DRAFT BASIC ASSESSMENT REPORT

ESTHER PARK EXTENSION 38 PHASE 2 RESIDENTIAL ESTATE

Part of the Remainder of Portion 221 of the Farm Zuurfontein 33-IR

Gaut: 002/17-18/E0109

For:

October 2017

Page 2: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

1

TABLE OF CONTENTS

SECTION A: ACTIVITY INFORMATION 6

1. ACTIVITY DESCRIPTION 6

2. APPLICABLE LEGISLATION, POLICIES AND/OR GUIDELINES 6

3. ALTERNATIVES 9

4. PHYSICAL SIZE OF THE ACTIVITY 11

5. SITE ACCESS 11

6. SITE OR ROUTE PLAN 11

7. SITE PHOTOGRAPHS 12

8. FACILITY ILLUSTRATION 12

SECTION B: DESCRIPTION OF RECEIVING ENVIRONMENT 13

1. PROPERTY DESCRIPTION 13

2. ACTIVITY POSITION 14

3. GRADIENT OF THE SITE 15

4. LOCATION IN LANDSCAPE 15

5. GROUNDWATER, SOIL AND GEOLOGICAL STABILITY OF THE SITE 16

6. AGRICULTURE 16

7. GROUNDCOVER 17

8. LAND USE CHARACTER OF SURROUNDING AREA 18

9. SOCIO-ECONOMIC CONTEXT 19

10. CULTURAL/HISTORICAL FEATURES 19

SECTION C: PUBLIC PARTICIPATION 21

1. ADVERTISEMENT 21

2. LOCAL AUTHORITY PARTICIPATION 21

3. CONSULTATION WITH OTHER STAKEHOLDERS 21

4. GENERAL PUBLIC PARTICIPATION REQUIREMENTS 21

5. APPENDICES FOR PUBLIC PARTICIPATION 21

SECTION D: RESOURCE USE AND PROCESS DETAILS 22

1. WASTE, EFFLUENT, AND EMISSION MANAGEMENT 22

2. WATER USE 23

3. POWER SUPPLY 23

4. ENERGY EFFICIENCY 23

SECTION E: IMPACT ASSESSMENT 24

1. ISSUES RAISED BY INTERESTED AND AFFECTED PARTIES 24

2. IMPACTS RESULTING FROM THE CONSTRUCTION AND OPERATIONAL PHASE 24

3. IMPACTS RESULTING FROM THE DECOMISSIONING AND CLOSURE PHASE 37

4. CUMULATIVE IMPACTS 38

5. ENVIRONMENTAL IMPACT STATEMENT 38

6. IMPACT SUMMARY OF PREFERRED PROPOSAL 39

7. SPATIAL DEVELOPMENT TOOLS 40

8. RECOMMENDATION OF THE PRACTITIONER 40

9. THE NEEDS AND DESIRABILITY OF THE PROPOSED DEVELOPMENT 41

10. THE PERIOD FOR WHICH THE ENVIRONMENTAL AUTHORISATION IS REQUIRED 41

11. ENVIRONMENTAL MANAGEMENT PROGRAMME (EMPr) 41

Page 3: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

2

Basic Assessment Report in terms of the National Environmental Management Act, 1998 (Act No. 107 of 1998), as amended, and the Environmental Impact Assessment Regulations, 2014 (Version 1)

Kindly note that: 1. This Basic Assessment Report is the standard report required by GDARD in terms of the EIA Regulations, 2014.

2. This application form is current as of 8 December 2014. It is the responsibility of the EAP to ascertain whether subsequent versions

of the form have been published or produced by the competent authority.

3. A draft Basic Assessment Report must be submitted, for purposes of comments within a period of thirty (30) days, to all State Departments administering a law relating to a matter likely to be affected by the activity to be undertaken.

4. A draft Basic Assessment Report (1 hard copy and two CD’s) must be submitted, for purposes of comments within a period of thirty (30) days, to a Competent Authority empowered in terms of the National Environmental Management Act, 1998 (Act No. 107 of 1998), as amended to consider and decide on the application.

5. Five (5) copies (3 hard copies and 2 CDs-PDF) of the final report and attachments must be handed in at offices of the relevant competent authority, as detailed below.

6. The report must be typed within the spaces provided in the form. The size of the spaces provided is not necessarily indicative of the amount of information to be provided. The report is in the form of a table that can extend itself as each space is filled with typing.

7. Selected boxes must be indicated by a cross and, when the form is completed electronically, must also be highlighted.

8. An incomplete report may lead to an application for environmental authorisation being refused.

9. Any report that does not contain a titled and dated full colour large scale layout plan of the proposed activities including a coherent legend, overlain with the sensitivities found on site may lead to an application for environmental authorisation being refused.

10. The use of “not applicable” in the report must be done with circumspection because if it is used in respect of material information that is required by the competent authority for assessing the application, it may result in the application for environmental authorisation being refused.

11. No faxed or e-mailed reports will be accepted. Only hand delivered or posted applications will be accepted.

12. Unless protected by law, and clearly indicated as such, all information filled in on this application will become public information on receipt by the competent authority. The applicant/EAP must provide any interested and affected party with the information contained in this application on request, during any stage of the application process.

13. Although pre-application meeting with the Competent Authority is optional, applicants are advised to have these meetings prior to

submission of application to seek guidance from the Competent Authority. DEPARTMENTAL DETAILS Gauteng Department of Agriculture and Rural Development Attention: Administrative Unit of the of the Environmental Affairs Branch P.O. Box 8769 Johannesburg 2000 Administrative Unit of the of the Environmental Affairs Branch Ground floor Diamond Building 11 Diagonal Street, Johannesburg Administrative Unit telephone number: (011) 240 3377 Department central telephone number: (011) 240 2500

Page 4: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

3

If this BAR has not been submitted within 90 days of receipt of the application by the competent authority and permission was not requested to submit within 140 days, please indicate the reasons for not submitting within time frame.

N/A

Is a closure plan applicable for this application and has it been included in this report? if not, state

reasons for not including the closure plan.

No closure of the residential estate is anticipated.

Has a draft report for this application been submitted to a competent authority and all State Departments administering a law relating to a matter likely to be affected as a result of this activity? Is a list of the State Departments referred to above attached to this report including their full contact details and contact person? If no, state reasons for not attaching the list.

N/A

Have State Departments including the competent authority commented?

If no, why?

Report has been submitted to state departments. Comments will be included in the Final Report

(For official use only)

NEAS Reference Number:

File Reference Number:

Application Number:

Date Received:

No

Yes

Yes

No

Page 5: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

4

SECTION A: ACTIVITY INFORMATION 1. PROPOSAL OR DEVELOPMENT DESCRIPTION

Project title (must be the same name as per application form):

Esther Park Extension 38 Phase 2 (Residential Estate) and a bridge with associated infrastructure.

Select the appropriate box

The application is for an upgrade of an existing development

The application is for a new development

X Other, specify

Does the activity also require any authorisation other than NEMA EIA authorisation?

YES NO

If yes, describe the legislation and the Competent Authority administering such legislation

National Water Act (NWA) (Act No.36 of 1998) for the application of a water Use Licence to be submitted to the Department of Water and Sanitation. The following water uses will be undertaken: Section 21 (i): Altering the bed, banks, course or characteristics of a watercourse Section 21 (c): Impeding or diverting the flow of water in a watercourse

If yes, have you applied for the authorisation(s)? YES NO

If yes, have you received approval(s)? (attach in appropriate appendix) YES NO

2. APPLICABLE LEGISLATION, POLICIES AND/OR GUIDELINES

List of legislation, policies and/or guidelines that are applicable to the application

Title of legislation, policy or guideline: Administering authority: Promulgation Date:

National Environmental Management Act, 1998 (Act No. 107 of 1998 as amended).

National & Provincial 27 November 1998

The National Water Act, 1998 (Act No. 36 of 1998) National Department of Water and Sanitation

26 August 1998

National Environmental Management: Air Quality Act, 2004 (Act 39 of 2004) (NEM: AQA)

National & Provincial 24 February 2005

National Heritage Resources Act, 1999 (Act No. 45 of 1965 (NHRA)

National & Provincial April 1999

Occupational Health and Safety Act (No 85 of 1993) National Department of Labour

23 June 1993

EIA Regulations GN 983 & GN 985 (Listing Notice 1&3) National and Provincial 8 December 2014

Gauteng Provincial Environmental Management Framework

Provincial May 2015

Red List Plant Species Guidelines Provincial 26 June 2006

Gauteng Noise Control Regulations, 1999 Provincial 1999

Gauteng Urban Edge 2008 / 2009 Provincial 2009

Ekurhuleni Biodiversity and open space strategy Ekurhuleni Metropolitan Municipality

May 2009

Ekurhuleni Metropolitan Municipality Environmental Policy

Ekurhuleni Metropolitan Municipality

2006

Page 6: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

5

Title of legislation, policy or guideline: Administering authority: Promulgation Date:

Ekurhuleni Metropolitan Municipality Biodiversity Plan Ekurhuleni Metropolitan Municipality

November 2012

Description of compliance with the relevant legislation, policy or guideline:

Legislation, policy of guideline Description of compliance

National Environmental Management Act No. 107 of 1998 (NEMA)

The National Environmental Management Act (Act No. 107 of 1998)

(NEMA) is the overarching framework for environmental legislation as

well as the Regulations for Environmental Impact Assessment. It sets out

the principles that serve as a general framework for environmental

planning, as guidelines by reference to which organs of state must

exercise their functions and guide other laws concerned with the

protection or management of the environment. The application takes into

account the environmental and socio-economic conditions in compliance

with the NEMA principles.

