draft - dallas construction projects · [ dart rr trk 200 ’ dart r.o.w. 1 span ... * per txdot...

1
PROPOSED R.O.W. PROPOSED R.O.W. 48’ FUTURE LANE 12’ 12’ 14’ 3’ 5’ 4’ SDWLK LANE LANE 1’ 11’ 12’ 14’ 1’ 3’ 5’ 4’ LANE LANE FUTURE LANE 1’ R.O.W. VARIES (140’ TYP) 48’ FM 546 1’ 1’ 11’ 1’ FUTURE LANE 1’ PGL 40’ MEDIAN [ FM 546 PROPOSED NEW ALIGNMENT VARIES (10’ TYP) 12’ VARIES (10’ TYP) 12’ N.T.S. PROPOSED TYPICAL SECTION WITH FUTURE LEFT TURN LANE 6’ FUTURE MEDIAN SDWLK** 10’ STA 35+62.00 TO STA 76+70.33 PECAN GROVE CEMETERY PECAN GROVE CEMETERY CITY OF McKINNEY LANDFILL KONE, INC. McKINNEY ISD ENSERCH CORP CITY OF McKINNEY WATLIN GROUP LP COUCH WAREHOUSE LTD McKINNEY ECONOMIC DEVELOPMENT CORP. 17,800 32,140 ------- 10,530 19,010 ------- 28,610 51,660 ------- 2,280 4,120 2,710 4,890 18,080 32,650 ------- 7,270 13,130 ------- 19,260 34,780 18,940 34,210 ------- 6,000 11,000 ------- 6,500 12,000 ------- 500 1,000 440 797 ------ 20 35 ---- 890 1,600 ------ 430 768 ---- 19,790 35,750 420 772 ---- 870 1,580 ------ 19,810 35,780 17,220 31,106 19,340 34,940 ------ 430 773 ---- ------- ------- ------- ------- 1,080 1,949 ------ 1,050 1,905 ------ ------- 1,070 1,929 ------ 1,490 2,695 150 266 ---- ------ ------- ------ FM 546 (EXISTING) FM 546 PROPOSED NEW ALIGNMENT FM 546 PROPOSED NEW ALIGNMENT FM 546 PROPOSED NEW ALIGNMENT FM 546 NEW ALIGNMENT PROJECT ANTICIPATED ADT ------ 1,000 2,000 = 2010 ADT = 2030 ADT ------ LEGEND SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION TRANSPORTATION PLANNING AND PROGRAMMING DIVISION DEC. 17, 2010 [ FM 546 PROPOSED NEW ALIGNMENT PROPOSED R.O.W. RETAINING WALL 1’ FM 546 RETAINING WALL 12’ LANE 15’ LANE 20’ 20’ 12’ FUTURE LANE 12’ FUTURE LANE 15’ LANE 12’ LANE OVERALL WIDTH=112’ 6’ SDWLK 1’ 1’ PGL 20’ LANE 22’ F-F CURB E-W TURNAROUND 6’ SDWLK 1’ 1’ 0.5’ CURB 0.5’ CURB PGL 20’ LANE 22’ F-F CURB E-W TURNAROUND 1’ 1’ 0.5’ CURB 0.5’ CURB 5’ 5’ R.O.W. VARIES (212’ TYP) 1’ 1’ 56’ 1’ T401 1’ PR1 1’ T401 56’ PGL N.T.S. 6’ SDWLK VARIES 4’ (1’ MIN) 22’ (TYP) VARIES 17’ TO 42’ EXIST./ PRESCRIPTIVE R.O.W. 8’ 8’ 16’ FUTURE MEDIAN 1’ 1’ 40’ MEDIAN PROPOSED (RETAINING WALL) - TYPICAL SECTION STA 23+50.00 TO STA 24+75.00 (SEGMENT A) STA 33+30.00 TO STA 35+62.00 (SEGMENT B) (NOTE: SEGMENT A INCLUDES U-TURNS AND SIDEWALKS.) 6’ 10’ TYP 6’ SDWLK** [ FM 546 PROPOSED NEW ALIGNMENT PROPOSED R.O.W. RETAINING WALL 1’ FM 546 RETAINING WALL 12’ LANE 15’ LANE 20’ 20’ 12’ FUTURE LANE 12’ FUTURE LANE 15’ LANE 12’ LANE OVERALL WIDTH=112’ 6’ SDWLK 1’ 1’ PGL 20’ LANE 22’ F-F CURB E-W TURNAROUND 6’ SDWLK 1’ 1’ 0.5’ CURB 0.5’ CURB PGL 20’ LANE 22’ F-F CURB E-W TURNAROUND 1’ 1’ 0.5’ CURB 0.5’ CURB 5’ 5’ R.O.W. VARIES (212’ TYP) 1’ 1’ 56’ 1’ T401 1’ PR1 1’ T401 56’ PGL N.T.S. 6’ SDWLK VARIES 4’ (1’ MIN) 22’ (TYP) VARIES 17’ TO 42’ EXIST./ PRESCRIPTIVE R.O.W. 8’ 8’ 16’ FUTURE MEDIAN 1’ 1’ 40’ MEDIAN PROPOSED (RETAINING WALL) - TYPICAL SECTION STA 23+50.00 TO STA 24+75.00 (SEGMENT A) STA 33+30.00 TO STA 35+62.00 (SEGMENT B) (NOTE: SEGMENT A INCLUDES U-TURNS AND SIDEWALKS.) 6’ 10’ TYP 6’ SDWLK** PROPOSED R.O.W. R.O.W. VARIES (212’ TYP) N.T.S. [ FM 546 PROPOSED NEW ALIGNMENT 1’ 1’ 14’ 12’ LANE 15’ LANE 12’ LANE 6’ SDWLK 15’ LANE PGL 1’ 1’ 6’ SDWLK 6’ PGL 20’ LANE 22’ F-F CURB E-W TURNAROUND 1’ 1’ 0.5’ CURB 0.5’ CURB 6’ SDWLK PGL 20’ LANE 22’ F-F CURB E-W TURNAROUND 1’ 1’ 0.5’ CURB 0.5’ CURB VARIES 14’ 1’ 1’ 7’ 7’ 14’ OVERALL BRIDGE WIDTH=49’ 1’ T401 FACE OF PR1 RAIL 1’ T401 OVERALL BRIDGE WIDTH=49’ FACE OF PR1 RAIL 10’ TYP 4’ (1’ MIN) 22’ (TYP) VARIES 17’ TO 222’ 12’ SHLD FUTURE LANE 12’ SHLD FUTURE LANE EXIST./ PRESCRIPTIVE R.O.W. 1’ 1’ 8’ 8’ 6’ SDWLK** 6’ MIN. 6’ MIN. PROPOSED BRIDGE - TYPICAL SECTION STA 24+75.00 TO STA 28+18.00 (SEGMENT A) STA 28+18.00 TO 33+30.00 (SEGMENT B) (NOTE: SEGMENT A INCLUDES U-TURNS AND SIDEWALKS.) 