DRAFT SCHWINDT & CO. RESERVE STUDY SERVICES PAGE 1 of 99 CALDERA SPRINGS MAINTENANCE PLAN UPDATE RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2020 https://www.schwindtco.com/ (503) 227-1165

Upload: others

Post on 18-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 1 of 99

CALDERA SPRINGS

MAINTENANCE PLAN UPDATE

RESERVE STUDY

LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION

2020

https://www.schwindtco.com/(503) 227-1165

Page 2: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 2 of 99

CALDERA SPRINGS OWNERS’ ASSOCIATION, INC.

Executive Summary

Year of Report:

January 1, 2020 to December 31, 2020

Number of Units:

320 Units

Parameters:

Beginning Balance: $1,476,958

Year 2020 Suggested Contribution: $206,839

Year 2020 Projected Interest Earned: $11,749

Inflation: 2.50%

Annual Increase to Suggested Contribution: 2.50%

Lowest Cash Balance Over 30 Years (Threshold): $392,216

Prior Year’s Actual Contribution: $201,794

The contribution is broken up as follows: 85% Master Association, 10% Sub-Association

and 5% Golf Course

jwong
Letter Head
Page 3: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTTABLE OF CONTENTS

Caldera Springs Owners' Association, Inc.

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 3 of 99

Disclosure Information 4 of 99

MAINTENANCE PLAN

Executive Summary of Maintenance Plan 8 of 99

Maintenance Plan 9 of 99

RESERVE STUDY

Property Description 20 of 99

Cash Flow Method - Threshold Funding Model Summary 21 of 99

Cash Flow Method - Threshold Funding Model Projection 22 of 99

Component Summary By Category 23 of 99

Component Summary By Group 27 of 99

Annual Expenditure Detail 30 of 99

Detail Report by Category 42 of 99

Roofing 42 of 99

Painting 43 of 99

Building Components 45 of 99

Gutters and Downspouts 49 of 99

Streets/Asphalt 50 of 99

Fencing/Security 54 of 99

Equipment 56 of 99

Interior Furnishings 66 of 99

Lighting 67 of 99

Recreation/Pool 70 of 99

Grounds Components 80 of 99

Signs 86 of 99

Doors and Windows 88 of 99

Inspections 90 of 99

Additional Disclosures 96 of 99

Page 4: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 4 of 99

Caldera Springs Owners’ Association, Inc.Maintenance Plan Update

Reserve Study Update - OffsiteDisclosure Information

2020

We have conducted an offsite reserve study update and maintenance plan update for Caldera Springs Owners’ Association, Inc. for the year beginning January 1, 2020, in accordance with guidelines established by the Community Associations Institute and the American Institute of Certified Public Accountants.

This reserve study and maintenance plan are in compliance with the legislative changes made in 2007 to ORS Chapters 94 and 100.

In addition to providing the reserve study and maintenance plan, we also provide tax and review/audit services to the Association.

Schwindt & Company believes that every Association should have a complete building envelope inspection within 12 months of completion of all construction and every 5 years. This inspection must be performed by a licensed building envelope inspector. Ongoing inspections of the property should be performed by a licensed inspector, with the exception of a roof inspection which may be performed by a licensed roofing contractor.

Increases in Roofing and Painting Costs.Over the last several years, roofing, painting and other costs have increased at a dramatic pace. Schwindt & Company has noted this in our reserve studies. We were not sure if this was a temporary price increase or the new normal in pricing. We are now of the opinion that these increased prices will most likely continue. Roofing costs have nearly doubled and painting costs have increased 50%. It is still possible to keep the increases to a minimum if Associations can find a vendor that will perform the work at a reduced price, however, these vendors are becoming rare.The main reason for increased prices aside from normal cost increases appear to be the availability of labor. Many workers left the industry during the downturn and have not reentered the job market thus driving up wage costs to attract qualified workers. Roofers and painters are also seeing increased demand for their services due to aging association property. These factors have created the perfect storm for increased prices.These increases are being built in to cost estimates and required contributions. Associations will see an increase in the suggested reserve contributions beginning with the 2018/2019 budget years and depending on the year the roofing and painting projects occur, the increases may be substantial.

Associations should have a complete building envelope study conducted every 3-5 years. If the Association chooses not to engage a qualified engineer or architect to perform a building envelope inspection, the Association should be 100% funded using the fully funded method of funding to insure funds are available to pay for unexpected costs

Page 5: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 5 of 99

Article I, Section 1.5 of the Association’s Declaration states, “The Common Areas are anticipated to include lakes, open meadows, pathways, pool, spas, fitness center, open spaces, roads and trails. In addition, the private ways (roads) are initially designated as Common Maintenance Areas.”

Article I, Section 1.6 of the Association’s Declaration states, “Common Maintenance Areas shall mean that property and/or Improvements for which the Association bears some responsibility to operate and/or maintain and/or repair and/or replace and/or insure. Common Maintenance Areas include the Common Areas.”

Article IV, Section 4.5 of the Association’s Declaration states, “The Association will permanently maintain, repair and replace as necessary all Common Maintenance Areas (including Common Areas).”

The Association has elected not to have an insurance deductible in the reserve study, deemed to be budgeted in the operating budget.

Assumptions used for inflation, interest, and other factors are detailed on page 20. Income tax factors were not considered due to variables affecting net taxable income and the election of the tax form to be filed.

David T. Schwindt, the representative in charge of this report, is a designated Reserve Study Specialist, Professional Reserve Analyst, and Certified Public Accountant licensed in the states of Oregon, Washington, California, and Arizona.

All information regarding the useful lives and costs of reserve components were derived by the Association, vendors, and various construction pricing and scheduling manuals.

The terms RS Means, National Construction Estimator, and Fannie Mae Expected Useful Life Tables and Forms refer to construction industry estimating databases that are used throughout the industry to establish cost estimates and useful life estimates for common building components and products. We suggest that the Association obtain firm bids for these services.

Many reserve studies do not include components such as the structural building envelope, plumbing (including water supply and piping), electrical systems and water/sewer systems because they are deemed to be beyond the usual 30 year threshold and reserve study providers are generally not experts in determining the estimated useful lives and replacement costs of such assets. Associations that are 20+ in age should consider adding funding for these components because the eventual cost may be one of the largest expenditures in the study. Because the eventual replacement costs and determination of the estimated useful life of such components depend on a number of factors, it is advisable to hire experts to advise the Association on such matters. Schwindt & Co believes the best way to determine costs and lives associated with these components is to perform an inspection of the applicable components which should include information about the component, steps to take to lengthen the estimated useful life, projected estimated useful life and estimated replacement costs. This inspection should be conducted by experts and should include a written report. This information will allow the reserve study provider and the Association to include appropriate costs, lives and projected expenditures in the study. Schwindt & Co believes that the cost of these inspections should be included in the reserve study as a funded component.

We are not aware of any material issues which, if not disclosed, would cause a material distortion of this report.

Certain information, such as the beginning balance of reserve funds and other information as detailed on the component detail reports, was provided by Association representatives and is deemed to be reliable by us. This reserve study is a reflection of the information provided to us and cannot be used for the purpose of performing an audit, a quality/forensic analysis, or background checks of historical records.

Schwindt & Company suggests the Association perform a building envelope inspection to determine the condition, performance, and the useful life of all the components.

Certain costs outlined in the reserve study are subjective, and, as a result, are for planning purposes only. All work should be bid out at the time of work. Actual costs will depend upon the scope of work as defined at the time the repair, replacement or restoration is performed. All estimates relating to future work are good faith estimates and projections are based on the estimated inflation rate, which may or may not prove accurate. All future costs and life expectancies should be reviewed and adjusted annually.

This reserve study, unless specifically stated in the report, assumes no fungi, mold, asbestos, lead paint, urea-formaldehyde foam insulation, termite control substances, other chemicals, toxic wastes, radon gas, electro-magnetic radiation or other potentially hazardous materials (on the surface or sub-surface), or termites on the property. The existence of any of these substances may adversely affect the accuracy of this reserve study. Schwindt & Company assumes no responsibility regarding such conditions, as we are not qualified to detect substances, determine the impact, or develop remediation plans/costs.

Page 6: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 6 of 99

Since destructive testing was not performed, this reserve study does not attempt to address latent and/or patent defects. Neither does it address useful life expectancies that are abnormally short due either to improper design, or installation, nor to subsequent improper maintenance. This reserve study assumes all components will be reasonably maintained for the remainder of their life expectancy.

Physical Analysis:

New projects generally include information provided by developers and/or refer to drawings.

Full onsite reserve studies generally include field measurements and do not include destructive testing. Drawings are usually not available for existing projects.

Onsite updates generally include observations of physical characteristics but do not include field measurements.

Please note that the Association has not had a complete building envelope inspection. The effects of not having information relating to this inspection are not known.

The client is considered to have deemed previously developed component quantities as accurate and reliable. The current work is reliant on the validity of prior reserve studies.

This reserve study should be reviewed carefully. It may not include all common and limited common element components that will require major maintenance, repair, or replacement in future years, and may not include regular contributions to a reserve account for the cost of such maintenance, repair, or replacement. The failure to include a component in a reserve study, or to provide contributions to a reserve account for a component, may, under some circumstances, require the association to (1) defer major maintenance, repair, or replacement, (2) increase future reserve contributions, (3) borrow funds to pay for major maintenance, repair, or replacement, or (4) impose special assessments for the cost of major maintenance, repair, or replacement.

Page 7: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 7 of 99

CALDERA SPRINGS OWNERS’ ASSOCIATION, INC.

MAINTENANCE PLAN UPDATE

2020

Page 8: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc. Executive Summary of Maintenance Plan

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 8 of 99

Regular maintenance of common elements is necessary to insure the maximum useful life and optimum performance of components. Of particular concern are items that may present a safety hazard to residents or guests if they are not maintained in a timely manner and components that perform a water-proofing function.

This maintenance plan is a cyclical plan that calls for maintenance at regular intervals. The frequency of the maintenance activity and the cost of the activity at the first instance follow a short descriptive narrative. This maintenance plan should be reviewed on an annual basis when preparing the annual operating budget for the Association.

Checklists, developed by Reed Construction Data, Inc., can be photocopied or accessed from the RS Means website:

http://www.rsmeans.com/supplement/67346.asp

They can be used to assess and document the existing condition of an association’s common elements and to track the carrying out of planned maintenance activities.