The National Environmental Management: Biodiversity Act (Act 10 of 2004)

The Act provides for the management and conservation of South Africa’s biodiversity within the framework of the NEMA. Areas of high biodiversity need to be protected. Should any protected plants be found on site, these will be managed in consultation with GDARD

The National Environmental Management: Waste Act, 2008 (Act No. 59 of 2008

No waste management license would be required for the construction or operational phases of the proposed activity. Only a limited amount of solid construction waste will be stored and handled on the site, before being hauled away and dumped at the nearest registered landfill site.

National Environmental Management: Air Quality Act, 2004 (Act 39 of 2004) (NEM: AQA)

During the construction phase, dust and the generation of noise can become a significant factor, especially to the surrounding landowners. However, if the development is well planned and the mitigating measures proposed in the EMPr are successfully implemented the proposed development’s contribution to air pollution and the generation of air pollution can become less significant

National Heritage Resources Act, 1999 (Act No. 45 of 1999 (NHRA)

The Act aims to promote the good management of the national heritage resources. According to the Act the South African Heritage Resources Agency (SAHRA) must be notified during the early planning phases of a project for any development that meet certain criteria. The Agency has been notified as required. Any artefacts uncovered during the construction phase will be reported to SAHRA as provided for in the EMPr.

Occupational Health and Safety Act (No 85 of 1993)

The Act provides for the health and safety of persons at work and for the health and safety of persons in connection with the use of machinery; the protection of persons other than persons at work, against hazards to health and safety arising out of or in connection with the activities of persons at work. The EMPr provides for measures to ensure that objectives of the Act are met on this site

EIA Regulations GN 983 (Listing Notice 1) and EIA Regulations GN 985 (Listing Notice 3)

The proposed development constitutes an activity listed under GN R. 983 and GN R. 985 and therefore a Basic Assessment Report process is being followed to obtain authorization from the GDARD.

Page 7: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

6

Legislation, policy of guideline Description of compliance

Gauteng Provincial Environmental Management Framework

The aim of the EMF is to guide the protection and enhancement of environmental assets and natural resources along with development patterns to ensure sustainable environmental management and development patterns within and around the Gauteng Province. The development site is located in Zone 1 of the EMF which aims to promote development infill, densification and concentration of urban development within the urban development zones as defined in the Gauteng Spatial Development Framework (GSDF). The proposed development is aligned with and is fully supportive of the objectives of the EMF.

Red List Plant Species Guidelines The purpose of the guidelines is to promote the conservation of Red List

Plant Species in Gauteng, which are species that face risk of extinction in

the wild. By protecting Red List Plant Species, conservation of diverse

landscapes is promoted which forms part of the overall environmental

preservation of diverse ecosystems, habitats, communities, populations,

species and genes in Gauteng.

Gauteng Noise Control Regulations, 1999

During the construction phase the impact of noise could be problematic, but such impacts are generally short term. One should note that practical mitigation measures for noise pollution are low, but certain measures can be implemented to mitigate the severity. These measures have been provided for in the EMPr

Gauteng Urban Edge 2008 / 2009

In terms of the RSDF policy document, as adopted by the City of Ekurhuleni Metropolitan Municipality, the property is situated well within the R21 corridor and the defined Urban Development Boundary.

Ekurhuleni Biodiversity and open space strategy

The EBOS serves as a strategy for biodiversity and opens space in the area and is supported by a range of implementation policies which are integral to the Spatial Development Frameworks. The site does not fall within or affect any of the key areas (open spaces and corridors) identified on the EBOS.

Ekurhuleni Metropolitan Municipality Environmental Policy

The policy aims at ensuring a safe and healthy environment for those living and working within the EMM and that infrastructure and development incorporate environmental considerations. The site is already disturbed and therefore no environmental sensitivities will be compromised.

Ekurhuleni Metropolitan Municipality Environmental Policy

The purpose of a bioregional plan is to inform land-use planning environmental assessment and authorizations and natural resource management, by a range of sectors whose policies and decisions impact on biodiversity. This is done by providing a map of biodiversity priority areas including Critical Biodiversity Areas and Ecological Support Areas, with accompanying land-use planning and decision making guidelines. According to the Bioregional Plan, the site falls within an agricultural area with no remaining natural areas. Therefore, the development supports the utilization of areas which do not have critical environmental resources which is aligned with the objectives of the plan.

Page 8: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

7

3. ALTERNATIVES

Describe the proposal and alternatives that are considered in this application. Alternatives should include a consideration of all possible means by which the purpose and need of the proposed activity could be accomplished. The determination of whether the site or activity (including different processes etc.) or both is appropriate needs to be informed by the specific circumstances of the activity and its environment.

The no-go option must in all cases be included in the assessment phase as the baseline against which the impacts of the other alternatives are assessed. Do not include the no go option into the alternative table below. Note: After receipt of this report the competent authority may also request the applicant to assess additional alternatives that could possibly accomplish the purpose and need of the proposed activity if it is clear that realistic alternatives have not been considered to a reasonable extent.

Please describe the process followed to reach (decide on) the list of alternatives below

The property forms part of an area currently experiencing urban growth and expansion including industrial and residential development. The location of the site is ideal for introducing the housing typology not currently

Provide a description of the alternatives considered

No. Alternative type, Description

1 Proposal The proposal entails the development of a residential estate with associated

infrastructure on approximately 17-hectare site – density, height?? Plus

construction of access road across a wetland

2 Alternative 1

In the event that no alternative(s) has/have been provided, a motivation must be included in the table below.

Given the location of the site, availability of services within is easy reach thereby making it easy to connect and service the township and the site is currently degraded and therefore the past existing environmental sensitivities will not affect the proposed development, no locational alternatives have been considered. Further, the housing typology selected will complement the general development of the area while ensuring densification within the area. While consideration was given to develop a ‘Residential 1 township, this option was discarded as it does not take into account government’s inclusionary policy and would not have provided affordable housing in the area. As part of the development; energy efficient options as well as water harvesting will be considered.

4. PHYSICAL SIZE OF THE ACTIVITY Indicate the total physical size (footprint) of the proposal as well as alternatives. Footprints are to include all new infrastructure (roads, services etc), impermeable surfaces and landscaped areas:

Size of the activity:

Proposed activity (Total environmental (landscaping, parking, etc.) and the building footprint)

17 ha

Alternatives:

Alternative 1 (if any) 4.7599 ha

Alternative 2 (if any)

Ha/ m2 Indicate the size of the site(s) or servitudes (within which the above footprints will occur):

Size of the site/servitude:

Proposed activity

Alternatives:

Alternative 1 (if any)

Alternative 2 (if any)

Page 9: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

8

Ha/m2 5. SITE ACCESS Proposal

Does ready access to the site exist, or is access directly from an existing road? YES NO

If NO, what is the distance over which a new access road will be built m

Describe the type of access road planned:

The study area is located in close proximity to west of Esther Park Phase 1 and the proposed site will be accessed through Parkland Drive. This will provide direct access to the proposed development site. Pls mention the underpass from Phase 1 to Phase 2

Access to Phase 1 will be gained off Modderfontein Road (R25) in the form of marginal (Left-in, Left-out) access and off Parkland Drive (M88) in the form of a signalized full junction. The proposed marginal (left-in, left-out) access will be provided at a distance of approximately 210 m to the west of the Modderfontein Road (R25)/Parkland Drive junction. This access will not only serve the proposed development but will also link with Parkland Drive via a proposed internal link road.

Figure 1: Esther Park Extension 38 Phase 2

Alternative 1

Does ready access to the site exist, or is access directly from an existing road? YES NO

If NO, what is the distance over which a new access road will be built m

Describe the type of access road planned:

Include the position of the access road on the site plan. (if the access road is to traverse a sensitive feature the impact thereof must be included in the assessment).

Page 10: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

9

Alternative 2

Does ready access to the site exist, or is access directly from an existing road? YES NO

If NO, what is the distance over which a new access road will be built m

Describe the type of access road planned:

Include the position of the access road on the site plan. (if the access road is to traverse a sensitive feature the impact thereof must be included in the assessment).

6. LAYOUT OR ROUTE PLAN A detailed site or route (for linear activities) plan(s) must be prepared for each alternative site or alternative activity. It must be attached to this document. The site or route plans must indicate the following: the layout plan is printed in colour and is overlaid with a sensitivity map (if applicable); layout plan is of acceptable paper size and scale, e.g.

o A4 size for activities with development footprint of 10sqm to 5 hectares; o A3 size for activities with development footprint of ˃ 5 hectares to 20 hectares; o A2 size for activities with development footprint of ˃20 hectares to 50 hectares); o A1 size for activities with development footprint of ˃50 hectares);

The following should serve as a guide for scale issues on the layout plan:

o A0 = 1: 500 o A1 = 1: 1000 o A2 = 1: 2000 o A3 = 1: 4000 o A4 = 1: 8000 (±10 000)

shapefiles of the activity must be included in the electronic submission on the CD’s; the property boundaries and Surveyor General numbers of all the properties within 50m of the site; the exact position of each element of the activity as well as any other structures on the site; the position of services, including electricity supply cables (indicate above or underground), water supply pipelines, boreholes, sewage

pipelines, septic tanks, storm water infrastructure; servitudes indicating the purpose of the servitude; sensitive environmental elements on and within 100m of the site or sites (including the relevant buffers as prescribed by the competent

authority) including (but not limited thereto): o Rivers and wetlands; o the 1:100 and 1:50 year flood line; o ridges; o cultural and historical features; o areas with indigenous vegetation (even if it is degraded or infested with alien species);

Where a watercourse is located on the site at least one cross section of the water course must be included (to allow the position of the relevant buffer from the bank to be clearly indicated)

FOR LOCALITY MAP (NOTE THIS IS ALSO INCLUDED IN THE APPLICATION FORM REQUIREMENTS)

the scale of locality map must be at least 1:50 000. For linear activities of more than 25 kilometres, a smaller scale e.g. 1:250 000 can

be used. The scale must be indicated on the map; the locality map and all other maps must be in colour; locality map must show property boundaries and numbers within 100m of the site, and for poultry and/or piggery, locality map must

show properties within 500m and prevailing or predominant wind direction; for gentle slopes the 1m contour intervals must be indicated on the map and whenever the slope of the site exceeds 1:10, the 500mm

contours must be indicated on the map; areas with indigenous vegetation (even if it is degraded or infested with alien species); locality map must show exact position of development site or sites; locality map showing and identifying (if possible) public and access roads; and the current land use as well as the land use zoning of each of the properties adjoining the site or sites.

