draft cidep sector plans sector profiles
DESCRIPTION
devTRANSCRIPT
Draft County Integrated Development Plan 2013 - 2017
Roadmap for Transforming Narok into a prosperous and competitive County. 29 August 2013
NAROK COUNTY GOVERNMENT
Narok County Integrated Development Plan (2013 -17) Page 1
Narok County Integrated Development Plan (2013 -17) Page 2
1 EDUCATION PROGRAMMES AND PROJECTS
Sector Profile
Status of Key performance indicators
Narok County are characterized by …enrolment, xyx literacy rates, school infrastructure (CDP).
Key challenges experienced in the sector include among others….low number of teachers, XXXX
Sector potential (PICTURE OF WHAT SECTOR CAN ACHIEVE IF THESE CHALLENGES/CONSTRAINTS ARE ADDRESSED OR MITIGATED)
Focus of the county government in the next five years (sub-sector and priority areas, strategies). The education agenda for the county in the next five years will on
Key flagship projects
Sector Summary
Sub-sector Priorities Programmes Flagship Projects
1. Early Childhood
Development
1. Programme Expansion 1. ECD Development programme 1. Construct/rehabilitate 450 ECD centres
2. Purchase 6 mobile ECD units
Sector Education
Sector Vision Improved lives through learning
Sector Mission
1. To provideadequate access to high quality education at all levels.
2. To transform acquired knowledge into innovative enterprise.
3. To promote alternative education.
Sector Justification - Enhanced literacy levels.
- Skill development for improved productivity.
- Improved transmission and reception of information and knowledge.
- Need to reduce school drop-out rates.
- Need to promote innovation.
- Enhanced competitiveness through human resource development.
- Technological advancement through skills development.
Narok County Integrated Development Plan (2013 -17) Page 3
Sub-sector Priorities Programmes Flagship Projects
3. Recruit/train 400 teachers
2. Performance improvement 2. Curriculum development programme 4. Adapted curriculum (cognition, creativity)
2. Adult Education 3. Ault Education programme expansion 3. Adult Education development programme 5. Recruit/train 60 teachers
6. Enterprise-linked AE curriculum
3. Primary education 4. Performance Improvement 4. Facilities improvement programme 7. Construct 1000 classrooms
5. Staff improvement programme 8. Train/recruit 1000 Teachers
9. Construct 400 teachers houses
10. Hardship allowance fund (0.5m/yr)
6. Learning support programme 11. Construct 200 Dormitories
12. School Feeding Project (20m/5yr)
7. Curriculum adaptation programme 13. Adapted Curriculum (lower school vernacular)
5. TIVET mainstreaming 8. Appropriate Skills Development Programme 14. 600 Wood/Metal/Home science workshops
6. Gender mainstreaming 9. Girl child education promotion programme 15. Provide1m sanitary towels (50m/yr)
16. 3 Girls' Rescue centre
4. Special needs 7. Special needs students 10. Special needs integration programme 17. 100 Special needs centres (embedded in existing schools)
5. Secondary education 8. Performance Improvement 11. Facilities improvement programme 18. 300 Classrooms
12. School equipments supply programme 19. 100 Equipped science laboratories
13. Learning support programme 20. 200 Dormitories
9. ICT Mainstreaming 14. School computerization programme 21. 2500 Computer labs
22. Train/recruit ICT teachers
10. TIVET Mainstreaming 15. School TIVET integration programme 23. 100 Wood/Metal workshops
16. Talent development programme 24. 6 Talent academies (1/Constituency)
11. Gender Mainstreaming 17. Girl child education promotion programme 25. 0.5m Sanitary towels (25m/yr)
1. Girls rescue programme 1. 3 Girls rescue centres
2. Girls protection laws
3.
6. TIVET 1. Programme Development 1. TIVET Facility development programme 4. Construct/rehabilitate 6 youth polytechnics
5. TIVET facilities development fund (50m/yr)
2. TIVET staff development programme 6. Train/Recruit 60 teachers
3. TIVET knowledge conversion programme 7. TIVET enterprise and innovation fund (10m/yr)
8.
Narok County Integrated Development Plan (2013 -17) Page 4
Sub-sector Priorities Programmes Flagship Projects
7. Tertiary colleges and
university
2. Expand access by locals to University 4. University expansion and decentralisation
programme
9. Build 5 new campuses
5. Students support programme 10. Establish bursary fund
11. HELB modelled revolving fund (2000 students)
3. Industry-academia linkages 6. Industry-academia linkages promotion
programme
12. Research fund (10m/yr)
7. Student placement and employment
programme
13. Attach students to local businesses (1000 students)
Detailed Education Sector Plan
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
Early
Childhood
Development
Programme
Expansion
1.1
Inadequate/Poor state of
existing ECD centres
Construct new/improve
existing facilities
Facilities development programme Construct/rehabilitate ECD
centres
To expand access to
ECD facilities
400-County
government
Countywide
Explore strategic
partnerships
ECD PPP programme Form partnerships To increase number of
ECD facilities
200-PPP Countywide
Long distances and sparse
settlements
Establishment mobile
ECD services
Mobile ECD outreach programme Purchase mobile ECD units To improve access to
ECD learning
1 units per
constituency
(6)
Every
constituency
Promote home-based
ECD teaching
Radio ECD outreach programme Radio programming
sessions
To improve access to
ECD learning
50 sessions Countywide
Parents education programme Parents training and
organisation
To enable home-based
ECD learning
As above Countywide
Failure to appreciate the
value of ECD
Sensitization on the
value of ECD
Community sensitisation
programme
Outreach campaigns To change perceptions
on ECD
As above Countywide
Shortage of qualified ECD
teachers
Recruit trained ECD
teachers
ECD Teacher development
programme
Employ qualified ECD
teachers
To expand access to
learning
1200 ECD
teachers (2
per school)
County wide
Train ECD teachers
locally
ECD teachers training programme Train new teachers To expand local
teaching capacity
250 over 5
years
Countywide
Conduct routine in-service
trainings
To upgrade the quality
of ECD teaching
Train/retrain
200 ECD
teachers
2 teachers per
ECD centre
Performance
improvement
Substandard/inferior
curriculum
Review and develop
quality curriculum
Curriculum development
programme
Adapt curriculum To make it more
relevant to county
context
Lump sum County wide
Narok County Integrated Development Plan (2013 -17) Page 5
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
Lack of access to quality
learning materials
Develop learning
materials
ECD materials development and
distribution programme
Acquisition materials To enhance learning
experience
Lump sum Countywide
Poor/Irregular attendance Provide food ECD centre feeding programme Feeding To encourage ECD
attendance
Lump sum Countywide
Adult
Education
AE programme
expansion
Poor perception of AE
programmes
Sensitize prospective
learners
AE promotion programme Sensitization campaigns To create awareness
of the importance of
ace
50 media
campaigns
Countywide
Inadequate Teachers Retrain in-service
of primary school
teachers to handle
AE
AE staff development programme Retrain teachers To expand access to AE 60 teachers Countywide
Inadequate facilities Offer AE facilities
within existing schools
AE facilities development
programme
Equip AE centres To make AE more
effective
Lump sum Countywide
Curriculum that does not fit
local situations
Adapt curriculum to
existing situation
and priorities
AE curriculum development
programme
Develop curriculum To make it relevant to
county and learners
needs
Lump sum Countywide
Primary
education
Performance
Improvement
Poor school attendance Punish non-attendance Education promotion programme School attendance
surveillance
To motivate
attendance
Lump sum Countywide
Provide lunch in
hardship areas
School feeding programme Feed children To improve attendance
through retention
1000 pupils Areas with low
enrolment rate
in the county
Long home-school distances Provide boarding
facilities
Pupils learning support
programme
Build boarding facilities for
upper school
To enhance quality of
learning environment
1200
dormitories
Countywide
Poorly trained/unqualified
teachers
Train untrained
teachers
Staff improvement programme Re-train teachers To enhance quality of
teaching
1000 teachers Countywide
Teacher absenteeism Improve supervision Learning support programme Supervise teacher
attendance
To reduce absenteeism Lump sum Countywide
De-motivated teachers Provide hardship
allowance
Staff improvement programme Establish hardship
allowance fund
To enhance the quality
of teaching
Cover 1200
teachers
Countywide
Provide housing for
teachers
Facilities improvement
programme
Construct teachers houses To improve working
conditions
500 teachers
houses
Countywide
Poor facilities and tools
Upgrade facilities Facilities improvement
programme
Construct additional
classrooms
To create more
learning space and
increase enrolment
100 classes
constructed
Countywide
Curriculum that does not fit
local situations
Adapt curriculum to
existing situation
AE curriculum development
programme
Develop curriculum To make it relevant to
county and learners
Lump sum Countywide
Narok County Integrated Development Plan (2013 -17) Page 6
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
and priorities needs
High drop-out rate Retention of
enrolled pupils
School retention programme Student- tracking database To increase graduation
rate
Each primary
school
countywide
Gender
mainstreaming
Early marriages
Sensitize community
about benefits of girl-
child education
Girl child education promotion
programme
Community sensitization
campaign
To change perceptions
about girl child
education
150 sessions Countywide
Punish parents who
remove girls from
school
Penalise non-co-operative
parents
To improve girl child
enrolment
Lump sum Countywide
Provide rescue services Girls rescue programme Recruit girls to centre To improve completion
rates for girls
1000 girls Countywide
Health challenges Provide sanitary towels Sanitary towels provision
programme
Provide sanitary towels To increase retention
rate
Lump sum Countywide
Special needs Special needs
students
Integration of special needs Provide special needs
infrastructure
Special needs integration
programme
Constructing ramps,
purchase equipment
To integrate special
need students
8000 persons countywide
Secondary
education
Performance
Improvement
Poor facilities
Upgrade facilities Facilities improvement
programme
Construct additional
classrooms
To create more
learning space and
increase enrolment
100 classes
constructed
Countywide
Inadequate learning
technologies and equipment
Improve on science
subjects
School equipments supply
programme
Construct science
laboratories
To enhance quality of
science subject
teaching/learning
100 labs
constructed
Countywide
Household chores Provide boarding
facilities
Facilities improvement
programme
Construct dormitories To afford students
more study time
200
dormitories
Countywide
ICT Mainstreaming Lack of computers Supply computers School computerization
programme
Build and equip computer
labs
To enable students to
grasp digital
technologies
2500
computers
Countywide
Train ICT teachers To enable teachers to
effectively teach ICT
150 teachers Countywide
Mainstreaming
vocational
training/talent
development
Lack of workshops and
equipments
Build and equip
workshops
School TIVET integration
programme
Construct workshops To enhance quality of
TIVET
teaching/learning
100
workshops
Countywide
Recruit teachers To make TIVET
teaching effective
150 teachers Countywide
Inadequate facilities for
extracurricular activities
Develop facilities and
supply equipment for
talent development
School talent development
programme
Develop Talent academies To enable students
develop sporting
prowess
1 per
constituency
(6)
Countywide
Narok County Integrated Development Plan (2013 -17) Page 7
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
Recruit talent trainers To make sports
training effective
5 teachers per
ward (150)
Countywide
Gender
mainstreaming
Early marriages
Sensitize community
about benefits of girl-
child education
Girl child education promotion
programme
Community sensitization
campaign
To change perceptions
about girl child
education
1 campaign
per ward
Countywide
Punish parents who
remove girls from
school
As above Arrest non-co-operative
parents
To improve girl child
enrolment
Lump sum Countywide
Provide rescue services Girls rescue programme Recruit girls to centre To improve completion
rates for girls
1000 girls Countywide
Teenage pregnancies Separate facilities for
girls
As above Establish girls-only facilities To improve learning
environment
1 facility per
ward
Countywide
Punish perpetrators Anti-teenage pregnancy
programme
Formulate law and
measures
To protect girls from
sex predators
Lump sum Countywide
Countywide
TIVET Programme
development
Lack of facilities
Develop purposely built
facilities
TIVET Facility
improvement/development
programme
Construct new polytechnics
To provide support to
the youth in the
informal sector
1 per
constituency
Countywide
Rehabilitate existing
polytechnics
To build capacity for
TIVET training
4 Countywide
Embed TIVET teaching in
secondary schools and
other tertiary facilities
As above Construct wood and metal
technology workshops in
schools
To expand access to
TIVET learning
1 per ward Countywide
High cost of TIVET training Allocate funds TIVET development programme TIVET facilities development
fund
To assist development
of TIVET institutions
All TIVET
institutions
Countywide
Inadequate teachers Recruit teachers TIVET staff development
programme
Recruit teachers To expand local
capacity for TIVET
training
40 teachers Countywide
Train local teachers Train teachers To expand local
capacity for TIVET
training
All TIVET
teachers
Countywide
Lack of capacity for skills
conversion/application
Enable graduates to
innovate and develop
enterprises
TIVET innovation and enterprise
development programme
TIVET enterprise fund To enable graduates
transition into
enterprise
Lump sum Countywide
Tertiary
colleges and
university
Expand access High cost of university
education
Provide bursaries Tertiary Education subsidy
programme
Establish bursary fund To enable poor
students afford higher
education
500 students countywide
Narok County Integrated Development Plan (2013 -17) Page 8
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
Expand higher
education loan
programme
Higher education credit
programme
Establish revolving fund To allow students to
access credit
200 students countywide
Poor performance in KCSE Improve KCSE
performance
KCSE improvement performance
programmes
KCSE improvement
performance projects
To increase the
number of students
joining university
All secondary
schools
Countywide
Few colleges and
universities
Decentralise Maasai
Mara University
University expansion and
decentralisation programme
Build new campuses To expand access to
University education
4 Kilgoris and
Olokurto,
Ololulunga, N-
Enkare
Allow other
university/colleges to
open branches in the
county
As above Build new campuses To expand access to
University education
Lump sum Countywide
Industry-academia
linkages
Inappropriate curriculum Adapt curriculum to
local needs
Curriculum adaptation programme Review curriculum To make it more
relevant to local job
market needs
Lump sum Countywide
Inadequate opportunities for
collaboration
Explore areas of
collaboration
Industry-academia linkages
promotion programme
Undertake study To inform programme
formulation for
collaborative ventures
Lump sum Countywide
Student placement and
employment programme
Attach students to local
businesses
To enable students to
get experience and
raise fees
500 students Countywide
Narok County Integrated Development Plan (2013 -17) Page 9
2 HEALTH SECTOR PROGRAMMES AND PROJECTS
Healt Sector Summary
Sub-sector Priorities Programmes Flagship Projects
1. Medical
Services
1. Service Delivery Improvement 1. Human Resource Development Programme 1. MMU Teaching and Referal Hospital (Level 5)
2. Health Facilities Improvement Programme 2. 6 hospitals (level 3), 15 health centres (level 2), 30 community dispensaries (level 1)
3. Heath Equipment and Technology Improvement Programme 3. 9 ambulances (3 for level 5, 6 for level 3)
4. 50 capacity mortuary (distributed to Narok, Kilgoris, Olokurto)
4. Health Management Information Systems 5. Automation of health records in all facilities (computers, software and Internet
connectivity)
6. Two 5-bed ICUs (Narok, Kilgoris)
7. 1 Renal Unit
5. Medical Supplies Programme 8. Medical Supplies warehouse at Narok Level 5 hospital
2. Special Needs Care 6. Trauma Management Programme 9. 2 Trauma care centres (Narok, Kilgoris)
7. Terminal Illnesses Care 10. 1 Hospice (aged, debilitative, palliative care)
2. Public
health
3. Mitigation of Environment induced
health conditions
8. Community Outreach and Public Health Extension Programme 11. Quarterly Urban Neighbourhood cleanup campaigns
12. Quarterly hand washing campaigns
9. Disease Surveillance Programme 13. Disease Control Centre in Narok
4. Eradication of Culture-induced health
complications
10. Harmful practices eradication programme 14. Anti-FGM Campaign
15. Domestiv Violence Response Unit
16. Training of Traditional Birth Attendance
5. Mitigation of Lifestyle Diseases 11. Healthy Lifestyles Promotion Programme 17. Nutrition and healthy lifestyles campaign
Sector Health
Sector Vision A healthy and productive people.
Sector Mission To provide quality, affordable and accessible curative and preventive healthcare services.
Sector Justification - For reduced prevalence of disease.
