

FROM: 0.25 Mile West of Route 732 TO: 0.02 Mile West of Route 732 (0.2300 MI)

90186 Alleghany County MIDLAND TRAIL (0060) $7,346,965Primary

Rte 60 Over Jackson River, VA Str. 1900

FROM: 0.06 RT 688 TO: 0.09 RT 688 (0.3000 MI)

90189 Alleghany County RTE 159 (0159) $2,204,640Primary

Rte 159 Over Crow Run, VA Str. 1119

FROM: 0.49 Mile West of Route 717 TO: 0.51 Mile West of Route 717

105190 Page County 0211 $14,774,758Primary

RTE 211(WBL) BRIDGE OVER SF SHEN. RIVER

FROM: 0.416 Mi. West of Int. Rte 646 TO: 0.226 Mi. East of Int. Rte 646 (0.6400 MI)

86315 Augusta County HANKEY MTN HIGHWAY (0250) $2,215,595Primary

Route 250 over Calfpasture River Va struc 1036 Fed ID 1866

FROM: 0.099 Mi E Rte 715 TO: 0.043 Mi W Rte 715 (0.1420 MI)

87942 Augusta County SHENANDOAH MOUNTAIN HWY (0250) $2,175,259Primary

Rte 250 Bridge Replacement at Ramseys Draft

FROM: 1.036 Miles West Rte 716 TO: 1.124 Miles West Rte 716 (0.0880 MI)

90184 Augusta County CHURCHVILLE AVE (0250) $4,399,861Primary

Route 250 over Whiskey Creek - Bridge and Approaches

FROM: 0.022 Miles West of Route 722 TO: 0.155 Miles East of Route 722 (0.1680 MI)

6Appendix is for informational purposes only.

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Bridge Rehabilitation/Replacement/Reconstruction

System UPC Jurisdiction / Name / Description Street(Route) Estimate

93459 Augusta County HANKEY MT. HIGHWAY (0250) $2,333,211Primary

Route 250 over White Oak Draft - Bridge and Approaches

FROM: 0.606 Miles West of Route 728 TO: 0.434 Miles West of Route 728 (0.1610 MI)

100778 Augusta County 0250 $3,967,392Primary

#SGR Bridge Replacement Rte 250over Bell Ck (VA Str 1028) 01

FROM: 0.32 Mi West of Int Rte 840 TO: 0.03 Mi West of Int Rte 840 (0.3000 MI)

74766 Highland County HIGHLAND TURNPIKE (0250) $2,200,338Primary

RTE 250 - BRIDGE & APPROACHES OVER CRAB RUN @ MCDOWELL

FROM: 0.01 MILE EAST ROUTE 645 TO: 0.014 MILE WEST ROUTE 654 (0.0910 MI)

90187 Page County 0340 $6,215,987Primary

Rte. 340 Over Cub Run. VA str. 1012

FROM: 0.47 Miles S. of Rte 685 TO: 0.10 Miles S. of Rte 685 (0.3690 MI)

12825 Warren County 0340 $30,609,353Primary

RTE 340 - WIDEN TO 5 LN STRUCTURE AT N FORK SHENANDOAH RVR

FROM: 0.020 KILOMETER SOUTH ROUTE 55 (PE & CONSTRUCTION) TO: 0.009 KILOMETER SOUTH ROUTE 637 (PE, CONSTRUCTION & R/W) (0.6560 KM)

76467 Warren County STONEWALL JACKSON HIGHWAY (0340) $17,108,326Primary

Route 340 Bridge Replacement & Approaches over Gooney Creek

FROM: 0.667 Miles South of Route 605 Poor House Road Int. TO: 0.330 Miles North of Route 605 Poor House Road Int. (0.9970 MI)

76469 Warren County 0340 $71,142,310Primary

RTE 340 -BRIDGE REPLMNT & APPR OVR S F SHENANDOAH RV & NSRR

FROM: 0.105 Miles S INT 18th St TO: 0.115 Miles N INT Rte 55 (0.7330 MI)

90492 Alleghany County MIDLAND TRAIL (0661) $4,366,242Secondary

Bridge Replacement of Rte 661 over Ogle Creek (Str. ID 1165)

FROM: 0.3 Mile East of Route 709 TO: 0.4 Mile East of Route 709 (0.1010 MI)

88564 Alleghany County NATURAL WELL RD (0638) $3,648,577Secondary

Rte 638 – Replace Bridge 01154 & Appr over Jackson River

FROM: 0.05 Mi. from Int. Rte. 687 TO: 0.54 Mi. from Int. RTE. 666 (0.2000 MI)

98957 Alleghany County SELMA LOW MOOR ROAD (0696) $2,165,853Secondary

Brge Repl, Rt 696 Selma Lowmr Rd Over Karnes Ck Fed ID-1195

FROM: 0.01Mi. W. Int. Rte. 616 TO: 0.08 Mi. W. Int. Rte. 616 (0.0700 MI)

82759 Augusta County HANGERS MILL ROAD (0801) $1,940,413Secondary

BRIDGE & APPROACHES OVER JENNINGS BRANCH

FROM: 0.15 MILE FROM INT. RTE. 250 TO: 0.28 MILE FROM INT. RTE. 250 (0.1300 MI)

90178 Augusta County HEWITT ROAD (0703) $2,700,000Secondary

#SGR Rte. 703 Over Edison Creek VA Str. 6100

FROM: 0.30 Mi. W. Rte. 708 TO: 0.20 Mi. W. Rte. 708 (0.1000 MI)

77423 Augusta County LEHIGH ROAD (0685) $1,204,585Secondary

Brig & Appr Repl. - RT 685 ovr Ltle Calfpstre Fed ID-28436

FROM: 0.45 Miles North-East of Int. w/ Rte. 684 TO: 0.52 Miles South of Int. w/ Rte. 42 (0.0500 MI)