Section A 6-8 has been duplicated 0 Number of times

Page 11: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

10

Figure 2: Esther Park Extension 38 Phase 2 Layout Plan

7. SITE PHOTOGRAPHS Site photographs are included as Appendix B 8. FACILITY ILLUSTRATION Appendix C

SECTION B: DESCRIPTION OF RECEIVING ENVIRONMENT

Note: Complete Section B for the proposal and alternative(s) (if necessary) Instructions for completion of Section B for linear activities

1) For linear activities (pipelines etc) it may be necessary to complete Section B for each section of the site that has a significantly different environment.

2) Indicate on a plan(s) the different environments identified 3) Complete Section B for each of the above areas identified 4) Attach to this form in a chronological order 5) Each copy of Section B must clearly indicate the corresponding sections of the route at the top of the next page.

Instructions for completion of Section B for location/route alternatives 1) For each location/route alternative identified the entire Section B needs to be completed 2) Each alterative location/route needs to be clearly indicated at the top of the next page 3) Attach the above documents in a chronological order

(complete only when appropriate)

Section B has been duplicated for sections of the route N/A times

Section B has been duplicated for location/route alternatives 0 times

Page 12: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

11

Instructions for completion of Section B when both location/route alternatives and linear activities are applicable for the application Section B is to be completed and attachments order in the following way

All significantly different environments identified for Alternative 1 is to be completed and attached in a chronological order; then All significantly different environments identified for Alternative 2 is to be completed and attached chronological order, etc.

Section B - Section of Route N/A (complete only when appropriate for above)

Section B – Location/route Alternative No. 0 (complete only when appropriate for above)

1. PROPERTY DESCRIPTION

Property description: (Including Physical Address and Farm name, portion etc.)

the Remainder of Portion 221 of the Farm Zuurfontein 33-IR

2. ACTIVITY POSITION Indicate the position of the activity using the latitude and longitude of the centre point of the site for each alternative site. The co-ordinates should be in decimal degrees. The degrees should have at least six decimals to ensure adequate accuracy. The projection that must be used in all cases is the WGS84 spheroid in a national or local projection.

Alternative: Latitude (S): Longitude (E):

-26.062580° 28.105285°

In the case of linear activities:

Alternative: Latitude (S): Longitude (E):

Starting point of the activity o o

Middle point of the activity o o

End point of the activity o o

For route alternatives that are longer than 500m, please provide co-ordinates taken every 250 meters along the route and attached in the appropriate Appendix

Addendum of route alternatives attached 0 The 21 digit Surveyor General code of each cadastral land parcel

PROPOSAL T O I R 0 0 0 0 0 0 0 0 0 0 3 3 0 0 2 2 1

Page 13: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

12

Figure 3: Esther Park Extension 38 Phase 2 locality map

3. GRADIENT OF THE SITE General gradient of the site.

Flat 1:50 – 1:20 1:20 – 1:15 1:15 – 1:10 1:10 – 1:7,5 1:7,5 – 1:5 Steeper than 1:5

4. LOCATION IN LANDSCAPE Indicate the landform(s) that best describes the site.

Ridgeline Plateau Side slope of

hill/ridge Valley Plain

Undulating plain/low hills

River front

5. GROUNDWATER, SOIL AND GEOLOGICAL STABILITY OF THE SITE

a) Is the site located on any of the following?

Shallow water table (less than 1.5m deep) YES NO

Dolomite, sinkhole or doline areas YES NO

Seasonally wet soils (often close to water bodies) YES NO Unstable rocky slopes or steep slopes with loose soil YES NO Dispersive soils (soils that dissolve in water) YES NO Soils with high clay content (clay fraction more than 40%) YES NO Any other unstable soil or geological feature YES NO An area sensitive to erosion YES NO

(Information in respect of the above will often be available at the planning sections of local authorities. Where it exists, the 1:50 000 scale Regional Geotechnical Maps prepared by Geological Survey may also be used).

b) are any caves located on the site(s) YES NO

If yes to above provide location details in terms of latitude and longitude and indicate location on site or route map(s) Latitude (S): Longitude (E):

o o

Page 14: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

13

c) are any caves located within a 300m radius of the site(s) YES NO

If yes to above provide location details in terms of latitude and longitude and indicate location on site or route map(s) Latitude (S): Longitude (E):

o o

d) are any sinkholes located within a 300m radius of the site(s) YES NO

If yes to above provide location details in terms of latitude and longitude and indicate location on site or route map(s) Latitude (S): Longitude (E):

o o

If any of the answers to the above are “YES” or “unsure”, specialist input may be requested by the Department

Figure 4: Esther Park Extension 38 Phase 2 Wetland and River Map

According to the Ecological Assessment compiled by the Inkuthanzo Holdings the site consists of secondary grassland, a koppie and the wetland with residential and industrial developments surrounding it. Degradation has taken place. The levels of impact on the site vary considerably with major contribution to this being human activities such as excavations, vegetation clearance, buildings, dumping of waste, street vagrants, uncontrolled fires, etc.

Page 15: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

14

Sourced from the Ecological Report

Figure 5: Esther Park Extension 38 Phase 2 Threatened Ecosystems Map

The state of the vegetation and species diversity as well as the degree of connectivity with surrounding open space id very poor due to disturbance which increases over time. At the time of the site visit, it was also evident that the remaining patches of grassland vegetation and rocky outcrops were heavily impacted. Most of the site consists of secondary Hyparrhenia hirta grassland, cleared area. The unchannelled wetland has been heavily impacted on by the development of the Gautrain line.

6. AGRICULTURE

Does the site have high potential agriculture as contemplated in the Gauteng Agricultural Potential Atlas (GAPA 4)? YES NO

Please note: The Department may request specialist input/studies in respect of the above.

Page 16: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

15

Figure 6: Esther Park Extension 38 Phase 2 Agricultural map

The land is located within an area where there is low agricultural potential. Further the site is: - located within the urban edge in terms of the provincial and municipal spatial plans; - located within Zone 1 as defined in the Provincial EMF.

7. GROUNDCOVER All identified rare or endangered species or other elements have been indicated on the sensitivity map. Indicate the types of groundcover present on the site and include the estimated percentage found on site

Natural veld - good condition

% =

Natural veld with scattered aliens

% =100

Natural veld with heavy alien infestation

% =

Veld dominated by alien species

% =

Landscaped (vegetation) % =

Sport field % =

Cultivated land % =

Paved surface (hard landscaping) % =

Building or other structure % =

Bare soil % =

Are there any rare or endangered flora or fauna species (including red list species) present on the site YES NO

If YES, specify and explain:

Are there any rare or endangered flora or fauna species (including red list species) present within a 200m (if within urban area as defined in the Regulations) or within 600m (if outside the urban area as defined in the Regulations) radius of the site.

YES NO

If YES, specify and explain:

Page 17: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

16

Are there any special or sensitive habitats or other natural features present on the site? YES NO

If YES, specify and explain:

There is a ridge and a wetland

Was a specialist consulted to assist with completing this section YES NO

If yes complete specialist details

Name of the specialist: Shamilla Jhupse Qualification(s) of the specialist: Prof. Nat. Sci Postal address: P.O. Box 012 Cloorkop, Kempton Park 1619 Postal code: 1619 Telephone: (011) 0361 584 Cell: (071) 230 1564 E-mail: [email protected] Fax: - Are any further specialist studies recommended by the specialist? YES NO

If YES, specify:

If YES, is such a report(s) attached? YES NO

If YES list the specialist reports attached below

Signature of specialist: See attached report Date:

Please note; If more than one specialist was consulted to assist with the filling in of this section then this table must be appropriately duplicated

8. LAND USE CHARACTER OF SURROUNDING AREA Using the associated number of the relevant current land use or prominent feature from the table below, fill in the position of these land-uses in the vacant blocks below which represent a 500m radius around the site

1. Vacant land 2. River, stream,

wetland 3. Nature conservation

area 4. Public open space 5. Koppie or ridge

6. Dam or reservoir 7. Agriculture 8. Low density residential 9. Medium to high density

residential 10. Informal residential

11. Old age home 12. Retail 13. Offices 14. Commercial &

warehousing 15. Light industrial

16. Heavy industrialAN 17. Hospitality facility 18. Church 19. Education facilities 20. Sport facilities

21. Golf course/polo fields

22. AirportN 23. Train station or

shunting yardN 24. Railway lineN

25. Major road (4 lanes or more) N

26. Sewage treatment plantA

27. Landfill or waste treatment siteA

28. Historical building 29. Graveyard 30. Archeological site

31. Open cast mine 32. Underground

mine 33.Spoil heap or slimes

damA 34. Small Holdings

Other land uses (describe):

NORTH

WEST

1;14;15 1;24 1;25;33 9;25 9;25 EAST

1;14;15 1;24 1;25 9;25 9;25

1;14;15 1;24 SITE 9;25 9;25

1;14;15 1;14;15;24; 14;15;24 14;15;24 14;15

1;14;15 1;14;15;24 14; 14;15;24 14;15 SOUTH

Note: More than one (1) Land-use may be indicated in a block

Page 18: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

17

Figure 7: Esther Park Extension 38 adjacent land uses Please note: The Department may request specialist input/studies depending on the nature of the land use character of the area and potential impact(s) of the proposed activity/ies. Specialist reports that look at health & air quality and noise impacts may be required for any feature above and in particular those features marked with an “A“ and with an “N” respectively.