- For improved health and quality of life.
- For reduced morbidity and mortality.
Narok County Integrated Development Plan (2013 -17) Page 10
Detaled Health Sector Plan
Sub-
sector
Priorities Constraints Strategies Programmes Projects Objectives 5 years
Targets
Location
Medical
Services
Neonatal and
maternal health
Inadequate facilities Construct maternity
facilities.
Maternity facilities
programme
New maternity facilities To reduce neonatal and maternal
neonatal morbility and mortality
30 Every sub location
Poor referral mechanism Provide ambulances Ambulance
programme
Ambulance purchase To improve referral system for
neonatal and maternal cases
10 NDH,KDH,ODH,N/EDH,LDH
,EMURUA DIKIRR
Human resources
for health
Lack of adequate HRH Recruitment HRH programme HRH recruitment To improve capacity to provide
quality services.
350 Countywide
Training HRH programme Training HRH To improve capacity to provide
quality services.
324 Two per health facility in
the county
Management of
health facilities
Lack of functional health facility
manageent structures
Training of management
teams
Governance and
management
programme
Training of health
facilities managers
To improve management of
health facilities
162 1 person in all the
hospitals countywide
Trauma
management
Lack of functional trauma respose
and managment teams
High prevance of trauma (accidents
and violence)
Emergency
preparedness
Emergency
preparedness
programme
Emergency ad reponse
teams
To enhance capacity to respond
to emergencies
20 All referral and district
hospitals
Financial
management in
health facilities
Lack of automated cash colllection
systems
Automating cash
collection system
Financial management
programme
Compurised cash
registers
To improve revenue collection in
hospitals
10 Countywide
Inaquage finnacial management
skills
Training financial
managers
Financial management
training
To improve financial
management skills
324 Two per health facility in
the county
Non-compliance to waivers
guidance.
Regulation of waiver
system to benefit the
needy
Waiver programme Waiver fund To waive bills for poor patients 90 All public health facilities
with inpatient services
the County
Lack of clarity on waiver system Review/development of
waiver guidelines
Waiver
policies/guidelines
To improve compliance on
waiver guidelines
1 County
Health facilities
infrastructure
Lack of medica equipment. Purchase of equipment Equipment
improvement
programme
Medical equipment To improve quality of service
delivery
100 County wide
Lack of ICT Purchase of computers ICT equipment 150 All health facilities in the
county
Lack of adequate buildings Construction of new
health facilities
Construction/renovati
on programme
Construction of new
health facilities
To improve access to healthcare
services.
9
Mokondo, Oloirowua,
Tikako, Kawai, Olesharo,
Enkiloriti, Chemamit,
Esoit, Ngoswan ,etc
Narok County Integrated Development Plan (2013 -17) Page 11
Sub-
sector
Priorities Constraints Strategies Programmes Projects Objectives 5 years
Targets
Location
Upgrading health
facilities
Construction/renovati
on programme
Referral health facilities To improve access to primary
health care
4 Narok, Kilgoris,
Ololulunga, Lolgorian,
District health facilities To improve access to primary
health care
15 TBD
Health Centres To improve access to primary
health care
9 N/ENKARE.Narosura,
E/DIKIRR,Sogoo,NTULELE,
NCHIPISHIP,O/NGATA
BARIKOI,OLOKURTO
Incinerators To improve waste disposal of
medical waste
13 Sub-county and County
referral hospitals
Mortuary coolers To improve access to mortuary
services
4 4 county referral
hospitals
Diagnostic services (lab) To improve quality of service 30 High volume facilities in
the County
Health
Management
Information
System
Lack of functional health managent
information system
Install HMIS in health
facilities
HMIS programme Data collections To improve data quality. 130 All public health facilities
Installation of eletronic
medical records
To improve patients’records. 10 High volume public
health facilities
Steady supply of
health products
Stock outs of health products Timely procurement and
distribution of health
products
Procurement and
distribution
programme
Procurement and
distribution
To ensure steady and timely
supply of health products.
105 All public health facilities
in the county
Lack of storage facilities Construction of storage
facilities
Health products
storage programme
County store To improve storage facilities for
health products.
1 Narok town
Sub-county stores To improve storage facilities for
health products.
4 All sub-counties
Facility-based stores To improve storage facilities for
health products.
105 All public health facilitie
Mismanagement of health products Automate inventory
management system
Inventory programme Inventory system To facilitate efficiency in
inventory management of health
products.
105 All public health facilitie
Renal services Lack of renal equipment. Establish of renal units Renal programme Renal units To enhance access to renal
services
2 Narok and Kilgoris
Hospice services Lack of facilities Integrate hospice
services within high
volume hospitals
Hospice programme Hospice Centres To enhance access to hospice
services
1 Narok
Narok County Integrated Development Plan (2013 -17) Page 12
Sub-
sector
Priorities Constraints Strategies Programmes Projects Objectives 5 years
Targets
Location
Public
health
Neonatal and
maternal health
Lack of awareness on neonatal
maternal health
Community sensitization Community Outreach
programme
Neonatal and maternal
health campaigns
To increase awareness in
neonatal and maternal health.
30 Every ward
Poor health seeking behaviour Community sensitization Community Outreach
programme
Health awareness
campaigns
To improve health seekign
behaviour.
30 Every ward
Inadequate community health
extension
Recruitment of CHEWs Community health
extension programme
CHEWs To increase the capacity on
community health extension.
364 Every sub location
Cultural practices Community sensitisation Community Outreach
programme
Health awareness
campaigns
To mitigate against negative
effects of cultural practices on
neonatal and maternal health
indicators.
30 Every ward
Capacity building
programme
Training of TBAs
To equip TBAs with knowledge
and skills in basic neonatal and
maternal health matters.
364 Every sub location
Training of alternative
medicine practitioners
To equip alternative medicine
practitioners with knowledge
and skills in basic neonatal and
maternal health matters.
364 Every sub location
Reproductive
health
Poor uptake of reproductive health
services
Integration of
reproductive health
services
Reproductive health
programme
Reproductive health
clinics
To increase uptake of
reproductive health services
125 All public health facilities
in Narok County
Retrogressive cultural practices. Community sensitization Community Outreach
programme
Awareness campaigns To increase awarness on range
of reproductive health service
offerings
30 Every ward
HIV/AIDS, TB and
Leprosy
Retrogressive cultural practices. Community sensitization Community Outreach
programme
Awareness campaigns To increase awareness on
harmful cultural practices.
182 Every sub-location
Stigma Community sensitization Community Outreach
programme
Awareness campaigns To increase awareness on
stigmatization of HIV/AIDS and
TB.
182 Every sub-location
Poor health seeking behaviour Community sensitization Community Outreach
programme
Health awareness
campaigns
To improve health seekign
behaviour.
30 Every ward
Unavailability of medication. Monitoring distribution
of medication
Health commodities
monitoring
programme
Rapid audits of health
commodities
To ensure availabity of drugs for
ART and TB treatment.
20 20% of health facilities
Poor accessibility to healthcare
services
Integrating ART and
PMCT care services
CCC programme CCCs To enhance accessibility of ART
and PMCT care services.
25 All health facilities in the
county
Narok County Integrated Development Plan (2013 -17) Page 13
Sub-
sector
Priorities Constraints Strategies Programmes Projects Objectives 5 years
Targets
Location
Low detection and
treatment TB cases
TB programme TB detection and
treament
To improve detection and
treatment rates of TB cases
97 All health facilities in the
county
Malaria and other
vector borne
diseases
Poor environmental conditions. Spraying of households Household spraying
programme
Spraying To prevent malaria spread. 22,800 In all locations
Distribution of LLITNs LLITNs programme LLITNs distribution To prevent malaria spread. 684,000 In all locations
Poor health seeking behaviour. Community sensitization Community Outreach
programme
Health awareness
campaigns
To improve health seeking
behaviour.
30 Every ward
Lifestyle diseases Lack of awareness.
Poor diet.
Opening wellness clinics
in high volume facilities.
Non-Communicable
Disease Control
Wellness clinics To reduce prevalence of lifestyle
diseases
11 Wellness clinics in County
and sub-county referral
hospitals
Human resources
for health
Lack of adequate HRH Recruitment HRH programme HRH recruitment To improve capacity to provide
quality services.
750 Countywide
Training HRH programme Training HRH To improve capacity to provide
quality services.
1250 Two per health facility in
the county
Communicable
diseases
High prevalence rates Hygiene promotion Hygiene promotion
programme
Hygiene promotion
campaigns
To increase awareness on
elimination of communicable
diseases.
30 Every ward
Handwashing facilities To reduce the prevalence of
communicable diseases.
350 12 schools per ward
Disease surveillance Disease surveillance
programme
Disease surveillance To monitor prevalance of
outbreaks.
100 All public health facilities
Sanitation facilities Sanitation programme Public toilets To improve public sanitation. 60 All townships in the
county
Village latrine coverage To improve public sanitation. 160 Villages per location
countywide
Waste disposal - public To improve public sanitation. 105 All public health facilities
Waste disposal –
households
To improve public sanitation. 6,000 200 households per
location with utensils
drying racks disposal pits
Narok County Integrated Development Plan (2013 -17) Page 14
Sub-
sector
Priorities Constraints Strategies Programmes Projects Objectives 5 years
Targets
Location
Sanitary health
inspection of food
premises and
institutions
Health inspection Health inspection
reports
To enforce health policies and
regulations.
60 All the townships
Eye care High prevalence of trachoma Community sensitization Community outreach Trachoma campaigns To precent blindness due to
trachoma
5 Countywide
Dental care Poor oral health practices Community sensitization Community outreach Oral health campaigns To improve oral health 20 Countywide
Health
Management
Information
System
Lack of functional health managent
information system
Install HMIS in health
facilities
HMIS programme Data collections To improve data quality. 105
All public health facilities
Purchase of smart
phones
To improve disease surveillance. 100
Public health
infrastructure
Inadequate transport facilities Purchase of vehicles and
motorbikes
Transport programme Motorbikes To facilitate mobility of health
workers for outreach
programmes.
30 Countywide for PHOs
Vehicles To facilitate mobility of health
workers for outreach
programmes.
8 Countywide –HMTs
Narok County Integrated Development Plan (2013 -17) Page 15
3 INDUSTRIALISATION SECTOR PROGRAMMES AND PROJECTS
Sector summary
Sub-sector Priority areas Programmes Flagship projects
1. Mining 1. Mapping and exploration 1. Minerals inventory programme 1. Resource mapping and exploration
2. Development of mining sector 2. Mining development programme 2. Gold mining at Lolgorian
3. Mining development framwork
3. Mining benefits distribution 3. Benefits distribution programme 4. Community development trust fund
2. Agro-processing 4. Milk processing 4. Milk processing programme 5. 12 Milk cooling plants
6. 1 Milk processing plant.
7. 12 Milk refrigeration trucks.
5. Livestock by-product processing 5. Livestock by-products processing programme 8. 1 Tannery
6. Meat processing 6. Meat processing programme 9. 1 Meat processing facility
7. Abattoirs programme 10. 4 Abattoirs
7. Farm input industry 8. Manure processing programme 11. 1 Animal Manure pelleting facility
8. Grain processing 9. Milling programme 12. 2 Milling plant
13. 1 Brewery plant
9. Sugar processing 10. Sugar programme 14. 2 Sugar factory
10. Tea processing factory 11. Tea programme 15. 2 Tea processing plant
11. Tomato processing 12. Tomato programme 16. 1Tomato processing facility
3. Light and cottage industry 12. Honey processing 13. Honey programme 17. 1 honey processing plant
13. Crafts and culture 14. Maasai artefacts 18. 1Production facility- craft-centres
15. Maasai attire/culture patenting programme. 19. 1 patent/branding/marketing/promotion centre.
Sector Industrialization
Sector Vision A vibrant industrial-led economy.
Sector Mission To facilitate value addition through competitive and innovative technology.
Sector Justification 1. Adds value to agricultural and livestock produce.
2. Creates jobs.
3. Promotes urbanization
4. Promotes regional competitiveness.
5. Promotes regional balance.
6. Taps natural resources.
Narok County Integrated Development Plan (2013 -17) Page 16
Detailed Industrialisation Sector Plan
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives 5 year
Targets
Location
Mining Revenue sharing
between national and
county government.
Non-existing framework
on revenue sharing.
Develop a framework for
revenue sharing with the
national government.
Policy and legislation
programme
Mining revenue
sharing framework.
To create a framework to enable local
communities benefit from mining.
Increase revenue to county
government.
1 County
Sensitization on
potential of mineral
resources.
Limited knowledge on
mineral resources.
Community sensitization Community Outreach
programme
Community
campaigns
To increase awareness of local
communities on their rights to benefit
from mineral resources.
5 Lolgorien and
other areas to be
identified
Land tenure issues.
Develop win-win strategy
between land owners and
government/investors
Stakeholder engagement
programme
Developing
framework for
engagement
To minimise conflicts arising from
resource use.
5 Lolgorien and
other areas to be
identified
Modernizing
technology used in
mining
Inappropriate
technology used in
mining.
Policy formulation on
technology and standards
for mining.
Policy, legislation
development programme
Mining technology
framework
To increase productivity in mining
To promote safe and envionmetally
friendly mining technologies
1 County
Identification and
mapping of mining
resources
Lack of inventory on
mining resources in the
County.
Identification, mapping
and inventorize of mineral
resources.
Minerals inventory
programme
Preparation of
minerals resource
plan
To determine county mineral potential.
To establish viability of all existing
minerals deposits in the county.
1 County
Exploration of
untapped mining
resources
High cost of exploration
of mineral resources.
Public Private
Partnerships with
potential investors.
PPP programme PPP in Mining
framework
To facilitate involvement of private
sector in exploration of mineral
resources
1 County
Agro
processing
Milk processing Seasonality.
Lack of processing
facilities.
Establish milk
cooling/processing plants.
Milk processing programme Milk cooling plants
To provide storage of milk. 12 One in each
constituency
Milk processing
plant.
To add value to milk products. 1 Narok
Milk refrigeration
trucks.
To facilitate timely transportation of
quality milk.
12 One in each
constituency
Poor quality milk due to
contamination
Capacity building (clean
production, quality inputs)
Capacity building
programme
Farmer trainings To improve the quality of milk from
farmers.
6 One training per
constituency
Milk processors
training
To improve the capacity of milk
processors on hygiene practices.
6 One training per
constituency
Narok County Integrated Development Plan (2013 -17) Page 17
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives 5 year
Targets
Location
Livestock by-product
processing
Limited production.
Lack of processing
facilities.
Livestock by-products
processing programme
Tannery To increase income from livestock by-
products
1 Narok town
Inadequate knowledge
on benefits of processed
products.
Sensitization of community Community Outreach
programme
Community
Outreach campaigns
To increase technical know-how on
processing of livestock by-products.
30 Each ward
Meat processing Lack of processing
facilities
Establish processing
facilities
Meat processing Meat processing
facility
To increase income from meat products. 1 Narok
Inadequate abattoirs Establish abattoirs Abattoirs programme Abattoirs
construction
To enhance safety of meat products. 4
abbortoirs
Suswa
Olokurto
Ewaso Ngiro
Kilgoris
Farm input industry Lack of infrastructure to
process farm inputs.
Establish farm input
processing facilities
Manure processing
programme
Manure processing
facility
To promote sustainable farming. 1 Olchorro
Grain processing Lack of processing
facilities in the county.
Promote post-harvest
processing.
Milling programme Milling plants To mitigate against crop perishability.
2 milling
plants
Narok and
Kilgoris
Brewery plant Job creation andincrease income. 1 Narok town
Sugar processing Inadequate sugar
processing facilities.
Contractual farming.
Promote presale value
addition.
Sugar programme Sugar factory To enable farmers get a better price
yield from crops.
2 Esoit Naibor-
Kilgoris
Lolgorian-
Kilgoris
Tea processing factory Inadequate tea
processing plants.
Enhance public private
partnerships in
establishment of tea
processing facilities.
Tea programme Tea processing
plant
To increase income for tea farmers.
To create jobs in the tea industry.
1 Shankoe -
Kilgoris
Tomato processing
Lack of processing
facilities.