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00 10+00 WB U-TURN PGL EB U-TURN PGL EXISTING GROUND AT PGL [ DART RR TRK 200’ DART R.O.W. WB U-TURN PGL EB U-TURN PGL 1 SPAN @ 105’ PRESTR CONC BEAMS 2 SPANS @ 125’=250’ PRESTR CONC BEAMS 4 SPANS @ 125’=500’ PRESTR CONC BEAMS TOTAL LENGTH OF BRIDGE=855’ PROPOSED PROFILE GRADE LINE PROPOSED 1-42" RCP EL = 556.32 PROPOSED 3-5’X3’ MBC EL = 570.95 PROPOSED 1-42" RCP EL=544.28 PROPOSED 1-42" RCP EL=549.73 CLEAR ZONE ENVELOPE STA = 11+50.00 EL = 552.72’ L = 200.00’ K = 62 ex = -0.81’ STA = 14+50.00 EL = 548.03’ L = 350.00’ K = 80 ex = 1.91’ STA = 18+00.00 EL = 557.81’ L = 350.00’ K = 152 ex = -1.00’ STA = 22+15.00 EL = 559.88’ L = 375.00’ K = 83 ex = 2.11’ STA = 30+75.00 EL = 602.88’ L = 500.00’ K = 62 ex = -5.03’ STA = 36+00.00 EL = 586.91’ L = 225.00’ K = 84 ex = 0.75’ STA = 42+35.00 EL = 584.61’ L = 225.00’ K = 106 ex = -0.60’ STA = 46+10.00 EL = 575.30’ L = 400.00’ K = 81 ex = 2.47’ STA = 49+10.00 EL = 582.70’ L = 150.00’ K = 71 ex = -0.40’ PROPOSED RETAINING WALL 4:1 DESIGN SCHEMATIC FUNCTIONAL CLASSIFICATION: COLLIN COUNTY NET LENGTH OF PROJECT: 1.70 MILES PREPARED BY: CIVIL ASSOCIATES, INC. TBPE REGISTRATION NO. F-006981 PREPARED BY: CIVIL ASSOCIATES, INC. TBPE REGISTRATION NO. F-006981 NASER ABUSAAD, P.E., AICP FM 546: 19,810 ADT (2010) 35,780 ADT (2030) FROM: SH 5 TO: WEST OF CR 317 BRAD HERNANDEZ, P.E. BRAD HERNANDEZ, P.E. NASER ABUSAAD, P.E., AICP THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY REVIEW SUBMITTAL. IT IS NOT INTENDED FOR CONSTRUCTION, BIDDING OR PERMIT PURPOSES. THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF PRELIMINARY REVIEW SUBMITTAL. IT IS NOT INTENDED FOR CONSTRUCTION, BIDDING OR PERMIT PURPOSES. WILLIAM L. HALE, P.E. DISTRICT ENGINEER C 2011 BY TEXAS DEPARTMENT OF TRANSPORTATION ALL RIGHTS RESERVED R C 2011 BY TEXAS DEPARTMENT OF TRANSPORTATION ALL RIGHTS RESERVED R ROLL 1: ROLL 2: ROLL INDEX ROLL 3: ROLL 1: ROLL 2: ROLL INDEX ROLL 3: SH 5 PROPOSED IMPROVEMENTS PLAN AND CROSS STREETS PROFILES FM 546 NEW ALIGNMENT STA 55+00 TO END PROJECT STA 100+04.77 FM 546 NEW ALIGNMENT STA 55+00 TO END PROJECT STA 100+04.77 PROPOSED MEDIAN TRAFFIC FLOW LEGEND PROPOSED CONCRETE ROADWAY SCALE IN FEET VERTICAL HORIZONTAL 50 0 100 200 20 10 0 5 NOTES: 2. FINAL DRIVEWAY LOCATIONS SHALL BE DETERMINED DURING THE FINAL DESIGN PHASE. 3. ALL DIMENSIONS ARE TO FACE OF CURB, UNLESS OTHERWISE NOTED. CONTROL: FM 546 COLLIN COUNTY PRIMARY CONTROL SAM#:29232-06 AUGUST 17, 2010 HORZ. DATUM: NAD-83 (CORS 2002) VERT. DATUM: NAVD-88 (CORS 2002) SURFACE COORDINATES ONLY VISIBLE UTILITIES AS OF AUGUST 17, 2010 WERE LOCATED. ALL POINTS WERE LOCATED USING THE WDS VRS NETWORK. ALL POINTS WERE CONVERTED TO SURFACE USING THE TXDOT COLLIN COUNTY COMBINED SCALE FACTOR OF 1.000152710. COORD. SYSTEM: TEXAS STATE PLANE NAD-83 (CORS 2002) PROJECT COMBINED SCALE FACTOR: 1.000152710 (0.99984731332) PT, NORTHING, EASTING, ELEV, DESCR. ELEVATIONS SHOWN BELOW ARE GPS DERIVED. 1. PROPOSED PROFILE GENERALLY FOLLOWS EXISTING. ZONE: TEXAS NORTH CENTRAL (4202) UNITS: U.S. SURVEY FEET GEOID: GEOID09 1,7118394.801,2544272.227,592.803,CP 1 2,7118047.423,2547458.336,593.656,CP 2 3,7117948.345,2550643.874,584.232,CP 3 4,7115059.867,2551507.404,584.688,CP 4 5,7111817.974,2551263.071,560.954,CP 5 6,7112390.337,2548233.38,536.095, CP 6 7,7116062.446,2547059.573,582.357,CP 7 8,7114876.011,2542248.738,570.296,CP 8 PROPOSED DRIVEWAY PROPOSED TURNAROUND PROPOSED STRUCTURE (BRIDGE) PROPOSED TRANSITION PAVEMENT PROPOSED CROSS DRAINAGE STRUCTURE SH 5 PROPOSED IMPROVEMENTS PLAN AND CROSS STREETS PROFILES PROPOSED RETAINING WALL FM 546 = 45 MPH AIRPORT ROAD = 45 MPH COUCH ROAD = 35 MPH U-TURN LANE = 15 MPH DESIGN SPEED: PROPOSED DRAINAGE EASEMENT EXISTING R.O.W./PROPERTY LINE "ACCESS BY PERMIT