Page 9: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 9 of 99

Caldera Springs Owners’ Association, Inc.Maintenance Plan

2020

Pursuant to Oregon State Statutes Chapters 94 and 100, which require a maintenance plan as an integral part of the reserve study, the maintenance procedures are as follows:

The Board of Directors should refer to this maintenance plan each year when preparing the annual operating budget for the Association to ensure that annual maintenance costs are included in the budget for the years that they are scheduled.

Property Inspection

Schwindt & Company recommends that a provision for the annual inspection of common area components be included in the maintenance plan for all associations. This valuable management tool will help to ensure that all components achieve a maximum useful life expectancy and that they are functioning as intended throughout their lifespan.

The inspection should be performed by a qualified professional and should include a written summary of conclusions with specific recommendations for any needed repairs or maintenance.

We suggest that the Association obtain firm bids for this service.

This expense should be included in the annual operating budget for the Association.

Frequency: Annually

Building Envelope Inspection – Common Building

Schwindt & Company recommends that all associations perform a building envelope inspection within 12 months of substantial completion of all construction or immediately upon detection of any water intrusion or mold problems. This inspection process may involve invasive testing if the problems detected are serious enough to warrant such measures.

The inspection should be performed by an architect, engineer, or State-licensed inspector who is specifically trained in forensic waterproofing analysis. The report should include a written summary of findings with recommendations for needed repairs or maintenance procedures.

All reserve studies and maintenance plans prepared by Schwindt & Company assume that any such recommendations will be followed and that all work will be performed by qualified professionals.

A complete envelope inspection will usually be required only one time, although a visual review of the building exterior may be advisable on a periodic basis under certain circumstances. The Association should consult with the inspector(s) who performs the original assessment to determine the best course of action for their individual situation.

Page 10: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 10 of 99

We suggest that the Association obtain firm bids for this service.

Frequency: Every 5 years

Roof Inspection – Common Building

Schwindt & Company recommends that a provision for the periodic inspection and maintenance of roofing and related components be included in the maintenance plan for all associations.

The frequency of this inspection will vary based on the age, condition, complexity, and remaining useful life of the roof system. As the roof components become older, the Association is well advised to consider increasing the frequency of this critical procedure.

The inspection should be performed by a qualified roofing professional and should include a written summary of conclusions with specific recommendations for any needed repairs or maintenance. Recommended maintenance should be performed promptly by a licensed roofing contractor.

We suggest that the Association obtain firm bids for this service.

This expense should be included in the annual operating budget for the Association.

Frequency: Refer to roof warranty for frequency

Automatic Entry Gates

Automatic entry gates to and from the grounds and buildings should be inspected bi-weekly, as they are critical points of vehicular and pedestrian security and safety.

The automatic vehicular gates should be reviewed for the following: binding integrity; condition of the parts; hinge and bracket condition; security; stability; and overall condition.

Deficiencies, required maintenance, and required repairs after completion of review should be noted by maintenance contractors and/or Association representatives.

This expense should be included in the annual operating budget for the Association.

Frequency: Bi-Weekly

Lighting: Exterior and Common Area Interior – Inspection/Maintenance

Note: Replacement of flickering or burned-out bulbs or lamps should be immediate.

Lighting is a crucial element in the provision of safety and security. All lighting systems should be inspected frequently and care must be taken to identify and correct deficiencies.

Various fixture and lamp types may be used according to area needs. Lighting systems should be designed to provide maximum, appropriate illumination at minimal energy expenditures. Lighting maintenance processes should include a general awareness of factors that cause malfunctions in lighting

Page 11: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 11 of 99

systems, such as dirt accumulation and lumen depreciation. It is important to fully wash, rather than dry-wipe, exterior surfaces to reclaim light and prevent further deterioration.

Deficiencies, required maintenance, and required repairs after completion of review should be noted by maintenance contractors and/or Association representatives.

Repairs and inspections should be completed by a qualified professional.

This expense should be included in the annual operating budget for the Association as general property maintenance expense.

Frequency: Bi-Weekly

Swimming Pool / Fitness Building

The swimming pool/fitness building may experience heavy traffic that can have a dramatic impact on the life expectancy of the equipment. Preventive maintenance is critical. Consult the manufacturers of exercise and weight equipment for specific maintenance. The overall condition of the floors and mats should be reviewed for deficiencies, such as excessive wears, stains, tears, and tripping hazards. The overall condition of the following should be reviewed: walls/ceilings; lighting fixture protection; exercise/weight equipment; location of signs and fire safety devices; fire extinguishers; and trash receptacles. Mirrors and glass should be reviewed for cracked/broken surfaces or rough edges.

Deficiencies, required maintenance, and required repairs after completion of review should be noted by maintenance contractors and/or Association representatives.

This expense should be included in the annual operating budget for the Association as general property maintenance expense.

Frequency: Monthly

Common Play Area – Review

As play areas, surfaces and equipment vary widely a general safety and maintenance protocol will be included in the maintenance plan. Management should work with their insurance company to identify additional specific recommendations and should consult manufacturer’s specifications.

Generally, in order to maintain a safe playing area, the following should be reviewed: signage visibility and currency; accessible safety/first aid equipment location; holes; and overall condition of grounds for deficiencies, such as vandalism, debris buildup, trash, or tripping hazards.

Deficiencies, required maintenance, and required repairs after completion of review should be noted by maintenance contractors and/or Association representatives.

This expense should be included in the annual operating budget for the Association as general property maintenance expense.

Page 12: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 12 of 99

Frequency: Monthly

Property Entrance - Review

The property entrance is a significant reflection on the development as a whole and is often the first stop in the development for residents, prospective residents or buyers, and visitors. The area should be consistently clean, functional, and accessible.

Deficiencies, required maintenance, and required repairs after completion of review should be noted by maintenance contractors and/or Association representatives.

This expense should be included in the annual operating budget for the Association as general property maintenance expense.

Frequency: Monthly

Swimming Pool and Spa

Swimming pool maintenance should be performed in conjunction with a service contractor. Preventive maintenance in this area consists of validating all equipment is present and functional on a monthly basis. Only certified professionals should complete repairs or maintenance procedures more advanced than manufacturer’s prescribed chemical treatments and cleaning. Maintenance staff should accompany professional during statutory inspections and maintenance to ensure that the physical work complies with contract and manufacturer’s specifications.

Preventative maintenance includes, but is not limited to, the review of the following: automatic fill device function; electrical component condition; pump/filter/chlorination function; thermostat; and heater function.

Whirlpools should be reviewed for the function of the timer, drainage and emergency switch.

Deck surface condition should be reviewed for deficiencies such as rough areas and tripping and slippage hazards. Fence and gates should be reviewed for the function of the anchors, latches, and the overall condition. Handrails and ladders should be reviewed for stability, hardware, and overall condition. Steps and treads should be reviewed for security and tread condition.

Safety equipment should be reviewed for its condition and function including, but not limited to, the following: the location and condition of the life ring; emergency telephone equipment; compliance of signage with codes and standards; visibility and overall condition of the signage; and fire extinguishers tag currency, placement, housing, hose and overall condition.

NOTE: Any and all electrical outlets near water should be serviced by a ground-fault circuit-interrupter (GFI) to protect users from electrical shock.

Water condition and cleanliness should be reviewed and must comply with local health standards. The County Health Department or local water management authority determines health standards in most communities. Standards must be posted within the pool area.

Page 13: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 13 of 99

Pool tile/plaster should be reviewed for its overall condition.

During the off-season when the pool is covered, check the fastening of the system monthly to make sure it hasn’t been tampered with.

Deficiencies, required maintenance, and required repairs after completion of review should be noted by maintenance contractors and/or Association representatives.

This expense should be included in the annual operating budget for the Association.

Frequency: Monthly

Windows and Doors – Common Building

Exterior window and door casings, sashes and frames should be inspected annually for twisting, cracking, deterioration or other signs of distress. Hardware and weather stripping should be checked for proper operation and fit. Gaskets and seals should be reviewed for signs of moisture intrusion. Weep holes should be cleaned. These building envelope components should be repaired and replaced as necessary.

Frequency: Monthly

Page 14: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 14 of 99

Gutters and Downspouts

Schwindt & Company recommends that all gutters and downspouts be cleaned, visually inspected, and repaired as required every six months in the spring and fall.

This important maintenance procedure will help to ensure that the gutters and downspouts are free-flowing at all times thus preventing the backup of water within the drainage system. Such backup can lead to water ingress issues along the roof edges, around scuppers or other roof penetrations and at sheet metal flashing or transition points that rely on quick and continuous discharge of water from surrounding roof surfaces to maintain a watertight building exterior.

This expense should be included in the annual operating budget for the Association.

Frequency: Semi-Annually, more often if necessary

HVAC – Clubhouse Air Conditioning Unit - Common Areas Only

Regular preventive maintenance of HVAC (heating, ventilation, and air-conditioning) systems is crucialto the quality of air and comfort level within the condominium community. Preventive maintenance is also important for energy efficiency and maximizing equipment life. HVAC systems should always sufficiently control temperature and humidity, distribute outside air uniformly, and isolate and remove odors and pollutants. Improper function and maintenance can cause indoor air pollution by allowing stale or contaminated air to remain in the building. It is essential that both the building’s common HVAC system and those for individual units have fully functional and regularly inspected pressure control, filtration, and exhaust equipment. HVAC systems must also be properly sized in proportion to the area and number of occupants.

Management may opt to contract outside professionals to handle this task, although the following preventive maintenance procedures can be conducted by in-house maintenance personnel. If an outside service contractor is used, be sure to validate their performance by an audit of service performed.

When performing any maintenance procedures, always refer to manufacturer’s recommendations. Diagnostic tools such as a digital HVAC analyzer can also be of help.

For all types of HVAC systems, change filters twice a year and post a sticker on the HVAC unit with the date of change and initials of the mechanic. If an outside service is used, plot the date of service on the wall chart and verify that performance is as per contract.

Frequency: Semi-Annually

Bridge Maintenance

Regular maintenance of the wooden foot bridge should include regular inspections and repairs and replacements of boards, fasteners, and railings. Fasteners and railings should be kept secure to ensure safety.

Page 15: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 15 of 99

This expense should be included in the Association’s operating budget.