Establishment of tomato
processing plants
Tomato programme Tomato processing
facility
Value addition to increase incomes. 2 plants Abossi- Emurua
Dikir, Narosura-
Narok South
Light and
cottage
industry
Honey processing Limited production. Promote commercial
production
Honey programme Establish honey
processing plant
Increase revenue earning
opportunities.
1 To be
determined.
Crafts and culture Inconsistency in quality
and supply.
Large-scale local artifacts
production.
Maasai artifacts
Production facility-
craft-centers
Job creation and income diversification 2 craft
centers
Narok town
Kigoris town
Lack of patents for crafts
and culture.
Establish mechanisms of
patenting Maasai attire
and culture.
Maasai attire/culture
patenting programme.
Establish a
patent/branding/ma
rketing/promotion
Ensure real owners of the culture
benefit and to minimise misuse of Maa
culture.
1
patenting
centre
Narok
Narok County Integrated Development Plan (2013 -17) Page 18
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives 5 year
Targets
Location
centre.
Human
resource
development
Human resource
development in
industrialization
Low local human
resource capacity in
industrialization
Capacity building to
increase skilled human
resource base
Industry wide trainings Short
courses/workshops
To build capacity of stakeholders in the
industry
6
seminars/
workshops
All County
Industrial Study
tours
To promote best practices in the
industry.
6 Study
tours
All County
Scholarships Mining To increase skilled human resources. 5 master
level
students
County wide
Agro-processing To increase skilled human resources. 10 master
level
students
County wide
Light cottage To increase skilled human resources. 15 master
level
students
County wide
Narok County Integrated Development Plan (2013 -17) Page 19
4 INSTITUTIONAL AND CAPACITY BUILDING SECTOR PROGRAMMES AND PROJECTS
Sector summary
Sub-sector Priority areas Programmes Flagship projects
1. Human resource Development 1. Skills development 1. Capacity building programme 1. Staff short courses training for 300 staff
2. Staff motivation and retention 2. Schemes of service 2. County pension scheme policy
3. Staff performance and management 3. Staff rationalisation and restructuring 3. Human resource audit/inventory
4. Human resources management system 4. Develop County Human Resource Information System (CHRIS)
5. Automation of registries
5. Results Based Management 6. Performance management tools
4. Tap expertise of County professionals 6. County Professions Engagement 7. Annual County Professions Forums
8. County human resources potential survey
2. Institutional Infrastructure
development
5. Transportation facilities 7. County transport 9. Purchase of 80 Vehicles in the county
6. Office accommodation 8. Construction/rehabilitation of buildings 10. Construction of county headquarters
11. Construction of sub county administrative/service delivery units
12. Rehabilitation of 30 existing buildings
7. ICT for service delivery 9. Internet infrastructure and Connectivity 13. ICT infrastructure at County HQs and sub-county levels
10. ICT training programme 14. ICT short courses for County HQs and sub-county staff
3. Internal Controls Systems 8. Financial, procurement, and asset
management systems
11. Financial, procurement, and asset
management systems
15. Automation of Payroll, revenue collection, procurement system
and asset registers
4. Public Private Partnerships 9. Institutional linkages and partnerships 12. PPP programme 16. Establishment of PPU Unit in the County
17. PPP feasibility studies, PPP fora and projects
Sector Institutional and Capacity building
Sector Vision
Effective service delivery.
Sector Mission
To strengthen institutional capacities and provide skilled human resource to enhance public service
delivery in the County.
To ensure efficient and effective resource management and accountability
Sector Justification Better service delivery.
Inculcates good governance and management culture.
Ecourages Public Private/Public Public Partnerships.
Ensures effective and efficient utilization of resources.
Promotes innovation, skills and talent development in the public service.
Narok County Integrated Development Plan (2013 -17) Page 20
Detailed Institutional and Capacity Building Sector Plan
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives 5 year
Targets
Location
Human resource
Development
Skills
development
Inadequate funding Increase funding for skills
development
Capacity building
programme
Training needs assessment To establish training needs of
county staff.
1 County wide
Lack of training policy Development a policy
framework for training
Staff short courses training To enhance skills and knowledge
of County staff to enable them
improve their performance.
200 County wide
Professional courses training To improve the capacity of
prefessionals.
100 County wide
Training policy framework 1 Narok
Staff motivation
and retention
Inadequate funding Develop staff motivation
and retention policies.
Schemes of service County pension scheme
policy
To enhance staff motivation and
retention.
Lumpsum County wide
Annual staff progression Lumpsum County wide
Staff motivation Annual staff of the year
awards
To recognise and reward best
performance.
5 County wide
Staff performance
and management
Unclear structures
resulting in duplication of
functions and inefficiency
Reform governance and
management structures.
Staff rationalisation
and restructuring
Human resource
audit/inventory
To clean the County staff roll. 1 County wide
Lack of an integrated
human resources
management system
Automate human
resources management
Human resources
management system
Develop County Human
Resource Information
System (CHRIS)
To enhance human resources
management.
1 County wide
Automation of registries To create an integrated human
resources registry.
All
registries
County wide
Lack of results based
management frameworks
Develop staff performance
improvement measures
Results Based
Management
Performance management
tools
To enhance performance of
county staff in service delivery.
Lump sum County wide
Tap expertise of
County
professionals
Lack of channels to engage
County professionals
Establish mechanisms for
periodic engagement with
County professions.
County Professions
Engagement
County Professions Forums To tap expertise of County
professionals in delivery the
development agenda of the
County
5 Narok/Nairobi
Lack of data on county
human resources
potential.
Conduct survey on county
human resources potential
County human resources
potential survey
To establish county human
resource potential
1 Narok/Nairobi
Institutional
Infrastructure
development
Transportation
facilities
Inadequate pool of
vehicles at the county
Allocate adequate funds
and engage in
procurement.
County transport
programme
Vehicles To improve mobility of County
staff.
80 County wide
Narok County Integrated Development Plan (2013 -17) Page 21
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives 5 year
Targets
Location
Office
accommodation
Lack of adequate office
facilities
Construction/rehabilitation
of county offices.
Construction/rehabilit
ation of Buildings
Construction of new
buildings
To create more space for office
accommodation.
10 Kilgoris, Emurua
Dikirr, Narok North,
Narok East, Narok
West.
Rehabilitation of existing
buildings
To create more space for office
accommodation.
30 Kilgoris, Emurua
Dikirr, Narok North,
Narok East, Narok
West.
Office furniture
facilities
Lack of adequate office
equipment and facilities.
Equipping offices with
required facilities.
Office furniture Executive seats To create an enabling office
working environment.
350 County wide
Executive tables 200 County wide
Cabinet shelves 40 County wide
Conference furniture (tables
– seats)
6 HQs and sub –
County level
Office equipment Air conditioners 80 HQs and sub –
County level
Fans and heating appliances 80 HQs and sub –
County level
Power supply Lack of generators Buy and install generators
in government buildings.
Power supply Generators To minimise interruption in
service delivery.
6 County wide
ICT for service
delivery
Lack of ICT infrastructure
and systems
Improve internet
connectivity
Internet Connectivity LAN/WAN at HQs and sub-
county
To improve internet connectivity. All buildings County wide
Installation of ICT facilities Internet equipment PCs To facilitate staff to use ICT in
performing their functions.
200 County wide
Laptops 100 County wide
UPSs small 100 Country wide
UPSs large 4 County wide
Printers 40 County wide
Training staff in ICT
applications
ICT training
programme
ICT short courses To build capacity of staff in use of
ICT.
400 County wide
Internal
Controls
Systems
Financial,
procurement, and
asset
management
systems
Manual management
systems.
Automation of
management systems
Financial Management
programme
Automation of Payroll
system
To improve internal control
systems to facilitate
effectiveness and efficiency in
management.
1 County wide
Automation of Revenue
collection system
To increase revenue collection. 1 County wide
Narok County Integrated Development Plan (2013 -17) Page 22
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives 5 year
Targets
Location
Procurement
programme
Automation of procurement
systems
To facilitate timely procurement
of goods and services.
1 County wide
Asset management
programme
Automation of asset
registers
To improve on asset
management.
1 County wide
Public Private
Partnerships
PPP framework
for engaging with
the private sector
Lack of a framework to
engage with the private
sector.
Domesticate and
implement PPP Act 2012.
PPP programme Establishment of PPU Unit To improve coordination of PPPs
in the county.
1 County
Feasibility studies in PPPs To estabish viability of PPPs in
different sectors.
5 County
Hold fora with the private
sector
PPP fora (Annual) To faciliate engagement with
private sector.
5 Narok
PPP projects (Annnual) To finance development projects
using PPPs.
5 TBD
Narok County Integrated Development Plan (2013 -17) Page 23
5 GENDER, YOUTH AND SOCIAL SERVICES PROGRAMMES AND PROJECTS
Sector summary
Sub-sector Priorities Programmes Flagship Projects
Sports Talent development Talent development programme 2 Olympic size sporting stadia and 4 training camps
Children service Children growth and development Children development and welfare programme 10 neighbourhood day-care centres,
2 Children parks and play grounds
Gender Gender equality Anti-gender-based violence programme 1 rescue/rehabilitation centre
Affirmative action programme Women’s enterprise fund
Youth affairs Youth employment Vocational training programme 1 vocational facility
Enhanced youth enterprise fund 10 million per year
Orphans and vulnerable children(OVC) Access to opportunities Orphans and Vulnerable C enablement programme OVC fund
Child abuse and exploitation Child rescue programme 1 children’s home
Persons with special needs Societal and economic integration Disability mainstreaming programme 100 Special unit in selected learning institutions
Elderly Quality of life Social welfare programme Elderly welfare fund
Hospice
Detailed Gender, Youth, Sports and Social services Sector Plan
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives 5 years
Targets
Location
Sports Provide and maintain sporting
facilities in the county
Low funding on sports Establish training camps and
grounds to nurture emerging
talents
Nurturing sporting
talent
Construct training
camps
To tap the sporting talents 1 Constituency
Train teachers on physical
education
Low or no sporting culture
Among the people
Provide and support sporting
talents
Nurturing sporting
talent
Talent identification In order nurture and
diverse skills
50,000 Countywide
Sector Gender, Youth, Sports and Social services
Sector vision A just, equal and cohesive society
Sector mission To improve individual and societal wellbeing through affirmative action, talent promotion and social service.
Sector justification Identify and Nurture talents for personal and societal development.
Provides conducive environment for personal growth and development.
Accords persons with special needs the opportunity to self-actualize in all spheres.
Promotes Equity and social cohesion
Narok County Integrated Development Plan (2013 -17) Page 24
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives 5 years
Targets
Location
Nurture the sporting talents
Preoccupation with other
chore
Leaving little time for
sporting
Nurturing sporting
talent
Training PE teachers
In order nurture and
diverse skills
120 Ward
Enhance sporting tourism in the
county
Lack of sponsorship To introduce sport completions
among the sub- counties
sporting tourism
programme
Organizing annual
county marathon
events 75KM, 42KMS
AND 21KMS
To develop sporting culture
and promote cohesiveness
4 County Level
Sporting facilities Secure and Construct
two sporting stadiums
To provide adequate
facilities for promotion of
sporting activities
2 Kilgoris/Narok
town
Advocacy Programmes Hold stakeholders
forum in each
constituency
Create awareness on the
importance of sports
60 Countywide
Children
Services
To provide conducive
environment for children to
grow and develop to their full
potential
Lack of resources Provide appropriate and
adequate children institutions
and services
coordinate delivery of
services to children
institutions
Inspections of
charitable children
institution
To coordinate delivery of
services to children
institutions
GoK Narok/kilgoris
Unfavourable cultural
practices
To promote the rights
and welfare of children
To increase
accessibility of
Departmental services
to the public
Opening of children
department in every sub
county
4 Sub county
Right of Children to
Participate
Children
Parliament/assemblies
To involve children in
Decision making in
development and in Issues
affecting them
120 County wide
Care and Protection in
Statutory institutions
To construct
2 children cells
1children remand
Home
1 Rehabilitation
school’
Effective rehabilitation
programmes
4
To effectively
coordinate Alternative
family care service
To provide Quality
adoption
Foster care
Guardian
Coordinate and provide
informed leadership in
quality alternative family
care services for deserving
children and Caretaker
GoK County wise
Narok County Integrated Development Plan (2013 -17) Page 25
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives 5 years
Targets
Location
To develop an effective
monitoring and
evaluation frame work
on children issues
Develop monitoring
and evaluation frame
work
Coordinated mechanism of
children’s issues
GoK County wise
Gender Gender based violence .patriarchal cultural
systems
Awareness creation
5.1 Law enforcement
Anti-gender-based
violence programme
Awareness campaign To sensitize community
against culture
60 County wide
Anti GBV enforcement
programme
Employ social workers To give home based training
on eradication of gender
inequality
40 County wide
Open gender desk in
all police section
To facilitate the reporting of
GBV incidents for easy
action by the GoK
GoK County wide
Toll Free calling
stations
To facilitate the reporting of
GBV incidents for easy
action by the GoK
1 County wide
Lack of empowerment Establish rescue and
rehabilitation services
Anti GBV rescue
programme
Establish Rescue
rehabilitation centre
To savage the victim
S of gender violence from
victimisation
1 County wide
Provide Entrepreneurship skills GbV and empowerment
programme
Entrepreneurship skill
development centre
To empower them with
skills
1000 County wide
Affirmative action Low level of education Formulate and promote girl-child
disadvantaged focused education
policy
Gender and disabled
focused education
programme
Build centres of
excellence for target
groups
To increase opportunities to
the disadvantaged
1 County wide
Sensitization and awareness
creation
Education awareness
promotion programme
Awareness campaigns To create awareness 60 County wide
Provide sanitary services for
women and girls from poor
households
Mainstreaming girls
and women in
development process
Provide sanitary pads
to girls and women
To increase self esteem and
maintain personal dignity
100000 County wide
Promote special-needs focused
policies and practices
Special needs
programme
Awareness campaigns To mainstream female
gender in the society
60 County wide
Skewed gender roles Sensitization and awareness
creation
Gender-roles
reorientation
programme
Awareness campaigns
against gender role
stereotypes
To sensitize the community 60 County wide
Promote equal decision-making
in maternal and reproduction
matters
Empowerment on their
rights to information on
maternal health and
Education and training
of women
To sensitize the community
women
2 County wide
Narok County Integrated Development Plan (2013 -17) Page 26
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives 5 years
Targets
Location
level ground in decision
making programme
Promote enforcement
of 2/3 rule in all
institution of learning
Enforcement of2/3
rule in all institution
To enforce TBD County wide
Retrogressive cultural practices Opposition from society Sensitization and awareness
recreation
Awareness creation Campaigns To sensitize the community 60 County wide
Strengthen legal enforcement
framework
Full enforcement on
gender based violence
Enforcement of gender
based project
To enforce GoK County wide
Weak legal enforcement
frame work
Legislate against retrogression Policy formulation on
retrogressive cultural
practices
Drafting of policy
targeting cultural
practices
To protect women against
retrogressive cultural
practices
GoK County wide
Media liberalization and Content
regulation and enforcement
Content monitoring and
regulation programme
Media campaign on
gender violence
To disseminate information
to the community on
benefits of gender equality
60 County wide
Youth
affairs
Employment creation Lack of entrepreneurial
skills, vocational skills and
agri-business
Establishment of vocational
training to boost skills
Vocational training
programme
Construction of
vocational facilities
To impart employable skills
to the youth
3 County wide
Lack of capital Economic empowerment through
enterprise fund
Youth enterprise
programme
Youth enterprise fund
project
To enhance access to
financing of youth
enteprises
GoK County wide
Involvement of youth in
illicit drinks and drug
abuse
Law enforcement To eradicate production and
consumption
GoK County wide
Inadequate
institutional structure
Strengthen the youth
empowerment institution frame
work
Youth empowerment
programme
Monitoring and
evaluation youth
empowerment
structure
To strengthen the existing
youth empowerment
institutional framework
GoK County wide
Moranism and other
retrogressive cultural
practices
Legislate against retrogressive
practices
Legislation against ret
rogation programme
Draft a legislation of
Legislation against ret
rogation practices
To liberate the youth from
retrogressive cultural
practices
GoK County wide
Sentization and awareness
creation
Sentization and
awareness
Campaigns To create awareness 60 County wide
Orphans and
venerable
Create an environment where
orphans and vulnerable
Voicelessness due to
threat from parents
Promote advocacy for OVCs OVCs rights
programme
Recruit legalofficers
dedicated to fight for
To Raise a Voice for the
voiceless
4 County wide
Narok County Integrated Development Plan (2013 -17) Page 27
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives 5 years
Targets
Location
children children will grow and develop
to attain full potential
against reporting the
violation of their rights
the rights OVCs
Child labour Retrogressive cultural
practices that are
disadvantageous children
Enforce state law against child
labour
Anti-Child labour
programme
Campaigns and
sensitization
To create sensitization 60 County wide
High level of poverty Lack of economic
empowerment for
vulnerable children
Economic empowerment for
benefactors of OVCs
Entrepreneur and life
skill training
programme
Cash transfer fund To empower parents with
vulnerable children
economically
20,000 County wide
Entrepreneur and life
skill training project
To empower parents with
vulnerable children with
skills
4 County wide
Lack of adequate targeted
institution for the orphans
and venerable children
Establish of a girl rescue centre Child rescue
programme
Construction of rescue
centre
To savage them from early
marriages and FGM
4 County wide
Establish a children home for the
orphans
Child rescue
programme
Construction of
children home
To help them have a better
life
4 County wide
Compromised administrative
forces that assist in defeating
justice
Promote advocacy for the
OVCs to access justice
Hire lawyers for OVCs OVCs Advocacy for
programme
Recruit dedicated OVCs
legal officers
To promote advocacy for the
voices less in the society
(OVCs)
4 County wide
Inadequate facilities for
disabilities
Erect a disability facility Development fund for
disability programme
Construction of
disability facility
project
To grant them right of
education
4 County wide
Persons
with Special
needs
Grant PWD decent living and
access to opportunity in social
economic political and physical
realm
Stigma due to un
favourable cultural values
Mainstreaming and
instutionalising PWD in
development process
Awareness creation
that disability is not in
ability
Sensitization campaign
on how to embrace
PWD in society
To dis-stigimize the
community
60 County wide
Weak enforcement on the
Persons with disabilities
Act
Strengthen the enforcement arm
on affirmative action towards
PWD guaranteed in the
constitution
Disability
Mainstreaming
Programme
Enforcement of law To protect them against
social, political, economic
and physical limitation.