ONLY" FM 546 NEW ALIGNMENT BEGIN PROJECT STA 10+44.90 TO STA 55+00 FM 546 NEW ALIGNMENT BEGIN PROJECT STA 10+44.90 TO STA 55+00 TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT LOCATION MAP (N.T.S.) PROJECT LOCATION COLLIN COUNTY DALLAS DISTRICT BEGIN PROJECT CSJ: 1013-01-026 END PROJECT CSJ:1013-01-026 75 TEXAS 121 TEXAS 5 TEXAS 121 TEXAS 5 FARM 546 ROAD FARM 546 ROAD FARM 546 ROAD 0 1 MILE PROJECT LOCATION COLLIN COUNTY DALLAS DISTRICT BEGIN PROJECT CSJ: 1013-01-026 END PROJECT CSJ:1013-01-026 75 TEXAS 121 TEXAS 5 TEXAS 121 TEXAS 5 FARM 546 ROAD FARM 546 ROAD FARM 546 ROAD 0 1 MILE DESIGN SCHEMATIC FUNCTIONAL CLASSIFICATION: COLLIN COUNTY NET LENGTH OF PROJECT: 1.70 MILES FM 546: 19,810 ADT (2010) 35,780 ADT (2030) WILLIAM L. HALE, P.E. DISTRICT ENGINEER DESIGN SPEED: TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT TxDOT - MINOR ARTERIAL CITY OF McKINNEY - URBAN MAJOR ARTERIAL (M6D) TxDOT - MINOR ARTERIAL CITY OF McKINNEY - URBAN MAJOR ARTERIAL (M6D) 5. SURVEY NOTES: DATE OF SURVEY, AUGUST 17, 2010 CSJ: 1013-01-026 FM 546 (NEW ALIGNMENT) SH 5 = 60 MPH * * PER TXDOT PLANS DATED NOV. 10, 1955 CSJ: 1013-01-026 FROM: SH 5 TO: WEST OF CR 317 FM 546 = 45 MPH SH 5 = 60 MPH * AIRPORT ROAD = 45 MPH COUCH ROAD = 35 MPH U-TURN LANE = 15 MPH * PER TXDOT PLANS DATED NOV. 10, 1955 LOCATION MAP (N.T.S.) FM 546 (NEW ALIGNMENT) PROPOSED SIDEWALK 4. CONTROL OF ACCESS WILL BE HANDLED IN ACCORDANCE WITH THE TxDOT ACCESS MANAGEMENT MANUAL. PROPOSED R.O.W. SERIAL NO. 83200 NOVEMBER, 2011 SERIAL NO. 100079 NOVEMBER, 2011 SERIAL NO. 83200 NOVEMBER, 2011 SERIAL NO. 100079 NOVEMBER, 2011 EASEMENT PROPOSED R.O.W. 60’ FUTURE LANE 12’ 12’ 12’ 6’ SDWLK LANE LANE 1’ 12’ 12’ 12’ 1’ 6’ LANE LANE FUTURE LANE 1’ R.O.W. VARIES (186’ MIN) 60’ 1’ 1’ 16’ PGL 40’ MEDIAN [ FM 546 PROPOSED NEW ALIGNMENT 14’ AUX LANE 14’ AUX LANE 1’ PROPOSED FM 546 TYPICAL SECTION N.T.S. BEGIN PROJECT TO STA 23+50.00 12’ 12’ 0.5’ CURB 10’ TYP FUTURE MEDIAN VARIES 13’ TO 144’ EXIST./ PRESCRIPTIVE R.O.W. 6’ (1’ MIN) 6’ SDWLK** WB TURNAROUND (WB-UTURN) CURVE WB-UTURN-1 PI STATION = 10+25.74 NORTHING = 7,116,891.58 EASTING = 2,544,829.38 DELTA = 3%%d 05’ 17.39" (LT) DEGREE OF CURVE = 5%%d 59’ 59.99" TANGENT = 25.74 LENGTH = 51.47 RADIUS = 954.93 PC STATION = 10+00.00 PT STATION = 10+51.47 CURVE WB-UTURN-2 PI STATION = 12+80.16 NORTHING = 7,116,793.61 EASTING = 2,545,064.19 DELTA = 26%%d 56’ 07.97" (RT) DEGREE OF CURVE = 5%%d 59’ 59.99" TANGENT = 228.69 LENGTH = 448.93 RADIUS = 954.93 PC STATION = 10+51.47 PT STATION = 15+00.40 CURVE WB-UTURN-3 PI STATION = 20+32.44 NORTHING = 7,116,214.44 EASTING = 2,545,557.42 DELTA = 90%%d 00’ 00.00" (RT) DEGREE OF CURVE = 90%%d 13’ 46.47" TANGENT = 63.50 LENGTH = 99.75 RADIUS = 63.50 PC STATION = 19+68.94 PT STATION = 20+68.68 EB TURNAROUND (EB-UTURN) CURVE EB-UTURN-1 PI STATION = 13+21.61 NORTHING = 7,116,824.57 EASTING = 2,544,883.45 DELTA = 36%%d 30’ 46.62" (RT) DEGREE OF CURVE = 5%%d 52’ 36.88" TANGENT = 321.61 LENGTH = 621.29 RADIUS = 974.93 PC STATION = 10+00.00 PT STATION = 16+21.29 CURVE EB-UTURN-2 PI STATION = 16+34.78 NORTHING = 7,116,563.42 EASTING = 2,545,093.42 DELTA = 1%%d 37’ 06.14" (LT) DEGREE OF CURVE = 5%%d 59’ 59.99" TANGENT = 13.49 LENGTH = 26.97 RADIUS = 954.93 PC STATION = 16+21.29 PT STATION = 16+48.27 CURVE EB-UTURN-3 PI STATION = 22+01.31 NORTHING = 7,116,132.10 EASTING = 2,545,460.73 DELTA = 90%%d 00’ 00.00" (LT) DEGREE OF CURVE = 90%%d 13’ 46.47" TANGENT = 63.50 LENGTH = 99.75 RADIUS = 63.50 PC STATION = 21+37.81 PT STATION = 22+37.56 END WALL EB-2 [ FM 546 NEW ALIGNMENT STA 35+62.00 57’ RT BEGIN WALL EB-1 [ FM 546 NEW ALIGNMENT STA 23+50.00 57’ RT BEGIN WALL WB-1 [ FM 546 NEW ALIGNMENT STA 23+50.00 57’ LT BEGIN WALL EB-2 [ FM 546 NEW ALIGNMENT STA 32+75.00 57’ RT END BRIDGE [ FM 546 NEW ALIGNMENT STA 