88819 Bath County JACKSON RIVER TRNPK (0687) $1,269,728Secondary

Bridge Replacement Over Cowardin Run (Str# 6136)

FROM: 0.45 MILL NORTH ROUTE 618 TO: 0.55 MILL NORTH ROUTE 618 (0.1000 MI)

7

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Bridge Rehabilitation/Replacement/Reconstruction

System UPC Jurisdiction / Name / Description Street(Route) Estimate

97113 Bath County JACKSON RIVER TURNPIKE (0687) $2,531,763Secondary

#SGR Bridge Only - Repl Rte 687 Jackson River Tpk Over Casca

FROM: 0.06 Mi South of Cascades Creek TO: 0.05 Mi North of Cascades Creek

98956 Clarke County OLD CHARLES TOWN ROAD (0761) $4,356,207Secondary

RTE 761 – Replace Bridge 05453 & Appr over Opequon Creek

FROM: 0.50 Mi. East from Int. w/ Rte. 666 TO: 0.85 Mi. West from Int. w/ Rte. 661 (1.0000 MI)

86316 Frederick County CARPERS VALLEY RD (0723) $1,857,073Secondary

#SGR Route 723 over Opequon Creek Va struc 6904

FROM: 0.05 MILES S. FREDERICK/ CLARKE C.L TO: 0.03 MILES N. FREDERICK/ CLARKE C.L (0.1000 MI)

90173 Frederick County FROMANS ROAD (0623) $2,146,629Secondary

Rte 623 - REPLACE BRIDGE Over Cedar Creek VA str. 6908

FROM: 0.125 Mi. West of Frederick and Shenandoah Co. line TO: 0.125 Mi. East of Frederick and Shenandoah Co. line (0.2400 MI)

100782 Rockbridge County 0610 $1,109,729Secondary

Bridge Replacement Rte 610 over Broad Ck (VA Str 6044)

FROM: 0.95 MI to Rte 678 TO: 1.15 MI to Rte 682 (0.2000 MI)

89071 Rockbridge County GILMORE'S MILL RD (0708) $1,396,649Secondary

Rt 708 - Bridge Replacement - Gilmore's Mill

FROM: 132’ West of Intersection at Rt.608 TO: 275’ East of Intersection at Rt. 608 (0.0770 MI)

82764 Rockbridge County WALKERS CREEK ROAD (0602) $1,332,656Secondary

Bridge & Approach Replacement – Rte 602 over Walker Creek

FROM: 0.09 Miles West of Int. w/ Rte. 731 TO: 0.02 Miles East of Int. w/ Rte. 731 (0.1100 MI)

97193 Rockbridge County WEST MIDLAND TRAIL (0850) $1,434,438Secondary

Bridge Replacement of Rte 850 over Bratton Creek

FROM: 0.04 MI W. RT 780 TO: 0.10 MI E. RT 780 (0.1310 MI)

97194 Rockbridge County WEST MIDLAND TRAIL (0850) $1,469,233Secondary

Bridge Replacement of Rt 850 over Kerrs Creek Str. ID# 29603

FROM: 1.32 Mi W Rt 629 TO: 1.52 Mi E Rt 633 (0.0850 MI)

98960 Rockingham County LAIRS RUN ROAD (0921) $1,780,152Secondary

Bridge Rehab of Rte 921 over N Fork Shenand Fed ID 16239

FROM: 0.10 Mi. W. Int. Rte. 259 TO: 0.04 Mi. W. Int. Rte. 259 (0.0600 MI)

100765 Shenandoah County 0620 $1,952,425Secondary

Bridge Repl Rt 620 over Smith Creek VA Str 6351 Fed ID 17119

FROM: 0.21 MI to Rte 732 TO: 0.34 MI to Rte 737 (0.1000 MI)

82769 Shenandoah County ARTZ ROAD (0663) $3,584,928Secondary

RTE663– Replace Bridge 17172 & Appr over NF Shenandoah River

FROM: 0.41 MILE TO INT RTE 11 TO: 0.68 MILE TO INT RTE 11 (0.2700 MI)

82767 Shenandoah County HEADLY ROAD (0600) $2,424,436Secondary

RTE600- Replace Bridge 17087 & Appr over NF Shenandoah River

FROM: AT INT RTE 654 TO: 0.13 MILE FROM INT RTE 654 (0.1300 MI)

98954 Shenandoah County ORCHARD DRIVE (0698) $2,788,768Secondary

#SGR Bridge & Approach Replacement - Rte 698 Over Mill Creek

FROM: 0.05 Mi. NW of Int. w/ Mill Creek Lane Rte.1315 TO: 0.03 Mi. NW of Int. w/ Bryce Road Rte. 263 (0.1500 MI)

8

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Bridge Rehabilitation/Replacement/Reconstruction

System UPC Jurisdiction / Name / Description Street(Route) Estimate

97281 Shenandoah County STONY CREEK ROAD (0675) $182,163Secondary

ARRA Bridge Repl. Rte. 675 Over Stony Creek (PE only)

FROM: 2.20 MI. TO RTE. 682 TO: 0.30 MI. TO RTE. 42

97282 Shenandoah County STONY CREEK ROAD (0675) $2,272,940Secondary

Rte. 675 Over Stoney Creek

FROM: 2.33 Mile North of Route 682 TO: 0.33 Mile South of Route 42 (0.0700 MI)

90968 Shenandoah County WATER STREET (0760) $1,491,150Secondary

Rte 760 Bridge Replace over Stony Creek, VA Str 6049

FROM: 0.22 Miles east of Rt. 1403 TO: 0.29 Miles east Rt. 1403 (0.0700 MI)

77272 Warren County MORGAN FORD ROAD (0624) $9,632,847Secondary

RTE 624 - BRIDGE & APPROACHES OVER SHENANDOAH RIVER

FROM: 0.03 Mi South of Rte 643 TO: 0.36 Mi North of Rte 643 (0.3900 MI)