GoK County wide
Inadequate of learning
institution that address
special needs
Mainstreaming and
instutionalising PWDs in
development process
Disability
Mainstreaming
programme
To establish a special
unit in every learning
institution to cater for
those people with
special needs
To address special learning
needs of PWD
30 County wide
Narok County Integrated Development Plan (2013 -17) Page 28
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives 5 years
Targets
Location
Elderly Improve quality of life to
elderly
Lack of safety nets Provide safety nets Social welfare
programme
Cash transfer fund 12000 County wide
Recruit social workers
to extend Home based
care
200 County wide
Sensitization project
for children to take
care of their parents
60 County wide
Narok County Integrated Development Plan (2013 -17) Page 29
6 ENERGY SECTOR PROGRAMMES AND PROJECTS
Sector summaries
Subsector Priorities Programmes Projects
1. Electricity 1. Rural electrification 1. Rural Electrification program 1. Rural electrification subsidy
2. Hydroelectricity development 2. Hydro electrification development program 2. 1 Hydroelectric development project
2. Bio mass 3. Wood fuel sufficiency 3. Wood fuel provision programme 3. Wood lots,
4. 50,000 Energy saving Jikos
4. Bio-diesel 4. Bio-diesel development programme 5. 1 Bio-diesel development project
3. Alternative energy sources 5. Geothermal power generation 5. Exploration of geo thermal energy 6. 1 Geothermal power plant at Suswa
6. Wind energy 6. Exploration of wind energy 7. Wind energy investment fund
7. Solar energy 7. Solar energy adoption programme 8. Solar Energy Fund
8. Biogas 8. Bio gas use promotion programme 9. Biogas installation subsidization fund
Detailed Energy sector plan
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year target Location
Electricity Rural electrification Low percentage of
connectivity to
households
Alternative financing options
Rural Electrification
program
Rural electrification
subsidy
To enhance affordability of
rural electrification
50000 house
holds
County wide
Dispersed settlements in
the vast county
Encourage concentrated
development
Sensitization and
awareness campaigns
To improve access to
affordable lighting
10 campaigns County wide
Sector Energy
Sector Vision Sustainable, clean and affordable energy for enhanced productivity.
Sector Mission
To provide efficient, reliable and cost effective energy through exploration of potential alternative energy sources in the County.
Sector Justification
a. To balance regional growth.
b. To improve living standards.
c. To improve livelihoods.
d. To support industrialization.
e. To conserve of environment.
Narok County Integrated Development Plan (2013 -17) Page 30
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year target Location
Establish a legal
framework to guide
compact/concentrated
development
To legalize and
institutionalize
compact/concentrated
development
1 County wide
Lack of sensitization on
available alternative
sources
Encourage and promote
alternative sources of
electricity
Sensitization and
awareness on
alternative sources of
electricity
Enhance knowledge and
appreciation of alternative
sources of energy
10 County wide
Hydroelectricity
development
Lack of geo-technical
data
Undertake a feasibility study Hydro electrification
development program
Feasibility study on
hydro electricity
production
To gain knowledge on the
potential of hydroelectricity
development
1 Mau area/Ewaso
ngiro
Lack of investments in
hydro electricity
Invest in hydroelectricity
development
Hydroelectric
development project
To supply electricity 1 Mau area/
Ewaso ngiro
Bio mass Wood fuel
sufficiency
Scarcity of forest
biomass
Planting exotic trees Wood fuel provision
programme
Wood lots To provide wood fuel Lump sum County wide
Energy wasteful
technologies.
Adopt efficiency biomass to
energy conversion
technologies
Energy saving Jikos To conserve wood fuel
consequently reduce women’s
workload
Lump sum County wide
Bio-diesel Lack of appropriate
technology
Encourage public private and
strategic investors
Bio-diesel development
programme
Bio-diesel development
project
To provide bio-diesel Lump sum County wide
Fossil fuels Paraffin substitution Lack of alternative
sources
Substitute with alternative
sources
Paraffin substitution
programme
Research on alternative
sources
To provide clean and cheap
energy
1 County wide
Alternative
energy sources
Geothermal power
generation
Community resistance
due to conflict of interest
Community sensitization Exploration of geo
thermal energy
Sensitization campaigns To create awareness on
importance of alternative
sources
1 Suswa
High cost of investment Strategic investors and public
private partnerships
Geothermal power
plant at Suswa
To increase energy sources 1 Suswa
Wind energy Lack of appropriate
technology
Research and study on wind
technology
Exploration of wind
energy
Feasibility study To increase energy sources 1 County wide
High cost of investment Encourage public private and
strategic investors
Wind energy
investment fund
To increase energy sources Lump sum County wide
Narok County Integrated Development Plan (2013 -17) Page 31
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year target Location
Solar energy High cost of installation Subsidize the provision of
solar energy
Solar energy adoption
programme
Solar Energy Fund To promote affordable and
clean energy
Lump sum County wide
Biogas High installation cost Promotion of biogas use Bio gas use promotion
programme
Biogas installation
subsidization fund
To provide clean and
affordable energy
10,000 house
holds
County wide
Narok County Integrated Development Plan (2013 -17) Page 32
7 URBANISATION SECTOR PROGRAMMES AND PROJECTS
Sector URBANISATION
Sector Vision Towards well planned, functional, sustainable, liveable, and beautiful towns within Narok County.
Sector Mission
1. Regulated Urbanisation for sustainability town development
2. Targeted urban investment for Regional competiveness
3. Balanced urbanization for County Growth
4. Facilitative urban management for productivity and equity
Sector Justification
Balanced regional growth
Improved living standards and environments
Support for value addition through industrialization
Tapping the development of unique sub-regional resources
Inter-county competitiveness through linkages
Peace building through cosmopolitan urbanisation
Themed urbanization (administrative, recreational, transit etc) for intra-county competitiveness
Urbanisation Sector Summary
Sub – sector Priorities Programmes Flagship projects
1. Urban growth management 1. Integrated and strategic urban
development plans
1. Urban planning programme 1. Integrated and strategic urban development plans (8 major
towns)
2. Establishment of a town planning department-
2. Development Control and enforcement 2. Development control and regulatory framework
programme
3. Land information system development
4. 60 township development plans
2. Community Facilities and amenities 3. Market Places 3. Community facilities development programme 5. 60 Market structures in urban areas
4. Social halls 6. 8 Social halls
5. Public convenience 7. 16 Public Toilets
6. Cemetery 8. Acquisition of 300 Acres for cemetery
3. Housing 7. Public servants housing 4. Public servant’s housing programme 9. Construction of 500 houses for public servants
8. Middle class medium density housing 5. Medium density housing programme 10. Construction of 500 medium density housing using available
low cost materials
Narok County Integrated Development Plan (2013 -17) Page 33
9. Slums upgrading 6. Slum upgrading programme 11. Land adjudication and registration
4. Recreation and entertainment 10. Recreation/Entertainment facilities 7. Recreation facilities development programme 12. Construction of 10 stadia
5. Open, green and blue spaces and parks 11. Open , Green blue and recreation al
spaces
8. Land banking programme 13. Acquisition of 300 acres
9. Land Repossession programme 14. Public utility plot repossession
6. Electricity 12. Rural centres electrification 10. Rural Electrification program 15. Rural electrification subsidy fund
13. Street lighting 11. Street lighting programme 16. Street lighting fund
7. ICT 14. Telephony and data conveyance 12. ICT improvement programme 17. Fibre optic installation
15. Digital mass media 18. 1 local radio station
8. Water Supply 16. Water reservoirs 13. Water supply programme 19. Construction of 3 water reservoir
17. Water treatment plant 20. Construction of 3 water treatment plant
18. Water reticulation 21. Construction of 3 water reticulation system
19. Rural water supply 22. Drilling of 60 bore holes
20. Water storage facilities 23. Rehabilitation of 18 water projects
9. Sewerage services 21. Sewerage disposal and treatment 14. Sewerage treatment programme 24. Construction of 2 sewer treatment plant
15. Sewerage disposal programme 25. Develop 2 sewerage reticulation system
10. Solid Waste management 22. Solid waste disposal and collection 16. Solid waste management programme 26. Purchase of land for40 solid waste disposal sites
27. Purchase of 500 skips
28. Purchase of 1000 dustbins
11. Drainage 23. Storm water drainage 17. Drainage Development and maintenance programme 29. Reclamation of encroached reserves
30. Construction of 4 check dams
Narok County Integrated Development Plan (2013 -17) Page 34
Detailed Urbanisation Sector Plan
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year
targets
Location
Urban growth
management
Integrated and strategic
urban development
planning
Planning Allocate funds for urban
planning
Planning in phases
Urban planning
Programming
Preparation of Integrated and
strategic urban development
plans
To guide urban
development
8 Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Ole Tipis, Suswa,
Ntulele, Ololulunga
Lack adequate
technological capacity
Improve access to relevant
technology and data.
Awareness on benefits of
planning
Purchase of planning
equipment and resources
Enhance
technological
capacity
Lump sum County wide
Development Control and
enforcement
Lack of information Develop a Land information
database
Development
control and
regulatory
framework
Develop Land information
system
To provide Land
information and
database
1 County wide
Lack of townships
development plans
Develop a framework for
development control
Preparation of township
development plans
To control
developments
60 County wide
Weak enforcement
framework
Strengthen through
legislation
Development
control and
regulatory
programme
Development control
enforcement
Ensure conformity to
development plans
30 County wide
Weak political and public
support
Sensitization and awareness
creation
Awareness and
sensitization
programme
Awareness and sensitization
campaign
Enhance public and
political goodwill
60 County wide
Community
Facilities and
amenities
Market Place Inadequate market
centres
Provision of market places Community
facilities
development
programme
Development of market
structures in urban areas
Provide market
facilities
60 County wide
Social halls Poor planning In cooperation in
development plans
Planning for social facilities Allocate space for
social halls
- Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Ole Tipis, Suswa,
Ntulele, Ololulunga
Lack of space Land acquisition and banking Acquisition of land Provide land for
social halls
8 Acres Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Ole Tipis, Suswa,
Ntulele, Ololulunga
Inadequate social
facilities
Provision of social facilities Construction of social halls Provide social
convenience
8 Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Narok County Integrated Development Plan (2013 -17) Page 35
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year
targets
Location
Ole Tipis, Suswa,
Ntulele, Ololulunga
Public convenience Inadequate public
convenience
Provision of public
conveniences
Construction of Public Toilets Enhance public
convenience in
urban areas
16 Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Ole Tipis, Suswa,
Ntulele, Ololulunga
Promote public private
partnerships
Lack of space Land Banking Acquisition of Land Provide space for
construction of
Public amenities
8 acres Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Ole Tipis, Suswa,
Ntulele, Ololulunga
Cemetery Lack of suitable space Land Banking Acquisition of Land for
cemetery
Provide space for
cemetery
300 acres County wide
Land grabbing
Poor maintenance Institution of management
and maintenance framework
Maintenance and management
of cemeteries
Maintenance of the
cemetery
lumpsum County wide
Housing Neighbourhood
development
Lack of planning and
development regulation
controls
Preparation of a plan and
enforcement of development
regulations control
Neighbourhood
planning and
development
programme
Preparation of neighbourhood
plans (development and
renewal)
To achieve serviced
well designed and
liveable
neighbourhoods
8 plans Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Ole Tipis, Suswa,
Ntulele, Ololulunga
Enforcement of Development
control by laws and
regulations
To achieve serviced
well designed and
liveable
neighbourhoods
- Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Ole Tipis, Suswa,
Ntulele, Ololulunga
Piecemeal development
and incremental growth
zoning Preparation of neighbourhood
plans
To achieve
harmonious
development
- Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Ole Tipis, Suswa,
Ntulele, Ololulunga
Enforcement of Development
control by laws and
regulations
To achieve serviced
well designed and
liveable
neighbourhoods
- Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Ole Tipis, Suswa,
Ntulele, Ololulunga
Poor design and
construction of houses
Enforcement of Development
Control
Supervision and Enforcement
of development controls
To ensure
compliance with
stipulated standards
of housing
- Kilgoris, Lolgran,
Olpusimoru, Olokurto,
Ole Tipis, Suswa,
Ntulele, Ololulunga
Narok County Integrated Development Plan (2013 -17) Page 36
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year
targets
Location
Speculative development Tax idle land Enforcement of development
regulations
To control sprawl - All county towns
Public servants housing Resource constraints Public private Public servant’s
housing
programme
Construction of houses for
public servants
To provide a
conducive working
environment
500 Narok, Ololulunga,
Kilgoris, Emurua dikir
High cost of building
materials
Adapt low cost building
materials and appropriate
technology
Construction of houses using
low cost and appropriate
technology
To provide
affordable housing
- Narok, Ololulunga,
Kilgoris, Emurua dikir
Limited skills and poor
workmanship
Capacity building Capacity building
in building
construction
technology
programme
Training in construction
technology
To build capacity in
construction
technology
- Narok, Ololulunga,
Kilgoris, Emurua dikir
Lack of land for
construction
Acquire land
Partnerships with real
estate’s players
Private public partnerships
Land acquisition
programme
Purchase land To acquire land for
construction
350 acres Narok, Ololulunga,
Kilgoris, Emurua dikir
Middle class medium
density housing
Inadequate resources Allocate funds
Partnerships with real estate
players
Public private partnerships
Provide incentives to the
investors e.g. taxation
Medium density
housing
programme
Construction of medium
density housing using
available low cost materials
Increase number of
middle class housing
500 Narok, Ololulunga,
Kilgoris, Emurua dikir
Purchase land Land acquisition 350 acres Narok, Ololulunga,
Kilgoris, Emurua dikir
High cost of building
materials
Adapt low cost building
materials and appropriate
technology
Promotion of low cost building
materials and appropriate
technology
To enhance
affordable housing
- County wide
Limited skills and poor
workmanship
Capacity building Capacity building Enhance skills and
development on
building and
construction
- County wide
Poor design and
construction
Enforce development control
measures
Development control and
regulations
To improve design
and construction
- County wide
Limited access to
housing finance
Enhance access to financial
resources and credit
facilities
Develop enabling environment
for private/public partnerships
and establish a housing
To improve access to
housing finance
Lumpsum County wide
Narok County Integrated Development Plan (2013 -17) Page 37
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year
targets
Location
development fund
Flouting of development
controls and regulations
Enforce regulatory control
frameworks
Development control and
regulations
Enhance compliance
with development
control regulations
County wide
Slums upgrading Land tenure system Establish ownership to land
rights.