Page 19: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

18

Figure 8: Esther Park Extension 38 Urban Edge

Have specialist reports been attached YES NO

If yes indicate the type of reports below

Fauna and Flora Habitat Assessment and Ridge Study (Appendix G1) YES NO

Wetland Delineation Report (Appendix G2) YES NO

Storm Water Report (Appendix G3)???? YES NO

Water & Sewerage Report (Appendix G4 ??? YES NO

Town Planning Memorandum (Appendix G5) YES NO

Heritage Impact Assessment Report??? YES NO

9. SOCIO-ECONOMIC CONTEXT Describe the existing social and economic characteristics of the area and the community condition as baseline information to assess the potential social, economic and community impacts.

According to the draft Regional Spatial Development Framework, the site is located in Region B situated within the north-western section of the EMM. The City of Tshwane forms the northern boundary and the City of Johannesburg forms the western boundary of Region B. The region is made up of the areas of Tembisa, a portion of Kempton Park, Edenvale, Bedfordview, Olifantsfontein/ Clayville and Bredell Agricultural holdings. The Region is favourably located in the Economic Activity and Employment Area of the Gauteng Province. In terms of the metropolitan vision, the region will see major urban growth due to the proximity to the airport and its expected growth as an Aerotropolis. In 2012, the region had a population of 690 000 people at a sparse density of 1 540 people /km². The population which accounted for 22% of the EMM population is projected to increase to more than 784000 by 2020. According to the RSDF, the finance sector is the largest contributor to the economy in Region B with the manufacturing and community services sector in second place. However, the construction sector has the

Page 20: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

19

10. CULTURAL/HISTORICAL FEATURES Please be advised that if section 38 of the National Heritage Resources Act 25 of 1999 is applicable to your proposal or alternatives, then you are requested to furnish this Department with written comment from the South African Heritage Resource Agency (SAHRA) – Attach comment in appropriate annexure 38. (1) Subject to the provisions of subsections (7), (8) and (9), any person who intends to undertake a development categorised as- (a) the construction of a road, wall, powerline, pipeline, canal or other similar form of linear development or barrier exceeding 300m in length; (b) the construction of a bridge or similar structure exceeding 50m in length; (c) any development or other activity which will change the character of a site- (i) exceeding 5 000 m2 in extent; or (ii) involving three or more existing erven or subdivisions thereof; or (iii) involving three or more erven or divisions thereof which have been consolidated within the past five years; or (iv) the costs of which will exceed a sum set in terms of regulations by SAHRA or a provincial heritage resources

authority; (d) the re-zoning of a site exceeding 10 000 m2 in extent; or (e) any other category of development provided for in regulations by SAHRA or a provincial heritage resources authority, must at the very earliest stages

of initiating such a development, notify the responsible heritage resources authority and furnish it with details regarding the location, nature and extent of the proposed development.

Are there any signs of culturally (aesthetic, social, spiritual, environmental) or historically significant elements, as defined in section 2 of the National Heritage Resources Act, 1999, (Act No. 25 of 1999), including archaeological or palaeontological sites, on or close (within 20m) to the site?

YES NO

If YES, explain: N/A

If uncertain, the Department may request that specialist input be provided to establish whether there is such a feature(s) present on or close to the site.

Briefly explain the findings of the specialist if one was already appointed:

Will any building or structure older than 60 years be affected in any way? YES NO

Is it necessary to apply for a permit in terms of the National Heritage Resources Act, 1999 (Act 25 of 1999)? YES NO

If yes, please attached the comments from SAHRA in the appropriate Appendix

fastest growth rate and is followed by the finance and transport sector. The trade sector recorded the largest employment figures in 2012 with a total of 32 400 or 21.5% of the total employment followed by the finance sector, with a total of 27 400 (18.2%). The mining sector with 616 (0.4%) employed the least number of people in Region B, just less than the electricity sector with 938 (0.6%) people employed. Although the agriculture sector currently contributes the least to the region’s economic growth, it is a sector which envelopes significant opportunities for future growth and development in the region. However, because of the location of the site (R21 corridor and earmarked for mixed use development including commercial and industrial uses) the site is expected to be developed in line with these provisions and therefore contribute to economic development and provided related employment opportunities.

Page 21: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

20

SECTION C: PUBLIC PARTICIPATION (SECTION 41) The public participation process is being conducted in accordance with the requirement of the EIA Regulations, 2014. 1. LOCAL AUTHORITY PARTICIPATION

Local authorities are key interested and affected parties in each application and no decision on any application can be made before the relevant local authority is provided with the opportunity to give input. The planning and the environmental sections of the City of Johannesburg Metropolitan Municipality have been informed of the application and given least thirty (30) calendar days to comment of on the Draft BAR.

Was the draft report submitted to the local authority for comment? YES NO

If yes, has any comments been received from the local authority? YES NO

If “YES”, briefly describe the comment below (also attach any correspondence to and from the local authority to this application):

If “NO” briefly explain why no comments have been received or why the report was not submitted if that is the case.

The Draft BAR has been circulated to the local authority and any comments received will be included in the final BAR.

2. CONSULTATION WITH OTHER STAKEHOLDERS Any stakeholder that has a direct interest in the activity, site or property, such as servitude holders and service providers, should be informed of the application at least thirty (30) calendar days before the submission of the application and be provided with the opportunity to comment.

Has any comment been received from stakeholders? YES NO

If “YES”, briefly describe the feedback below (also attach copies of any correspondence to and from the stakeholders to this application):

If “NO” briefly explain why no comments have been received

The Draft BAR has been advertised inviting stakeholders to review and comment on it.

3. GENERAL PUBLIC PARTICIPATION REQUIREMENTS

The public participation process has been undertaken in accordance with the requirements of the Regulations. The need for a public meeting or any other additional measure will be determined by the responses received from the public. All comments and responses to each comment of the public / interested and affected party are being recorded in the Comments and Responses Report as prescribed in the regulations and will be attached to the Final BAR. 4. APPENDICES FOR PUBLIC PARTICIPATION All public participation information is to be attached in the appropriate Appendix. The information in this Appendix is to be ordered as detailed below Appendix 1 – Proof of site notice Appendix 2 – Written notices issued as required in terms of the regulations Appendix 3 – Proof of newspaper advertisements Appendix 4 –Communications to and from interested and affected parties Appendix 5 – Minutes of any public and/or stakeholder meetings Appendix 6 - Comments and Responses Report Appendix 7 –Comments from I&APs on Basic Assessment (BA) Report Appendix 8 –Comments from I&APs on amendments to the BA Report Appendix 9 – Copy of the register of I&Ap

Page 22: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

21

SECTION D: RESOURCE USE AND PROCESS DETAILS Note: Section D is to be completed for the proposal and alternative(s) (if necessary)

Instructions for completion of Section D for alternatives

1) For each alternative under investigation, where such alternatives will have different resource and process details (e.g. technology alternative), the entire Section D needs to be completed

4) Each alterative needs to be clearly indicated in the box below 5) Attach the above documents in a chronological order

(complete only when appropriate)

Section D Alternative No. Proposal (complete only when appropriate for above)

1. WASTE, EFFLUENT, AND EMISSION MANAGEMENT Solid waste management

Will the activity produce solid construction waste during the construction/initiation phase? YES NO

If yes, what estimated quantity will be produced per month? 2000m3

How will the construction solid waste be disposed of (describe)?

Construction waste will comprise mainly of excess spoil material from ground excavation and trenching activities, vegetation, construction material, general waste from site personnel, paints and solvents and waste water and sewage to be disposed of at registered sites. Spoil material will be reused where possible (as backfill or erosion mitigation works) while excess spoil will need to be disposed of off-site. Spoil material will be hauled with tipper trucks to be a pre-determined spoil site, the area will be covered with a layer of topsoil and re-vegetated. General waste will be kept in bins within the construction site and will be collected and disposed of into a skip and transported to the nearest landfill site. Spent canisters for paints and solvents will be the responsibility of the respective contractor and shall be disposed of at a suitably licensed landfill site or recycled as required.

Where will the construction solid waste be disposed of (describe)?

Spoil material will be re-used as backfill material and excess will be disposed of at the nearest registered Municipal Dumping site.

General waste that is not recyclable will be disposed of at the nearest municipal landfill site;

Hazardous waste (paint) will be disposed of at hazardous landfill site.

Will the activity produce solid waste during its operational phase? YES NO

If yes, what estimated quantity will be produced per month? Not available???

How will the solid waste be disposed of (describe)?

Solid waste will be collected and disposed of by the municipality.

Has the municipality or relevant service provider confirmed that sufficient air space exists for treating/disposing of the solid waste to be generated by this activity?

YES NO

Where will the solid waste be disposed if it does not feed into a municipal waste stream (describe)?

To be disposed of at licensed landfill site.

Note: If the solid waste (construction or operational phases) will not be disposed of in a registered landfill site or be taken up in a municipal waste stream, the applicant should consult with the competent authority to determine whether it is necessary to change to an application for scoping and EIA.