17831 Clifton Forge MAIN (0060) $4,252,347Urban

RTE 60 - MAIN STREET BRIDGE REPLACEMENT

MAIN STREET BRIDGE OVER SMITH CREEK

103088 Luray WEST MAIN ST (U000) $3,978,457Urban

W Main St Bridge Rehab/Replace over Hawksbill Crk

FROM: Int of Broad St/Bus 340 TO: Int of Hawksbill St (0.0900 MI)

Construction : Bridge Rehabilitation/Replacement/Reconstruction Total $329,554,771

Construction : Forest Highway

System UPC Jurisdiction / Name / Description Street(Route) Estimate

56152 Alleghany County SAILINGS MTN RD (0617) $649,376Secondary

RTE 617 - Safety Improvements

FROM: 0.48 Mile South Int. Route 616 TO: 0.03 Mile South Int. Route 616 (0.4500 MI)

56362 Warren County INDIAN HOLLOW ROAD (0613) $6,417,142Secondary

FOREST HWY PROJ TO REPLACE LOW WATER BRIDGE

FROM: 0.03 Miles South of INT. Rte. 628 TO: 0.29 Miles North of INT. Rte. 628 (0.3200 MI)

Construction : Forest Highway Total $7,066,518

Construction : Rail

System UPC Jurisdiction / Name / Description Street(Route) Estimate

105102 Rockbridge County RT. 39 - MAIN STREET (0039) $245,291Primary

Rt. 39 - Install Flashing Lights&Gates w/CWT Predictors

FROM: .10 Mi. S of Rt 42 TO: At BBRR Crossing DOT 224816D

107031 Augusta County RAILROAD AVE (0687) $225,933Secondary

RT 687-Upgrade Flashing Lights & Gates & Add CWT Predictors

FROM: 92 ft from Rt. 42 TO: At BBRR Crossing #224797B

105101 Staunton MONTGOMERY AVE. (0000) $229,555Urban

Montgomery Ave-Install Flashing Lights&Gates w/CWT Predictor

FROM: 95 ft SW of Stuart St TO: At BBRR Crossign DOT 224764N

Construction : Rail Total $700,779

9

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Safety/ITS/Operational Improvements

System UPC Jurisdiction / Name / Description Street(Route) Estimate

4463 Alleghany County 0064 $9,688,192Interstate

RTE 64 - TURN LANE MODIFICATIONS & SIGNALS AT ROUTES 60/220

FROM: 0.447 KILOMETER WEST ROUTES 60/220 & ROUTE 648 TO: 0.658 KILOMETER EAST ROUTES 60/220 & ROUTE 648 (1.1050 KM)

106248 Alleghany County INTERSTATE 64 (0064) $8,840,000Interstate

I-64 EXIT 21 ALLEGHANY CO. INTERCHANGE IMPROVEMENTS

FROM: Interchange Modification of TO: Exit 21 (0.5000 MI)

104815 Augusta County 0064 $5,435,656Interstate

I-64 ACTIVE TRAFFIC & SAFETY MANAGEMENT SYSTEM

FROM: Waynesboro TO: Yancey Mills (11.0000 MI)

84429 Staunton District-wide 0064 $3,320,710Interstate

I-64 Afton Mtn. Safety Improve. - High Tension Cable Barrier

FROM: Mile Post 97.1 TO: Mile Post 106.4 (9.3000 MI)

79923 Augusta County I-81 (0081) $2,688,439Interstate

#HB2.FY17 RTE 81 - SAFETY IMPROVEMENTS, EXIT 213

FROM: EXIT 213 Southbound Acceleration Lane TO: EXIT 213 Northbound Acceleration Lane (0.4000 MI)

109376 Frederick County 0081 $3,450,904Interstate

#HB2.FY17 I-81 Exit 323 NB Accel and SB Decel Lane Extension

FROM: NB Decel TO: SB Accel (0.2500 MI)

84363 Rockbridge County 0081 $81,033,370Interstate

I-81 Northbound Truck Climbing Lane

FROM: 0.43 Mi. N. Route 11 TO: 2.08 Mi. N. Route 710 (6.9700 MI)

109198 Rockbridge County R-VA IS00081NB (0081) $2,431,978Interstate

#SGR Staunton Dist. State of Good Repair Paving Project(PM-8

FROM: 181.09 TO: 184.21 (3.1200 MI)

104563 Shenandoah County 0081 $11,443,658Interstate

I-81 PAVEMENT REHABILITATION - SITE 2

FROM: MP 264.98 TO: MP 275.90 (10.9200 MI)

68719 Staunton District-wide 0081 $654,483Interstate

RTE 81- PROJECT DEVELOPMENT & MANAGEMENT

DISTRICTWIDE

104552 Augusta County VARIOUS (9999) $3,180,348Interstate

Interstate Plant Mix Schedule (PM-8Q-14)

FROM: Various TO: Various (4.5600 MI)

102838 Stanley AYLOR GRUBBS AVE (0000) $76,667Miscellaneous

Town of Stanley - SRTS - Stanley ES - Bike/Ped Imp

FROM: W Main St TO: Cubbage Rd

T19144 Staunton District-wide 0000 $0Miscellaneous

CN:SAFETY/ITS/OPERATIONAL/IMPROVMENTS

101699 Staunton District-wide 9999 $6,478,908Miscellaneous

Staunton Districtwide Guardrail Upgrades For Paving Projects

FROM: Various TO: Various

107023 Staunton District-wide 9999 $660,000Miscellaneous

SIGNAL UPGRADES - STAUNTON DISTRICT

FROM: Various TO: Staunton District

10

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Safety/ITS/Operational Improvements