Land adjudication and
registration
Security of tenure to
enhance quality
housing
development
Lumpsum Narok
Lack of political and
public goodwill
Awareness and sensitization Sensitization
programme
Sensitization campaigns Create awareness
on importance of
slum upgrading
5 Narok
Flouting of development
controls and regulations
Enforce regulatory control
frameworks
Development Control and
regulations
- Narok
Recreation and
entertainment
Recreation/Entertainment
facilities
Lack of space Allocate space Recreation
facilities
development
programme
Purchase of land To provide space for
construction
50 Acres County wide
(TBD) based on
need
Construction of stadia Enhance recreation
and entertainment
10 County wide
(TBD) based on
need
Poor maintenance Institute management and
maintenance framework
Maintenance of existing
facilities
Improve condition of
recreation and
entertainment
facilities
Lumpsum County wide
Mismanagement Institute management and
maintenance frameworks
Integrated
finance
management
system
capacity building Improve financial
management
10 County wide
Open, green and
blue spaces and
parks
Open , Green blue and
recreational spaces
Few land banks Purchase land banks Land banking
programme
Land acquisition Avail adequate land
for PU development
300 acres County wide
Land grabbing Reposes grabbed land Land
Repossession
programme
PU plot repossession To repossess
grabbed land
All
Narok County Integrated Development Plan (2013 -17) Page 38
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year
targets
Location
Awareness against Land
grabbing
Public utility
watchdog
Program
Awareness Campaign To enlist the
community in
safeguarding
against land
grabbers
8 campaigns County wide
Signage and Landmarks To protect PU land
against grabbers
TBD County wide
Legislate against Land
grabbing
PU land
demarcation, and
titling
programme
PDP preparation To locate PU land - County wide
Cadastral survey Demarcate the PU
land
- County wide
Registration of public utility
plots
Secure title Deed County wide
Limited resources Strategic investor Public
private partnerships
Lobby for Donor
funding/grants
Resource
mobilization
programme
Commercial concessions Improve provision
of services
County wide
Lack of a siting plan and
development guidelines
Prepare a siting plan and
development guidelines
Open and
recreational
space planning
programme
Preparation of siting plans
and development guidelines
Allocate space and
provide guidelines
for development
- County wide
Poor management and
maintenance
Institute management and
maintenance framework
Urban greening
programme
Landscaping Beautification of
open and
recreational spaces
30 County wide
Electricity Rural centres
electrification High cost of connection
Alternative financing options
e.g. stima loan
Rural
Electrification
program
Rural electrification subsidy
fund
To enhance
affordability of
rural
electrification
80000 house
holds
County wide
Dispersed settlements in
the vast county
Electrification as a social
service project and not
commercial venture
Alternative electricity sources
Solar, biogas and wind
To improve access
to affordable
lighting
80000 house
holds
County wide
Lack of sensitization on
available alternative
Encourage and promote
alternative sources of
Sensitization and awareness
on alternative sources of
Enhance
knowledge and
10 Campaigns County wide
Narok County Integrated Development Plan (2013 -17) Page 39
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year
targets
Location
sources electricity electricity appreciation of
alternative
sources of energy
Street lighting High installation cost Allocation of funds Street lighting
programme
Street lighting To ensure lighting
in all public areas
30 centres County wide
Poor maintenance Public private partnerships Street lighting maintenance
fund
Facilitate
maintenance of
street lights
30 County wide
High running Cost Public private partnership Street lighting Light and signage 30 County wide
vandalism Strengthen Law enforcement Law enforcement To protect the
street lighting
facilities from
vandalism
- County wide
ICT Telephony Inadequate network
coverage
Enhance network coverage ICT improvement
programme
Fibre optic installation Enhance
communication
TBD County wide
Data conveyance Low uptake Sensitise people on the
importance of data
conveyance
Fibre optic installation Enhance internet
access
- County wide (centres)
Digital mass media Poor coverage Enhance network Increase booster stations Enhance
dissemination of
information
- County wide
Establish local radio station Enhance
dissemination of
information
1 Narok
Water Supply Water reservoirs Inadequate facilities Provide space and resources
to construct water reservoirs
Water supply
programme
Construction of water reservoir Provide water
supply to the
urban and rural
population
3 Narok, Lolgorian
Kilgoris
Water treatment plant Inadequate treatment
facilities
Plan for water treatment
plants
Construction of water
treatment plant
Provision of clean
water
3 Narok, Lolgorian
Kilgoris
Water reticulation Inadequate reticulation
in urban areas
Provide resources for water
reticulation
Water reticulation Improve water
supply in urban
areas
3 Narok, Lolgorian
Kilgoris
Narok County Integrated Development Plan (2013 -17) Page 40
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year
targets
Location
Design To guide water
reticulation
system
3 Narok, Lolgorian
Kilgoris
Water bowsers Improve water
supply in urban
areas
8 Narok, Lolgorian
Kilgoris
Rural water supply Poor rural centres water
supply
Enhance access to clean
water in rural areas
Drilling of bore holes Improve water
provision in rural
areas
60 County wide
Construction of water kiosks Improve water
supply
18 County wide
Rehabilitation of the water
projects
Improve water
supply
18 County wide
Water storage facilities Lack of water storage
facilities
Improve water storage
facilities
Construction of masonry water
tanks
Provide water
storage facilities
100 County wide
Sewerage services Sewerage disposal and
treatment
Lack of sewerage
treatment plant
planning and construction of
treatment plant
Sewerage
treatment
programme
Construction of sewer
treatment plant
Treatment of
liquid waste from
urban areas
2 Narok, Kilgoris
Lack of sewer
reticulation in urban
areas
Install sewer reticulation
systems
Sewerage
disposal
programme
Develop a reticulation system To facilitate
conveyance of
liquid waste for
treatment
2 Narok, Kilgoris
Use of pit latrines in
urban areas
Encourage use of septic
tanks and cess pools
Sensitization on the use of
septic tanks and cess pools
Promote proper
sewerage
disposal
5 campaigns Narok, Kilgoris,
Lolgorian, Suswa, Ole
tipis
Few exhausters Encourage use of digesters Sensitization on the use of
digesters
Reduce the
volume of waste
to be exhausted
5 Narok, Kilgoris,
Lolgorian, Suswa, Ole
tipis
Poor construction of
septic tanks and cess
pools
Enforce regulations and
standards
Capacity building , control and
regulation of construction of
septic tanks and cess pools
Facilitate
collection and
disposal of
sewerage from
septic tanks and
cess pools
60 County wide
Solid Waste Solid waste disposal and
collection
Inadequate disposal
sites
Large volume of waste
Acquire landfills and
disposal sites
Solid waste
management
programme
Purchase of land for solid
waste disposal sites
To acquire land
for solid waste
disposal
40 (10 each) Narok, Ololulunga,
Kilgoris, Emurua dikir
Narok County Integrated Development Plan (2013 -17) Page 41
Subsector Priorities Constraints Strategies Programmes Projects Objectives 5 year
targets
Location
management generated
Inadequate disposal
skips
Acquire skips Purchase skips To facilitate
storage and
collection
500 County wide
Inadequate disposal bins Acquire dust bins Purchase dustbins To prevent
littering
1000 County wide
Proper waste
management
Lack of a solid waste
management system
framework
Strengthen the system Develop a framework for solid
waste management
To facilitate
collection of solid
waste in urban
areas
- Narok, Ololulunga,
Kilgoris, Emurua dikir
Solid waste conservation
measures sensitization (3Rs)
To reduce waste
and conserve the
environment
4 campaigns Narok, Ololulunga,
Kilgoris, Emurua dikir
Poor solid waste
collection services
Improve solid waste
collection services
Contracting solid waste
collection services
To facilitate
collection of solid
waste in urban
areas
4 Towns Narok, Ololulunga,
Kilgoris, Emurua dikir
Drainage Storm water drainage Encroachment of
drainage basins and
riparian reserves
Reclamation of encroached
spaces
Reclamation and
restoration
programme
Reclamation of encroached
reserves
Improve drainage
of storm water
Lump sum County wide
Restoration of riparian
reserves
Improve drainage
of storm water
Lump sum County wide
Diversion and closing of
natural water ways
Restoration of the water
ways
Restoration of natural water
ways
Improve drainage
of storm water
- County wide
Deforestation and
destruction of land cover
Increase land cover Reforestation and afforestation Increase land
cover and
minimize runoff
Lump sum County wide
Blockage of storm water
drains
Regular maintenance of
storm water drains
Development and
maintenance
programme
Maintenance of storm water
drains
Improve the
drainage of storm
water
Lump sum County wide
Construction of check dams Minimize flooding
and siltation in
storm water
drains rivers
Lumpsum County wide
Narok County Integrated Development Plan (2013 -17) Page 42
8 AGRICULTURE, LIVESTOCK AND FISHERIES SECTOR
Sector summary
Sub-sector Priorities Programmes Flagship Projects
Agriculture 1. Sector (farm) productivity 1. Mechanisation enhancement programme 1. Mechanisation guarantee facility
2. Meteorological information dissemination programme 2. 3 meteorological sub stations
3. Clean seed development programme 3. 1 tissue culture lab
4. Grain seed production farms (5000 Acres)
4. ‘Clean seed’ seed bulking programme 5. Potato seed multiplication centres (30 Acres)
5. Organic fertilizer promotion programme 6. 4 Livestock manure pelleting plant
6. Agricultural input support programme 7. 1.5 b Ksh Agricultural revolving fund
2. Irrigation promotion 7. Irrigation expansion programme 8. Farm Irrigation conversion project
9. 1.0b Ksh Credit facility to fund irrigation initiatives
10. 6 Water dams and water reticulation system construction
3. Traditional and high value
crops production
8. Traditional and High value crops Research programme 11. Traditional and High value crop research fund
4. Sector profitability 9. Pre & post harvest losses mitigation programme 12. 1.0 b Kshs Crop-loss insurance fund & 6 storage facilities
10. Post-harvest processing programme 13. 3 Primary level processing factories
11. Value addittion industrialisation programme 14. 6 Value addition factories
5. Soil and water conservation 12. Organic fertilizer use promotion programme 15. Organic fertilizer use campaign
13. Land reclamation programme 16. Degraded land reclamation
6. Climate change adaptation 14. Climate Change Adaptation and Implementation
Programme
17. Early warning system
Livestock 7. Sector productivity 15. Livestock breeds improvement programme 18. Breed improvement project (4,700 breeding animals)
Sector Agriculture, Livestock and Fisheries
Sector Vision
To become an economically vibrant and viable sector
Sector Mission
1. To improve livelihoods by optimizing production.
2. To adopt best practices in commercial agriculture.
3. To adopt and maintain sustainable animal and cash crop production practices.
4. To add value to primary farm products facilitating their competitiveness nationally and internationally.
Sector Justification
- Food security
- Employment creation and Incomes
- Industrialization and wealth creation
Narok County Integrated Development Plan (2013 -17) Page 43
Sub-sector Priorities Programmes Flagship Projects
19. Upgrade Narok Pastoral Training Centre to Middle Level College
8. Disease eradication 16. Disease control and surveillance programme 20. Disease free zones or compartments
9. Pasture provision 17. Pasture Improvement Programme 21. 30 Pasture development (Strategic feed reserve)
22. Feeds manufacturing plants
10. Water availability 18. Water harvesting and storage programme 23. 120 Water pans
11. Sector optimization 19. Market development programme 24. 1 Tannery
20. Profit Maximization Programme 25. Disaster preparedness and response contingency fund
Fisheries 12. Sector development 21. Fisheries development programme 26. 100 Fish pond
27. 20 Fingerlings breeding centre ( 1 m)
28. Stocking of water bodies
29. 1 Fish feed factory
30. 40 Extension services recruitment
13. Products marketing 22. Fish Products promotion programme 31. Fish Market in Narok Town
32. Construction of a processing plant and cooling plant
Detailed Agriculture, Livestock and Fisheries Sector Plan
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
Agriculture
Sector (farm)
productivity
Poor farming
techniques
Expand extension
services
Enhanced agricultural
extension services
programme
Recruit agricultural
extension personnel
To enable farmers access
information on better
farming techniques
30 extension workers
(1 per ward)
County wide
Purchase of extension
service motorbikes
To expand coverage of
extension services
30 motorbikes County wide
Low levels of
mechanization
Promote mechanization Mechanisation
enhancement program
Establish mechanisation
guarantee facility
To enable farmers purchase
agricultural equipment
Lump sum County wide
Farm equipment purchase
fund
To enable farmers acces
cheap mechanization options
Lump sum County wide
Farm equipment hiring
plan
To enable farmers hire
equipment at a subsidised
cost when season requires
Lump sum County wide
Unavailability of local
skilled labour
Train locals in
agricultural skills
Local farmers skills
improvement
programme
Training of farmers To enable farmers improve
farming skills for
productivity
Lump sum County wide
Narok County Integrated Development Plan (2013 -17) Page 44
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
Encourage labour
mobility
Periodic and collective
labour importation
programme
Labour recruitment To enable farmers to access
adequate labour during
planting and harvest season
Lump sum County wide
Adverse Impacts of
nature
Provide meteorological
information
Meteorological
information
dissemination program
Installation of
meteorological stations
Avoid adverse weather
impacts on crops
1 station Narok
Installation of
meteorological substations
To collect localised weather
variability information
3 substations County wide
Daily and seasonal
weather forecast
transmission
To keep the farmers abreast
with current weather
information
2 times daily radio
bulletin
County wide
Poor seed varieties Encourage the use of
disease-free seed
Clean seed development
programme
Construction of tissue
culture labs
To enable farmers gain
access to disease free seed
1 Lab Narok FTC
Grain seed production
farms
To have a reserve of grain
seed for planting
5000 Acres Narok North, East
Skills Development
Programme
Train seed production
personel
To train personnel who can
act as TOT and farmer
trainers
30 TOTs County wide
Inadequate supply of
clean seed
Enhance access to clean
seed
Seed bulking
programme of clean
seed
Establish potato seed
multiplication centres
To provide clean seed to
farmers at convenient
locations
30 Acres (5X6 sites) County wide
High cost of quality
farm inputs
Promote the use of
organic fertilizer
Organic fertilizer
promotion programme
Construct a livestock
manure pelleting plant
To sustainably recycle farm
waste products
4 pelleting plants Narok North, East,
West and South
Assist farmers to access
quality and affordable
farm inputs
Agricultural input
support programme
Establish a revolving fund To assist farmers in
accessing farm imputs at
affordable prices and flexible
terms
1.5b ksh Countywide
Irrigation
promotion
Low level of adoption
of irrigation practices
Encourage adoption of
irrigation practices
Irigation expansion
programme
Farm conversion project To expand irrigable area Lump sum County wide
Inadequate Funding Increase allocation of
funds
Irigation expansion
funding programme
Establish credit facility to
fund irrigation initiatives
To enable farmers access
funds
1.0b ksh County wide
Inadequate local skills Disseminate knowledge
on irrigation skills and
technologies
Irrigation sensitization
and awareness
programme
Conduct farmer
sensitization and
awareness creation
Increase the farmers
knowledge of irrigation
technologies
Lump sum County wide
Construct demonstration
stations
To edicate farmers on
irrigation techniques
2 demonstration
stations
County wide
Expand extension Enhaced irrigation Recruit irrigation extension To enable farmers access 12 extension officers County wide
Narok County Integrated Development Plan (2013 -17) Page 45
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
services extension services
programme
officers information on irrigation
techniques
Purchase motorbikes for
irrigation extension
services
To expand coverage of
extension services
12 motorbikes County wide
Unavailability of
irrigation
infrastructure
Construct irrigation
infrastructure
Irrigation infrastructure
development
programme
Build water dams for
irrigation
Provide water for irrigation 6 dams County wide
Construct water
reticulation system
To supply water to irrigable
farms
1 system County wide
Traditional and
high value crops
production
Poor perception of
traditional crops
Sensitization on
nutritional value of
traditional crops
Farmer sensitization
and awareness creation
programme
Conduct Awareness
campaigns
To change farmers
perceptions regarding
traditional crops
10 (2 annually) County wide
Low knowledge about
local production
potential
Conduct research on
potential, feasibility and
viability
Traditional and High
value crops Research
programme
Conduct Research To establish type of crops,
production potential and
enterprise viability
1 study County wide
High costs of
introducing high value
crops
Increase allocation of
funds
High value crops
funding programme
Establish credit/subsidy
facility
To enable farmers access
cheap financing options
1.0b Kshs County wide
Sector
profitability
Pre-harvest losses Insure against weather-
induced losses
Pre-harvest losses
mitigation programme
Establish crop-loss
insurance fund
To compensate farmers for
losses incurred
1.0b Kshs County wide
Post-harvest losses Improve storage
mechanisms
Post-harvest losses
mitigation programme
Construct storage facilities To preserve post-harvest
crop quality
6 storage stations at
5.4m per one
County wide
Promote post-harvest
processing (primary
level)
Post-harvest processing
programme
Construct primary level
processing factories
To mitigate against crop
perishability
6 rudimentary factories County wide
Carry out research on
alternative post-harvest
processing technologies
To reduce the quantity of
post harvest losses incurred
by farmers
1 study County wide
Poor Market
exploitation
Regulate and explore
potential markets
Market Exploitation
Programme
Market awareness To find external markets for
farmers to sell their produce
profitably
Lump sum County wide
Promote Pre-sale value
addition
Value addittion
industrialisation
programme
Build value-adding
factories
To enable farmers get a
better price yield from crops
2 factories County wide
Narok County Integrated Development Plan (2013 -17) Page 46
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
Promote fair trade
practices
As above Fair trade incorporation To assist farmers in
implementing fair trade
policies
Lump sum County wide
Soil and water
conservation
Poor land development
practices
Sensitize people on
sustainable land
development practices
Sustainable agriculture
programme
Conduct sensitization and
awareness campaigns
To enable farmers access
information on soil and
water conservation
techniques
30 campaigns
(6 annual campaigns)
County wide
Rampant use of
synthetic fertilizers,
pesticides and
herbicides
Sensitization on the
negative impacts of
fertilizer pesticide and
herbicide use
Farmer sensitization
and awareness
programme
Conduct sensitization and
awareness campaigns
To help farmers use farm
chemicals responsibly
30 campaigns
(6 annual campaigns)
County wide
Promote use of organic
fertilizer
Organic fertilizer use
promotion programme
Facilitate use of organic
fertilizer
To prevent land degradation 30 campaigns
(6 annual campaigns)
County wide
Carry out reclamation of
degraded lands
Land reclamation
programme
Reclaim degraded land To re-establish soil fertility
and productivity
Lump sum County wide
Climate change
adaptation
Unpredictable weather
patterns
Improve acces to timely
and accurate
meteorological data and
information
CC Adaptation and
Implementation
Programme
Prepare an early warning
system
To equip farmers with
reliable information time the
planting season.
