Draft CIP Standards Version 5 Project 2008-06 Cyber Security Order 706 January 10, 2012 Most of the material presented has been compiled from NERC webinars and drafting team meetings

Upload: yardley-pittman

Post on 31-Dec-2015

32 views

Category:

Documents


0 download

DESCRIPTION

Draft CIP Standards Version 5. Project 2008-06 Cyber Security Order 706 January 10, 2012. Most of the material presented has been compiled from NERC webinars and drafting team meetings. January 6 Official Ballot Results. Next Steps. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Draft CIP Standards Version 5

Draft CIP Standards Version 5

Project 2008-06 Cyber Security Order 706 January 10, 2012

Most of the material presented has been compiled from NERC webinars and drafting team meetings

Page 2: Draft CIP Standards Version 5

January 6 Official Ballot Results

Ballot

ResultsCIP-002-5 Cyber Security Quorum: 93.62%

Approval: 22.09%

CIP-003-5 Cyber Security Quorum: 93.62%Approval: 33.49%

CIP-004-5 Cyber Security Quorum: 93.62%Approval: 26.82%

CIP-005-5 Cyber Security Quorum: 93.62%Approval: 28.04%

CIP-006-5 Cyber Security Quorum: 93.61%Approval: 29.60%

CIP-007-5 Cyber Security Quorum: 93.61%

Approval: 24.15%

CIP-008-5 Cyber Security Quorum: 94.02%

Approval: 34.30%

CIP-009-5 Cyber Security Quorum: 93.61%

Approval: 27.28%

CIP-010-5 Cyber Security Quorum: 93.61%

Approval: 26.61%

CIP-011-5 Cyber Security Quorum: 93.61%

Approval: 29.88%

CIP V5 Implementation Plan Quorum: 92.15%

Approval: 42.06%

CIP V5 Definitions Quorum: 92.56%

Approval: 25.34%

Page 3: Draft CIP Standards Version 5

Next Steps

The drafting team will consider all comments and determine what changes to make to each of the standards, the implementation plan, and the definitions.

After the drafting team has revised the standards, they will be submitted, along with the team’s Consideration of Comments, for quality review and subsequently posted for a successive ballot.

Page 4: Draft CIP Standards Version 5

• Consideration of commentsJanuary 6 – March 26

• 30-day posting for comment and successive ballot

March 26 –April 27

• Possible Recirculation ballotJune 6–22

Projected 2012 Schedule

Page 5: Draft CIP Standards Version 5

DefinitionsRetired and Replaced

Critical assets Replaced by CIP-002 Attachment 1 and BES Reliability

Operating Services definition Critical cyber assets

Replaced by BES Cyber Asset and BES Cyber System Physical security perimeter

Replaced by Defined Physical Boundary No more “six-wall” specification

Page 6: Draft CIP Standards Version 5

DefinitionsCore Applicable Assets

Cyber Assets Programmable electronic devices including the hardware, software, and data in those devices

BES Cyber Asset A Cyber Asset that if rendered unavailable, degraded, or misused would, within 15 minutes of its operation, mis-operation, or non-operation, when required, adversely impact one or more BES Reliability Operating Services

BES Cyber System One or more BES Cyber Assets that are typically grouped together, logically or physically, to operate one or more BES Reliability Operating Services Largely replaces Critical Cyber Asset Provides an opportunity for controls to be applied at a system level

Page 7: Draft CIP Standards Version 5

Levels of Impact

High Impact Large Control Centers CIP-003 through 009+

Medium Impact Generation and Transmission Other Control Centers Similar to CIP-003 to 009 v4

All other BES Cyber Systems Security Policy Security Awareness Incident Response Boundary Protection

Page 8: Draft CIP Standards Version 5

CIP-002-5 Summary of Modifications

Categorized list of High and Medium Impact Attachment 1 criteria

Other BES Cyber Systems deemed to be Low Impact by default

Update required lists for significant changes to BES that affect High/Medium categorization

Senior manager or delegate annual review and approval

Page 9: Draft CIP Standards Version 5

CIP-003-5 was reorganized to only include elements of policy and cyber security program governance.◦ Elements that addressed Change Control and

Configuration Management were moved to CIP-010-5

◦ Elements that address Information Protection were moved to CIP-011-5

CIP-003-5 Summary of Modifications

Page 10: Draft CIP Standards Version 5

CIP-004-5 Summary of Modifications (1/2)

Training◦ Addition of visitor control program◦ Reorganization of requirements into the respective

requirements for “program” and “implementation” of the training.