Frequency: Annually

Aluminum Fence – Swimming Pool - Inspection

Aluminum fences require regular inspection of paint condition, rust and other corrosion, and vegetation and trash buildup. The overall condition of the fence should be reviewed for deficiencies such as vegetation encroachment, debris buildup, holes, sagging areas, missing segments, rust, and vandalism.

Deficiencies, required maintenance, and required repairs after completion of review should be noted by maintenance contractors and/or Association representatives.

This expense should be included in the Association’s operating budget and may be considered part of the annual property inspection.

Frequency: Annually

Lawn Irrigation System

Periodic maintenance to the lawn irrigation system should be anticipated with this type of component. These maintenance procedures will include replacement of the control mechanism, replacement of damaged piping, upgrading of sprinkler heads and valve components, and any other work that is advised by repair professionals.

In recent years, improvements have been made to this type of system, which has increased the efficiency of the water distribution process. Such improvements can be expected to continue to be made and the owners of such systems are well advised to plan on periodic upgrades to maintain the efficiency of their systems.

Lawn irrigation systems also require periodic testing to ensure proper operation. Sometimes this testing is mandated by ordinance or building codes. All work on lawn irrigation systems must be performed by licensed contractors who specialize in this type of work.

This expense should be included in the annual operating budget for the Association.

Frequency: Annually

Quarry Wood Sealing

Maintenance of the exterior siding includes regularly scheduled cleaning and inspection of the surface areas for cracks, peeling paint or other sealants, deterioration of the base material, and failure of caulking or other sealant materials that serve a waterproofing function.

This maintenance provision is for the periodic sealing of the exterior wood siding and wood fence. The siding should be cleaned, repaired as required, and primed and sealed with premium quality exterior house sealant in accordance with the siding manufacturer’s specifications. The work should be

Page 16: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 16 of 99

performed by a qualified, licensed painting contractor.

This expense is included in the reserve study for the Association.

Frequency: Every 7 years

Asphalt– Seal Coating

Maintenance of asphalt paving includes the periodic application of an asphalt emulsion sealer or “seal coat” as it is commonly known. This procedure is typically performed every 4 to 7 years depending on a variety of factors that can affect the useful life of the sealer.

Vehicle traffic is one such factor, and associations that have asphalt paving that carries considerable vehicle traffic should consider a maintenance program that calls for seal coating of asphalt driving surfaces as frequently as every 4 years.

This maintenance procedure involves thoroughly cleaning all pavements, filling of any surface cracks, and patching of any locally damaged pavement surfaces. The emulsion sealer is then applied.

Parking area demarcation lines will need to be renewed each time a seal coat is applied. The component expense includes the cost of this work as well as the seal coating cost.

According to the Association, an analysis for the asphalt was done in 2010 by Capitol Asset & Pavement Services, Inc.

This work should be performed by a licensed paving contractor.

This expense is included in the reserve study for the Association.

Paths: Asphalt Seal Coat

Frequency: Every 7 years

Roads: Asphalt Seal Coat

Frequency: Every 7 years

Asphalt Edges – Paint

There are asphalt edges around the roads that are painted.

This expense is included in the reserve study for the Association.

Frequency: Every 4 years

Swimming Pool/Fitness Building - Interior Paint

The interior painted surfaces of the swimming pool/fitness building should be cleaned, repaired as

Page 17: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 17 of 99

required, primed and painted with premium quality interior house paint in accordance with the manufacturer’s specifications. The work should be performed by a qualified, licensed painting contractor.

This expense is included in the reserve study for the Association.

Frequency: Every 5 years

Exterior Stone Siding - Sealing

Maintenance will include cleaning and repairing any damaged surface areas, repair of the mortar joints as required, and the application of a suitable masonry sealer.

It is recommended that the same type of sealer be used on subsequent renewals, as this will minimize the chance that incompatible materials will be used.

This expense is included in the reserve study for the Association.

Frequency: Every 5 years

Exterior Stone Siding - Repointing

Repointing brick improves water penetration resistance and will increase the life of the component.

Defective mortar should be removed, the joints cleaned and repointed with the appropriate type mortar, and a suitable sealer applied. It is recommended that the same type of sealer be used on subsequent renewals as this will minimize the chance that incompatible materials will be used.

This work should be performed by a licensed brick mason.

This expense is included in the reserve study for the Association.

Frequency: Every 25 years

Re-stain Teak Furniture

Teak furniture at the swimming pool area will require staining to prolong its useful life.

This work should be performed by a professional.

This expense is included in the reserve study for the Association.

Frequency: Every 2 years

Boiler Maintenance

Maintenance of the boiler includes regularly scheduled inspections and maintenance.

The boiler and related components should be checked for leaks. The boiler and related components

Page 18: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 18 of 99

should also be checked for proper operation and settings. Filters should be changed and all components serviced as required. The surrounding area should be cleaned at the time of servicing.

Inspections and maintenance should be performed by a qualified, licensed service provider.

We understand that this expense is included in the annual operating budget for the Association.

Frequency: Monthly to Annually

This maintenance plan is designed to preserve and extend the useful life of assets and is dependent upon proper inspection and follow up procedures.

Page 19: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 19 of 99

CALDERA SPRINGS OWNERS’ ASSOCIATION, INC.

RESERVE STUDY

LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION

2020

Page 20: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Property Description

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 20 of 99

Caldera Springs Owners’ Association, Inc. is a Planned Unit Community (P.U.D.) consists of 320 single-family homes located in Sunriver, Oregon. The property was constructed in 2006. The Association shall provide exterior improvements upon the common areas, such as paint, maintenance, repair and replacement for the following: roofs; gutters; downspouts; and exterior building surfaces of the pool and fitness building; and lakes; open meadows; pathways; pool; spas; fitness center; open spaces; roads; and trails. The individual homeowners are responsible for all maintenance and repair of the interior and exterior of their home.

According to the Association’s governing documents, the Sub-Association, Cabin Lots shall pay an amount equal to 10% of assessments to Caldera Springs, the master Association. The Golf Amenity Owner shall pay an amount equal to 5% of assessments for the golf property to Caldera Springs, the master Association.

A site visit was performed by Schwindt & Company in 2009, 2015 and 2017. Schwindt & Co did not investigate components for defects, materials, design or workmanship. This would ordinarily be considered in a complete building envelope inspection. Our condition assessment considers if the component is wearing as intended. All components are considered to be in fair condition and appear to be wearing as intended unless noted otherwise in the component detail.

This study uses information supplied by the Association, vendors, and various construction pricing and scheduling manuals to determine useful lives and replacement costs.

Funds are being accumulated in the replacement fund based on estimates of future need for repairs and replacement of common property components. Actual expenditures, investment income and provisions for income taxes, however, may vary from estimated amounts and the variations may be material. Therefore, amounts accumulated in the replacement fund may not be adequate to meet future funding needs.

If additional funds are needed, the Association has the right, subject to member approval by a vote of 2/3 of the members voting in person or by proxy at a meeting, to increase regular assessments or levy special assessments, or it may delay repairs or replacements until funds are available.

Page 21: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Cash Flow Method - Threshold Funding Model Summary

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 21 of 99

Report Date November 5, 2019

Budget Year Beginning January 1, 2020Budget Year Ending December 31, 2020

Total Units 320

Report Parameters

Inflation 2.50%Annual Assessment Increase 2.50%Interest Rate on Reserve Deposit 0.75%

2020 Beginning Balance $1,476,958

Threshold Funding Fully Reserved Model Summary

This study utilizes the cash flow method and the threshold funding model, which establishes a reserve funding goal that keeps the reserve balance above a specified dollar or percent funded amount. The threshold method assumes that the threshold method is funded with a positive threshold balance, therefore, "fully reserved".

The following items were not included in the analysis because they have useful lives greater than 30 years: grading/drainage; foundation/footings; storm drains; telephone, cable, and internet lines.

This funding scenario begins with a contribution of $206,839 in 2020 and increases 2.50% each year for the remaining years of the study. A minimum balance of $392,216 is maintained.

The contribution is broken up as follows: 85% Master Association, 10% Sub-Association and 5% Golf Course.

The reserve study cash flow model includes an annual increase in the required contribution over the 30 year period. Since the current Board and membership only has the authority to obligate the Association for the current budget year, the cash flow model relies on the actions of future Boards to adhere to the required increase in the annual reserve contribution. Because of the possibility that future Boards, due to budgetary constraints, are not able to increase the reserve contribution to the required amount to provide for adequate funding, the Association may be at risk in the future of special assessing the members to fund needed expenditures.

The purpose of this study is to insure that adequate replacement funds are available when components reach the end of their useful life. Components will be replaced as required, not necessarily in their expected replacement year. This analysis should be updated annually.

Cash Flow Method - Threshold Funding Model Summary of Calculations

Required Annual Contribution $206,839.00$646.37 per unit annually

Average Net Annual Interest Earned $11,748.76Total Annual Allocation to Reserves $218,587.76

$683.09 per unit annually

Page 22: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Cash Flow Method - Threshold Funding Model Projection

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 22 of 99

Beginning Balance: $1,476,958Projected Fully

Annual Annual Annual Ending Funded PercentYear Contribution Interest Expenditures Reserves Reserves Funded

2020 206,839 11,749 117,296 1,578,250 2,035,532 78%2021 212,010 13,050 50,288 1,753,021 2,249,560 78%2022 217,310 12,920 247,663 1,735,588 2,278,022 76%2023 222,743 13,614 143,067 1,828,879 2,420,528 76%2024 228,312 15,226 27,096 2,045,320 2,691,271 76%2025 234,019 16,872 29,787 2,266,424 2,971,974 76%2026 239,870 15,009 505,031 2,016,272 2,787,181 72%2027 245,867 12,716 566,647 1,708,207 2,541,075 67%2028 252,013 9,179 736,338 1,233,061 2,122,476 58%2029 258,314 6,128 674,302 823,201 1,765,121 47%2030 264,771 6,646 201,863 892,756 1,890,669 47%2031 271,391 8,318 55,103 1,117,361 2,176,993 51%2032 278,175 8,406 274,701 1,129,242 2,252,776 50%2033 285,130 10,369 31,845 1,392,896 2,586,954 54%2034 292,258 12,136 66,996 1,630,293 2,901,219 56%2035 299,565 11,985 331,896 1,609,946 2,979,233 54%2036 307,054 13,667 94,717 1,835,950 3,310,948 55%2037 314,730 6,397 1,297,707 859,370 2,426,750 35%2038 322,598 6,214 353,395 834,788 2,497,514 33%2039 330,663 7,872 115,806 1,057,517 2,822,883 37%2040 338,930 4,432 805,487 595,392 2,459,004 24%2041 347,403 6,235 111,417 837,613 2,807,229 30%2042 356,088 5,201 500,202 698,701 2,775,679 25%2043 364,990 7,672 40,764 1,030,599 3,224,539 32%2044 374,115 9,438 146,353 1,267,799 3,586,923 35%2045 383,468 12,018 48,810 1,614,475 4,069,142 40%2046 393,055 14,279 103,616 1,918,193 4,518,305 42%2047 402,881 10,410 933,018 1,398,466 4,139,902 34%2048 412,953 10,674 388,185 1,433,909 4,322,117 33%2049 423,277 2,920 1,467,889 392,216 3,414,105 11%