System UPC Jurisdiction / Name / Description Street(Route) Estimate

107024 Staunton District-wide 9999 $2,000,000Miscellaneous

ROADWAY DEPARTURE COUNTERMEASURES - STAUNTON DISTRICT

FROM: VARIOUS TO: STAUNTON DISTRICT

107025 Staunton District-wide 9999 $405,367Miscellaneous

DISTRICTWIDE BUCKLE-UP SIGNING SAFETY IMPROVEMENT - STAUNTON

FROM: Various TO: Staunton District

105392 Staunton District-wide 0011 $367,000Primary

I-81 Corr Tech Adv-11 Signal Comm Cam - Botetourt to WVA

FROM: Botetourt County TO: West Virginia

105598 Rockingham County 0033 $400,000Primary

CURVE SAFETY - ROUTE 33 WEST - ROCKINGHAM COUNTY

FROM: WVA line TO: 3.9 Mi. E WVA line (0.2000 MI)

109378 Rockingham County RAWLEY PIKE (0033) $9,366,944Primary

#HB2.FY17 Route 33 Rawley Pike Roadway Improvements

FROM: Skidmore Fork Road TO: Laural Woods Lane (1.8340 MI)

109068 Warren County STRASBURG ROAD (0055) $2,275,000Primary

TRENCH WIDEN SHOULDERS AND INSTALL RUMBLE STRIPES - RTE 55

FROM: SHENANDOAH CL TO: FRONT ROYAL CL (7.2200 MI)

105394 Augusta County 0250 $167,200Primary

I-64 Corr Tech Adv-250 Signal Comm Cam - I-81 to Albemarle

FROM: I - 81 TO: Albemarle County (14.8300 MI)

77093 Rockingham County 0253 $7,424,008Primary

RTE 253 - PORT REPUBLIC ROAD - RECONSTR TO 4 LANES

FROM: 0.215 MILES SOUTH OF RTE 704, BOYERS RD. TO: 0.02 MILES NORTH OF HARRISONBURG EAST CITY LIMITS (1.5650 MI)

109062 Rockingham County BROCKS GAP ROAD (0259) $2,700,000Primary

TRENCH WIDEN SHOULDERS AND INSTALL RUMBLE STRIPS RTE 259

FROM: ROUTE 612 TO: WVA SL (12.2500 MI)

93349 Rockingham County EASTSIDE HIGHWAY (0340) $1,948,067Primary

Install LTL and Street Lighting on US 340

FROM: 0.17 mi S of Rte 253 TO: 0.16 mi N of Rte 253 (0.3250 MI)

107019 Staunton District-wide 0340 $3,000,000Primary

RTE 340 - SAFETY IMPROVEMENTS

FROM: NCL - Luray - Page County TO: Rte 619 - Warren County

109072 Warren County WINCHESTER ROAD (0522) $400,000Primary

SIGNAL COORDINATION OF 6 INTERSECTIONS - I-66 EB TO RTE 661

FROM: I-66 EB RAMP TO: ROUTE 661

104527 Augusta County VARIOUS (9999) $2,355,493Primary

Primary Plant Mix Schedule (PM-8E-14)

FROM: Various TO: Various (17.1000 MI)

104529 Page County VARIOUS (9999) $611,281Primary

Primary Plant Mix Schedule (PM-8F-14)

FROM: Various TO: Various (4.4600 MI)

11

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Safety/ITS/Operational Improvements

System UPC Jurisdiction / Name / Description Street(Route) Estimate

108067 Staunton District-wide 9999 $300,000Primary

ADA Compliance

FROM: Various TO: Various

108579 Staunton District-wide 9999 $575,000Primary

Real Time Adaptive Signal Controllers - NWRO

FROM: Regionwide TO: Regionwide

80271 Augusta County DAM TOWN ROAD (0616) $4,083,541Secondary

#HB2.FY17 RTE 616 - RECONSTRUCTION - DAM TOWN ROAD (MR)

FROM: 0.018 MILE EAST ROUTE 777 TO: 2.134 MILE EAST ROUTE 777 (2.1160 MI)

50075 Augusta County GOOSE CREEK RD (0640) $2,611,446Secondary

Realign Rt. 640 E. with Rt. 640 W. (Wayne Dist)

FROM: 0.17MILE SOUTH ROUTE 250 TO: INTERSECTION ROUTE 250 (0.1700 MI)

80272 Augusta County HOWARDSVILLE TURNPIKE (0610) $4,855,016Secondary

#HB2.FY17 RTE 610 - RECONSTRUCTION (SR)

FROM: 0.099 Miles South Int. Rte 608 TO: 0.623 Miles South Int. Rte 608 (0.5240 MI)

81642 Bath County MAIN STREET (0615) $415,403Secondary

Drainage Improvements DownTown Hot Springs

FROM: Rte 615; 200 feet west of Rte 220 Int. TO: Rte 220: 307 feet east of Rte 615 Int. (0.2500 MI)

82664 Page County LEAKESVILLE ROAD (0616) $1,604,139Secondary

RTE 616 - RECONSTRUCTION OF ROADWAY

FROM: Fr: 0.164 Mi. South of Int. of Leakesville Rd. & Bulldog Dr. TO: To: 0.151 Mi. North of Int. Leakesville Rd. & Bulldog Dr. (0.3150 MI)

8765 Rockbridge County LONG HOLLOW ROAD (0631) $14,072,585Secondary

RTE 631 - RECONSTRUCTION

FROM: BUENA VISTA CORPORATE LIMITS TO: 0.01 Mii West Intersection of Hevener Drive (1.4400 MI)

90969 Shenandoah County SEVEN FOUNTAIN ROAD (0758) $1,528,649Secondary

Rte 758 Bridge Repl over Passage Creek VA Str 6113 Fed 17320

FROM: 0.68 Mi. east of Rt. 678 TO: 0.77 miles east of Rt. 678 (0.0900 MI)

17714 Warren County HAPPY CREEK RD (0624) $10,487,052Secondary

#HB2.FY17 RTE 624 - RECONSTRUCTION

FROM: ECL FRONT ROYAL TO: ROUTE 645 (0.9000 MI)

52243 Warren County ROCKLAND ROAD (0658) $4,688,257Secondary

ROUTE 658 - RELOCATE INTERSECTION

FROM: Intersection of Rte 340/522 TO: 0.53 Mile East of Routes 340/522 (0.5300 MI)

105272 Berryville SWAN AVE (0000) $87,357Urban

TOWN OF BERRYVILLE - SRTS - JOHNSON-WILLIAMS MS - SIDEWALK

FROM: 220 Ft W. of Buckmarsh St. TO: 840 Ft W. of Buckmarsh St. (0.1500 MI)

104065 Buena Vista 10TH STREET (U000) $86,627Urban

Pedestrian and ADA Access Safety Improvements Along 10th St.