33+30.00 BEGIN WALL WB-2 [ FM 546 NEW ALIGNMENT STA 32+75.00 57’ LT BEGIN BRIDGE [ FM 546 NEW ALIGNMENT STA 24+75.00 BEGIN TRAFFIC RAIL STA 22+58.50 END TRAFFIC RAIL STA 35+62.00 END WALL WB-2 [ FM 546 NEW ALIGNMENT STA 35+62.00 57’ LT BEGIN WALL WB-3 [ FM 546 NEW ALIGNMENT STA 22+50.00 100’ LT END WALL WB-3 [ FM 546 NEW ALIGNMENT STA 26+10.00 95’ LT END MBGF SH 5 NB | STA 136+36.58, 39.17’ RT BEGIN MBGF SH 5 NB | STA 130+77.34, 86.50’ RT END WALL WB-1 END WALL EB-1 [ FM 546 NEW ALIGNMENT STA 24+75.00 | WB TURNAROUND (WB-UTURN) [ COUCH DR STA 12+14.63= [ FM 546 PROP NEW ALIGNMENT STA 44+88.47 [ COUCH DR CURVE FM546-1 CURVE FM546-2 CURVE FM546-3 CURVE EB-UTURN-1 CURVE WB-UTURN-2 CURVE WB-UTURN-1 [ FM 546 NEW ALIGNMENT [ FM 546 NEW ALIGNMENT PRC 10+51.47 CURVE WB-UTURN-3 CURVE FM546-1 PI STATION = 17+95.54 NORTHING = 7,116,981.92 EASTING = 2,544,820.42 DELTA = 49%%d 39’ 03.47" (RT) DEGREE OF CURVE = 5%%d 00’ 00.00" TANGENT = 530.11 LENGTH = 993.02 RADIUS = 1,145.92 PC STATION = 12+65.44 PT STATION = 22+58.46 CURVE FM546-2 PI STATION = 31+68.87 NORTHING = 7,115,885.20 EASTING = 2,545,754.40 DELTA = 31%%d 55’ 00.14" (LT) DEGREE OF CURVE = 5%%d 00’ 00.00" TANGENT = 327.68 LENGTH = 638.33 RADIUS = 1,145.92 PC STATION = 28+41.19 PT STATION = 34+79.52 CURVE FM546-3 PI STATION = 60+93.19 NORTHING = 7,114,992.63 EASTING = 2,548,557.06 DELTA = 29%%d 57’ 47.18" (RT) DEGREE OF CURVE = 5%%d 00’ 00.00" TANGENT = 306.65 LENGTH = 599.26 RADIUS = 1,145.92 PC STATION = 57+86.54 PT STATION = 63+85.81 PC 10+00.00 | EB TURNAROUND (EB-UTURN) CURVE EB-UTURN-3 END WB TURNAROUND | WB-UTURN PT STA 20+68.68= END EB TURNAROUND | EB-UTURN PT STA 22+37.56 CURVE EB-UTURN-2 EXIST./ PRESCRIPTIVE R.O.W. EXIST. R.O.W. [ EXIST. OLD MILL ROAD [ FM 546 PROPOSED NEW ALIGNMENT PROPOSED R.O.W. EXISTING FM 546 TYPICAL SECTION 24’ 2 - 12’ EXIST. LANES N.T.S. SUPERELEVATION TABLE BASELINE CURVE NAME DIRECTION FM546EB EB -2.00% -2.00% FM546WB WB 10+00.00 11+75.00 2.00% 21+69.00 25+44.00 -2.00% FM546WB WB -2.00% 42+09.00 43+44.00 -0.50% 46+33.00 47+68.00 -2.00% -- -2.00% 2.00% END CROSS SLOPE FULL SUPERELEVATION BEGIN TRANSITION BEGIN CROSS SLOPE END TRANSITION AND BEGIN FULL SUPERELEVATION END FULL SUPERELEVATION AND BEGIN TRANSITION END TRANSITION 42+09.00 43+44.00 -0.50% 46+33.00 47+68.00 -- FM546-1 -- UTURN-3 MATCH SH 5 TURNAROUND -- -- -- 21+30.00(EB) 19+50.00(WB) 600 590 580 570 560 600 590 580 570 560 550 550 540 540 SEE ROLL 3 OF 3 FOR SH 5 PROPOSED IMPROVEMENTS HORIZONTAL ALIGNMENT- CURVE DATA [ PROPOSED FM 546 R=80’ R=80’ R=50’ R=50’ R=620’ BEGIN TRANSITION COUCH DR [ STA 6+63.00 MATCH EXISTING PAVEMENT R=80’ R=31.50’ END TRANSITION COUCH DR [ STA 16+67.00 MATCH EXISTING PAVEMENT R=20’ R=20’ SEE ROLL 3 OF 3 FOR SH 5 PROPOSED IMPROVEMENTS EXISTING/ PRESCRIPTIVE ROW END CONSTRUCTION BEGIN TRANSITION COUCH DR [ STA 14+00.00 FUTURE CONSTRUCTION BY OTHERS EXISTING/ PRESCRIPTIVE ROW PROPOSED 1-42" RCP [ FM 546 STA 10+78.35 PROPOSED 1-42" RCP | WB U-TURN STA 17+43.18 PROPOSED 1-42" RCP | EB U-TURN STA 19+15.69 ** PER CITY OF McKINNEY CODE OF ORDINANCES, SECTION 142-105: CONSTRUCTION OF PROPOSED SIDEWALK SHALL BE THE RESPONSIBILITY OF THE DEVELOPER WHEN DEVELOPMENTS ALONG THE PROPOSED ROADWAY OCCUR BEFORE AND/OR CONCURRENTLY WITH THE ROADWAY CONSTRUCTION. IF NO DEVELOPMENT OCCURS, PROPOSED SIDEWALKS SHALL BE CONSTRUCTED WITH ROADWAY. BEGIN PROJECT CSJ: 1013-01-026 FM 546 (NEW ALIGNMENT) [ FM 546 STA 10+44.90 MATCH EXISTING PAVEMENT CSJ: 0047-05-050 SH 5 NB | STA 131+11.36 PROPOSED 3-5’ X 3’ MBC [ FM 546 STA 45+03.00 SEE ROLL 2 OF 3 FOR CULVERT OUTFALL LOCATION FEMA 100-YR FLOODPLAIN DRAINAGE EASEMENT 48’ X 50’ DRAINAGE EASEMENT 66’X12’ DRAINAGE EASEMENT 60’X14’ BEGIN CONSTRUCTION END TRANSITION COUCH DR [ STA 9+20.00 MATCH EXISTING PAVEMENT EASEMENT EASEMENT EASEMENT