Can any part of the solid waste be classified as hazardous in terms of the relevant legislation? YES NO

If yes, inform the competent authority and request a change to an application for scoping and EIA.

Section D has been duplicated for alternatives times

Page 23: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

22

Is the activity that is being applied for a solid waste handling or treatment facility? YES NO

If yes, the applicant should consult with the competent authority to determine whether it is necessary to change to an application for scoping and EIA.

Describe the measures, if any, that will be taken to ensure the optimal reuse or recycling of materials:

It is proposed that all waste construction materials be sorted into recyclable and non-recyclable materials. The recyclable materials should be re-used where possible or disposed of by a recycling company.

Liquid effluent (other than domestic sewage)

Will the activity produce effluent, other than normal sewage, that will be disposed of in a municipal sewage system?

YES NO

If yes, what estimated quantity will be produced per month? N/A

If yes, has the municipality confirmed that sufficient capacity exist for treating / disposing of the liquid effluent to be generated by this activity(ies)?

YES NO

Will the activity produce any effluent that will be treated and/or disposed of on site? Yes NO

If yes, what estimated quantity will be produced per month? N/A

If yes describe the nature of the effluent and how it will be disposed.

N/A

Note that if effluent is to be treated or disposed on site the applicant should consult with the competent authority to determine whether it is necessary to change to an application for scoping and EIA

Will the activity produce effluent that will be treated and/or disposed of at another facility? YES NO

If yes, provide the particulars of the facility:

Facility name:

Contact person:

Postal address:

Postal code:

Telephone: Cell:

E-mail: Fax:

Describe the measures that will be taken to ensure the optimal reuse or recycling of waste water, if any:

Liquid effluent (domestic sewage)

Will the activity produce domestic effluent that will be disposed of in a municipal sewage system? YES NO

If yes, what estimated quantity will be produced per month?

If yes, has the municipality confirmed that sufficient capacity exist for treating / disposing of the domestic effluent to be generated by this activity(ies)?

YES NO

According to the engineering report sewer pipelines will be connected to the existing sewer system, please refer to the GLS report attached as Annexure G4.?????????

Will the activity produce any effluent that will be treated and/or disposed of on site? YES NO

If yes describe how it will be treated and disposed off.

Emissions into the atmosphere

Will the activity release emissions into the atmosphere? YES NO

If yes, is it controlled by any legislation of any sphere of government? YES NO

If yes, the applicant should consult with the competent authority to determine whether it is necessary to change to an application for scoping and EIA.

If no, describe the emissions in terms of type and concentration:

The proposed development will not generate any emissions. Only the additional vehicle traffic, exhaust fumes may have an influence, but is regarded as insignificant.

2. WATER USE

Indicate the source(s) of water that will be used for the activity

municipal Directly from water board

groundwater river, stream, dam or lake other the activity will not use water

If water is to be extracted from groundwater, river, stream, dam, lake or any other natural feature, please indicate

Page 24: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

23

the volume that will be extracted per month: N/A

If Yes, please attach proof of assurance of water supply, e.g. yield of borehole, in the appropriate Appendix

Does the activity require a water use permit from the Department of Water Affairs? YES NO

If yes, list the permits required

If yes, have you applied for the water use permit(s)? YES NO

If yes, have you received approval(s)? (attached in appropriate appendix) YES NO

3. POWER SUPPLY

Please indicate the source of power supply eg. Municipality / Eskom / Renewable energy source

City Power Ekurhuleni (Municipality) is it called City Power??

If power supply is not available, where will power be sourced from?

N/A

4. ENERGY EFFICIENCY

Describe the design measures, if any, that have been taken to ensure that the activity is energy efficient:

Energy saving measures such as energy saving lighting choices will be implemented during operation. Further energy saving measures could be included in the design of structures. Describe how alternative energy sources have been taken into account or been built into the design of the activity, if any:

The following alternative energy sources can be considered: Biomass This option was rejected because the fuel required for producing electricity is not locally available, the distance between the source of biomass and the power plant must be short for economic viability. Gas This option will be considered if Egoli Gas pipeline is available and/or if the energy spent in processing the gas and transporting it to site does not affect the viability of this development. Coal fired generation This option was rejected because of the distance from the coal fields and because pollution is not allowed in this area. Solar Use of solar power for water heating and outside lighting will be encouraged this development.

SECTION E: IMPACT ASSESSMENT The assessment of impacts must adhere to the minimum requirements in the EIA Regulations, 2014, and should take applicable official guidelines into account. The issues raised by interested and affected parties should also be addressed in the assessment of impacts as well as the impacts of not implementing the activity (Section 24(4)(b)(i).

1. ISSUES RAISED BY INTERESTED AND AFFECTED PARTIES Summarise the issues raised by interested and affected parties.

To be included in the final BAR Summary of response from the practitioner to the issues raised by the interested and affected parties (including the manner in which the public comments are incorporated or why they were not included) (A full response must be provided in the Comments and Response Report that must be attached to this report):

To be included in the Final BAR

Page 25: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

24

2. IMPACTS THAT MAY RESULT FROM THE CONSTRUCTION AND OPERATIONAL PHASE

Briefly describe the methodology utilised in the rating of significance of impacts

The beneficial and adverse impacts of the proposed development have been discussed below.

Nature: classification of whether the impact is positive or negative, direct or indirect.

Extent: spatial scale of impact and classified as:

o Site: the impacted area is the whole or significant portion of the site (1).

o Local: Within a radius of 2 km of the construction site (2).

o Regional: the impacted area extends to the immediate, surrounding and neighbouring

properties. o National: the impact can be considered to be of national significance.

Duration: Indicates what the lifetime of the impact will be and is classified as:

o Short term: The impact will either disappear with mitigation or will be mitigated through

natural process in a span shorter than the construction phase. o Medium term: The impact will last for the period of the construction phase, where after it will be

entirely negated.

o Long term: The impact will continue or last for the entire operational life of the development,

o but will be mitigated by direct human action or by natural processes thereafter. The only class of

impact which will be non-transitory.

o Permanent: Mitigation either by man or natural process will not occur in such a way or in such a

time span that the impact can be considered transient.

Intensity: Describes whether an impact is destructive or benign;

o Low: Impact affects the environment in such a way that natural, cultural and social functions

and processes are not affected. o Moderate: Affected environment is altered, but natural, cultural and social functions and

processes continue albeit in a modified way. o High: Natural, cultural and social functions and processes are altered to the extent that they

temporarily cease.

o Very High: Natural, cultural and social functions and processes are altered to extent that they

permanently cease.

o Probability: Describes the likelihood of an impact actually occurring:

o Improbable: Likelihood of the impact materialising is very low

o Possible: The impact may occur

o Highly Probable: Most likely that the impact will occur

o Definite: Impact will certainly occur.

Significance: Based on the above criteria the significance of issues the total number of points scored for

each impact indicates the level of significance of the impact, and is rated as:

o Low: the impacts are less important.

o Medium: the impacts are important and require attention; mitigation is required to reduce the

negative impacts.

o High: the impacts are of great importance. Mitigation is therefore crucial.

Page 26: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

25

Cumulative: In relation to an activity, means the impact of an activity that in itself may not be significant

but may become significant when added to the existing and potential impacts eventuating from similar or

diverse activities or undertakings in the area.

Mitigation: Where negative impacts are identified, mitigation measures (ways of reducing impacts) have been identified. An indication of the degree of success of the potential mitigation measures is given per impact.

Criteria for the rating of impacts

Criteria Description

Extent National The whole of South Africa

Regional Provincial and parts of neighbouring provinces

Local Within a radius of 2km of the construction site

Site Confined to the construction site

Duration Permanent Mitigation either by man or natural process will not occur in such a way or in such a time span that the impact can be considered transient

Long-term The impact will continue or last for the entire operational life of the development, but will be mitigated by direct human action or by natural processes thereafter. The only class of impact which will be non-transitory

Medium-term The impact will last for the period of the construction phase, where after it will be entirely negated

Short-term The impact will either disappear with mitigation or will be mitigated through natural process in a span shorter than the construction phase

Intensity Very High Natural, cultural and social functions and processes are altered to extent that they permanently cease

High Natural, cultural and social functions and processes are altered to extent that they temporarily cease

Moderate Affected

environment is altered, but natural, cultural and social functions and processes continue.

Low Impact affects the environment in such a way that natural, cultural and social functions

Probability Definite Impact will certainly occur

Highly Probable Most likely that the impact will occur

Possible The impact may

occur

Improbable Likelihood of the impact materialising is very low

Rating 4 3 2 1

Significance Rating of classified impacts

Impact Points Description

Low 4-6 An acceptable impact for which mitigation is desirable but not essential. The impact by itself is insufficient even in combination with other low impacts to prevent the development being approved. These impacts will result in either positive or negative medium to short term effects on the social and/or natural environment.

Medium 7-9 An important impact which requires mitigation. The impact is insufficient by itself to prevent the implementation of the project but which in conjunction with other impacts may prevent its implementation. These impacts will usually result in either a positive or negative medium to long-term effect on the social and/or natural environment.

High

10 12 A serious impact, if not mitigated, may prevent the implementation of the project (if it is a negative impact). These impacts would be considered by society as constituting a major and usually a long-term change to the (natural &/or social) environment and result in severe effects or beneficial effects.

Page 27: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

26

Very high 13-16 A very serious impact which, if negative, may be sufficient by itself to prevent implementation of the project. The impact may result in permanent change. Very often these impacts are unmitigatable and usually result in very severe effects, or very beneficial effects

Status Denotes the perceived effect of the impact on the affected area

Positive (+) Beneficial impact

Negative (-) Adverse impact

Negative impacts are shown with a (-) while positive ones are indicated as (+) Briefly describe and compare the potential impacts (as appropriate), significance rating of impacts, proposed mitigation and significance rating of impacts after mitigation that are likely to occur as a result of the construction phase for the various alternatives of the proposed development. This must include an assessment of the significance of all impacts.