Personnel Risk Assessment◦ Changed to only initial identity verification◦ Now includes documenting the processes used to

determine when to deny access◦ Reorganization of requirements into the

respective requirements for “program” and “implementation”

Page 11: Draft CIP Standards Version 5

CIP-004-5 Summary of Modifications (2/2)

Authorization◦ Consolidated authorization and review

requirements from CIP-003-4, CIP-004-4, CIP-006-4 and CIP-007-4

◦ Allow quarterly and annual reviews to find and fix problems rather than self-report everything as a violation

Revocation◦ Remove ability to access BES Cyber System when

access no longer needed

Page 12: Draft CIP Standards Version 5

CIP-005-5 Summary of Modifications

Define ‘External Connectivity’ for scope modification

Focus on ‘Electronic Access Points’ vs. ESP Require IDS at Control Centers Add clarity to ‘secure’ dialups Consolidated Monitoring and Vulnerability

Assessment Requirements in CIP-007 and CIP-011 respectively

Removed Appropriate Use Banner Incorporated CIP-005-4 Urgent Action revisions

Page 13: Draft CIP Standards Version 5

CIP-006-5 Summary of Modifications

Physical Security Program◦ Must define the operational or procedural controls

to restrict physical access◦ Removed current “6 wall” wording to instead

require Defined Physical Boundary ◦ For High Impact, added the need to utilize two or

more different and complementary physical access controls to restrict physical access

◦ Testing changed to a 24 month cycle with ongoing discussions of different cycles based on environment.

Page 14: Draft CIP Standards Version 5

CIP-007-5 Summary of Modifications (1/2)

Addition of physical I/O port requirement Security Patch management source

requirement Non-prescriptive malware requirement Security Event Monitoring failure handling Bi-weekly log summary/sampling reviews

Page 15: Draft CIP Standards Version 5

CIP-007-5 Summary of Modifications (2/2)

Simplified access-control requirements, removed TFE language while strengthening password requirements

Added requirement for maintenance devices Consolidated vulnerability assessment in

CIP-010-5 Disposal requirement moved to CIP-011-5

Page 16: Draft CIP Standards Version 5

CIP-008-5 Summary of Modifications

Defined Reportable Cyber Security Incident for clearer

Working to harmonize with EOP-004-2 Includes additional specification on update

and lessons learned associated with the response plan.

Page 17: Draft CIP Standards Version 5

CIP-009-5 Summary of Modifications

Added requirement to implement the response plan.

Verification of backup media information prior to storage

Preservation of data for analysis

Page 18: Draft CIP Standards Version 5

CIP-010-5 Summary of Modifications

Consolidates all references to Configuration Change Management and Vulnerability Assessments.◦ Previously these requirements were dispersed

throughout CIP-003-4, CIP-005-4, and CIP-007-4

Page 19: Draft CIP Standards Version 5

CIP-011-5 Summary of Modifications

Consolidates all references to Information Protection and Media Sanitization.◦ Previously these requirements were dispersed

throughout CIP-003-4 and CIP-007-4 Requirements for authorization and

revocation of access to BES Cyber System Information moved to CIP-004-5.

Shifts the focus of the requirements for media sanitization from the Cyber Asset to the information itself.

Page 20: Draft CIP Standards Version 5

Proposed Effective Date for Version 5

18 Months Minimum – The standards shall become effective on the later of January 1, 2015, or the first calendar day of the seventh calendar quarter after the date of the order providing applicable regulatory approval. Notwithstanding any order to the contrary, CIP-002-4 through CIP-009-4 do not become effective, and CIP-002-3 through CIP-009-3 remain in effect and are not retired until the effective date of the Version 5 CIP Cyber Security Standards under this implementation plan.

In jurisdictions where CIP-002-4 through CIP-009-4 have not yet become effective according to their implementation plan (even if approved by order), this implementation plan and the Version 5 CIP Cyber Security Standards supersede and replace the implementation plan and standards for CIP-002-4 through CIP-009-4.

Page 21: Draft CIP Standards Version 5

Questions?