Upload: phamcong

Post on 22-Jul-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DRAFT - Dallas Construction Projects · [ dart rr trk 200 ’ dart r.o.w. 1 span ... * per txdot plans dated nov. 10, 1955 csj: 1013-01-026 from: sh 5 to: west of cr 317 fm 546 =

PROPOSED

R.O.W.

PROPOSED

R.O.W.

48’

FUTURE

LANE

12’12’14’3’

5’

4’

SDWLK

LANE LANE

1’

11’ 12’ 14’ 1’ 3’

5’

4’

LANELANEFUTURE

LANE

1’

R.O.W. VARIES (140’ TYP)

48’

FM 546

1’ 1’ 11’1’

FUTURE

LANE

1’

PGL

40’ MEDIAN

[ FM 546

PROPOSED

NEW ALIGNMENT

VARIES

(10’ TYP)

12’ VARIES

(10’ TYP)

12’

N.T.S.

PROPOSED TYPICAL SECTION

WITH FUTURE LEFT TURN LANE

6’

FUTURE

MEDIAN SDWLK**10’

STA 35+62.00 TO STA 76+70.33

PECAN GROVE CEMETERYPECAN GROVE CEMETERY

CITY OF McKINNEY LANDFILL

KONE, INC.

McKINNEY ISD

KONE, INC.

PRESTON 56 LP

INTERNATIONAL PAPER CO.

TROIANI

PECAN GROVE CEMETERY

ENSERCH

CORP

McKINNEY INDUSTRIAL PARK #2

CITY OF McKINNEY

WATLIN

GROUP

LP

COUCH

WAREHOUSE

LTD

McKINNEY

ECONOMIC

DEVELOPMENT

CORP.

17,800

32,140

-------

10,530

19,010

-------

28,610

51,660

-------

2,280

4,120

2,710

4,890

18,080

32,650-------

7,270

13,130-------

19,260

34,780

18,940

34,210

-------

6,000

11,000-------

6,500

12,000

-------

500

1,000

440

797

------

20

35

----

890

1,600------

430

768

----

19,790

35,750

420

772----

870

1,580

------

19,810

35,780

17,220

31,106

19,340

34,940

------

430

773----

--------------------- -------

1,080

1,949------

1,050

1,905------

-------

1,070

1,929

------

1,490

2,695

150

266

----

------

-------

------

FM 546

(EXISTING)

FM 546

PROPOSED

NEW ALIGNMENT

FM 546

PROPOSED

NEW ALIGNMENT

FM 546

PROPOSED

NEW ALIGNMENT

FM 546 NEW ALIGNMENT PROJECT

ANTICIPATED ADT

------

1,000

2,000

= 2010 ADT

= 2030 ADT

------

LEGEND

SOURCE:

TEXAS DEPARTMENT OF TRANSPORTATION

TRANSPORTATION PLANNING AND PROGRAMMING DIVISION

DEC. 17, 2010

[ FM 546

PROPOSED

NEW ALIGNMENT PROPOSED

R.O.W.

RETAINING WALL

1’

FM 546

RETAINING WALL

12’

LANE

15’

LANE

20’ 20’

12’

FUTURE

LANE

12’

FUTURE

LANE

15’

LANE

12’

LANE

OVERALL WIDTH=112’

6’

SDWLK

1’

1’

PGL

20’

LANE

22’

F-F CURB

E-W TURNAROUND

6’

SDWLK

1’ 1’

0.5’

CURB

0.5’

CURB

PGL

20’

LANE

22’

F-F CURB

E-W TURNAROUND

1’1’

0.5’

CURB

0.5’

CURB

5’ 5’

R.O.W. VARIES (212’ TYP)

1’ 1’

56’

1’

T401

1’

PR1

1’

T401

56’

PGL

N.T.S.

6’

SDWLK

VARIES 4’

(1’

MIN)

22’

(TYP)

VARIES

17’ TO 42’

EXIST./

PRESCRIPTIVE

R.O.W.

8’ 8’

16’

FUTURE

MEDIAN

1’ 1’40’

MEDIAN

PROPOSED (RETAINING WALL) - TYPICAL SECTION

STA 23+50.00 TO STA 24+75.00 (SEGMENT A)

STA 33+30.00 TO STA 35+62.00 (SEGMENT B)

(NOTE: SEGMENT A INCLUDES U-TURNS AND SIDEWALKS.)

6’ 10’

TYP

6’

SDWLK**

[ FM 546

PROPOSED

NEW ALIGNMENT PROPOSED

R.O.W.

RETAINING WALL

1’

FM 546

RETAINING WALL

12’

LANE

15’

LANE

20’ 20’

12’

FUTURE

LANE

12’

FUTURE

LANE

15’

LANE

12’

LANE

OVERALL WIDTH=112’

6’

SDWLK

1’

1’

PGL

20’

LANE

22’

F-F CURB

E-W TURNAROUND

6’

SDWLK

1’ 1’

0.5’

CURB

0.5’

CURB

PGL

20’

LANE

22’

F-F CURB

E-W TURNAROUND

1’1’

0.5’

CURB

0.5’

CURB

5’ 5’

R.O.W. VARIES (212’ TYP)

1’ 1’

56’

1’

T401

1’

PR1

1’

T401

56’

PGL

N.T.S.

6’

SDWLK

VARIES 4’

(1’

MIN)

22’

(TYP)

VARIES

17’ TO 42’

EXIST./

PRESCRIPTIVE

R.O.W.

8’ 8’

16’

FUTURE

MEDIAN

1’ 1’40’

MEDIAN

PROPOSED (RETAINING WALL) - TYPICAL SECTION

STA 23+50.00 TO STA 24+75.00 (SEGMENT A)

STA 33+30.00 TO STA 35+62.00 (SEGMENT B)

(NOTE: SEGMENT A INCLUDES U-TURNS AND SIDEWALKS.)

6’ 10’

TYP

6’

SDWLK**

PROPOSED

R.O.W.

R.O.W. VARIES (212’ TYP)

N.T.S.

[ FM 546

PROPOSED

NEW ALIGNMENT

1’

1’

14’12’

LANE

15’

LANE

12’

LANE

6’

SDWLK

15’

LANE

PGL

1’

1’

6’

SDWLK

6’

PGL

20’

LANE

22’

F-F CURB

E-W TURNAROUND

1’ 1’

0.5’

CURB

0.5’

CURB6’

SDWLK

PGL

20’

LANE

22’

F-F CURB

E-W TURNAROUND

1’1’

0.5’

CURB

0.5’

CURB

VARIES

14’

1’ 1’

7’7’

14’OVERALL BRIDGE WIDTH=49’

1’

T401FACE OF PR1 RAIL

1’

T401

OVERALL BRIDGE WIDTH=49’

FACE OF PR1 RAIL

10’

TYP

4’

(1’

MIN)

22’

(TYP)

VARIES

17’ TO 222’

12’ SHLD

FUTURE

LANE

12’ SHLD

FUTURE

LANE

EXIST./

PRESCRIPTIVE

R.O.W.

1’1’

8’ 8’

6’

SDWLK**

6’

MIN.

6’

MIN.

PROPOSED BRIDGE - TYPICAL SECTION

STA 24+75.00 TO STA 28+18.00 (SEGMENT A)

STA 28+18.00 TO 33+30.00 (SEGMENT B)

(NOTE: SEGMENT A INCLUDES U-TURNS AND SIDEWALKS.)