1 system County wide
Unavailability of hybrid
crops
Provison of knowledge As above Research on county specific
adaptable crop varietites
To supply information and
procurew adaptable crops
Lump sum County wide
Lack of adaptation
technology
As above Provide technology of
coping with vulgaries
To enable farmers access
local technologies for coping
with CC
Lump sum County wide
As above Crop insuarance fund To enable farmers bounce
back after a season loss
1.0 b Kshs County wide
Expand extension
services targetting CC
adaptation
As above Train extension workers To enable farmers access
information on adapting to
CC and coling strategies
30 extension workers
Livestock Sector
productivity
.
Low yielding breeds Promote acquisition of
high yielding livestock
breeds
Livestock breeds
improvement
programme
Breed improvement project To improve livestock breeds
and products
4,700 available
breeding animals
County wide
Improve yields by
selective breeding
As above AI Services To produce high yielding
varieties
22,000 AI conducted County wide
Coordinate provision of As above Upgrading of breeding To make breeding services 2 Upgraded breeding County wide
Narok County Integrated Development Plan (2013 -17) Page 47
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
breeding services
centers accessible to farmers centers (Narok PTC and
Narok Sheep& Goats)
Poverty and low
monetary investment
in animal husbandry
practices
Expand access to
finance
As above Livestock development
fund
To make money accessible to
farmers at a cheap cost
1.0b Kshs County wide
High cost of breeding
stocks
As above As above Subsidize AI services
To make extension services
affordable
Lump sum
County wide
Lack of technical know-
how among farmers
Expand access to
extension services
Livestock keepers skills
development
programme
Recruit livestock extension
officers
To improve access to
knowledge and extension
services
30 extension workers County wide
Invest in
demonstrations, field
days and farmers visits
As above Upgrade Narok Pastoral
Training Centre to Middle
Level College
To Train animal production
and health technicians
6 new buildings
constructed in addition
to already exisiting
ones.
220 students trained
Narok North
Disease
Prevalence of disease
vectors
Expand access
preventive and curative
services
Disease control and
surveillance programme
Vector surveillance To have an effective vector-
borne disease control
mechanism.
Lump sum County wide
As above As above To create disease free
zones or compartments
To eradicate market
sensitive diseases
Lump sum County wide
As above As above Construction of cattle dips To protect livestock against
vector-borne disease
148 cattle dips County wide
As above As above Rehabilitation of cattle dips As above 146 rehabilitaded dips County wide
As above As above Rehabilitation of crushes As above 271 rehabilitated
crushes
County wide
Few vaccines available As above As above Livestock vaccination
campaign
To protect livestock from
disease and eradicate
notifiable diseases
100 Awareness
campaigns conducted
County wide
As above As above Construction and
rehabilitation of cold chain
facilities
To preserve viability of
vaccines
2 cold chain County wide
Quarantine affected As above Construction of Quarantine To prevent the spread of 30 quarantine stations County wide
Narok County Integrated Development Plan (2013 -17) Page 48
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
livestock and areas stations communicable diseases
Expand access
preventive and curative
services
As above Construct and equip
satellite labs
To facilitate prompt disease
diagnosis
2 labs Kilgoris and Narok
Town
Promote adoption of
disease resistance
breed
Livestock breeds
improvement
programme
Crossbreeding To adapt livestock to disease
environments
Lump sum County wide
Pasture Poor pasture quality
Low volumes of
available feeds
Increase Pasture
availability to the
farmers
Pasture Improvement
Programme
Pasture development
(Strategic feed reserve)
To ensure adequate and
quality feed materials
availability throughout the
year
30 strategic food
reserve stores
County wide
Little or less
nutritionally available
feeds
Promote nutritious
pasture accessibility
As above Feeds manufacturing
plants
To make high quality and
affordable feeds available
throughout the year
2 factories to be
established
Narok town and
Kilgoris
Water Long distances to
water points
Reduce trekking
distance to livestock
watering point
Water harvesting and
storage programme
Construct water pans To make water available for
livestock throughout the year
120 new water pans
Narok East, South,
Trans-Mara
As above Rehabilitate water pans As above 40 water pans
rehabilitated
Sector
optimization
8.1 .
Non present livestoack
yards or holding
grounds
Design and operate
livestock sale yards and
holding grounds
Market development
programme
Construction of sale yards
To maximize profits 25 sale yards
constructed
County wide
As above Rehabilitation of sale
yards
As above 16 rehabilitated sale
yards
County wide
Lack of professionally
manned abattoires
Provide clean abattoires Market development
programme
Construction
of abattoirs
To improve on good
production practices
1 abattoir constructed County wide
A lack of refrigirated
vehicles for produce
transportation
Provide cooling services
to the milk farmers
Market development
programme
Construction of milk
cooling plants
To avoid milk spoilage while
bulking for marketing
2 milk cooling plants County wide
6 refrigirated vehicles County wide
Narok County Integrated Development Plan (2013 -17) Page 49
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
Loss of livestock on
market days
Brand the animals to
avoid theft
Market development
programme
Animal identification and
traceability
To reduce livestock thefts
1,200,000 brandings to
de done
County wide
Wastage of alternative
raw materials from
livestock
Promote value
addition to the
alternative raw
materials harvested
from livestock
Profit Maiximation
Programme
Construction of hides and
skin bandas and tanneries
To maximize profits and
create employment
20 hides and skin
bandas constructed
1 Tannery
County wide
Little information on
markets
To give farmers a
platform for knowing
the best markets for
their livestock
Profit Maiximation
Programme
Establishment of market
Information and
dissemination platform
To increase awareness of
various aspects of livestock
production and marketing
Information centre for
market trends
County wide
Rearing of only one
type of animals
Promote mixing of
animal types
Profit Maiximation
Programme
Diversification of Livestock To increase the number of
emerging livestock kept
44,000 emerging
livestock kept
County wide
Rehabilitation of holding
grounds
To maximize profits from
livestock sales
8 rehabilitated holding
grounds
County wide
Overgrazing and
undergrazing
Promote space
maximization
Profit Maiximation
Programme
Ranching development To encourage farmers to
move towards ranching as a
sustainable mode of
production
Lump sum County wide
Reforestation To prevent rampant
overgrazing
County wide
Disasters reducing
herd numbers
significantly
Implementation of
county disaster
management strategies
and protocols
Profit Maiximation
Programme
Provide contingency fund
for disaster preparation
and response
To enhance disaster
preparedness and response
1.0b Kshs County wide
Fisheries Sector
productivity
Lack of fish
consumption practices
Promote fish
consumption culture
Fisheries support
programme
Technical support project To give knowledge on aqua
culture
Information centre County wide
Fisheries marketing
programme
Develop cold chain
facilities
Establish longer fish
consumption life
County wide
Develop fish market
facilities in Narok town
Establish market for fish 1 open air market County wide
Construct fish processing To establish state of the art 1 factory County wide
Narok County Integrated Development Plan (2013 -17) Page 50
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
facilities fish processing facilities
Fish promotion and
production improvement
programme
Fish seed (fingerlings)
breeding centre)
To construct a centralised
location where fish breeding
information and material can
be accessed.
1 centre County wide
Fish pond constructions 4 ponds County wide
Water bodies stocking
project
To ensure adequate fresh
water supply for aqua culture
County wide
Fish feed factory To have a raw materials
(fish feeds) access point
1 factory County wide
Narok County Integrated Development Plan (2013 -17) Page 51
9 LANDS, FORESTRY, WATER AND ENVIRONMENT SECTOR PROGRAMMES AND PROJECTS
Sector Summary
Sub-sector Priorities Programmes Flagship Projects
Land
1. Security of Tenure 1. Land information management programme 1. Digital and topographical mapping ( whole county)
Establishment of a county GIS platform and lab
2. County Land information system
2. Land disputes resolution programme 3. 4 Local land courts
3. Land Tenure Security programme 4. Cadastral surveys
5. Land parcels registration
2. Use optimisation and sustainability 4. Land use optimization programme 6. County spatial plan and
7. Special area land use plans(Mau, Mara dispersal,
Suswa)
Forestry 3. Forest cover 5. Afforestation programme 8. 1million tree nursery seedlings and 1m Trees planted
6. Forest Monitoring and surveillance programme 9. 100 forest guards engagement
4. Forest products 7. Sustainable lumbering programme 10. Anti-lumbering enforcement campaign
11. 2 modern saw mills
8. High Value Tree Planting programme 12. Plant 1million high value trees - medicinal, fodder,
timber
Water 5. Water sources 9. Water Sources Conservation programme 13. Identification and delineation of water towers and
catchment areas ( Mau, Naimina enkiyio, shartuka,
oloomisimis, enoosupukia)
Sector Lands, Forestry, Environment and Water
Sector Vision A resource sufficient county.