FROM: Intersection of Magnolia Ave TO: 0.40 M. West Int. Magnolia Ave (0.4000 MI)

104069 Buena Vista 29TH STREET (U000) $252,837Urban

Ped and ADA Access Safety Improvements Route 60

FROM: .01 mile west fof Rte. 608 (Stuartburg Rd.) TO: Intersection of Beech Ave (0.1000 MI)

12

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Safety/ITS/Operational Improvements

System UPC Jurisdiction / Name / Description Street(Route) Estimate

108554 Buena Vista MAGNOLIA AVE (U000) $503,230Urban

Magnolia Ave Ped, ADA Safety Improvements

FROM: 0.01 Mi. S. Int. of 20th Street TO: 0.01 Mi. N. Int. of 22nd Street (0.2500 MI)

104066 Buena Vista MAGNOLIA AVENUE (U000) $118,962Urban

Ped and ADA Access Safety Improvements Magnolia Ave

FROM: 0.02 miles north of 16th Street TO: 19th Street (0.2600 MI)

104067 Buena Vista MAGNOLIA AVENUE (U000) $77,235Urban

Ped and ADA Access Safety Improvements Magnolia Ave

FROM: 24th Street TO: 25th Street (0.0500 MI)

104068 Buena Vista MAGNOLIA AVENUE (U000) $135,963Urban

Ped and ADA Access Safety Improvements Magnolia Ave

FROM: 14th Street TO: Dickenson Avenue (0.9100 MI)

68088 Buena Vista RIDGE ROAD (0060) $503,736Urban

RTE 60 - UPGRADE INTERSECTION C&G and SIDEWALK

FROM: Intersection of Rte 60 & Ridge Road TO: Intersection of Maple Ave (0.2200 MI)

105099 Clifton Forge U000 $2,078,914Urban

#HB2.FY17 Clifton Forge Business Park Access Road

FROM: Intersection Main Street Rte. 60 TO: 0.16 Mi. N. Int. Main Street (0.1600 MI)

68089 Covington DURANT ROAD (U000) $2,505,623Urban

DURANT RD - Spot Safety & Operational Improvement

FROM: From: 0.367 Mi. South Int. Thacker Ave. TO: To: 0.015 Mi. North Int. Thacker Ave. (0.3820 MI)

93876 Elkton NORTH STUART AVENUE (0340) $1,420,659Urban

Sidewalk, Minor Roadway Improvements

FROM: 0.18 Miles South of E Street TO: 0.013 Miles North of F Street (0.2800 MI)

72610 Front Royal HAPPY CREEK ROAD (U000) $7,864,509Urban

HAPPY CREEK RD - 2 LANE RECONSTRUCTION (PE ON ID 8598)

FROM: SIXTH STREET & BRADFORD DRIVE TO: 1.0 KM WEST OF ROUTE 606 (SHENANDOAH SHORES ROAD) (1.5800 KM)

92608 Grottoes 3RD STREET (0256) $977,996Urban

Ped and ADA Access Safety Improvements Rte 256 Grottoes

FROM: Route 340 TO: West Corporate Limits (1.0000 MI)

88300 Luray MAIN STREET / 211 BUS (0000) $1,731,761Urban

Luray Intersection Improvements

FROM: Int Route 340/211 TO: 0.03 Mi East Int Northcott Dr (0.3100 MI)

52050 Strasburg QUEEN STREET (U000) $2,218,705Urban

QUEEN ST - 2 LANES, GRADE & DRAIN, CURB & GUTTER, Replace Br

FROM: 0.088 MI W. OF S. MASSANUTTEN STREET TO: 0.044 MI W. OF S. MASSANUTTEN STREET

76676 Woodstock EAST RESERVOIR ROAD (U000) $3,307,738Urban

EAST RESERVOIR ROAD - IMPROVEMENTS TO APPROACH TO ROUTE 11

FROM: 0.025 Miles West Route 11 TO: 0.203 Miles East Route 11 (0.2300 MI)

Construction : Safety/ITS/Operational Improvements Total $241,896,613

13

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Transportation Enhancement/Byway/Non-Traditional

System UPC Jurisdiction / Name / Description Street(Route) Estimate

91232 Stanley EAST MAIN STREET (0340) $25,000Enhancement

Construction of gateway signage and landscaping

FROM: .2 miles north of Route 689 TO: .28 miles west of Route 622

88005 Luray EN00 $1,131,238Enhancement

Luray Passenger Station - Phase III continued rehabilitation

100616 Luray EN00 $302,828Enhancement

Luray Passenger Station Rehabilitation - C504 Exhibits

108098 Luray EN00 $43,465Enhancement

Luray Passenger Station Rehabilitation - C505 Roof Elements

108099 Luray EN00 $50,835Enhancement

Luray Passenger Station Rehabilitation - C506 Exhib Casework

99494 Highland County EN01 $875,464Enhancement

The Highland Center - C502 Interior & Exterior Improvements

The Highland Center

59800 Lexington EN01 $146,177Enhancement

RENOVATE JORDAN HOUSE FOR USE AS TRANSPORTATION MUSEUM

FROM: INCLUDES STABILIZATION OF COVERED BRIDGE OVERLOOK; COMPLETE TO: CHESSIE NATURE TRAIL; RIVERFRONT TRAIL AND PARKING LOT