15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+0010+00

WB

U-TURN

PGL

EB

U-TURN

PGL

EXISTING

GROUND

AT PGL

[ DART

RR TRK

200’

DART

R.O.W.

WB

U-TURN

PGL

EB

U-TURN

PGL

1 SPAN

@ 105’

PRESTR

CONC

BEAMS

2 SPANS @ 125’=250’

PRESTR CONC BEAMS

4 SPANS @ 125’=500’

PRESTR CONC BEAMS

TOTAL LENGTH OF BRIDGE=855’

PROPOSED

PROFILE

GRADE

LINE

PROPOSED

1-42" RCP

EL = 556.32

PROPOSED

3-5’X3’ MBC

EL = 570.95

PROPOSED

1-42" RCP

EL=544.28

PROPOSED

1-42" RCP

EL=549.73

CLEAR ZONE

ENVELOPE

STA = 11+50.00

EL = 552.72’

L = 200.00’

K = 62

ex = -0.81’

STA = 14+50.00

EL = 548.03’

L = 350.00’

K = 80

ex = 1.91’

STA = 18+00.00

EL = 557.81’

L = 350.00’

K = 152

ex = -1.00’

STA = 22+15.00

EL = 559.88’

L = 375.00’

K = 83

ex = 2.11’

STA = 30+75.00

EL = 602.88’

L = 500.00’

K = 62

ex = -5.03’

STA = 36+00.00

EL = 586.91’

L = 225.00’

K = 84

ex = 0.75’

STA = 42+35.00

EL = 584.61’

L = 225.00’

K = 106

ex = -0.60’

STA = 46+10.00

EL = 575.30’

L = 400.00’

K = 81

ex = 2.47’

STA = 49+10.00

EL = 582.70’

L = 150.00’

K = 71

ex = -0.40’

PROPOSED

RETAINING

WALL

4:1

DESIGN SCHEMATIC

FUNCTIONAL CLASSIFICATION:

COLLIN COUNTY

NET LENGTH OF PROJECT: 1.70 MILES

PREPARED BY:

CIVIL ASSOCIATES, INC.

TBPE REGISTRATION NO. F-006981

PREPARED BY:

CIVIL ASSOCIATES, INC.

TBPE REGISTRATION NO. F-006981

NASER ABUSAAD, P.E., AICP

FM 546: 19,810 ADT (2010) 35,780 ADT (2030)

FROM: SH 5

TO: WEST OF CR 317

BRAD HERNANDEZ, P.E. BRAD HERNANDEZ, P.E.NASER ABUSAAD, P.E., AICP

THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF

PRELIMINARY REVIEW SUBMITTAL.

IT IS NOT INTENDED FOR CONSTRUCTION,

BIDDING OR PERMIT PURPOSES.

THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF

PRELIMINARY REVIEW SUBMITTAL.

IT IS NOT INTENDED FOR CONSTRUCTION,

BIDDING OR PERMIT PURPOSES.

WILLIAM L. HALE, P.E.

DISTRICT ENGINEER

C 2011 BY TEXAS DEPARTMENT OF

TRANSPORTATION

ALL RIGHTS RESERVED

R

C 2011 BY TEXAS DEPARTMENT OF

TRANSPORTATION

ALL RIGHTS RESERVED

R

ROLL 1:

ROLL 2:

ROLL INDEX

ROLL 3:

ROLL 1:

ROLL 2:

ROLL INDEX

ROLL 3: SH 5 PROPOSED IMPROVEMENTS PLAN

AND CROSS STREETS PROFILES

FM 546 NEW ALIGNMENT

STA 55+00 TO END PROJECT STA 100+04.77

FM 546 NEW ALIGNMENT

STA 55+00 TO END PROJECT STA 100+04.77

PROPOSED MEDIAN

TRAFFIC FLOW

LEGEND

PROPOSED CONCRETE ROADWAY

SCALE IN FEET

VERTICAL

HORIZONTAL

50 0 100 200

201005

NOTES:

2. FINAL DRIVEWAY LOCATIONS

SHALL BE DETERMINED DURING

THE FINAL DESIGN PHASE.

3. ALL DIMENSIONS ARE

TO FACE OF CURB, UNLESS

OTHERWISE NOTED.

CONTROL:

FM 546 COLLIN COUNTY

PRIMARY CONTROL

SAM#:29232-06

AUGUST 17, 2010

HORZ. DATUM: NAD-83 (CORS 2002)

VERT. DATUM: NAVD-88 (CORS 2002)

SURFACE COORDINATES

ONLY VISIBLE UTILITIES AS OF

AUGUST 17, 2010 WERE LOCATED.

ALL POINTS WERE LOCATED USING

THE WDS VRS NETWORK.

ALL POINTS WERE CONVERTED

TO SURFACE USING THE TXDOT

COLLIN COUNTY COMBINED

SCALE FACTOR OF 1.000152710.

COORD. SYSTEM:

TEXAS STATE PLANE NAD-83 (CORS 2002)

PROJECT COMBINED SCALE FACTOR:

1.000152710 (0.99984731332)

PT, NORTHING, EASTING, ELEV, DESCR.

ELEVATIONS SHOWN BELOW ARE

GPS DERIVED.

1. PROPOSED PROFILE GENERALLY

FOLLOWS EXISTING.

ZONE: TEXAS NORTH CENTRAL (4202)

UNITS: U.S. SURVEY FEET

GEOID: GEOID09

1,7118394.801,2544272.227,592.803,CP 1

2,7118047.423,2547458.336,593.656,CP 2

3,7117948.345,2550643.874,584.232,CP 3

4,7115059.867,2551507.404,584.688,CP 4

5,7111817.974,2551263.071,560.954,CP 5

6,7112390.337,2548233.38,536.095, CP 6

7,7116062.446,2547059.573,582.357,CP 7

8,7114876.011,2542248.738,570.296,CP 8

PROPOSED DRIVEWAY

PROPOSED TURNAROUND

PROPOSED STRUCTURE (BRIDGE)

PROPOSED TRANSITION PAVEMENT

PROPOSED CROSS

DRAINAGE STRUCTURE

SH 5 PROPOSED IMPROVEMENTS PLAN

AND CROSS STREETS PROFILES

PROPOSED RETAINING WALL

FM 546 = 45 MPH

AIRPORT ROAD = 45 MPH

COUCH ROAD = 35 MPH

U-TURN LANE = 15 MPH

DESIGN SPEED:

PROPOSED DRAINAGE EASEMENT

EXISTING R.O.W./PROPERTY LINE

"ACCESS BY PERMIT ONLY"

FM 546 NEW ALIGNMENT

BEGIN PROJECT STA 10+44.90 TO STA 55+00

FM 546 NEW ALIGNMENT

BEGIN PROJECT STA 10+44.90 TO STA 55+00

TEXAS DEPARTMENT OF TRANSPORTATION

DALLAS DISTRICT

LOCATION MAP(N.T.S.)