Sector Mission
1. Optimal utilization of landed resources for growth.
2. Efficient use and development of land resource for sustained productivity and posterity.
Sector Justification
Food sufficiency
Mitigation of effects of climate change
Provision of a clean and healthy environment
Sustained economic growth and societal well-being
Narok County Integrated Development Plan (2013 -17) Page 52
Sub-sector Priorities Programmes Flagship Projects
6. Water channels and Riparian areas 10. Riparian areas protection and regeneration
programme
14. Delineate and delimit riparian corridors and areas
15. 1000 km of forest reserve
11. Water Channels Conservation programme 16. Enact and enforce antipollution legislation
Environment
7. Pollution Mitigation 12. Solid Waste Management Programme 17. 1 Landfill and recycling plant
18. 20 dumping license permits and Waste segregation
13. Sanitation Management Programme 19. Sewage treatment plant
20. Construction of liquid waste lagoons
8. Land Reclamation 14. Farm lands Restoration Programme 21. Farm rejuvenation – 10,000 acres
15. Land Reclamation Programme 22. 50 acres of Quarry zones reclamation
16. 23. Disaster Management Plan
24. Rural flood control measures- Suswa, Ololulung’a
9. Fragile Ecosystem 17. Environmental Conservation and Protection
Programme
25. County Environment Conservation plan
Detailed Lands, Forestry, Water ad Environment Sector Plan
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
Land Security of Tenure Poor land records Establish digital land
information systems
Land information
development
programme
Develop County Land information
system
To capture accurate data on land
and ownership
c/f LIMS
below
County Wide
Political interference
in land adjudication
process
De-politicize the land
adjudication process
Land disputes resolution
programme
Establish local land courts To unlock stalled registration
processes
4 Countywide
Community wrangles
over beneficiaries
Hear and determine existing
land disputes
As above As above To pre-empt and arbitrate
ownership disputes
Countywide
Boundary disputes Boundary verification and
delimitation
Land Tenure Security
programme
Undertake cadastral surveys To establish boundaries Lump sum Countywide
Register land parcels To secure ownership rights Lump sum Countywide
Land Information
management
systems
Lack of accurate data Undertake digital mapping and
cadastral survey
Land Information
Systems development
programme
Undertake Aerial survey To capture accurate raw data 1 Countywide
Narok County Integrated Development Plan (2013 -17) Page 53
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
As above Prepare digital topo-cadastral
maps
To process acquired data Lump sum Countywide
As above Prepare elaborate LIS To generate an information
referral system
1 Countywide
Lack of modern
equipment and
software
Acquire modern technology
and equipment
As above Acquire mobile GIS To assist in data capture 1 per
constituency(
6)
Countywide
As above Construct and equip a GIS lab To facilitate processing, safe
storage and ease of access of
acquired data
2 Labs Narok, Kilgoris
towns
As above Develop a public user interface To promote transparency of
records
1 Countywide
Inadequate personnel Recruit/train qualified GIS/LIS
personnel
As above Recruit qualified personnel To generate accurate data and
systems
2 Countywide
Use optimisation
and sustainability
Uncontrolled
subdivisions
Regulate land subdivision
processes
Land use optimization
programme
Prepare county spatial To suggest a countywide
framework for effective
exploitation of land resources
1 Countywide
Prepare Area land use plans To determine minimum land
sizes and assist in enforcement
10 Countywide
Prepare urban land use plans As above 20 Countywide
Restrictive zoning in
urban areas
Promote flexible (mix-use)
development framework
As above Prepare rezoning plans and mix-
use regulations
To optimise utilisation of urban
land
20 Countywide
Urban land
speculation
Introduce disincentives to fight
speculation
As above
Urban sprawl Designate town limits As above Town boundary designation To assist compact urbanisation Lump sum Key urban
areas
Human-wildlife
interface
Nomadic-pastoralism Promote sedentary
pastoralism and modern
ranching
Pastoralism
modernisation
programme
Establish strategic pasture
reserves
To ensure availability of
livestock feeds throughout the
year
Lump sum Countywide
Land mutations in
wildlife dispersal
areas
Control land subdivisions Dispersal Areas
protection programme
Prepare land use plans in areas
surrounding wildlife habitats
To safeguard the animal
dispersal areas
3 Countywide
Secure dispersal areas As above Buy corridors To secure inter- habitat wildlife
passage
500km Countywide
Establish conservancies To expand the dispersal area 45,000 acres
Lack of a fences
around wildlife
Erect electric fences around
protected areas
Park protection
programme
Park and protected areas
electrical fencing
To restrict movement of wildlife
in and out of the park
250 km Countywide
Narok County Integrated Development Plan (2013 -17) Page 54
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
habitats
Increase in wildlife
populations
Redistribute the wildlife Wildlife redistribution
programme
Periodic restocking and species
redistribution exercises
To establish a harmonious
balance in population of the
different wildlife species
Lump sum Main parks
Forestry Expansion of
forest coverage
Deforestation Encourage re-planting Afforestation
programme
Establish tree nurseries To supply trees for the
afforestation effort
1m seedlings Countywide
Tree planting campaign To expand forest cover 1m trees County wide
Encroachment Prevent encroachment Forest Monitoring and
surveillance programme
Employ forest guards To police and prevent further
encroachment
100 County wide
Charcoal burning Ban charcoal production As above As above To preserve trees County wide
Encourage use of alternative
energy sources
Alternative energy
programme
Biogas adoption campaign To supply alternative energy Lump sum County wide
Optimal
Utilization of
forest products
Indiscriminate
Lumbering
Control lumbering Sustainable lumbering
programme
Anti-lumbering enforcement
campaign
To arrest uncontrolled lumbering Lump sum County wide
Introduce conditional licences To enforce lumbers code of
conduct
Lump sum County wide
Build modern saw mill To minimize wastage and
support organized re-
afforestation effort
2 saw mills Kilgoris &
Oloolongoi
Encourage re-afforestation Re-afforestation
programme
Re-afforestation campaign To reclaim deforested areas 500,000 trees County wide
Lack of appreciation
on the role of forests
Sensitize local community on
role of forest
Forest Conservation
Programme
Sensitization campaign To improve people's perception
of forest products
Lump sum County wide
Expand economic value of
forest area and products
Ecosystem Value
Restitution services e.g
Carbon credit
Undertake study to establish
values
To establish value of forest area
and products and produce
inventory
1 study County wide
Encourage planting high-value
trees
Hign Value Tree Planting
programme
Plant high value trees -
medicinal, fodder, timber
To optimize benefits from forest
areas and products
0.5m trees County wide
Water Water sources
Conservation
Encroachment upon
water towers and
sources
Secure water sources
Water Sources
Conservation
programme
Undertake study on water
catchment areas
To identify and inventorise
water catchment areas
1 study County wide
Inadequate
knowledge of
Delineation of water catchment
areas
As above Identification and delineation of
water catchment areas
To provide data to aid
protection of water catchment
1 database County wide
Narok County Integrated Development Plan (2013 -17) Page 55
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
catchment areas areas
Lack of data on
underground water
reserves
Inventorise underground
water reserves
As above Undertake study on underground
water sources
To inventorise the capacity of
underground water and give
abstraction permits
1 database County wide
Protection of
water channels
and Riparian
areas
Encroachment of
riparian lands
Enforce laws to prevent
encroachment
Riparian areas
protection and
regeneration
programme
Delineate and delimit riparian
corridors and areas
To prevent encroachment Lump sum County wide
Plant trees along riparian areas To prevent encroachment and
beautify the water channels
County wide
Pollution of water
sources
Institute pollution control
measures
Water Channels
Conservation
programme
Enact and enforce antipollution
legislation
To prevent pollution of surface
water and channels
Lump sum County wide
Improper discharge of
household and farm
liquid waste into
water channels
Regulate quality of effluent
being discharged into water
channels
As above Effluent clean up campaign To discharge waste with safe
effluent levels into water
channels by light industries and
homes
Lump sum County wide
As above As above To preserve water quality County wide
Indiscriminate
dumping of solid
wastes
Prevent waste from being
washed down the rivers
As above Undertake water surface clean-
up campaign
To clean up rivers and riparian
areas
10 clean ups County wide
Environment
Pollution
Mitigation
Lack of dumping sites Provision of designated
dumping areas
Solid Waste
Management
Programme
Create a landfill To have a designated area for
dumping and recycling solid
waste
1 landfill County wide
Indiscriminate
dumping
Establish waste collection
centres
As above Licensing programme To provide dump site licences to
specific individuals
20 licences County wide
Create a culture of waste
segregation
As above Waste segregation To foster waste segregation and
minimize the effects of
hazardous materials being
released into the environment
Lump sum County wide
Encourage recycling,
renewing, reduce and reuse
As above Construct a recycling plant To foster waste recycling and
reuse
1 plant County wide
Narok County Integrated Development Plan (2013 -17) Page 56
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
To sensitize people on benefits
of clean urban areas
As above Urban Clean Up campaigns To eradicate solid waste menace 10 campaigns Main towns
Sewage dumping in
rivers
Operationalize liquid waste
treatment systems
Sanitation Management
Programme
Sewage treatment plant To clean up sewage before
discharging into rivers
1 plant Main towns
As above Construction of liquid waste
lagoons
To create functioning liquid
waste lagoons
Lump sum Narok,
Ololulunga and
Kilgoris
Industrial fumes being
released into the air
Establish a sulphur and
chloride free filtration system
in industries
Air Pollution Control
Programme
Formulate regulations and
enforcement of filtration
mechanisms
To have zero chemical emission
levels from the industries
Lump sum Industrial
areas
As above As above To reduce the number of
respiratory diseases in the
county
Lump sum County wide
Land Reclamation Poor farming
Techniques
Rehabilitation of degraded
farm areas and derelict lands
Farm lands Restoration
Programme
Farm rejuvenation To renew farm lands that are no
longer productive
Lump sum County wide
Resistance from land
owners
Sensitize owners on benefits
of productive lands
As above Sensitization campaign To get cooperation from farmers
in reclaiming their lands
Lump sum County wide
Lack of knowledge on
components of
pristine/ healthy
lands
To restore towns and riparian
areas into healthy sections
Land Reclamation
Programme
Quarry zones reclamation To create a wildlife sanctuary
from the defunct quarry lands
Lump sum Ololulunga
Town Greening To transform towns into green
areas with accessible open
public spaces
Lump sum Narok and
Kilgoris
Riparian reserves reclamation To protect the water bodies from
further human encroachment
Lump sum County wide
CC Adaptation Ignorance of CC
reality
Localise MEAs Climate change
adaptation Programme
Awareness creation campaign on
radio
To understand the effects of
anthropogenic activities on our
climate
Lump sum County wide
Cushion farmers from adverse
effects of CC
As Above Undertake study of local coping
mechanisms of CC
To adopt local strategies of
coping with CC e.g. herd
reduction
1 Study County wide
As Above As Above To have an operational
information centre
Lump sum County wide
Have a disaster preparedness
plan to forestall the effects of
weather vulgaries
As Above Prepare a Disaster Management
Plan and regulation
To appreciate and know how to
mitigate the various disasters
that can arise.
1 plan County Wide
Narok County Integrated Development Plan (2013 -17) Page 57
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
Rural flood control measures To lessen the damage caused by
uncontrolled flooding.
Lump sum County Wide
Conservation of
Fragile Ecosystem
Protection of environmentally
significant areas
Environmental
Conservation and
Protection Programme
Identification and study on
fragile ecosystems
To capture and know the
threatened ecosystems
1 study County wide
As Above Prepare County Environment
Action Conservation plan
To domesticate the plan 1 plan County Wide
As Above As Above To conserve environmentally
significant areas
1 plan County Wide
As Above Environmental education and
awareness in schools
To create awareness about
environmental protection
Lump sum County wide
Incorporate environmental
concerns into developmental
plans
Environmental Impact
Assessment and Audits
Advocacy Programme
Conduct EIAs for any
development project
To ensure safety of the
environment before any
interference is commenced
Need by need
basis
County wide
Narok County Integrated Development Plan (2013 -17) Page 58
10 TRADE AND COMMERCE SECTOR PROGRAMMES AND PROJECTS
Sectory Summary
Sub-sector Priorities Programmes Flagship projects
Co-operatives 1. Co-operative development 1. Cooperatives development and support
programme
1. Farm products marketing co-operatives (milk, potatoes,
wool, livestock)
2. Credit facilities 2. Establish a co-operative development fund (1Billion)
Small Medium Enterprises and informal trade 3. Business development 2. Small market enterprise support
programme
3. Market Stalls stock sale yards (30 towns)
4. Market centres and prices information
4. Formalizing informal trade 3. Promotion of multipurpose co-operatives 5. Sensitization and awareness creation
4. Regulation of informal trade 6. Planning and land acquisition
5. Business support services 5. Financing 7. Enterprise development fund
6. Business support services program 8. Establish 2 business information centre
9. Establishment of two business incubation centres
Sector Trade and commerce
Sector Vision
Global leaders in promoting trade, investment, cooperative and private sector development.
Sector Mission
To facilitate trade and investment by championing an enabling environment, policy framework for
domestic and export business to thrive.
Sector Justification
Employment and income creation.
Bonding to control supply and demand.
Increase availability of goods and services.
Enhance County competitiveness and attractiveness to investment.
Enhance revenue base.
Narok County Integrated Development Plan (2013 -17) Page 59
Detailed Trade adn Commerce Sector Plan
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets 5 year targets Location
Co-operatives Livestock products
marketing
Animal feeds and
poor marketing
systems
Holding ground for feedlots
Cooperative support
programme
Sensitization and
awareness creation
project
To increase
awareness and
sensitize
40 campaigns County Wide
Credit facilities
High interest rates
and lack of
collateral
The county to create revolving
fund as a seed capital
Establish a co-
operative
development fund
Enhance access to
financial support
Lump sum TBD
Horticulture and
dairy cooperative
societies
Exploitation by
middlemen, high
cost of inputs,
irrigation and lack
of technology
The county to create revolving
fund as a capital and sensitize
them on entrepreneurship and
self-employment
Capacity building, availability
&affordability of in-puts
Training and capacity
building programmes
Improve knowmedge
and skills on business
10 trainings County wide
Small Medium
Enterprises
Market
Lack of space . County government to
identify/acquire ideal land for
the markets
Market expansion
programme
Land acquisition and
planning
Provide market and
trading areas
500 acres of Land County wide
Youth enterprise
Limited business
and entrepreneur
skills
Training on business and
entrepreneurship
Business incubation
centres
Improve knowledge and
skills on business
2 Kilgoris
Narok Town
Lack of stalls Construct rental stalls
Market stalls stock
sale yards
Provide trading spaces 30 towns County wide
Credit facilities Lack of affordable
credit facilities&
sufficient capital
Establish credit facilities to
improve SMEs
Small market
enterprise support
programme
Establish
cooperatives and
credit facilities
Enhance access to credit
for SMEs
Lumpsum County wide
one stop charges
To have one stop shop
for business start-up
processes
1 Narok town
Marketing systems
Excessive
middlemen
Establish & install processing
plants
Market centres and
prices information
Have standardised
market environment
and commerce
development
TBD TBD
Market research &
development and
Increase market share 1 research County wide
Narok County Integrated Development Plan (2013 -17) Page 60
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets 5 year targets Location
formulation of policy
& regulation
framework
Informal trade Formalizing
informal trade
Lack of corporate
identity
Encourage traders to form
associations & Sacco
Promotion of
multipurpose co-
operatives
Sensitization and
awareness creation
Enhance informal trade 40 campaigns County wide
Form business producer groups
Create an institutional
framework (rent and
remuneration)
Enhance informal trade 4 institutions TBD
Establish structures they can
operate from
Market research on
feasibility
Increase market share 1 market research TBD
Regulization of
informal trade
Planning and land
acquisition
Enhance informal trade 200 acres TBD
Business support
services
Credit facilities
Lack of
entrepreneurship
skills
The county to create an
operational and revived joint
loan board framework
Business support
services program
Enterprise
development fund
Support business and
expand their scope
TBD TBD
Provide basic
amenities
Improve sanitation and
basic amenities
4 toilets in each Market TBD
Business support
centre- data bank
Lack of a business
incubation centre
Business
information
centres
Establish a data collection &
business incubation centre
Establish business
information centre
Facilitate access to
information
2 Narok and Kilgoris
Support
infrastructure
programme
Security Improve security and
provide safe
environments to carry
out trading activities
10 personel TBD
Construction of
market stalls
Provide spaces to carry
out small scale trading
200 container stalls TBD
Enterprise
development fund
Facilitate access to
financial support
Lump sum County wide
Training and capacity
building
Enhance knowledge and
capacity
10 trainings County wide
Monitoring and
evaluation
Enhance accountability
and follow up
lumpsum County wide
Narok County Integrated Development Plan (2013 -17) Page 61
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets 5 year targets Location
Service
diversification
Service
diversification
programme
Build a cultural centre Showcase Maasai
culture
1 Narok town
Build an international
conference facility
Provide conference
facilities
1 Narok town
Build a town gallery Showcase Maasai
culture
1 Narok town
Narok County Integrated Development Plan (2013 -17) Page 62
11 TRANPORT INFRASTRUCTURE SECTOR PROGRAMMES AND PRIORITIES
Sector Summary
Sub-sector Priorities Programmes Projects
Roads Improve regional connectivity and linkages National Highways development programme Tarmacking of 250 km of highways and Regional roads
Upgrading of 400Km of regional roads
Improve Access to Resource areas Rural Roads development programme Tarmacking of 250Km of selected roads rural
Gravelling of 186Km of Park roads
Enhance rural access Gravelling of 1566Km of rural roads
Construction of 60 bridges
Construction of 3000m culverts
Construction of 125Km of stock routes
Improve urban access, circulation and mobility Construct bus terminus and car parking in Narok and Kilgoris
Air transport facilities Relocate all the air facilities from the Maasai Mara Air facilities relocation Construction of 3air facilities
Relocation of 8 airfacilities from the Maasai mara
Sector Roads
Sector Vision
Adequate access and connectivity for better productivity, competitiveness and liveability.
Sector Mission
- Regional market connectivity for enhanced competitiveness.
- A quality all weather rural access network for enhanced economic productivity.
- A well planned paved multimodal urban network for enhanced urban access, liveability and
productivity.
- Strategically located all-purpose air facilities for promotion of tourism, commerce and industry.
Sector Justification - Improved access to resource areas.
- Intra and Inter-linkage to markets.
Narok County Integrated Development Plan (2013 -17) Page 63
Detailed Transport Infrastructure Sector Plan
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
Roads Improve regional
connectivity and
linkages
Inadequate funding Lobbying and advocacy
for increase of
allocation of funds
National Highways
development
programme
Tarmacking of highways
and Regional roads
Enhance regional
connectivity
250 km County wide
Upgrading of regional roads 400Km County wide
Local opposition to
tarmac road
development
Set in place protection
mechanisms to counter
land subdivision and
land sale
Conservation concerns
Sensitize communities
to see logic of avoiding
construction of roads
through conservation
areas
Fragile geological
profile
Proper design of roads
Off-road flood control
measures
Improve Access to
Resource areas
Inadequate funding Lobbying and advocacy
for increase of
allocation of funds.
Enhancing public private
partnerships.
Rural Roads
development
programme
Tarmacking of selected
roads
Enhance accessibility to
key resource ares
250Km County wide
Conservation concerns Sensitize communities
to see logic of avoiding
construction of roads
through conservation
areas
Gravelling of Park roads Enhance access to the
Maasai Mara
186Km County wide
Enhance rural
access
Poor construction Proper tendering and
evaluation
Gravelling of rural roads Anhance access to
farms, markets and
other rural areas
1566Km County wide
Narrow road reserves Expansion of road
reserves
Construction of bridges Enhance reliable
transportation
60 County wide
Construction of culverts Improve road quality
and safety
3000m County wide
Construction of stock routes Facilitate the movement
of livestock.