CONSTRUCTION PHASE: Potential impacts:

Significance rating of impacts (+ve or -ve)

Proposed mitigation:

Significance rating after mitigation:

Risk of the impact and mitigation not being implemented

Geology and soils –

Loss of soil from excavations due to erosion.

Soil erosion due to ineffective storm water management. It is anticipated that erosion incidences might occur during wet seasons especially on the stockpiles (Topsoil and Subsoil).

• Storm water runoff shall be considered and its flow controlled on the construction site.

• Stockpiles should not be higher than 3-5 meters.

• Excavation must not be left open for longer than four weeks.

• Proper storm water management measures must be put in place.

• No ponding of water must be allowed on site

Low

Fauna and flora

Construction activities may result in habitat destruction which will impact significantly on the faunal communities including avifauna.

Site preparation and construction may result in the disturbance of and the loss of vegetation and potentially the loss of protected plant species.

Site clearing and the removal of vegetation may lead to increased runoff and erosion.

Changes to vegetation communities due to alien invasion resulting in altered habitat integrity

• Any fauna directly threatened by the construction activities should be removed to a safe location by a suitably qualified person.

• The collection, hunting or harvesting of any animals at the site should be strictly forbidden.

• Fires should only be allowed within fire-safe demarcated areas.

• Vegetation clearing should be kept minimal and only area to be used for construction should be cleared.

• Where soil disturbance is required for the laying of service infrastructure, the topsoil should be put aside and replaced after the infrastructure has been installed.

• Areas to be cleared should be demarcated.

Low

Topography Alteration of topography due to stockpiling of soil, building material and debris and waste material on site.

All stockpiles must be restricted to designated areas and are not to exceed a height of 3-5 metres.

Stockpiles created during the construction phase are not to remain during the operational phase.

Low

Page 28: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

27

The contractor must be limited to clearly defined access routes to ensure that sensitive and undisturbed areas are not disturbed.

Groundwater and surface water

Construction works could cause water pollution, siltation, soil erosion and soil compaction

Surface water flows will be altered mainly as a change in surface permeability.

Wetland will be affected during the bridge construction

The flow of the wetland will be diverted

• Construction works must be kept to a minimum on site and only be done one section at a time to prevent excessive open soil areas that could lead to soil erosion, siltation and excessive compaction.

• A storm water management plan must be compiled to direct the water flow to minimize the impact of the water on the surrounding environment.

• Construction on the wetland should be kept to a minimum

• Construction on the wetland should not take place during summer season.

Medium-low

Air Quality:

Construction activities have been the potential to be sources of fugitive dust as a result of construction activities These include:

• Dust from access roads and areas cleared for construction of the pipeline.

• Emissions from construction machinery and equipment.

• Trucks transporting spoil

• Dust suppression measures through

regular application of water must be implemented on temporary dirt roads and during the transportation of material during dry periods. Water used for this purpose must be used in quantities that will not result in the generation of run-off.

• Adherence to speed limits on site roads to prevent the liberation of dust into the atmosphere must be enforced.

• All site workers will need to wear the appropriate PPE to avoid any exposure to contaminated dust particles.

Very low

Noise There is likely to be an increase in noise pollution due to, among others, the excavations and site clearing, construction vehicles and construction staff, operation of cement mixer machine at the site, blasting and or drilling.

• All equipment and activities to comply with noise regulations.

• Silencer units in vehicles and equipment to be maintained in good working order.

• Workers working in area where the 8-hour ambient noise levels exceed 85dBA must have the appropriate Personal Protective Equipment (PPE).

• Work should be carried out between 7am and 5pm weekdays and 7am-2pm Saturdays. No work should be carried out during Sundays or holidays.

Low

Visual Intrusion & Light pollution

• Unkempt site due to littering and illegal dumping on site and surrounding areas.

• Removal of vegetation may cause visual intrusion.

• Unsightly construction waste pile may be visually intrusive

• All rubbish and excess rubble including excess soil and bedrock to be removed to a registered waste disposal facility. A certificate of disposal must be obtained for any waste that is disposed of.

• Refuse bins must be provided on site and these must be emptied regularly.

• The location of the construction camp must be carefully selected so that the camp is not visually intrusive.

Low

Page 29: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

28

• Lights from the contractor’s camp and the construction site could be visually intrusive.

• Indigenous plants or trees not affecting the alignment of the pipeline must be retained to provide screens.

• Light pollutions should be minimised. Lighting is to be sufficient for safety and security purposes, but shall not be intrusive to neighbouring residents, disturb wildlife.

• Should overtime/night work be authorised, the Contractor shall be responsible to ensure that lighting does not cause undue disturbance to neighbouring residents. In this situation low flux and frequency lighting shall be utilised.

Waste management Waste generation during the construction phase will have a negative impact on the environment, if not controlled adequately. Waste streams likely to include domestic waste, spent grinding material, mixed concrete, paint cans and brushes, construction rubble and other construction waste

• General waste should be placed in water tight containers and disposed of on a regular basis.

• Records of all waste taken off site and disposed of must be kept as evidence.

• Building rubble must be re-used, where possible. Excess rubble must be disposed of at an appropriate site.

• Burning of waste material will not be permitted.

• Spillages of hazardous substances must be cleaned up using absorbent material provided in spill kits on site, and must be disposed of together with other hazardous material at a hazardous waste landfill. Absorbent materials used to clean up spillages should be disposed of in a separate hazardous waste bin.

• The storage area for hazardous material must be concreted, bunded, covered, labelled and well ventilated.

• Employees to be provided with appropriate PPE for handling hazardous materials.

Low

Traffic The construction phase is likely to generate additional traffic in terms of construction vehicles and heavy vehicles delivering materials to the site.

• Caution to be taken to ensure construction vehicles are not parked in such a way as to block through/passing traffic.

• Proper and adequate lanes to allow for ingress/egress to be provided.

• Warning signs to be placed on site to warn motorists of construction activities.

Low

Safety and Security A construction site can be a dangerous place and thus could result in harm to people and property and by their nature act as a magnet to the unemployed, resulting in large numbers of people gathering around the site.

• The site camp to be fenced off to prohibit unauthorized entry.

• Health and Safety Officer to be appointed to continuously monitor the safety conditions during construction.

• All construction staff must have the appropriate PPE.

• Staff handling chemicals or hazardous materials must be trained in the use of the

Low

Page 30: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

29

substances and the environmental, health and safety consequences of incidents.

• Access to fuel and other equipment stores is to be strictly controlled

• Record and report any environmental, health and safety incidents to the responsible person.

• Signs should be erected to warn of construction activities.

• The site and crew are to be managed in strict accordance with the Occupational Health and Safety Act (Act No. 85 of 1993) and the National Building Regulations

• All structures that are vulnerable to high winds must be secured.

• All manhole openings are to be covered and clearly demarcated with danger tape.

• Potentially hazardous areas such as trenches are to be cordoned off and clearly marked at all times.

• The basic spill control kit must be available at each construction camp within the site.

• The Contractor is to ensure traffic safety at all times, and shall implement road safety precautions for this purpose.

• All vehicles and equipment used on site must be operated by appropriately trained and / or licensed individuals in compliance with all safety measures as laid out in the Occupational Health and Safety Act (Act No. 85 of 1993) (OHSA).

• An environmental awareness training programme for all workers shall be put in place by the Contractor. Before commencing with any work, all workers shall be appropriately briefed about the EMPr and relevant occupational health and safety issues.

• Adequate emergency facilities must be provided for the treatment of any emergency on the site. Emergency procedures must be available on site and communicated to all.

• The nearest emergency service provider must be identified and Emergency contact numbers are to be displayed conspicuously at prominent position.

• No loitering around the site for people seeking temporary employment is to be allowed

Disruption to Road Users & Road Infrastructure

• Access to the construction area must be predetermined and used during constructions.

• The working area (disturbance corridor) and all exposed trenches must be fenced off with barrier netting, danger tape & droppers.

Low

Page 31: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

30

• Excavated earth material should not be dumped/ stockpiled in the road in any way that will obstruct traffic flow.

• The temporary removal and subsequent replacement of trees and fencing along the road must be done in such a way as to reinstate the original condition of the site.

• An appropriately qualified person must oversea the removal and re-planting of the trees.

• Warning signage must be erected as appropriate to warn road-users of the presence of construction workers and construction vehicles.

Impacts to Cultural/ Historical Resources

Any artifacts or cultural resources encountered during construction must be preserved and removed with the assistance of a qualified specialist

Low

Employment /job opportunities created Construction activities will result in the creation of some job opportunities

+ve No mitigation required +ve

Increase in revenue base +ve No mitigation required +ve

Alignment with spatial plans +ve +ve

Operational Phase

Potential impacts:

Significance rating of impacts

Proposed mitigation:

Significance rating after mitigation

Risk of mitigation not being implemented

Bio-physical Impacts

Geology and soils

Potential for erosion, degradation and loss of topsoil due to exposed areas and storm water runoff.

Loss destruction and/or eradication of threatened, near-threatened and declining plant species.

Impact on late-successional/untransformed (Primary) plant communities of particular scientific, conservation or educational value

Proper storm water management to direct storm water runoff to be implemented.

Areas susceptible to erosion must be protected by installing the necessary protective materials.

Rehabilitation will be undertaking for vegetation and species removed.

Low

Surface , subsurface and groundwater pollution

Contamination of surface and groundwater due to

No contaminated water from the site to be diverted into the natural watercourse.