Page 23: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Component Summary By Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 23 of 99

Serv

ice

Dat

e in

Yea

r

Rep

lace

men

tU

sefu

lA

djus

tmen

tR

emai

ning

Uni

ts

Cos

t

Uni

t

Cos

t

Cur

rent

Description

RoofingSwimming Pool/Fitness Building: Roof Re.. 2007 2037 30 0 17 1 Total 66,567.50 66,567 Roofing - Total $66,567

PaintingAsphalt Edges - Paint 2016 2020 4 0 0 1 Total 3,479.09 3,479Bridge & Dock: Paint/Seal 2016 2020 7 -3 0 1 Total 13,263.00 13,263Pool and Spa: Artificial Rocks - Paint 2012 2021 10 -1 1 1 Total 7,919.86 7,920 Painting - Total $24,662

Building ComponentsExterior Stone Siding - Partial Replacement 2007 2032 25 0 12 1,144 SF 28.86 @ 25% 8,254Exterior Stone Siding - Repoint 2007 2032 25 0 12 1,144 SF 18.83 @ 25% 5,385Exterior Stone Siding - Sealing 2016 2021 5 0 1 1,144 SF 1.12 1,281Quarry & Harper's Outpost Wood - Sealing 2014 2023 7 2 3 9,344 SF 1.43 13,362Quarry Wood - Sealing(2020) 2014 2020 7 -1 0 1 Total 2,650.00 2,650Siding, Wood - Partial Replacement 2007 2032 25 0 12 9,344 SF 8.88 @ 25% 20,744 Building Components - Total $51,676

Gutters and DownspoutsGutters and Downspouts - Partial Replace.. 2007 2037 30 0 17 1 Total 3,548.65 @ 50% 1,774 Gutters and Downspouts - Total $1,774

Streets/AsphaltCrack Sealing Roads & Paths 2019 2021 2 0 1 1 Total 13,000.00 13,000Paths: Asphalt Overlay 2007 2026 14 5 6 1 Total 380,960.44 380,960Paths: Asphalt Sealcoat 2016 2023 7 0 3 1 Total 38,913.44 38,913Roads: Asphalt Overlay I 2007 2028 21 0 8 1 Total 860,226.94 @ 50% 430,113Roads: Asphalt Overlay II 2007 2029 21 1 9 1 Total 860,226.94 @ 50% 430,113Roads: Asphalt Patching UnfundedRoads: Asphalt Sealcoat Phase (I) UnfundedRoads: Asphalt Sealcoat Phase (II) 2035 2035 7 0 15 1 Total 172,045.16 172,045 Streets/Asphalt - Total $1,465,146

Fencing/SecurityAluminum Powder Coated Fence - Replace.. 2007 2027 20 0 7 1 Total 12,302.03 12,302Gate Hardware - Renew/Replace 2007 2037 30 0 17 3 Each 29,572.18 88,717Tennis Courts: Fencing 2007 2032 25 0 12 1 Total 30,077.27 30,077Wood Fence 2007 2037 30 0 17 100 LF 35.48 3,548 Fencing/Security - Total $134,644

Page 24: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Component Summary By Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 24 of 99

Serv

ice

Dat

e in

Yea

r

Rep

lace

men

tU

sefu

lA

djus

tmen

tR

emai

ning

Uni

ts

Cos

t

Uni

t

Cos

t

Cur

rent

Description

EquipmentAudio System - Replacement 2000 2020 10 0 0 1 Total 8,805.00 8,805Boiler - Snow Melt System - Replacement 2007 2027 20 0 7 1 Total 79,726.60 79,727Data Card Printer - Replacement 2018 2023 5 0 3 1 Total 2,096.12 2,096Discovery Park: Fixtures/Equipment - Rep.. 2007 2020 10 2 0 1 Total 2,800.00 2,800Discovery Park: Fixtures/Equipment - Rep.. 2007 2030 10 2 10 1 Total 26,023.53 26,024John Derre - Replacement 2007 2022 15 0 2 1 Total 5,519.06 5,519Lake and Streams: Pumps 2018 2028 10 0 8 3 Each 4,100.00 12,300Lake: Pump Station Computer 2017 2027 10 0 7 1 Total 11,828.87 11,829Lakes Aerators - Replacement 2007 2020 5 6 0 3 Each 1,774.33 5,323Maintenance Cart - Replacement 2007 2022 15 0 2 1 Total 7,726.69 7,727Metal Benches - Replacement 2007 2027 20 0 7 7 Each 1,774.33 12,420Pavilion Equipment: Renew/Replace 2019 2029 10 0 9 1 Total 18,045.05 18,045Pick Up Truck - Replacement 2007 2022 10 5 2 1 Total 38,633.45 38,633Sable Rock Park: Furniture/Equipment 2008 2029 20 1 9 1 Total 37,379.24 37,379Snow Plow: 2014 - Replacement 2014 2034 20 0 14 1 Total 6,622.87 6,623Snow Plow: 2016 - Replacement 2016 2023 7 0 3 1 Total 4,092.18 4,092Swimming Pool/Fitness Building: Exercise .. 2007 2022 10 5 2 1 Total 47,315.50 47,315Swimming Pool/Fitness Building: HVAC 2007 2022 15 0 2 1 Total 39,940.50 39,940Swimming Pool/Fitness Building: Miscella.. 2007 2027 20 0 7 1 Total 7,097.32 7,097Swimming Pool/Fitness Building: Quarry .. 2007 2022 10 5 2 1 Total 13,313.49 13,313Water Heater 2007 2022 15 0 2 2 Each 887.17 1,774 Equipment - Total $388,783

Interior FurnishingsRestroom Fixtures - Upgrade 2007 2022 15 0 2 1 Total 17,743.31 17,743Swimming Pool/Fitness Building: Flooring 2007 2022 10 5 2 1 Total 7,097.32 7,097 Interior Furnishings - Total $24,841

LightingBridge Lighting - Replacement 2011 2021 10 0 1 1 Total 4,525.63 4,526Christmas Lights - Replacement 2014 2020 4 0 0 1 Total 5,798.47 5,798Entry/Exterior Lighting - Replacement 2007 2020 10 3 0 1 Total 30,960.99 30,961Gate Lights - Replacement 2016 2026 10 0 6 1 Total 12,974.38 12,974Interior Lighting 2007 2027 20 0 7 12 Each 118.28 1,419Pathway Lights - Replacement 2016 2026 10 0 6 1 Total 12,359.47 12,359 Lighting - Total $68,038

Recreation/PoolPool Covers 2008 2023 15 0 3 1 Total 25,254.64 25,255

Page 25: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Component Summary By Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 25 of 99

Serv

ice

Dat

e in

Yea

r

Rep

lace

men

tU

sefu

lA

djus

tmen

tR

emai

ning

Uni

ts

Cos

t

Uni

t

Cos

t

Cur

rent

Description

Recreation/Pool continued...Pool Heater 2011 2023 12 0 3 1 Total 26,650.00 26,650Pool Resurfacing 2007 2027 20 0 7 1 Total 49,089.82 49,090Pool Safety Camera - Replacement 2008 2020 10 0 0 1 Total 1,210.00 1,210Pool Umbrella 2020, 2021 2019 2020 1 0 0 1 Total 6,000.00 6,000Pool Umbrella 2022+ 2019 2022 1 2 2 1 Total 3,075.00 3,075Pool and Spa Filters 2007 2022 15 0 2 1 Total 33,283.74 33,284Pool and Spa: Other Replacements 2017 2020 1 0 0 1 Total 2,828.52 2,829Pool: Lounge Chair Cushion - Replacement 2018 2028 10 0 8 1 Total 26,968.77 26,969Pool: Splash Monitor 2014 2021 7 0 1 1 Total 4,140.11 4,140Pool: Spray Pad - Filter Replacement 2008 2023 15 0 3 1 Total 1,478.60 1,479Pool: Spray Pad - Heater Replacement 2007 2022 15 0 2 1 Total 3,548.65 3,549Pool: Spray Pad - Pump Replacement 2019 2034 15 0 14 1 Total 1,182.89 1,183Pool: Teak Furniture - Replacement 2007 2027 20 0 7 1 Total 130,117.61 130,118Pumps Replacement I 2007 2020 10 0 0 3 Each 7,000.00 21,000Pumps Replacement II 2019 2029 10 0 9 3 Each 7,000.00 21,000Spa A Controller - Replacement 2016 2026 10 0 6 1 Total 4,888.00 4,888Spa Heater A 2016 2021 5 0 1 1 Total 7,265.00 7,265Spa Heater B 2019 2024 5 0 4 1 Total 7,265.00 7,265Spa Resurfacing 2007 2022 15 0 2 2 Each 5,914.43 11,829Tennis Courts: Nets 2018 2028 10 0 8 1 Total 525.31 525 Recreation/Pool - Total $388,601

Grounds ComponentsAccess Control: Gates Card Readers - Repl.. 2018 2028 10 0 8 1 Total 25,753.12 25,753Access Control: Gates Renew/Replace 2017 2028 10 1 8 3 Each 28,389.29 85,168Bike Racks - Replacement 2007 2027 20 0 7 3 Total 591.44 1,774Bridge - Wood 2007 2037 30 0 17 1 Total 133,135.02 133,135Concrete Pavers - Partial Replacement 2007 2037 30 0 17 1,561 SF 18.09 @ 50% 14,119Exterior Concrete - Partial Replacement 2007 2037 30 0 17 1 Total 266,270.00 @ 50% 133,135Irrigation - VFD Replacement 2016 2026 10 0 6 1 Total 7,753.61 7,754Irrigation System - Repairs 2019 2029 10 0 9 1 Total 5,125.00 5,125Lake: Liner and Stream Repair 2007 2037 30 0 17 1 Total 177,433.10 177,433Pool: Fire Pit - Rebuild 2013 2020 7 0 0 1 Total 3,000.00 3,000Sports Courts: Resurfacing 2017 2027 10 0 7 1 Total 7,291.34 7,291 Grounds Components - Total $593,688