101714 Alleghany County EN03 $519,928Enhancement

Jackson River Scenic Trail - Phase II C502

FROM: Station 243+50 (end of Phase I) TO: Station 522+04 at S. Smith Bridge Road (5.2700 MI)

103096 Alleghany County EN03 $2,108,065Enhancement

Jackson River Scenic Trail - Phase III

FROM: Smith Bridge Road to TO: Station 865+49 (6.5000 MI)

108068 Alleghany County EN03 $609,390Enhancement

Jackson River Scenic Trail - Phase 4

FROM: Terminus of Jackson River Scenic Trail TO: City of Covington (0.5000 MI)

87026 Dayton EN07 $921,578Enhancement

Town of Dayton - Sidewalks, Landscaping & Bicycle Corridors

FROM: Construction of sidewalks, bicycle corridors and TO: landscaping on designated streets in Dayton

91229 Clifton Forge EN08 $596,810Enhancement

C&O Railway Heritage Center

91231 Shenandoah County EN08 $1,922,500Enhancement

Restoration of significant remnants of the Valley Turnpike

91233 Stephens City VALLEY PIKE (EN08) $1,140,000Enhancement

Route 11-construction of sidewalks and curb & gutter

FROM: Various TO: Stephens City

91234 Strasburg KING STREET (EN08) $3,508,930Enhancement

Streetscape improvements in downtown Strasburg

FROM: Capon Street TO: N&S Railroad Crossing (0.6600 MI)

14

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Transportation Enhancement/Byway/Non-Traditional

System UPC Jurisdiction / Name / Description Street(Route) Estimate

94285 Lexington EN09 $361,018Enhancement

City of Lexington Courthouse Area Utility Undergrounding

94283 Rockbridge County EN09 $218,750Enhancement

Rockbridge County Directional Signage

94284 Warren County EN09 $217,500Enhancement

Warren County Shared-Use Trail

102731 Warren County EN09 $340,090Enhancement

Eastham Trail - Phase II C502

103589 Mt. Jackson ROUTE 11 - MAIN STREET (EN12) $943,870Enhancement

Mt. Jackson Sidewalks

FROM: 0.08 Mi. South of Shenandoah Street - Rt.743 TO: Avondale Ave - Rt 1316 (2.5300 MI)

103586 Warren County EN12 $442,819Enhancement

Warren County Shared-Use Trail at Eastham Park Phase III

106022 Clifton Forge EN14 $309,965Enhancement

Smith Creek Corridor Shared-Use Trail

106052 Front Royal EN14 $159,364Enhancement

Front Royal Pedestrian Improvements

107655 Buena Vista EN15 $205,194Enhancement

Enderly Heights Elementary SRTS

FROM: Enderly Heights Elementary School TO: 3rd Street and Magnolia Avenue

107657 Front Royal EN15 $103,781Enhancement

Westminster Drive Sidewalk

FROM: John Marshall Highway (Rte. 55) TO: Warren County High School

107656 Warren County EN15 $891,544Enhancement

Appalachian Trail Connector

FROM: Town of Front Royal TO: Appalacian Trail Crossing

109026 Glasgow EN16 $294,400Enhancement

BLUE RIDGE ROAD SHARED-USE PATH

FROM: Powhatan Street / Town Library TO: Blue Ridge Road and Fitzlee Street

84147 Alleghany County EN96 $144,858Enhancement

Oakland Church Restoration - Phase II

97887 Highland County EN97 $87,500Enhancement

McDowell Battlefield Center Improvements C502

FROM: 161 Mansion House Road TO: 161 Mansion House Road

T19134 Staunton District-wide 0000 $0Miscellaneous

CN:TRANSPORTATION ENHANCEMENT/BYWAY/OTHER NON-TRADITIONAL

59798 Highland County EN01 $825,000Primary

CONSTRUCT SIDEWALKS IN VARIOUS LOCATIONS

HIGHLAND COUNTY AND TOWN OF MONTEREY

15

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

NonMPO: Staunton

Construction : Transportation Enhancement/Byway/Non-Traditional

System UPC Jurisdiction / Name / Description Street(Route) Estimate

70313 Alleghany County EN03 $591,381Primary

JACKSON RIVER SCENIC TRAIL

FROM: DEVELOPMENT OF A 17 MILE TRAIL FOR HIKING, BIKING, AND TO: HORSEBACK RIDING & RESTORATION OF DEPOT FOR AMENITITES

17580 Highland County EN97 $445,000Primary

BATTLEFIELD INTERPRETIVE CENTER AND MUSEUM

FROM: 161 Mansion House Road TO: 161 Mansion House Road

80486 Clifton Forge U000 $1,262,079Urban

CONSTRUCT ACCESS ROAD & ROADWAY IMPROVEMENTS CHESSIE SITE

CHESSIE SITE (0.2000 MI)

75269 Covington EN04 $657,032Urban

MAPLE AVENUE STREETSCAPE

FROM: STREETSCAPE IMPROVEMENTS TO INCLUDE LANDSCAPING, UTILITY TO: RELOCATIONS, DRAINAGE, CROSSWALKS, ETC.

56448 Lexington EN00 $375,000Urban

VIRGINIA MILITARY INSTITUTE - CONSTRUCT NEW PARKING AREA AND

PEDESTRIAN/BICYCLE TRAILS

52028 Waynesboro EN99 $885,182Urban

CITY OF WAYNESBORO - APPROX 6 MILES OF BICYCLE/PEDESTRIAN

FROM: GREENWAY ALONG THE SOUTH RIVER & APPROX 1 SQ MILE OF ACCESS TO: & OTHER IMPROVEMENTS IN THE CENTRAL BUSINESS DISTRICT

Construction : Transportation Enhancement/Byway/Non-Traditional Total $23,663,535

NonMPO: Staunton Total $602,882,216

16

Staunton STIP Report 3/31/2017 1:43:40 PM

D R A

F T

UPC NO 57844 SCOPE Environmental Only

SYSTEM Miscellaneous JURISDICTION Statewide OVERSIGHT NFO

PROJECT ENVIRONMENTAL EQ429 FORM PROCESSING CHARGES ADMIN BY Rail

DESCRIPTION FROM: FOR HIGHWAY/RAIL SAFETY PROJECTS WITHOUT PE NUMBERS TO: ASSIGNED.