Approved storm water management and any contaminated water to be

Page 32: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

31

spillage, leakage, incorrect storage and handling of chemicals, oils, lubricants, fuels and other hazardous materials.

diverted away from the stormwater drains.

Increased storm water run-off

Paved surfaces and roofing will lead to increased storm water runoff

Adequate storm water provisions must be implemented to decrease surface water runoff as a result of increased in paved surfaces. Examples if techniques to be implemented includes: Infiltration trenches; Porous Pavements, Grassed/vegetated swales, filter strips and sedimentation basins.

Areas previously cleared of vegetation to should be landscaped with indigenous vegetation to prevent erosion.

Low

Ecology, vegetation and animal life

Spread of alien and invasive species

Programme to control the spread of alien and invasive species to be implemented on an ongoing basis.

Landscaping plan to be developed and implemented. The plan to provide for use of predominately indigenous vegetation.

Socio-economic Impacts

Increase in noise level/pollution

Activities associated with the development and increased traffic noise within the development boundaries may contribute to increase in noise levels.

The National Noise Laws and provincial Noise Regulations must be adhered to, including the local by-laws where applicable.

Low

Air quality

Air pollution could arise from vehicular/tailpipe emissions and operations on site.

Emission standards and bylaws to be observed/enforced.

Activities on site to be monitored and non-compliance with bylaws addressed

Low

Visual impact including light pollution

Transformation of ‘vacant’ piece of land will have a visual impact in the area;

Poor design and finishing of

Architectural character of the development must result in an aesthetically pleasing environment.

Ensure that the design fits into and enhances the corridor development and it is aesthetically pleasing.

Ensure that all infrastructure, the site and general surroundings are

Low

Page 33: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

32

structures may be visually intrusive

Lights from the development could be visually intrusive

maintained in a neat and appealing way

Rehabilitation of disturbed areas and re-establishment of vegetation. Indigenous plants or trees should be planted to break the lines of the buildings making them less visually intrusive

No Go

Potential impacts:

Significance rating of impacts

Proposed mitigation:

Significance rating after mitigation

Risk of mitigation not being implemented

Geology and soils No disturbance of soils on the site, therefore soil erosion less likely to take place on site

+ve Land owner to continue to manage erosion on site

+ve Medium-high

Fauna and flora No disturbance of fauna and flora on the proposed site area.

+ve Continued clearance of alien vegetation by land owner

+ve Medium-high

Topography No impact

Air Quality No impact

Groundwater and surface water pollution No pollution as a result of development

+ve +ve

Noise No noise disturbance to neighboring residential estates due to construction works on site

+ve +ve

Visual Intrusion & Light pollution

+ve No impact +ve

Waste management No impact

Traffic No impact

Disruption to Road Users & Road Infrastructure

No impact

Impacts to Cultural/ Historical Resources

No impact

Employment /job opportunities created No job opportunities will be created

-ve Alternative sources of employment to be investigated and implemented

-ve High

Increase in tax base for municipality

-ve Alternative sources of revenue to be investigated and implemented

-ve High

Alignment with spatial plans -ve Plans to be amended to align with open space provision

-ve

List any specialist reports that were used to fill in the above tables. Such reports are to be attached in the appropriate Appendix.

Ecological Assessment Scan Report

Town Planning Report (Memorandum)

Civil Services Report

Heritage Impact Assessment Report

Traffic Impact Assessment

Page 34: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

33

Describe any gaps in knowledge or assumptions made in the assessment of the environment and the impacts associated with the proposed development.

N/A

3. IMPACTS THAT MAY RESULT FROM THE DECOMISSIONING AND CLOSURE PHASE Briefly describe and compare the potential impacts (as appropriate), significance rating of impacts, proposed mitigation and significance rating of impacts after mitigation that are likely to occur as a result of the decommissioning and closure phase for the various alternatives of the proposed development. This must include an assessment of the significance of all impacts.

Potential impacts: Significance rating of impacts:

Proposed mitigation: Significance rating of impacts after mitigation:

Risk of the impact and mitigation not being implemented

Geology and soils - Soil erosion and loss

of soils. - Stability of slopes and

stream banks

- Protection of exposed soils. - Soil erosion prevention measures

implemented especially during rainy season.

- Immediate rehabilitation of exposed areas.

- Provide effective short-term measures for slope stabilisation, sediment control and subsidence control

- Provide adequate drainage systems to minimise and control infiltration

Medium

Hydrology and Water pollution Sediment mobilisation and transport in short to medium term Debris in the wetland system

- Prevention of sediment transportation by use of sediments ponds.

- Use of trappings to reduce amount of debris in the water.

- Avoid works during high-flow periods. Limit movement into and across the stream to the essential.

- Diverting stream-flow to avoid mixing of water with high solid content.

Medium

Fauna and Flora- - Re-establishment of natural

vegetation (long-term) - Connectivity and ecosystem

establishment (long- term)

Rehabilitation measures including planting of vegetation implemented

Low

Waste Generation and disposal of solid waste could have negative consequences on the environment

- Part of demolition material to be re-used on other construction sites;

- Limit disposal at landfills to non- recyclable material;

- Waste must be disposed of in the appropriate manner at a licensed disposal site.

Low

Air quality Dust pollution Noise pollution

- Dust control measures (water suppression, covers etc)

- Avoid demolition during windy months Restricted working hours

- Noise abatement measures implemented

Low

Although no decommission is envisaged in the long-term, the table below presents potential impacts and mitigation measures should this take place in future.

Page 35: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

34

Negative Socio-economic impacts Loss of accessibility. Traffic congestion on alternative routes Scaring of the affected land in the short- medium term

- Alternative routes/diversions used. - Upgrades on other adjacent roads to

accommodate traffic - Decommissioning and rehabilitation plan

created and implemented

Medium

Employment opportunities Temporary job opportunities created

+ve Use of labour from surrounding communities +ve

Where applicable indicate the detailed financial provisions for rehabilitation, closure and ongoing post decommissioning management for the negative environmental impacts.

N/A

4. CUMULATIVE IMPACTS

Describe potential impacts that, on their own may not be significant, but is significant when added to the impact of other activities or existing impacts in the environment. Substantiate response:

Cumulative impacts refer to the incremented impacts resulting from the implementation of an activity on a common resource which are added to the impacts of other past, present or reasonably foreseeable future activities. The potential cumulative impacts of the township both during construction and occupation by considering the effects of the development have been considered relative to the;

- The biophysical environment; and - Socio-economic conditions

According to the ecological assessment report, the proposed study area consists of secondary grassland however, there are major levels of impacts contributed by human activities such as excavations, vegetation clearance, etc and the state of vegetation and species diversity as well as the degree of connectivity with surrounding open space is very poor due to disturbances. There might be potential impacts for flora and fauna on the proposed development area, such as loss destruction and/or eradication of threatened near-threatened and declining plant species, Impact on late-successional/untransformed (Primary) plant communities of particular scientific, conservation or educational value, Impact on sensitive ecological systems; wetlands and drainage lines and isolated outcrops with bush clump formation.

5. ENVIRONMENTAL IMPACT STATEMENT Taking the assessment of potential impacts into account, please provide an environmental impact statement that sums up the impact that the proposal and its alternatives may have on the environment after the management and mitigation of impacts have been taken into account with specific reference to types of impact, duration of impacts, likelihood of potential impacts actually occurring and the significance of impacts.

Proposal

The short term environmental impacts of the activity include increased construction vehicles, possible dust, noise pollution and employment opportunities during the construction phase. Long term employment, sustained economic development that enhances the provincial and municipal, potential increase in traffic, loss destruction and/or eradication/on eradication of threatened, near-threatened and declining plant species is some of the key impacts resulting from the implementation of the activity. The implementation of mitigation measures identified above and in the attached EMPr is expected to result in the mitigation of the negative impacts to acceptable levels. The overall environmental and socio-economic benefits associated with the proposed development far outweigh the short and long term negative impacts that may result from the development. If the recommendations in the EMPr are implemented and monitored, then the proposed development as outlined will not have negative impacts on society and the environment.

Alternative 1

Page 36: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

35

No-go (compulsory)

The ‘no-go’ option will mean that current activities (agriculture) continue on site. While this will lead to retention of agricultural land in the short-medium term, the environmental economic consequences in the immediate to long would be negative. From this perspective the no-go alternative could potentially result in:

- Opportunities for provision of affordable housing. - Development of alternative land uses which might not realize the full potential of the site or

which might present with negative environmental and socio-economic consequences. - Loss of opportunity to bring in investment and create employment opportunities where

there is a high order road infrastructure. - Implementation of the no-go alternative will likely result in a less favourable land uses for

the site. This is not considered desirable given that the existing land use is not considered desirable given that the existing land use is not contributing to the strategic development vision of the area as presented in spatial plans.

6. IMPACT SUMMARY OF THE PROPOSAL OR PREFERRED ALTERNATIVE

Impact Significance after mitigation

Proposal No-Go

CONSTRUCTION

Geology and soils +ve

Fauna and flora +ve

Topography

Air Quality

Groundwater and surface water +ve

Noise +ve Visual Intrusion & Light pollution +ve Waste management

Traffic

Safety and Security

Disruption to Road Users & Road Infrastructure

Impacts to Cultural/ Historical Resources

Employment /job opportunities created +ve -ve

Increase in tax base +ve -ve

Alignment with spatial plans +ve -ve

For proposal:

After mitigation, the significance of all impacts in the short-term, are rated as low. Positive impacts of medium significance would be realized in employment opportunities, increase in municipal tax base as well as compliance with the spatial plans.