SignsCommon Area Signage 2007 2027 20 0 7 1 Total 118,288.72 118,289Street Signs: Repair 2019 2020 1 0 0 1 Total 2,101.25 2,101

Page 26: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Component Summary By Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 26 of 99

Serv

ice

Dat

e in

Yea

r

Rep

lace

men

tU

sefu

lA

djus

tmen

tR

emai

ning

Uni

ts

Cos

t

Uni

t

Cos

t

Cur

rent

Description

Doors and WindowsGlass Doors Replacement 2007 2037 30 0 17 14 Each 1,182.89 16,560Windows Replacement 2007 2038 30 1 18 33 Each 1,182.89 39,035 Doors and Windows - Total $55,596

InspectionsBuilding Envelope Inspection 2007 2020 7 6 0 1 Total 8,076.68 8,077Electrical Inspection 2007 2032 25 0 12 1 Total 8,076.68 8,077Plumbing Inspection 2007 2032 25 0 12 1 Total 8,076.68 8,077 Inspections - Total $24,230

Total Asset Summary $3,408,636

Page 27: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Component Summary By Group

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 27 of 99

Serv

ice

Dat

e in

Yea

r

Rep

lace

men

tU

sefu

lA

djus

tmen

tR

emai

ning

Uni

ts

Cos

t

Uni

t

Cos

t

Cur

rent

Description

CapitalAccess Control: Gates Card Readers - Repl.. 2018 2028 10 0 8 1 Total 25,753.12 25,753Access Control: Gates Renew/Replace 2017 2028 10 1 8 3 Each 28,389.29 85,168Aluminum Powder Coated Fence - Replace.. 2007 2027 20 0 7 1 Total 12,302.03 12,302Audio System - Replacement 2000 2020 10 0 0 1 Total 8,805.00 8,805Bike Racks - Replacement 2007 2027 20 0 7 3 Total 591.44 1,774Boiler - Snow Melt System - Replacement 2007 2027 20 0 7 1 Total 79,726.60 79,727Bridge - Wood 2007 2037 30 0 17 1 Total 133,135.02 133,135Bridge Lighting - Replacement 2011 2021 10 0 1 1 Total 4,525.63 4,526Christmas Lights - Replacement 2014 2020 4 0 0 1 Total 5,798.47 5,798Common Area Signage 2007 2027 20 0 7 1 Total 118,288.72 118,289Data Card Printer - Replacement 2018 2023 5 0 3 1 Total 2,096.12 2,096Discovery Park: Fixtures/Equipment - Rep.. 2007 2030 10 2 10 1 Total 26,023.53 26,024Entry/Exterior Lighting - Replacement 2007 2020 10 3 0 1 Total 30,960.99 30,961Gate Hardware - Renew/Replace 2007 2037 30 0 17 3 Each 29,572.18 88,717Gate Lights - Replacement 2016 2026 10 0 6 1 Total 12,974.38 12,974Glass Doors Replacement 2007 2037 30 0 17 14 Each 1,182.89 16,560Interior Lighting 2007 2027 20 0 7 12 Each 118.28 1,419Irrigation - VFD Replacement 2016 2026 10 0 6 1 Total 7,753.61 7,754John Derre - Replacement 2007 2022 15 0 2 1 Total 5,519.06 5,519Lake and Streams: Pumps 2018 2028 10 0 8 3 Each 4,100.00 12,300Lake: Pump Station Computer 2017 2027 10 0 7 1 Total 11,828.87 11,829Lakes Aerators - Replacement 2007 2020 5 6 0 3 Each 1,774.33 5,323Maintenance Cart - Replacement 2007 2022 15 0 2 1 Total 7,726.69 7,727Metal Benches - Replacement 2007 2027 20 0 7 7 Each 1,774.33 12,420Paths: Asphalt Overlay 2007 2026 14 5 6 1 Total 380,960.44 380,960Pathway Lights - Replacement 2016 2026 10 0 6 1 Total 12,359.47 12,359Pavilion Equipment: Renew/Replace 2019 2029 10 0 9 1 Total 18,045.05 18,045Pick Up Truck - Replacement 2007 2022 10 5 2 1 Total 38,633.45 38,633Pool Covers 2008 2023 15 0 3 1 Total 25,254.64 25,255Pool Heater 2011 2023 12 0 3 1 Total 26,650.00 26,650Pool Resurfacing 2007 2027 20 0 7 1 Total 49,089.82 49,090Pool Safety Camera - Replacement 2008 2020 10 0 0 1 Total 1,210.00 1,210Pool Umbrella 2020, 2021 2019 2020 1 0 0 1 Total 6,000.00 6,000Pool Umbrella 2022+ 2019 2022 1 2 2 1 Total 3,075.00 3,075Pool and Spa Filters 2007 2022 15 0 2 1 Total 33,283.74 33,284Pool and Spa: Other Replacements 2017 2020 1 0 0 1 Total 2,828.52 2,829Pool: Fire Pit - Rebuild 2013 2020 7 0 0 1 Total 3,000.00 3,000Pool: Lounge Chair Cushion - Replacement 2018 2028 10 0 8 1 Total 26,968.77 26,969Pool: Splash Monitor 2014 2021 7 0 1 1 Total 4,140.11 4,140Pool: Spray Pad - Filter Replacement 2008 2023 15 0 3 1 Total 1,478.60 1,479

Page 28: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Component Summary By Group

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 28 of 99

Serv

ice

Dat

e in

Yea

r

Rep

lace

men

tU

sefu

lA

djus

tmen

tR

emai

ning

Uni

ts

Cos

t

Uni

t

Cos

t

Cur

rent

Description

Capital continued...Pool: Spray Pad - Heater Replacement 2007 2022 15 0 2 1 Total 3,548.65 3,549Pool: Spray Pad - Pump Replacement 2019 2034 15 0 14 1 Total 1,182.89 1,183Pool: Teak Furniture - Replacement 2007 2027 20 0 7 1 Total 130,117.61 130,118Pumps Replacement I 2007 2020 10 0 0 3 Each 7,000.00 21,000Pumps Replacement II 2019 2029 10 0 9 3 Each 7,000.00 21,000Restroom Fixtures - Upgrade 2007 2022 15 0 2 1 Total 17,743.31 17,743Roads: Asphalt Overlay I 2007 2028 21 0 8 1 Total 860,226.94 @ 50% 430,113Roads: Asphalt Overlay II 2007 2029 21 1 9 1 Total 860,226.94 @ 50% 430,113Sable Rock Park: Furniture/Equipment 2008 2029 20 1 9 1 Total 37,379.24 37,379Snow Plow: 2014 - Replacement 2014 2034 20 0 14 1 Total 6,622.87 6,623Snow Plow: 2016 - Replacement 2016 2023 7 0 3 1 Total 4,092.18 4,092Spa A Controller - Replacement 2016 2026 10 0 6 1 Total 4,888.00 4,888Spa Heater A 2016 2021 5 0 1 1 Total 7,265.00 7,265Spa Heater B 2019 2024 5 0 4 1 Total 7,265.00 7,265Spa Resurfacing 2007 2022 15 0 2 2 Each 5,914.43 11,829Sports Courts: Resurfacing 2017 2027 10 0 7 1 Total 7,291.34 7,291Swimming Pool/Fitness Building: Exercise .. 2007 2022 10 5 2 1 Total 47,315.50 47,315Swimming Pool/Fitness Building: Flooring 2007 2022 10 5 2 1 Total 7,097.32 7,097Swimming Pool/Fitness Building: HVAC 2007 2022 15 0 2 1 Total 39,940.50 39,940Swimming Pool/Fitness Building: Miscella.. 2007 2027 20 0 7 1 Total 7,097.32 7,097Swimming Pool/Fitness Building: Quarry .. 2007 2022 10 5 2 1 Total 13,313.49 13,313Swimming Pool/Fitness Building: Roof Re.. 2007 2037 30 0 17 1 Total 66,567.50 66,567Tennis Courts: Fencing 2007 2032 25 0 12 1 Total 30,077.27 30,077Tennis Courts: Nets 2018 2028 10 0 8 1 Total 525.31 525Water Heater 2007 2022 15 0 2 2 Each 887.17 1,774Windows Replacement 2007 2038 30 1 18 33 Each 1,182.89 39,035Wood Fence 2007 2037 30 0 17 100 LF 35.48 3,548 Capital - Total $2,747,621

Non-CapitalAsphalt Edges - Paint 2016 2020 4 0 0 1 Total 3,479.09 3,479Bridge & Dock: Paint/Seal 2016 2020 7 -3 0 1 Total 13,263.00 13,263Building Envelope Inspection 2007 2020 7 6 0 1 Total 8,076.68 8,077Concrete Pavers - Partial Replacement 2007 2037 30 0 17 1,561 SF 18.09 @ 50% 14,119Crack Sealing Roads & Paths 2019 2021 2 0 1 1 Total 13,000.00 13,000Discovery Park: Fixtures/Equipment - Rep.. 2007 2020 10 2 0 1 Total 2,800.00 2,800Electrical Inspection 2007 2032 25 0 12 1 Total 8,076.68 8,077Exterior Concrete - Partial Replacement 2007 2037 30 0 17 1 Total 266,270.00 @ 50% 133,135Exterior Stone Siding - Partial Replacement 2007 2032 25 0 12 1,144 SF 28.86 @ 25% 8,254Exterior Stone Siding - Repoint 2007 2032 25 0 12 1,144 SF 18.83 @ 25% 5,385

Page 29: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Component Summary By Group