125Km County wide
Improve urban Inadequate funds Increase allocation of Urban Roads Preparation of urban roads Provide roadmap and 2 County
Narok County Integrated Development Plan (2013 -17) Page 64
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
access, circulation
and mobility
funds Development
programme
masterplan blueprint for urban
infrastructure
development
Expansion and
mordernisation of urban
roads
Enhance access and
circulation
1 Narok, Kilgoris
Paving of selected urban
roads
Improve quality of
urban roads
63Km Narok and Kilgoris
Construction of storm water
drains
Improve stormwater
drainage
Narok
Construct bus terminus and
car parking
Enhance local and
regional mobility
Narok, Kilgoris
Enhancement of non
motorised transport
Improve roadsafety for
non motorised road
users
Narok
Air transport
facilities
Maintenance of
existing air
facilities
Inadequate funds Lobbying and advocacy
for allocation of funds
Air transport Facilities
Development
Maintenance of existing air
facilities
Improve air transport
services
5 County wide
Construct all-
purpose air
facilities in strategic
locations in the
county
Financial constraints Strategic investor PPP
Adequate budgetary
allocation
Preparation of air transport
master plan
Guide the development
and imrpovement
airtransport facilities
1 Cuounty
Land for construction
of the facilities
Early planning and
acquisition of land
Acquisition of land for
construction of air facilities
Increase number and
expand purpose of air
facilities
1200(Ha) County wide
Design of airfacilities Standard airfacilities 3 County
Relocate all the air
facilities from the
Maasai Mara
Opposition from major
stakeholders
Incentive and
disincentive
programmes
Air facilities relocation Construction of air facilities Expand purpose of air
facilities
3 County wide
Cost of relocation Lobbying and advocacy
for allocation of funds
Relocation of airfacilities
from the maasai mara
Enhance economic
sustainability in the
county
8 Mara outskirts
Link air facilities to
existing and new
access roads
Poor quality of roads Tarmacking and
gravelling of trunk and
rural roads
Inadequate funds Adequate budgetary
allocations
Narok County Integrated Development Plan (2013 -17) Page 65
Sub-sector Priorities Constraints Strategies Programmes Projects Objectives Targets Location
Transport
infrastructure
management
Revitalise
infrastructure
management
Limited funding to
transport management
function
Increased allocation of
funding to transport
management
Transport infrastructure
management
programme
Roads management
committee
Oversee the
management and
maintenance of
transport infrastructure
10 Sub counties
Lack of maintenance
equipment.
Purchase maintenance
equipment
Maintenance equipment Facilitate maintenance
of transport
infrastructure
Assorted equipment
Monitoring and evaluation To track the state of
roads.
1 in a quarter
Policy formulation Effective transport
infrastructure
management
1 policy Narok
Narok County Integrated Development Plan (2013 -17) Page 66
12 WILDLIFE, HERITAGE AND TOURISM SECTOR
Wildlife, Heritage and Tourism Sector summary
Sub-sector Priorities Programmes Flagship Projects
Nature based tourism 1. Wildlife management/protection 1. Wildlife protection programme 1. Anti-poaching
2. Semi-Autonomous Management Agency
2. Infrastructure improvement programme 3. Park infrastructure development
3. Wildlife corridor programme 4. Land Buying/Leasing
4. Revenue collection sustainance 5. Park rates review
5. Specialised training programme 6. Targeted training to locals
6. Research programme 7. Conservation linked research
2. Human-wildlife interface 7. Pastoralism modernisation programme 8. Establish strategic pasture reserves
8. Dispersal Areas protection programme 9. land use plans
9. Wildlife redistribution programme 10. Periodic restocking and species redistribution
3. Diversification of products/places 10. Diversification programme 11. New low & high end tourism products
11. Marketing programme 12. Targeted marketing
12. Maasai branding programme 13. Maasai brand patenting
4. Conservation Sensitization 13. Community sensitization programme 14. Aggressive campaigns
14. Climate change adaptation programme 15. Climate change awareness and adaptation
5. Develop golf courses 15. Golf course development programme 16. Golf courses
Cultural tourism 6. Develop cultural centres 16. Cultural centres programme 17. Cultural centres
Community-based conservancies 7. Streamlining conservancies legislation 17. Community-based conservancies programme 18. Conservancies legislation
Conference tourisms 8. Introduction of conference tourisms 18. Conference tourism programme 19. conference tourism facilities
Sector Tourism
Sector Vision The premier tourism destination in Africa.
Sector Mission To develop and promote unique and diverse tourism products within a sustainable framework.
Sector Justification
1. Revenue generation for the county.
2. Recreation.
3. Conservation of biodiversity.
4. Preserves heritage.
5. Creates employment through craft industries.
6. For Economic diversification.
Narok County Integrated Development Plan (2013 -17) Page 67
Detailed Heritage, Wildlife and Tourism Sector Plan
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
Nature based
tourism
Wildlife
management/protect
ion
Insecurity/Poaching
Use of technology in
overall management of
nature based tourism
Wildlife
protection
programme
Anti-poaching
To reduce poaching and
effectively manage wildlife
resources
250 officers Wild life
inhabited
areas
Establish
management
agency
As above 1 semi-autonomous
agency
Lack/poor Infrastructure
Improve infrastructure Infrastructure
improvement
programme
Park roads,
To improve accessibility,
communication, and connectivity
100km park roads Wildlife
inhabited
areas
Communication
boosters,
As above Establish communication
mast/boosters through
PPP
Within and
around Maasai
Mara
Drilling water
boreholes
As above 5 boreholes Along wildlife
corridors
Encroachment of wildlife
corridors
Reclaim/acquire wildlife
corridors
Wildlife corridor
programme
Buy/Lease To increase wildlife dispersal
area
1000 acres Entire county
Reduce seasonal
fluctuations in visitor
numbers through
price/product initiatives
Revenue
collection
sustenance
Charged rates
modification
To ensure constant availability of
cash regardless of seasons
Packaging rates
according to seasons
Maasai Mara
Shortage of local
trained/professional
Personnel
Specialised training in the
industry
Specialised
training
programme
Targeted training to
locals
To incorporate locals in the sector
economy
1000 persons Entire county
Lack of awareness on
conservation related issues
Generation of new
conservation knowledge
through research
Research
programme
Conservation linked
research
To effectively manage tourism
industry
1 research consortium Entire county
Diversification of
products/places
Lack of resources to procure
new sites/places and
products
Developing both high and
low end nature-tourism
(birds watching, recreation
facilities, quality of
facilities,
Diversification
programme
Introducing new low
and high end
tourism products
To increase and diversity
industry potential
3 new products Entire county
Narok County Integrated Development Plan (2013 -17) Page 68
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
Promoting ecosystem as
filming destination
Marketing
programme
Targeted marketing As above 1 campaign/marketing
initiative
Entire county
Strengthening Maasai
branding
Maasai branding
programme
Brand Maasai As above Patenting maa artifacts Entire county
Open up tourism circuit
(Mau, Suswa, Narok )
Tourism circuit
programme
Tourism circuit As above 3 new tourist sites Entire county
Sensitization on the
importance of
conservation and the
impact of human
activities on the
ecosystem
Human wildlife conflict
Sustain awareness
campaigns
Community
sensitization
programme
Aggressive
campaigns
To ensure
preservation/protection of
wildlife heritage by
1 sustained campaign Entire county
Environmental factors
Sensitize the locals in
climate change adaptation
measures
Climate change
adaptation
programme
Climate change
awareness and
adaptation
As above 1 Climate change
initiative
Sports tourism
High altitude training
facilities
Lack of Sports facilities Nurture talent through
targeted training
Talent
development
programme
Construct a youth
training facility
To exploit youths potential 1 training facility A high altitude
area within
the county
Develop golf courses It is a high end recreation
initiative
Establishing new golf
course
Development golf
course
programme
Construct a golf
course in Mau forest
To open up new untapped
tourism potentials
A new golf course Mau forest
Cultural
tourism
Develop cultural
centres
Exploitation of Maa culture
Establishing cultural
centres in the county
Organizing local and
international trade-fares
and exhibitions
Cultural centres
programme
Construct cultural
centres
To maximise revenue proceed
from the cultural sector
2 cultural centre Narok town
Suswa
Community-
based
conservancies
Streamlining
conservancies
legislation
Lack of guidelines in the
management of the
conservancies
Develop legislation to
recognize and regulate
their operations and
functions of conservancies
Community-based
conservancies
programme
Enact legislation To enact and enforce a legislation
framework on conservancies
Conservancies
legislation streamlining
County wide
Conference
tourisms
Introduction of
conference tourisms
Lack of facilities and poor
infrastructure
Establish high
end conference
tourism
Conference
tourism
programme
Construct
conference tourism
To exploit this type of tourism 3 conference tourism Entire County
Narok County Integrated Development Plan (2013 -17) Page 69
13 SAFETY AND SECURITY
Sector summary
Sub-sector Priorities Programmes Flagship Projects
1. Disaster preparedness and
management
1. Disaster risk reduction 1. Disaster preparedness, response and management
programme
1. Develop an integrated disaster early warning system
2. County and sub county multi-sectoral Disaster response
teams
2. Environmental Protection 2. Environmental protection programme 3. Monitoring and enforcement unit
2. Firefighting equipment 3. Fire prevention and response
3. fire prevention and response programme 4. 2 Major Fire stations and 5 minor stations
3. Occupation Safety and Health 4. Occupational hazards 4. OSH enforcement programme 5. OSH watchdog unit
4. Policing 5. law and order enforcement 5. service improvement programme 6. Recruit 500police officers
7. 300M police housing fund
8. Purchase 30 patrol vehicles
6. community policing
6. Expansion of police services 9. 12 police station
7. Community policing programme 10. 30 community police posts
7. Tourist Safety and security 8. Tourist surveillance programme 11. Tourist police unit
5. Flood protection 8. flood control 9. flood control and mitigation programme 12. 4 Check dams
13. 50Km of Gabions
6. Peace building 9. Social Cohesion 10. Sensitization programme 14. Campaigns on peace building(10)
11. Dispute resolution and reconciliation programme 15. Multi-sectoral arbitration committee
10. human wildlife co-existence
12. Human wildlife co-existence programme 16. Compensation fund
Sector Safety and security.
Sector vision A secure and safe county.
Sector mission To promote diversity, interactive and peaceful co-existence.
Sector justification - Saving lives and property
- Preventing disruption of economic activities
- Disaster risk reduction
- Protects our environment
Narok County Integrated Development Plan (2013 -17) Page 70
Detailed Sector Plan
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
Disaster
preparedness
and
management
Saving lives and property Lack of early warning system Develop a proper warning
signals
Disaster
management
programme
Recruite skilled
manpower
To prevent disaster 30 Sub counties
Poor response mechanism
Build capacity (equipments
and manpower)
Disaster
management
programme
Recruite skilled
manpower
establish skilled manpower
for disaster response
30 ward
Purchase ambulance Ensure proper equipment
and resources
3 County wide
Purchase mobile
clinics
Lack of preparedness
Effective dissemination of
information and e.g
evacuation
Awareness
creation of
insuarance
Promotion of general
insuarance cover
,through media
Recovery from loss through
disaster
60 County wide
Disaster risk reduction Lack of coordinated
harmonised action plan on
disaster risk reduction
Establish a team of disaster
management and
preparedness drawn from
all sectors
Disaster
preparedness
programme
Build a team from all
sectors
To create team work in
efforts towards risk
deduction and
preparedness
1 Countywide
Environmental Protection Lack of environmental
protection framework
Awareness of
environmental protection
framework
Environmental
protection
programme
inspection and
controlenvironmental
i mpact on all
development
Prevent disaster from
existing development
60 wards
Weak enforcement arm on
environmental offences
Strengthen enforcement and
regulation
Environmental
Audit and
monitoring
programme
Carry out an
environmental audit
on all development
project
To penalise
environmentatal offenders
60 wards
Fire fighting
equipment
Fire prevention
weak enforcement building
codes
Fire prevention strategy
Sensitization
programme on fire
prevention
Awereness campaign
on use of building
desighn and
constructionpractices
for fire
prevention(media)
Spread of fire through
buildings
2 countywise
Weak enforcement of Strengthen enforcement OSH watchdog Awereness campaign Minimise incident of fire 2 countywise
Narok County Integrated Development Plan (2013 -17) Page 71
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location Occupation health and safety
regulations
arm of ministry of labour enforcement
programme
on compliance of
Occupation health and
safety regulations for
fire prevention(media)
through human error
Prompt fire Fighting
Lack of fully equipped fire
station
Establish a reliable fire
station
Build capacity for
fire fighting
programme
Develop a fully-
fledged fire station in
major urban areas
To enhance quick response
of fire break out
1 Kilgoris,narok,lolgorian
Purchase of fire
engines
To equip the team for fire
fighting
3 Countywise
Limited skills and capacities Recruit qualified fire men
Build capacity for
fire fighting
programme
Skilled and adequate
manpower to fight
fire
To build manpower 30 All Wards
Policing Maintain law and order
Inadequate staffing
recruit and facilitate
Police recruitment
programme
Recruit police To increase Number of
police to serve the raising
population
1000 County ward
Inadequate Equipment and
police station
Purchase police equipment Police equipment
programme
Purchase Police
equipment
(land rovers)
To facilitate police to
maintain law and order
30 All Wards
Establish well distributed
police service
Expansion of
police services
Erect new police post To bring the police service
close to people
30 All Wards
Enhance community
policing
Stigma towards police force Awareness creation Community policy
programme
Campaigns e.g. toa
habari kwa police
Create cohesiveness
between police and
community
60 County wide
Enhance cooperation
between private security
firms and public police force
Policing agent
coordination
programme
Stakeholders forum
and workshops
To build coordinated public
and private policing force 1
2 Countywide
Inadequate lighting
facilitating crime
Ensure well lighted towns
and villages
Street lighting
programme
Install street lighting
and flood light in dark
spots
To enhance security TBD All Wards
Safety and security of
tourist
Increased crime targeting
tourists
Ensure safety and security
to tourist
Tourist
surveillance
programme
Establish tourist
police unit (3)
To affirm security and
safety to the tourist
30M Tourist destinations
Installation of
surveillance
equipment
To monitor movement of
tourist
10M Tourist destinations
Narok County Integrated Development Plan (2013 -17) Page 72
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location Check dams Prevention and mitigation
of flooding
Lack of space for
construction
Acquisition or land banking
of land
land banking
programme
Purchase of land Provision of suitable lands 500acres
150M
Destruction of land cover
upstream could lead to
siltation/destruction of check
dams
Mitigate against flooding
Environmental
protection
Recruit extension
officers(30)
To mitigate against
flooding
30 (10M)
per yr
Peace building Cohesion of the diverse
community
Cattle rustling
Initiate peace initiatives Sensitization
programme
Campaigns on peace
building(3)
To enhance cohesion of
diverse community
3M
Customary alternative
dispute resolution
mechanism, penalising and
compensation as in Maasai
culture
Dispute resolution
and reconsiliation
programme
Enforcement of
statutory law
To enhance dispute
resolution and enforcement
TBD
Land disputes Reconciliation of land
ownership
Land ownership
reconsiliation
programme
Establish genuine
owners of the land in
the ministry of land
records
To resolve conflict on
multiple ownership of land
parcels
3M
Fast tracked adjudication of
land and issuance of tenure
documents
Land adjudication
and registration
programme
land adjudication and
registration
To fast track the issuance
of land titles
3M
Displacements and relocation
from forests
Develop a clear Formal
resettlement plan
resettlement
programme
Resettlement of
displaced persons
To ensure conservation of
resources and livelihoods
of the affected persons
TBD
Local mechanisms for
compensation
Compensation
programme
IDP Compensation
frame work
To conserve livelihood of
the project affected
persons
TBD
Resource Based Conflict
resolution
Scarcity of water and
pasture for the pastoralist
Resource based
Conflict resolution
programme
3 Campaign and
sensitization
To enhance cohesion and
harmony in sharing
resources
3M
Drilling of borehole
at intervals (10)
To increase watering point
in order to reduce
competition
15M Countywide
Co-existence human
wildlife
Human wildlife conflict Establish a framework that
encourages co-existence of
wildlife and community
Human wildlife co-
existence
programme
Enforcement of
wildlife policy and
regulation
To curb human
encroachment
TBD
Establish a To deliver justice to the TBD
Narok County Integrated Development Plan (2013 -17) Page 73
Sub-sector Priorities Constrains Strategies Programmes Projects Objectives Targets Location
Compensation
framework for the
victims of wildlife
attack
victims of wildlife
Animal encroachment Erect physical barrier to
catel the movement of
animals to the community
land
Electrical fence
programme
Erect electric fence
between game
reserve and
community land
To protect people from
wildlife
TBD(KWS)
Human encroachment Curb Human encroachment
on game reserves
Conservancy
enhancement
programme
Establish and
strengthening the
existing
conservancies
To enable the villagers
defend tourist as an
enterprise
6M Countywide
Negative political influence Awareness and
sensitization
Education and
sensitatization
programme
Campaigns 3 To create understanding of
the benefits of wildlife
conservation
3M