PROGRAM NOTE All funding obligated based on current estimates/allocations

ROUTE/STREET ENV0 TOTAL COST $2,014,277

FUND SOURCE MATCH FY18 FY19 FY20 FY21

PE Federal - STP/STBG $0 ($42,991) $0 $0 $0

UPC NO 65542 SCOPE Preliminary Engineering

SYSTEM Miscellaneous JURISDICTION Statewide OVERSIGHT NFO

PROJECT PRELIMINARY ENGINNERING CHARGES FOR HWY/RAIL SAFETY PROJECTS

ADMIN BY Rail

DESCRIPTION FROM: PRELIMIARY ENGINEERING CHARGE CODE FOR HIGHWAY/RAIL SAFETY TO: PROJECTS FOR RAILROAD COMPANY/CONTRACTOR CHARGES

PROGRAM NOTE All funding obligated based on current estimates/allocations

ROUTE/STREET RRSO TOTAL COST $1,672,060

FUND SOURCE MATCH FY18 FY19 FY20 FY21

$0 $0 $0 $0 $0

Miscellaneous Projects

NonMPO: Statewide

1

Statewide STIP Report 3/13/2017 3:55:41 PM

D R A

F T

GROUPING Construction : Rail

ROUTE/STREET TOTAL COST $1,680,000

FUND SOURCE MATCH FY18 FY19 FY20 FY21

$0 $0 $0 $0 $0

GROUPING Construction : Safety/ITS/Operational Improvements

ROUTE/STREET TOTAL COST $23,132,148

FUND SOURCE MATCH FY18 FY19 FY20 FY21

$0 $0 $0 $0 $0

GROUPING Construction : Transportation Enhancement/Byway/Non-Traditional

ROUTE/STREET TOTAL COST $4,154,481

FUND SOURCE MATCH FY18 FY19 FY20 FY21

$0 $0 $0 $0 $0

GROUPING Maintenance : Preventive Maintenance and System Preservation

PROGRAM NOTE Funding identified to be obligated districtwide as projects are identified.

ROUTE/STREET TOTAL COST $988,650,934

FUND SOURCE MATCH FY18 FY19 FY20 FY21

$0 $0 $0 $0 $0

GROUPING Transit : Vehicles

ROUTE/STREET TOTAL COST $3,750,000

FUND SOURCE MATCH FY18 FY19 FY20 FY21

$0 $0 $0 $0 $0

Project Groupings

NonMPO: Statewide

2

Statewide STIP Report 3/13/2017 3:55:41 PM

D R A

F T

NonMPO: Statewide

Construction : Rail

System UPC Jurisdiction / Name / Description Street(Route) Estimate

93035 Statewide HIGHWAY-RAIL CROSSING INVENTORY (9999) $1,680,000Miscellaneous

Statewide Highway-Rail Crossing Inventory

Statewide

Construction : Rail Total $1,680,000

Construction : Safety/ITS/Operational Improvements

System UPC Jurisdiction / Name / Description Street(Route) Estimate

90426 Statewide 0000 $2,243,036Interstate

511 STATEWIDE TRAVELER INFORMATION PROGRAM

FROM: Statewide TO: Statewide

102932 Statewide VARIOUS INTERSTATES AND SELECTED NON-IS LIMITED AC (0000)

$108,610Interstate

Statewide installation of Reference Location Signs (RLS)

FROM: various TO: various

105375 Statewide 9999 $4,814,300Interstate

I-81 CORRIDOR CONGESTION IMPROVEMENTS MM 0 TO MM 323

(323.0000 MI)

98528 Statewide 0000 $1,500,000Miscellaneous

SHSP Development and Implementation

FROM: SHSP Development and Implementation TO: Statewide

105493 Statewide 0000 $350,000Miscellaneous

Straight Line Diagram Project

FROM: Various TO: Various

107949 Statewide 9999 $126,202Miscellaneous

Statewide Buckle Up Sign Fabrication Project

FROM: 1 TO: 2 (1.0000 MI)

110368 Statewide 9999 $7,890,000Miscellaneous

STATEWIDE HSIP IMPLEMENTATION

FROM: Statewide TO: Statewide

110369 Statewide 9999 $1,900,000Miscellaneous

SHSP DEVELOPMENT AND IMPLEMENTATION

FROM: Statewide TO: Statewide

110370 Statewide 9999 $1,200,000Miscellaneous

STATEWIDE SAFETY DATA AND SOFTWARE

FROM: Statewide TO: Statewide

105594 Statewide 0000 $3,000,000Primary

MUTCD Compliance Sign Condition Assessment

FROM: Statewide TO: Statewide

Construction : Safety/ITS/Operational Improvements Total $23,132,148

3Appendix is for informational purposes only.