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 29 of 99

Serv

ice

Dat

e in

Yea

r

Rep

lace

men

tU

sefu

lA

djus

tmen

tR

emai

ning

Uni

ts

Cos

t

Uni

t

Cos

t

Cur

rent

Description

Non-Capital continued...Exterior Stone Siding - Sealing 2016 2021 5 0 1 1,144 SF 1.12 1,281Gutters and Downspouts - Partial Replace.. 2007 2037 30 0 17 1 Total 3,548.65 @ 50% 1,774Irrigation System - Repairs 2019 2029 10 0 9 1 Total 5,125.00 5,125Lake: Liner and Stream Repair 2007 2037 30 0 17 1 Total 177,433.10 177,433Paths: Asphalt Sealcoat 2016 2023 7 0 3 1 Total 38,913.44 38,913Plumbing Inspection 2007 2032 25 0 12 1 Total 8,076.68 8,077Pool and Spa: Artificial Rocks - Paint 2012 2021 10 -1 1 1 Total 7,919.86 7,920Quarry & Harper's Outpost Wood - Sealing 2014 2023 7 2 3 9,344 SF 1.43 13,362Quarry Wood - Sealing(2020) 2014 2020 7 -1 0 1 Total 2,650.00 2,650Roads: Asphalt Patching UnfundedRoads: Asphalt Sealcoat Phase (I) UnfundedRoads: Asphalt Sealcoat Phase (II) 2035 2035 7 0 15 1 Total 172,045.16 172,045Siding, Wood - Partial Replacement 2007 2032 25 0 12 9,344 SF 8.88 @ 25% 20,744Street Signs: Repair 2019 2020 1 0 0 1 Total 2,101.25 2,101 Non-Capital - Total $661,015

Total Asset Summary $3,408,636

Page 30: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 30 of 99

Description Expenditures

Replacement Year 2020Asphalt Edges - Paint 3,479Audio System - Replacement 8,805Bridge & Dock: Paint/Seal 13,263Building Envelope Inspection 8,077Christmas Lights - Replacement 5,798Discovery Park: Fixtures/Equipment - Repair 2,800Entry/Exterior Lighting - Replacement 30,961Lakes Aerators - Replacement 5,323Pool and Spa: Other Replacements 2,829Pool Safety Camera - Replacement 1,210Pool Umbrella 2020, 2021 6,000Pool: Fire Pit - Rebuild 3,000Pumps Replacement I 21,000Quarry Wood - Sealing(2020) 2,650Street Signs: Repair 2,101

Total for 2020 $117,296

Replacement Year 2021Bridge Lighting - Replacement 4,639Crack Sealing Roads & Paths 13,325Exterior Stone Siding - Sealing 1,313Pool and Spa: Artificial Rocks - Paint 8,118Pool and Spa: Other Replacements 2,899Pool Umbrella 2020, 2021 6,150Pool: Splash Monitor 4,244Spa Heater A 7,447Street Signs: Repair 2,154

Total for 2021 $50,288

Replacement Year 2022John Derre - Replacement 5,798Maintenance Cart - Replacement 8,118Pick Up Truck - Replacement 40,589Pool and Spa Filters 34,969

Page 31: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 31 of 99

Description Expenditures

Replacement Year 2022 continued...Pool and Spa: Other Replacements 2,972Pool Umbrella 2022+ 3,231Pool: Spray Pad - Heater Replacement 3,728Restroom Fixtures - Upgrade 18,642Spa Resurfacing 12,428Street Signs: Repair 2,208Swimming Pool/Fitness Building: Exercise Equipment 49,711Swimming Pool/Fitness Building: Flooring 7,457Swimming Pool/Fitness Building: HVAC 41,962Swimming Pool/Fitness Building: Quarry Office Furniture 13,987Water Heater 1,864

Total for 2022 $247,663

Replacement Year 2023Crack Sealing Roads & Paths 14,000Data Card Printer - Replacement 2,257Paths: Asphalt Sealcoat 41,906Pool and Spa: Other Replacements 3,046Pool Covers 27,196Pool Heater 28,699Pool Umbrella 2022+ 3,311Pool: Spray Pad - Filter Replacement 1,592Quarry & Harper's Outpost Wood - Sealing 14,389Snow Plow: 2016 - Replacement 4,407Street Signs: Repair 2,263

Total for 2023 $143,067

Replacement Year 2024Asphalt Edges - Paint 3,840Christmas Lights - Replacement 6,400Pool and Spa: Other Replacements 3,122Pool Umbrella 2022+ 3,394Spa Heater B 8,019Street Signs: Repair 2,319

Total for 2024 $27,096

Page 32: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 32 of 99

Description Expenditures

Replacement Year 2025Crack Sealing Roads & Paths 14,708Lakes Aerators - Replacement 6,022Pool and Spa: Other Replacements 3,200Pool Umbrella 2022+ 3,479Street Signs: Repair 2,377

Total for 2025 $29,787

Replacement Year 2026Exterior Stone Siding - Sealing 1,486Gate Lights - Replacement 15,046Irrigation - VFD Replacement 8,992Paths: Asphalt Overlay 441,797Pathway Lights - Replacement 14,333Pool and Spa: Other Replacements 3,280Pool Umbrella 2022+ 3,566Spa A Controller - Replacement 5,669Spa Heater A 8,425Street Signs: Repair 2,437

Total for 2026 $505,031

Replacement Year 2027Aluminum Powder Coated Fence - Replacement 14,623Bike Racks - Replacement 2,109Boiler - Snow Melt System - Replacement 94,770Bridge & Dock: Paint/Seal 15,766Building Envelope Inspection 9,601Common Area Signage 140,608Crack Sealing Roads & Paths 15,453Interior Lighting 1,687Lake: Pump Station Computer 14,061Metal Benches - Replacement 14,764Pool and Spa: Other Replacements 3,362Pool Resurfacing 58,352Pool Umbrella 2022+ 3,655

Page 33: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 33 of 99

Description Expenditures

Replacement Year 2027 continued...Pool: Fire Pit - Rebuild 3,566Pool: Teak Furniture - Replacement 154,669Sports Courts: Resurfacing 8,667Street Signs: Repair 2,498Swimming Pool/Fitness Building: Miscellaneous Equipment 8,436

Total for 2027 $566,647

Replacement Year 2028Access Control: Gates Card Readers - Replacement 31,378Access Control: Gates Renew/Replace 103,769Asphalt Edges - Paint 4,239Christmas Lights - Replacement 7,065Data Card Printer - Replacement 2,554Lake and Streams: Pumps 14,986Pool and Spa: Other Replacements 3,446Pool Umbrella 2022+ 3,747Pool: Lounge Chair Cushion - Replacement 32,859Pool: Splash Monitor 5,044Roads: Asphalt Overlay I 524,051Street Signs: Repair 2,560Tennis Courts: Nets 640

Total for 2028 $736,338

Replacement Year 2029Crack Sealing Roads & Paths 16,235Irrigation System - Repairs 6,400Pavilion Equipment: Renew/Replace 22,536Pool and Spa: Other Replacements 3,532Pool Umbrella 2022+ 3,840Pumps Replacement II 26,226Roads: Asphalt Overlay II 537,153Sable Rock Park: Furniture/Equipment 46,682Spa Heater B 9,073Street Signs: Repair 2,624

Total for 2029 $674,302

Page 34: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 34 of 99

Description Expenditures

Replacement Year 2030Audio System - Replacement 11,271Discovery Park: Fixtures/Equipment - Replacement 33,312Entry/Exterior Lighting - Replacement 39,633Lakes Aerators - Replacement 6,814Paths: Asphalt Sealcoat 49,812Pool and Spa: Other Replacements 3,621Pool Safety Camera - Replacement 1,549Pool Umbrella 2022+ 3,936Pumps Replacement I 26,882Quarry & Harper's Outpost Wood - Sealing 17,104Snow Plow: 2016 - Replacement 5,238Street Signs: Repair 2,690

Total for 2030 $201,863

Replacement Year 2031Bridge Lighting - Replacement 5,938Crack Sealing Roads & Paths 17,057Exterior Stone Siding - Sealing 1,681Pool and Spa: Artificial Rocks - Paint 10,392Pool and Spa: Other Replacements 3,711Pool Umbrella 2022+ 4,035Spa Heater A 9,532Street Signs: Repair 2,757

Total for 2031 $55,103

Replacement Year 2032Asphalt Edges - Paint 4,679Christmas Lights - Replacement 7,798Electrical Inspection 10,862Exterior Stone Siding - Partial Replacement 11,101Exterior Stone Siding - Repoint 7,243Pick Up Truck - Replacement 51,958Plumbing Inspection 10,862Pool and Spa: Other Replacements 3,804

Page 35: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 35 of 99

Description Expenditures

Replacement Year 2032 continued...Pool Umbrella 2022+ 4,136Siding, Wood - Partial Replacement 27,898Street Signs: Repair 2,826Swimming Pool/Fitness Building: Exercise Equipment 63,634Swimming Pool/Fitness Building: Flooring 9,545Swimming Pool/Fitness Building: Quarry Office Furniture 17,905Tennis Courts: Fencing 40,451

Total for 2032 $274,701

Replacement Year 2033Crack Sealing Roads & Paths 17,921Data Card Printer - Replacement 2,890Pool and Spa: Other Replacements 3,899Pool Umbrella 2022+ 4,239Street Signs: Repair 2,897

Total for 2033 $31,845

Replacement Year 2034Bridge & Dock: Paint/Seal 18,740Building Envelope Inspection 11,412Pool and Spa: Other Replacements 3,997Pool Umbrella 2022+ 4,345Pool: Fire Pit - Rebuild 4,239Pool: Spray Pad - Pump Replacement 1,671Snow Plow: 2014 - Replacement 9,358Spa Heater B 10,265Street Signs: Repair 2,969

Total for 2034 $66,996

Replacement Year 2035Crack Sealing Roads & Paths 18,828Lakes Aerators - Replacement 7,709Pool and Spa: Other Replacements 4,097Pool Heater 38,597

Page 36: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 36 of 99

Description Expenditures

Replacement Year 2035 continued...Pool Umbrella 2022+ 4,454Pool: Splash Monitor 5,996Roads: Asphalt Sealcoat Phase (II) 249,173Street Signs: Repair 3,043

Total for 2035 $331,896

Replacement Year 2036Asphalt Edges - Paint 5,165Christmas Lights - Replacement 8,608Exterior Stone Siding - Sealing 1,902Gate Lights - Replacement 19,261Irrigation - VFD Replacement 11,510Pathway Lights - Replacement 18,348Pool and Spa: Other Replacements 4,199Pool Umbrella 2022+ 4,565Spa A Controller - Replacement 7,256Spa Heater A 10,785Street Signs: Repair 3,119