PROJECT LOCATION

COLLIN COUNTY

DALLAS DISTRICT

BEGIN PROJECTCSJ: 1013-01-026

END PROJECTCSJ:1013-01-026

75

TEXAS

121

TEXAS

5

TEXAS

121

TEXAS

5

FARM

546

ROAD

FARM

546

ROAD

FARM

546

ROAD

0 1 MILEPROJECT LOCATION

COLLIN COUNTY

DALLAS DISTRICT

BEGIN PROJECTCSJ: 1013-01-026

END PROJECTCSJ:1013-01-026

75

TEXAS

121

TEXAS

5

TEXAS

121

TEXAS

5

FARM

546

ROAD

FARM

546

ROAD

FARM

546

ROAD

0 1 MILE

DESIGN SCHEMATIC

FUNCTIONAL CLASSIFICATION:

COLLIN COUNTY

NET LENGTH OF PROJECT: 1.70 MILES

FM 546: 19,810 ADT (2010) 35,780 ADT (2030)

WILLIAM L. HALE, P.E.

DISTRICT ENGINEER

DESIGN SPEED:

TEXAS DEPARTMENT OF TRANSPORTATION

DALLAS DISTRICT

TxDOT - MINOR ARTERIAL

CITY OF McKINNEY - URBAN MAJOR ARTERIAL (M6D)

TxDOT - MINOR ARTERIAL

CITY OF McKINNEY - URBAN MAJOR ARTERIAL (M6D)

5. SURVEY NOTES:

DATE OF SURVEY, AUGUST 17, 2010

CSJ: 1013-01-026

FM 546 (NEW ALIGNMENT)

SH 5 = 60 MPH *

* PER TXDOT PLANS DATED NOV. 10, 1955

CSJ: 1013-01-026

FROM: SH 5

TO: WEST OF CR 317

FM 546 = 45 MPH

SH 5 = 60 MPH *

AIRPORT ROAD = 45 MPH

COUCH ROAD = 35 MPH

U-TURN LANE = 15 MPH

* PER TXDOT PLANS DATED NOV. 10, 1955

LOCATION MAP(N.T.S.)

FM 546 (NEW ALIGNMENT)

PROPOSED SIDEWALK

4. CONTROL OF ACCESS WILL BE

HANDLED IN ACCORDANCE WITH

THE TxDOT ACCESS MANAGEMENT

MANUAL.

PROPOSED R.O.W.

SERIAL NO. 83200

NOVEMBER, 2011

SERIAL NO. 100079

NOVEMBER, 2011

SERIAL NO. 83200

NOVEMBER, 2011

SERIAL NO. 100079

NOVEMBER, 2011

EASEMENT

PROPOSED

R.O.W.

60’

FUTURE

LANE

12’12’12’

6’

SDWLK

LANE LANE

1’

12’ 12’ 12’

1’

6’

LANELANEFUTURE

LANE

1’

R.O.W. VARIES (186’ MIN)

60’

1’

1’ 16’

PGL

40’ MEDIAN

[ FM 546

PROPOSED

NEW ALIGNMENT

14’

AUX

LANE

14’

AUX

LANE

1’

PROPOSED FM 546

TYPICAL SECTION

N.T.S.

BEGIN PROJECT TO STA 23+50.00

12’ 12’

0.5’

CURB

10’

TYP

FUTURE

MEDIAN

VARIES

13’ TO 144’

EXIST./

PRESCRIPTIVE

R.O.W.

6’

(1’

MIN)

6’

SDWLK**

WB TURNAROUND (WB-UTURN)

CURVE WB-UTURN-1

PI STATION = 10+25.74

NORTHING = 7,116,891.58

EASTING = 2,544,829.38

DELTA = 3%%d 05’ 17.39" (LT)

DEGREE OF CURVE = 5%%d 59’ 59.99"

TANGENT = 25.74

LENGTH = 51.47

RADIUS = 954.93

PC STATION = 10+00.00

PT STATION = 10+51.47

CURVE WB-UTURN-2

PI STATION = 12+80.16

NORTHING = 7,116,793.61

EASTING = 2,545,064.19

DELTA = 26%%d 56’ 07.97" (RT)

DEGREE OF CURVE = 5%%d 59’ 59.99"

TANGENT = 228.69

LENGTH = 448.93

RADIUS = 954.93

PC STATION = 10+51.47

PT STATION = 15+00.40

CURVE WB-UTURN-3

PI STATION = 20+32.44

NORTHING = 7,116,214.44

EASTING = 2,545,557.42

DELTA = 90%%d 00’ 00.00" (RT)

DEGREE OF CURVE = 90%%d 13’ 46.47"

TANGENT = 63.50

LENGTH = 99.75

RADIUS = 63.50

PC STATION = 19+68.94

PT STATION = 20+68.68

EB TURNAROUND (EB-UTURN)

CURVE EB-UTURN-1

PI STATION = 13+21.61

NORTHING = 7,116,824.57

EASTING = 2,544,883.45

DELTA = 36%%d 30’ 46.62" (RT)

DEGREE OF CURVE = 5%%d 52’ 36.88"

TANGENT = 321.61

LENGTH = 621.29

RADIUS = 974.93

PC STATION = 10+00.00

PT STATION = 16+21.29

CURVE EB-UTURN-2

PI STATION = 16+34.78

NORTHING = 7,116,563.42

EASTING = 2,545,093.42

DELTA = 1%%d 37’ 06.14" (LT)

DEGREE OF CURVE = 5%%d 59’ 59.99"

TANGENT = 13.49

LENGTH = 26.97

RADIUS = 954.93

PC STATION = 16+21.29

PT STATION = 16+48.27

CURVE EB-UTURN-3

PI STATION = 22+01.31

NORTHING = 7,116,132.10

EASTING = 2,545,460.73

DELTA = 90%%d 00’ 00.00" (LT)

DEGREE OF CURVE = 90%%d 13’ 46.47"

TANGENT = 63.50

LENGTH = 99.75

RADIUS = 63.50

PC STATION = 21+37.81

PT STATION = 22+37.56

END WALL EB-2

[ FM 546

NEW ALIGNMENT

STA 35+62.00

57’ RT

BEGIN WALL EB-1

[ FM 546

NEW ALIGNMENT

STA 23+50.00

57’ RT

BEGIN WALL WB-1

[ FM 546

NEW ALIGNMENT

STA 23+50.00

57’ LT

BEGIN WALL EB-2

[ FM 546

NEW ALIGNMENT

STA 32+75.00

57’ RT

END BRIDGE

[ FM 546

NEW ALIGNMENT

STA 33+30.00

BEGIN WALL WB-2

[ FM 546

NEW ALIGNMENT

STA 32+75.00

57’ LT

BEGIN BRIDGE

[ FM 546

NEW ALIGNMENT

STA 24+75.00

BEGIN TRAFFIC RAIL

STA 22+58.50

END TRAFFIC RAIL

STA 35+62.00

END WALL WB-2

[ FM 546

NEW ALIGNMENT

STA 35+62.00

57’ LT

BEGIN WALL WB-3

[ FM 546

NEW ALIGNMENT

STA 22+50.00

100’ LT

END WALL WB-3

[ FM 546

NEW ALIGNMENT

STA 26+10.00

95’ LT

END MBGF

SH 5 NB |

STA 136+36.58,

39.17’ RT

BEGIN MBGF

SH 5 NB |

STA 130+77.34,

86.50’ RT

END WALL WB-1

END WALL EB-1

[ FM 546

NEW ALIGNMENT

STA 24+75.00

| WB TURNAROUND

(WB-UTURN)