Statewide STIP Report 3/13/2017 3:55:41 PM

D R A

F T

NonMPO: Statewide

Construction : Transportation Enhancement/Byway/Non-Traditional

System UPC Jurisdiction / Name / Description Street(Route) Estimate

94804 Statewide EN00 $32,876Enhancement

Enhancement Training Account

97845 Statewide EN10 $500,000Enhancement

Journey Through Hallowed Ground - landscaping master plan

FROM: Maryland State Line TO: City of Charlottesville

97847 Statewide EN10 $218,750Enhancement

Develope applications to promote VA scenic & Historical Rd

98023 Statewide EN10 $562,500Enhancement

Civil War battlefield SmartTour applications

103701 Statewide EN99 $150,960Enhancement

Civil Rights in Education Heritage Trail, Signage

FROM: Statewide TO: Statewide

106834 Statewide SB05 $298,000Enhancement

VIRGINIA CAPITAL TRAIL AMENITIES

FROM: HENRICO CO LINE TO: JAMESTOWN TRAILHEAD (51.0000 MI)

95464 Statewide SB09 $1,996,125Enhancement

Journey Through Hallowed Ground Graphic and Visual Identity

78248 Statewide EN05 $125,000Primary

STATEWIDE ROADWAY SIGNAGE

80711 Statewide SB05 $120,270Primary

VIRGINIA CAPITAL TRAIL INTERPRETIVE INFORMATION

FROM: Chickahominy River TO: Jamestown (6.6000 MI)

105764 Statewide SB05 $150,000Primary

VIRGINIA CAPITAL TRAIL SIGNAGE

FROM: Henrico County Line TO: Jamestown Trailhead (51.0000 MI)

Construction : Transportation Enhancement/Byway/Non-Traditional Total $4,154,481

Maintenance : Preventive Maintenance and System Preservation

System UPC Jurisdiction / Name / Description Street(Route) Estimate

T2129 Statewide 0000 $988,650,934Miscellaneous

PREVENTATIVE MAINTENANCE AND SYSTEMS OPERATIONS

Maintenance : Preventive Maintenance and System Preservation Total $988,650,934

4

Statewide STIP Report 3/13/2017 3:55:41 PM

D R A

F T

NonMPO: Statewide

Transit : Vehicles

System UPC Jurisdiction / Name / Description Street(Route) Estimate

T11356 Funding VRE9 $3,750,000Rail

VRE Purchase Locomotives

FROM: VRE Locomotives - VRE0009 TO: Northern Virginia District

Transit : Vehicles Total $3,750,000

NonMPO: Statewide Total $1,021,367,563

5

Statewide STIP Report 3/13/2017 3:55:41 PM

D R A

F T

TAB

LE C

FED

ERAL

FU

ND

ING

CAT

EGO

RIE

S ST

ATEW

IDE

FISC

AL C

ON

STR

AIN

T O

F TH

E ST

IP

Hig

hway

Pro

ject

sFF

Y 20

18- F

FY 2

021

Proj

ecte

d O

blig

atio

n Au

thor

ityPl

anne

d O

blig

atio

ns

Proj

ecte

d O

blig

atio

n Au

thor

ityPl

anne

d O

blig

atio

ns

Proj

ecte

d O

blig

atio

n Au

thor

ityPl

anne

d O

blig

atio

ns

Proj

ecte

d O

blig

atio

n Au

thor

ityPl

anne

d O

blig

atio

ns

Proj

ecte

d O

blig

atio

n Au

thor

ityPl

anne

d O

blig

atio

nsFo

rmul

a O

AB

R/B

RO

S45

,030

,299

$

68

,431

,674

92,6

45,0

0075

,072

,748

281,

179,

721

$

C

MA

Q (1

)93

,987

,533

$

28

,804

,769

$

29

,245

,308

$

26

,738

,559

$

17

8,77

6,16

9$

EN

(644

,667

)$

-$

-$

-$

(644

,667

)$

NH

FP8,

673,

597

$

16,8

23,6

11$

40,8

72,9

29$

1,61

6,78

3$

67

,986

,920

$

N

HS

/NH

PP

289,

886,

272

$

20

8,56

4,27

0$

351,

479,

657

$

34

4,06

7,50

4$

1,

193,

997,

703

$

RS

TP (1

)15

6,68

2,75

4$

64,6

41,1

05$

65,4

53,3

59$

58,0

98,5

77$

446,

190,

524

$

S

TP/S

TBG

257,

997,

483

$

23

8,82

5,86

4$

259,

198,

529

$

20

4,22

2,10

4$

72

2,73

5,08

8$

TAP

20,4

88,5

91$

5,56

4,98

9$

75

7,54

3$

-$

878,

424,

394

$

Su

btot

al --

For

mul

a O

A99

8,29

1,28

3$

872,

101,

862

$

1,

020,

918,

592

$

631,

656,

282

$

1,

045,

464,

915

$

839,

652,

325

$

1,

063,

237,

819

$

709,

816,

275

$

4,12

7,91

2,60

9$

3,

768,

645,

852

$

Spec

ial O

AA

PD

-$

-$

-$

14,0

87,9

67-

$

-

$

-

$

-

$

14

,087

,967

$

D

EM

O7,

340,

037

$

-$

1,01

5,17

8$

-

$

13

7,20

0$

-$

-$

8,49

2,41

5$

E

B/M

G-

$

23

,593

,488

$

-

$

1,

900,

465

$

-$

143,

405

$

-

$

-

$

25

,637

,358

$

S

AFE

TEA

-LU

EA

RM

AR

KS

-$

6,18

7,06

5$

-

$

-

$

-

$

-

$

-

$

-

$

6,

187,

065

$

Subt

otal

-- S

peci

al O

A (2

)-

$

37

,120

,590

$

-

$

17

,003

,610

$

-

$

28

0,60

5$

-$

-$

-$

54,4

04,8

05$

Hig

hway

Tot

al99

8,29

1,28

3$

909,

222,

452

$

1,

020,

918,

592

$

648,

659,

892

$

1,

045,

464,

915

$

839,

932,

930

$

1,

063,

237,

819

$

709,

816,

275

$

4,12

7,91

2,60

9$

3,

823,

050,

657

$

(1)

CM

AQ

& R

STP

Pla

nned

and

Pro

ject

ed O

blig

atio

ns in

clud

e bo

th D

RP

T an

d V

DO

T(2

) S

peci

al O

A -

Pla

nned

Obl

igat

ions

incl

ude

carr

y-ov

er re

venu

e fro

m p

revi

ous

year

s an

d/or

pro

ject

s to

be

iden

tifie

d fo

r fut

ure

year

s

Fund

Sou

rce

FFY

2019

FFY

2020

FFY

2021

FFY

2018

TOTA

L

D R A

F T