Total for 2036 $94,717

Replacement Year 2037Bridge - Wood 202,581Concrete Pavers - Partial Replacement 21,484Crack Sealing Roads & Paths 19,781Exterior Concrete - Partial Replacement 202,581Gate Hardware - Renew/Replace 134,993Glass Doors Replacement 25,199Gutters and Downspouts - Partial Replacement 2,700John Derre - Replacement 8,398Lake: Liner and Stream Repair 269,985Lake: Pump Station Computer 17,999Maintenance Cart - Replacement 11,757Paths: Asphalt Sealcoat 59,211Pool and Spa Filters 50,645

Page 37: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 37 of 99

Description Expenditures

Replacement Year 2037 continued...Pool and Spa: Other Replacements 4,304Pool Umbrella 2022+ 4,679Pool: Spray Pad - Heater Replacement 5,400Quarry & Harper's Outpost Wood - Sealing 20,332Restroom Fixtures - Upgrade 26,999Snow Plow: 2016 - Replacement 6,227Spa Resurfacing 17,999Sports Courts: Resurfacing 11,095Street Signs: Repair 3,197Swimming Pool/Fitness Building: HVAC 60,774Swimming Pool/Fitness Building: Roof Replacement 101,290Water Heater 2,700Wood Fence 5,399

Total for 2037 $1,297,707

Replacement Year 2038Access Control: Gates Card Readers - Replacement 40,166Access Control: Gates Renew/Replace 132,833Data Card Printer - Replacement 3,269Lake and Streams: Pumps 19,184Pool and Spa: Other Replacements 4,412Pool Covers 39,389Pool Umbrella 2022+ 4,796Pool: Lounge Chair Cushion - Replacement 42,062Pool: Spray Pad - Filter Replacement 2,306Street Signs: Repair 3,277Tennis Courts: Nets 819Windows Replacement 60,882

Total for 2038 $353,395

Replacement Year 2039Crack Sealing Roads & Paths 20,782Irrigation System - Repairs 8,193Pavilion Equipment: Renew/Replace 28,848

Page 38: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 38 of 99

Description Expenditures

Replacement Year 2039 continued...Pool and Spa: Other Replacements 4,522Pool Umbrella 2022+ 4,916Pumps Replacement II 33,572Spa Heater B 11,614Street Signs: Repair 3,359

Total for 2039 $115,806

Replacement Year 2040Asphalt Edges - Paint 5,701Audio System - Replacement 14,428Christmas Lights - Replacement 9,501Discovery Park: Fixtures/Equipment - Replacement 42,643Entry/Exterior Lighting - Replacement 50,733Lakes Aerators - Replacement 8,722Paths: Asphalt Overlay 624,248Pool and Spa: Other Replacements 4,635Pool Safety Camera - Replacement 1,983Pool Umbrella 2022+ 5,039Pumps Replacement I 34,411Street Signs: Repair 3,443

Total for 2040 $805,487

Replacement Year 2041Bridge & Dock: Paint/Seal 22,276Bridge Lighting - Replacement 7,601Building Envelope Inspection 13,565Crack Sealing Roads & Paths 21,835Exterior Stone Siding - Sealing 2,152Pool and Spa: Artificial Rocks - Paint 13,302Pool and Spa: Other Replacements 4,751Pool Umbrella 2022+ 5,165Pool: Fire Pit - Rebuild 5,039Spa Heater A 12,202Street Signs: Repair 3,529

Total for 2041 $111,417

Page 39: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 39 of 99

Description Expenditures

Replacement Year 2042Pick Up Truck - Replacement 66,510Pool and Spa: Other Replacements 4,869Pool Umbrella 2022+ 5,294Pool: Splash Monitor 7,127Roads: Asphalt Sealcoat Phase (II) 296,188Street Signs: Repair 3,617Swimming Pool/Fitness Building: Exercise Equipment 81,457Swimming Pool/Fitness Building: Flooring 12,219Swimming Pool/Fitness Building: Quarry Office Furniture 22,920

Total for 2042 $500,202

Replacement Year 2043Crack Sealing Roads & Paths 22,940Data Card Printer - Replacement 3,699Pool and Spa: Other Replacements 4,991Pool Umbrella 2022+ 5,426Street Signs: Repair 3,708

Total for 2043 $40,764

Replacement Year 2044Asphalt Edges - Paint 6,293Christmas Lights - Replacement 10,488Paths: Asphalt Sealcoat 70,384Pool and Spa: Other Replacements 5,116Pool Umbrella 2022+ 5,562Quarry & Harper's Outpost Wood - Sealing 24,168Snow Plow: 2016 - Replacement 7,402Spa Heater B 13,140Street Signs: Repair 3,801

Total for 2044 $146,353

Replacement Year 2045Crack Sealing Roads & Paths 24,101

Page 40: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 40 of 99

Description Expenditures

Replacement Year 2045 continued...Lakes Aerators - Replacement 9,869Pool and Spa: Other Replacements 5,244Pool Umbrella 2022+ 5,701Street Signs: Repair 3,896

Total for 2045 $48,810

Replacement Year 2046Exterior Stone Siding - Sealing 2,435Gate Lights - Replacement 24,655Irrigation - VFD Replacement 14,734Pathway Lights - Replacement 23,487Pool and Spa: Other Replacements 5,375Pool Umbrella 2022+ 5,843Spa A Controller - Replacement 9,289Spa Heater A 13,806Street Signs: Repair 3,993

Total for 2046 $103,616

Replacement Year 2047Aluminum Powder Coated Fence - Replacement 23,962Bike Racks - Replacement 3,456Boiler - Snow Melt System - Replacement 155,291Common Area Signage 230,403Crack Sealing Roads & Paths 25,321Interior Lighting 2,765Lake: Pump Station Computer 23,040Metal Benches - Replacement 24,192Pool and Spa: Other Replacements 5,509Pool Heater 51,909Pool Resurfacing 95,617Pool Umbrella 2022+ 5,989Pool: Teak Furniture - Replacement 253,443Sports Courts: Resurfacing 14,202Street Signs: Repair 4,093

Page 41: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Annual Expenditure Detail

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 41 of 99

Description Expenditures

Replacement Year 2047 continued...Swimming Pool/Fitness Building: Miscellaneous Equipment 13,824

Total for 2047 $933,018

Replacement Year 2048Access Control: Gates Card Readers - Replacement 51,416Access Control: Gates Renew/Replace 170,037Asphalt Edges - Paint 6,946Bridge & Dock: Paint/Seal 26,480Building Envelope Inspection 16,125Christmas Lights - Replacement 11,577Data Card Printer - Replacement 4,185Lake and Streams: Pumps 24,557Pool and Spa: Other Replacements 5,647Pool Umbrella 2022+ 6,139Pool: Fire Pit - Rebuild 5,989Pool: Lounge Chair Cushion - Replacement 53,843Street Signs: Repair 4,195Tennis Courts: Nets 1,049

Total for 2048 $388,185

Replacement Year 2049Crack Sealing Roads & Paths 26,603Irrigation System - Repairs 10,488Pavilion Equipment: Renew/Replace 36,928Pool and Spa: Other Replacements 5,788Pool Umbrella 2022+ 6,293Pool: Splash Monitor 8,472Pool: Spray Pad - Pump Replacement 2,421Pumps Replacement II 42,975Roads: Asphalt Overlay I 880,187Roads: Asphalt Sealcoat Phase (II) 352,074Sable Rock Park: Furniture/Equipment 76,493Spa Heater B 14,867Street Signs: Repair 4,300

Total for 2049 $1,467,889

Page 42: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 42 of 99

Swimming Pool/Fitness Building: Roof Replacement

Asset ID 1019Capital

RoofingPlaced in Service January 2007

Useful Life 30Replacement Year 2037

Remaining Life 17

1 Total @ $66,567.50Asset Cost $66,567.50

Percent Replacement 100%Future Cost $101,290.32

This provision provides funding to replace the composition roof on the swimming pool/fitness building and the pavilion.

Schwindt & Company estimated 6,840 square feet of roofing on the swimming pool/fitness building and 2,100 square feet of roofing on the pavilion. The total area is 8,940 square feet of roofing.

The cost was provided by the Association in 2009.

According to the Association, the roof is a 40 to 50 year roof. However, for funding purposes, a useful life of 30 years is used in the reserve study.

Roofing - Total Current Cost $66,567

Page 43: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 43 of 99

Asphalt Edges - Paint

Asset ID 1105Non-Capital

PaintingPlaced in Service January 2016

Useful Life 4Replacement Year 2020

Remaining Life 0

1 Total @ $3,479.09Asset Cost $3,479.09

Percent Replacement 100%Future Cost $3,479.09

This provision provides funding to paint the asphalt edges, every 4 years, for $3,000. This information was provided by the Association on February 16, 2011.

In 2011, the Association provided that the asphalt edges did not get painted in 2011 as scheduled; therefore, they will paint the edges in 2012.

Bridge & Dock: Paint/Seal

Asset ID 1109Non-Capital

PaintingPlaced in Service January 2016

Useful Life 7Adjustment -3

Replacement Year 2020Remaining Life 0

1 Total @ $13,263.00Asset Cost $13,263.00

Percent Replacement 100%Future Cost $13,263.00

This provision provides funding to paint and seal the bridge and dock. This includes the suspensions.

According to the Association, all wood components will need sealing.

Schwindt & Company estimated 846 square feet of the bridge.

In 2011, the Association provided that the bridge and bridge suspensions were painted and sealed for $2,450. In 2015 the cost was updated to $7,000.

The useful life was provided by the Association on September 14, 2010.

Page 44: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 44 of 99

Pool and Spa: Artificial Rocks - Paint

Asset ID 1111Non-Capital

PaintingPlaced in Service January 2012

Useful Life 10Adjustment -1

Replacement Year 2021Remaining Life 1

1 Total @ $7,919.86Asset Cost $7,919.86

Percent Replacement 100%Future Cost $8,117.86

This provision provides funding for painting of the artificial rocks at the swimming pool and spa.

In 2011, the Association provided that efflorescence stains on the artificial rocks will need to be removed and repaint in 2012 for $7,000. The Association would like this component to occur every 10 years.