[ COUCH DR STA 12+14.63=

[ FM 546 PROP NEW ALIGNMENT

STA 44+88.47

[ COUCH DR

CURVE FM546-1

CURVE FM546-2

CURVE FM546-3

CURVE EB-UTURN-1

CURVE

WB-UTURN-2

CURVE

WB-UTURN-1

[ FM 546

NEW ALIGNMENT

[ FM 546

NEW ALIGNMENT

PRC 10+51.47

CURVE

WB-UTURN-3

CURVE FM546-1

PI STATION = 17+95.54

NORTHING = 7,116,981.92

EASTING = 2,544,820.42

DELTA = 49%%d 39’ 03.47" (RT)

DEGREE OF CURVE = 5%%d 00’ 00.00"

TANGENT = 530.11

LENGTH = 993.02

RADIUS = 1,145.92

PC STATION = 12+65.44

PT STATION = 22+58.46

CURVE FM546-2

PI STATION = 31+68.87

NORTHING = 7,115,885.20

EASTING = 2,545,754.40

DELTA = 31%%d 55’ 00.14" (LT)

DEGREE OF CURVE = 5%%d 00’ 00.00"

TANGENT = 327.68

LENGTH = 638.33

RADIUS = 1,145.92

PC STATION = 28+41.19

PT STATION = 34+79.52

CURVE FM546-3

PI STATION = 60+93.19

NORTHING = 7,114,992.63

EASTING = 2,548,557.06

DELTA = 29%%d 57’ 47.18" (RT)

DEGREE OF CURVE = 5%%d 00’ 00.00"

TANGENT = 306.65

LENGTH = 599.26

RADIUS = 1,145.92

PC STATION = 57+86.54

PT STATION = 63+85.81

PC 10+00.00

| EB

TURNAROUND

(EB-UTURN)

CURVE

EB-UTURN-3

END WB TURNAROUND

| WB-UTURN PT STA 20+68.68=

END EB TURNAROUND

| EB-UTURN PT STA 22+37.56

CURVE

EB-UTURN-2

EXIST./

PRESCRIPTIVE

R.O.W.

EXIST.

R.O.W.

[ EXIST.

OLD MILL ROAD

[ FM 546

PROPOSED

NEW ALIGNMENT

PROPOSED

R.O.W.

EXISTING FM 546

TYPICAL SECTION

24’

2 - 12’

EXIST.

LANES

N.T.S.

SUPERELEVATION TABLE

BASELINE CURVE NAME DIRECTION

FM546EB EB -2.00% -2.00%

FM546WB WB 10+00.00 11+75.00 2.00% 21+69.00 25+44.00 -2.00%

FM546WB WB -2.00% 42+09.00 43+44.00 -0.50% 46+33.00 47+68.00 -2.00%

-- -2.00% 2.00%

END CROSS

SLOPE

FULL

SUPERELEVATION

BEGIN

TRANSITION

BEGIN CROSS

SLOPE

END TRANSITION

AND BEGIN FULL

SUPERELEVATION

END FULL

SUPERELEVATION AND

BEGIN TRANSITION

END

TRANSITION

42+09.00 43+44.00 -0.50% 46+33.00 47+68.00--

FM546-1

--

UTURN-3

MATCH SH 5

TURNAROUND -- -- --21+30.00(EB) 19+50.00(WB)

600

590

580

570

560

600

590

580

570

560

550 550

540540

DRAFT

SEE ROLL 3 OF 3

FOR SH 5 PROPOSED

IMPROVEMENTS

HORIZONTAL ALIGNMENT- CURVE DATA

[ PROPOSED FM 546

R=80’

R=80’

R=50’

R=50’

R=620’

BEGIN TRANSITION

COUCH DR

[ STA 6+63.00

MATCH EXISTING PAVEMENT

R=80’

R=31.50’

END TRANSITION

COUCH DR

[ STA 16+67.00

MATCH EXISTING

PAVEMENT

R=20’

R=20’

SEE ROLL 3 OF 3

FOR SH 5 PROPOSED

IMPROVEMENTS

EXISTING/

PRESCRIPTIVE ROW

END CONSTRUCTION

BEGIN TRANSITION

COUCH DR

[ STA 14+00.00

FUTURE

CONSTRUCTION

BY OTHERS

EXISTING/

PRESCRIPTIVE ROW

PROPOSED

1-42" RCP

[ FM 546

STA 10+78.35

PROPOSED

1-42" RCP

| WB U-TURN

STA 17+43.18

PROPOSED

1-42" RCP

| EB U-TURN

STA 19+15.69

** PER CITY OF McKINNEY CODE OF ORDINANCES,

SECTION 142-105: CONSTRUCTION OF

PROPOSED SIDEWALK SHALL BE THE RESPONSIBILITY

OF THE DEVELOPER WHEN DEVELOPMENTS ALONG

THE PROPOSED ROADWAY OCCUR BEFORE AND/OR

CONCURRENTLY WITH THE ROADWAY CONSTRUCTION.

IF NO DEVELOPMENT OCCURS, PROPOSED SIDEWALKS

SHALL BE CONSTRUCTED WITH ROADWAY.

BEGIN PROJECT

CSJ: 1013-01-026

FM 546 (NEW ALIGNMENT)

[ FM 546 STA 10+44.90

MATCH EXISTING PAVEMENT

CSJ: 0047-05-050

SH 5 NB | STA 131+11.36

PROPOSED 3-5’ X 3’ MBC

[ FM 546 STA 45+03.00

SEE ROLL 2 OF 3 FOR

CULVERT OUTFALL

LOCATION

FEMA 100-YR

FLOODPLAIN

DRAINAGE

EASEMENT

48’ X 50’

DRAINAGE

EASEMENT

66’X12’

DRAINAGE

EASEMENT

60’X14’

BEGIN CONSTRUCTION

END TRANSITION

COUCH DR

[ STA 9+20.00

MATCH EXISTING PAVEMENT

EASEMENT

EASEMENT

EASEMENT