No-go alternative:

Having assessed the significance of impacts of the proposal and alternative(s), please provide an overall summary and reasons for selecting the proposal or preferred alternative.

The information contained in this DBAR and specialist studies, provides a detailed and comprehensive description of the proposed project, baseline environment and potential environmental impacts associated with the proposed activity. As no significant impacts that cannot be mitigated were identified, we are of the

Page 37: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

36

opinion that the project should proceed, provided the necessary mitigation and management measures are implemented. Furthermore, should the proposed development be approved, the social and economic benefits to the province and Ekurhuleni communities will be significantly positive. The proposed application and development of the land as being applied for is consistent with the institutional planning policy adopted for the area by the municipality and the province and will contribute to establishment of the R21 Corridor and possible stimulus in the development in the area. The development is needed, desirable and it is recommended that it be allowed to proceed.

7. SPATIAL DEVELOPMENT TOOLS Indicate the application of any spatial development tool protocols on the proposed development and the outcome thereof.

- Ekurhuleni Metropolitan Municipality Regional Spatial Development Framework Region B the activity is fully aligned with the provisions thereof;

- Protection of Agricultural Land-GAPA activity is aligned with the provisions thereof; - Gauteng Spatial Development EMF-activity will be located in the Urban Development Zone and

fully complies with the provisions thereof; 8. RECOMMENDATION OF THE PRACTITIONER

Is the information contained in this report and the documentation attached hereto sufficient to make a decision in respect of the activity applied for (in the view of the Environmental Assessment Practitioner as bound by professional ethical standards and the code of conduct of EAPASA).

YES NO

If “NO”, indicate the aspects that require further assessment before a decision can be made (list the aspects that require further assessment):

Nil

If “YES”, please list any recommended conditions, including mitigation measures that should be considered for inclusion in any authorisation that may be granted by the competent authority in respect of the application:

- Precautionary measures for developing on dolomite area to be adhered to. Foundation designs to be as per the recommendations of the geotechnical engineer.

- Areas susceptible to erosion must be protected by installing the necessary protective materials. - Waste recycling to be promoted and, where possible construction waste should be recycled or reused

while specialist service providers are to be appointed to remove waste for disposal at licensed disposal facilities.

- All hazardous substance must be stored on an impervious surface in a designated bunded area able to contain 110 % to the total volume of materials stored at any given time. Containers for organic solvents can only be cleared on site if containers for liquid waste are provided on site.

- Should any potentially culturally significant artefacts or graves be found during construction, the affected site to be cordoned off and an assessment by Cultural Heritage practitioner be done before proceeding with construction.

- The provisions of the EMPr and other conditions in the Specialist reports must be adhered to.

Page 38: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

37

9. THE NEEDS AND DESIREBILITY OF THE PROPOSED DEVELOPMENT (as per notice 792 of 2012, or the updated version of this guideline)

Needs as well as Desirability as per the Town Planning memo. The development concept of the subject property is high density (76 units/ha) residential with a height of 4

storeys. As mentioned the subject property is located to the West and adjacent to the existing Esther Park

Extension 1 township and to the East of the existing Founders Hill industrial development. The proposed

development of the property for high density residential uses will fit in with the nature of the larger urban

area and when assessing the site specific characteristics that is applicable to the subject property it becomes

clear that the subject proposed development concept is both desirable and needed.

When assessing the surrounding urban environment, it is evident that the area to the east of the subject

property is predominately residential in nature ( Esther Park Extension 1 and 13) and the area to the west

and south caters for industrial uses (Founders Hill Industrial Park, etc) The specific land uses and surrounding

zoning has been addressed in the first part of the memorandum and along with the master road planning

network that was also illustrated it provides the spatial perspective that confirms the use of the property as

envisaged by this application is correct.

As indicated the divide that is created by the Gautrain rail line gives form to the layout of Esther Park Extension

38. The proposed K115 and PWV3 roads provides a clear buffer between the proposed township. Effectively

then Esther Park 38 is located and connected only to the existing residential Esther Park township to the east.

Esther Park Extension 1 is predominantly residential 1 stands with a small central medium/high density

residential development and Esther Park Extension 13 is a medium/high residential township. Considering

the housing typology of the surrounding area the position of a higher density residential development on the

subject property will enhance the urban residential perspective of the area and will provide a housing type

that is not available in the area.

The nature of the subject property is currently underdevelopment and vacant. The development of the

property will provide a much needed spatial upliftment for the existing residential area surrounding the

proposed township is older in nature and the construction of the proposed development will breathe new

life into Esther Park community.

10. THE PERIOD FOR WHICH THE ENVIRONMENTAL AUTHORISATION IS REQUIRED (CONSIDER WHEN THE

11. ENVIRONMENTAL MANAGEMENT PROGRAMME (EMPr) (must include post construction monitoring requirements and when these will be concluded.)

If the EAP answers “Yes” to Point 7 above then an EMP is to be attached to this report as an Appendix EMPr attached Yes

10 years

Page 39: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

38

SECTION F: APPENDIXES The following appendixes must be attached as appropriate (this list is inclusive, but not exhaustive): It is required that if more than one item is enclosed that a table of contents is included in the appendix

Appendix A: Site Plan Appendix A¹: Locality Plan Appendix A²: Layout Plan Appendix B: Site Photographs Appendix C: Facility illustration(s) Appendix D: Route position information Appendix E: Public Participation information Appendix E¹: Proof of Notices Appendix E²: Written Notices Issued Appendix Eᵌ: Newspaper Advert Appendix E⁵: Minutes of Meetings Appendix E⁶: Comments of Issues Report Appendix E⁷: Comments and I&Aps on BAR Appendix E⁸: Copy of Register of I&Aps Appendix F: Water use license(s) authorization, SAHRA information, service letters from municipalities, water supply

information Appendix G: Specialist reports Appendix G¹: Ecological Impact Assessment Appendix Gᵌ: Geotechnical Report Appendix Gᵌ: Town Planning Memorandum Report Appendix G⁴: Heritage Impact Assessment Appendix G⁵: Traffic Impact Assessment Appendix H: Draft EMPr Appendix I: Other information

The public participation information will be included on the Final Basic Assessment Report CHECKLIST To ensure that all information that the Department needs to be able to process this application, please check that:

Where requested, supporting documentation has been attached; All relevant sections of the form have been completed.

Page 40: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

39

APPENDIX A: SITE PLAN

Page 41: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

40

APPENDIX A¹: LOCALITY PLAN

Page 42: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

41

APPENDIX A²: LAYOUT PLAN

Page 43: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

42

APPENDIX B: SITE PHOTOGRAPHS

Page 44: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

43

APPENDIX C: FACILITY ILLUSTRATION

Page 45: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

44

APPENDIX D: ROUTE POSITION N/A

Page 46: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

45

APPENDIX E: PUBLIC PARTICIPATION INFORMATION

Page 47: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

46

APPENDIX E¹: PROOF OF NOTICES

(To be included on the Final BAR)

Page 48: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

47

APPENDIX E²: WRITTEN NOTICES ISSUED (To be included on the Final BAR)

Page 49: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

48

APPENDIX Eᵌ: PROOF OF NEWSPAPER ADVERTISEMENTS

(To be included on the Final BAR)

Page 50: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

49

APPENDIX E⁴: COMMUNICATIONS TO AND FROM INTERESTED PARTIES

(To be included on the Final BAR)

Page 51: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

50

APPENDIX E⁵: MINUTES OF ANY PUBLIC AND/OR STAKEHOLDER MEETINGS

(To be included on the Final BAR)

Page 52: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

51

APPENDIX E⁶: COMMENTS AND RESPONSES REPORT

(To be included on the Final BAR)

Page 53: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

52

APPENDIX E⁷: COMMENTS FROM I&APs ON BASIC ASSESSMENT (BA) REPORT

(To be included in the Final BAR)

Page 54: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

53

APPENDIX E⁸: COPY OF THE REGISTER OF I&APS

Nr Registered Parties Contact Details Address

Stakeholders

1 Department of Water Affairs [email protected] [email protected] [email protected] [email protected] [email protected]

Anna Malemela & Tshepo Mathebe 15th Floor 285 Bothongo Building Francis Baard Street Tel 012 386 1406 Fax:086 573 2897

2 Council for Geo- Science

[email protected] [email protected]

280 Pretoria Road, Silverton, PRETORIA

3 PHRAG [email protected]

4 Eskom [email protected] [email protected]

5 City of Ekurhuleni [email protected]

Page 55: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

54

APPENDIX F: WATER USE LICENSE(S) AUTHORISATION, SAHRA INFORMATION SERVICE LETTERS FROM MUNICIPALITIES,

WATER SUPPLY INFORMATION

Page 56: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

55

APPENDIX G: SPECIALIST REPORTS

Page 57: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

56

APPENDIX G¹: ECOLOGICAL ASSESSMENT

Page 58: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

57

APPENDIX G²: GEOTECHNICAL REPORT

Page 59: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

58

APPENDIX Gᵌ: TOWN PLANNING MEMORANDUM REPORT

Page 60: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

59

APPENDIX G⁴: HERITAGE IMPACT ASSESSMENT

Page 61: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

60

APPENDIX G⁵: TRAFFIC IMPACT ASSESSMENT

Page 62: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

61

APPENDIX G⁶: CIVIL SERVICES REPORTS

Page 63: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

62

APPENDIX H: DRAFT EMPR

Page 64: DRAFT BASIC ASSESSMENT REPORT · esther park extension 38 phase 2 residential estate- gaut 002/17-18/e0109 1 table of contents section a: activity information 6 1. activity description

Esther Park Extension 38 Phase 2 Residential Estate- Gaut 002/17-18/E0109

63

APPENDIX I: Other Information