Painting - Total Current Cost $24,662

Page 45: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 45 of 99

Exterior Stone Siding - Partial Replacement

Asset ID 1074Non-Capital

Building ComponentsPlaced in Service January 2007

Useful Life 25Replacement Year 2032

Remaining Life 12

1,144 SF @ $28.86Asset Cost $8,253.96

Percent Replacement 25%Future Cost $11,100.66

This provision provides funding for partial replacement of the exterior stone siding on the swimming pool and fitness building. Partial replacement is based on the expectation that most of the stone will be in good enough condition that a full replacement is not needed.

Schwindt & Company estimated 1,144 square feet of stone siding.

The cost and useful life assumptions are based on a per square foot estimate provided by

Pardue Restoration. The Association will need to obtain bids for this work.

Exterior Stone Siding - Repoint

Asset ID 1073Non-Capital

Building ComponentsPlaced in Service January 2007

Useful Life 25Replacement Year 2032

Remaining Life 12

1,144 SF @ $18.83Asset Cost $5,385.38

Percent Replacement 25%Future Cost $7,242.74

This provision provides funding for repointing of the exterior stone siding on the swimming pool and fitness building.

Schwindt & Company estimated 1,144 square feet of stone siding.

The cost is based on a per square foot estimate provided by Pardue Restoration. The

Association will need to obtain bids for this work.

The useful life assumption is based on estimates established by RS Means and/or the National Estimator.

Page 46: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 46 of 99

Exterior Stone Siding - Sealing

Asset ID 1072Non-Capital

Building ComponentsPlaced in Service January 2016

Useful Life 5Replacement Year 2021

Remaining Life 1

1,144 SF @ $1.12Asset Cost $1,281.28

Percent Replacement 100%Future Cost $1,313.31

This provision provides funding for sealing of the exterior stone siding on the swimming pool/fitness building.

Schwindt & Company estimated 1,144 square feet of siding.

The cost is based on a per square foot estimate provided by Pardue Restoration. The

Association will need to obtain bids for this work.

The useful life assumption is based on estimates established by RS Means and/or the National

Estimator.

Quarry & Harper's Outpost Wood - Sealing

Asset ID 1067Non-Capital

Building ComponentsPlaced in Service January 2014

Useful Life 7Adjustment 2

Replacement Year 2023Remaining Life 3

9,344 SF @ $1.43Asset Cost $13,361.92

Percent Replacement 100%Future Cost $14,389.33

This provision provides funding to seal the exterior wood siding of the swimming pool/fitness building, cedar walls in the hallway of the fitness building, the pavilion, and the wood fence. This also includes Harper's Outpost.

According to the Association, all wood components will need sealing.

Schwindt & Company estimated 1,400 square feet of the pavilion, 6,864 square feet of the swimming pool/fitness building, and 1,080 square feet of the cedar walls in the hallway. The total area is 9,344 square feet.

The cost is based on a per square foot estimate provided by Ken Verhaalen of Verhaalen

Page 47: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 47 of 99

Quarry & Harper's Outpost Wood - Sealing continued...

Painting, Inc. The Association will need to obtain bids for this work.

The useful life was provided by the Association on September 14, 2010.

Quarry Wood - Sealing(2020)

Asset ID 1140Non-Capital

Building ComponentsPlaced in Service January 2014

Useful Life 7Adjustment -1

Replacement Year 2020Remaining Life 0

1 Total @ $2,650.00Asset Cost $2,650.00

Percent Replacement 100%Future Cost $2,650.00

This provision provides funding to seal the exterior wood siding of the south and eastern expsoure of the Quarry building.

According to the Association, all wood components will need sealing.

Schwindt & Company estimated 1,400 square feet of the pavilion, 6,864 square feet of the swimming pool/fitness building, and 1,080 square feet of the cedar walls in the hallway. The total area is 9,344 square feet.

The cost is based on a bid received by the Association.

The useful life was provided by the Association on September 14, 2010.

Siding, Wood - Partial Replacement

Asset ID 1081Non-Capital

Building ComponentsPlaced in Service January 2007

Useful Life 25Replacement Year 2032

Remaining Life 12

9,344 SF @ $8.88Asset Cost $20,743.68

Percent Replacement 25%Future Cost $27,897.94

This provision provides funding to partially replace the exterior wood siding of the swimming pool/fitness building, cedar walls in the hallway of the fitness building, and the pavilion.

According to the Association, the wood components will need sealing.

Page 48: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 48 of 99

Siding, Wood - Partial Replacement continued...

Schwindt & Company estimates 1,400 square feet of the pavilion, 6,864 square feet of the swimming pool/fitness building, and 1,080 square feet of the cedar walls in the hallway. The total area is 9,344 square feet.

The cost is based on a per square foot estimate provided by Ken Verhaalen of Verhaalen

Painting, Inc. The Association will need to obtain bids for this work.

The useful life assumption is based on estimates established by RS Means and/or the National Estimator.

Building Components - Total Current Cost $51,676

Page 49: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 49 of 99

Gutters and Downspouts - Partial Replacement

Asset ID 1077Non-Capital

Gutters and DownspoutsPlaced in Service June 2007

Useful Life 30Replacement Year 2037

Remaining Life 17

1 Total @ $3,548.65Asset Cost $1,774.32

Percent Replacement 50%Future Cost $2,699.84

This provision provides funding for partial repair and/or replacement to the copper gutters and downspouts at the same time the roof is replaced.

Schwindt & Company estimated 286 lineal feet of gutters and downspouts.

The cost was provided by the Association to fund for 50% replacement on September 14, 2010.

According to the Association, the gutters are copper.

The useful life was provided by the Association, and timing is to coincide with the roof replacement.

Gutters and Downspouts - Total Current Cost $1,774

Page 50: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 50 of 99

Crack Sealing Roads & Paths

Asset ID 1131Non-Capital

Streets/AsphaltPlaced in Service January 2019

Useful Life 2Replacement Year 2021

Remaining Life 1

1 Total @ $13,000.00Asset Cost $13,000.00

Percent Replacement 100%Future Cost $13,325.00

This provision is for the crack sealing of the roads and paths every two years as needed.

The cost and useful life are based on information from the Association.

Paths: Asphalt Overlay

Asset ID 1101Capital

Streets/AsphaltPlaced in Service January 2007

Useful Life 14Adjustment 5

Replacement Year 2026Remaining Life 6

1 Total @ $380,960.44Asset Cost $380,960.44

Percent Replacement 100%Future Cost $441,797.31

This provision provides funding to overlay the walking paths, per the Association.

The Association provided the length and width of the common area streets and pathways. Schwindt & Company calculated 328,501 square feet of asphalt roads. The cost and replacement year information was provided by the Association on February 16, 2011.

The useful life is based on estimates established by RS Means and/or the National Estimator.

Paths: Asphalt Sealcoat

Asset ID 1099Non-Capital

Streets/AsphaltPlaced in Service January 2016

Useful Life 7Replacement Year 2023

Remaining Life 3

1 Total @ $38,913.44Asset Cost $38,913.44

Percent Replacement 100%Future Cost $41,905.52

This provision provides funding to seal coat the walking paths in 2016, per the Association.

Page 51: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 51 of 99

Paths: Asphalt Sealcoat continued...

The Association provided the length and width of the common area streets and pathways. Schwindt & Company calculated 328,501 square feet of asphalt roads. The replacement year information was provided by the Association on February 16, 2011. This was done in 2016 for $36,135.

The useful life is based on estimates established by RS Means and/or the National Estimator.

Roads: Asphalt Overlay I

Asset ID 1102Capital

Streets/AsphaltPlaced in Service January 2007

Useful Life 21Replacement Year 2028

Remaining Life 8

1 Total @ $860,226.94Asset Cost $430,113.47

Percent Replacement 50%Future Cost $524,051.50

This provision provides funding to overlay the asphalt roads and other asphalt pavements that were constructed in 2007. This component will occur in 2028 and 2029, per the Association.

The Association provided an area of 715,243 square feet of asphalt roads and 26,528 square feet of other asphalt pavements. The cost to overlay these areas is $741,771, provided by the Association on February 16, 2011.

The useful life is based on estimates established by RS Means and/or the National Estimator.

Roads: Asphalt Overlay II

Asset ID 1121Capital

Streets/AsphaltPlaced in Service January 2007

Useful Life 21Adjustment 1

Replacement Year 2029Remaining Life 9

1 Total @ $860,226.94Asset Cost $430,113.47

Percent Replacement 50%Future Cost $537,152.79

This provision provides funding to overlay the asphalt roads and other asphalt pavements that were constructed in 2007. This component will occur in 2028 and 2029, per the Association.

The Association provided an area of 715,243 square feet of asphalt roads and 26,528 square

Page 52: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 52 of 99

Roads: Asphalt Overlay II continued...

feet of other asphalt pavements. The cost to overlay these areas is $741,771, provided by the Association on February 16, 2011.

The useful life is based on estimates established by RS Means and/or the National Estimator.

Roads: Asphalt Patching

Asset ID 1141Non-Capital

Streets/AsphaltPlaced in Service January 2017

Useful Life 7Adjustment -4

Replacement Year 2020Remaining Life 0

1 Total @ $36,750.00Asset Cost $36,750.00

Percent Replacement 100%Future Cost $36,750.00

This provision provides funding to patch the asphalt roads and other pavements.

The useful life is based on estimates established by RS Means and/or the National Estimator.

Roads: Asphalt Sealcoat Phase (I)

Asset ID 1057Non-Capital

Streets/AsphaltPlaced in Service January 2017

Useful Life 7Replacement Year 2024

Remaining Life 4

1 Total @ $172,045.16Asset Cost $172,045.16

Percent Replacement 100%Future Cost $189,905.67

This provision provides funding to seal coat the asphalt roads and other pavements that were constructed in 2007. The Association plans to wait until all construction is completed.

The Association provided an area of 715,243 square feet of asphalt roads and 26,528 square feet of other pavements. The cost to seal coat these areas is $148,354, provided by the Association on February 16, 2011. This has been delayed to 2017 by the Association in 2015.

The useful life is based on estimates established by RS Means and/or the National Estimator.

Page 53: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 53 of 99

Roads: Asphalt Sealcoat Phase (II)

Asset ID 1104Non-Capital

Streets/AsphaltPlaced in Service January 2035

Useful Life 7Replacement Year 2035

Remaining Life 15

1 Total @ $172,045.16Asset Cost $172,045.16

Percent Replacement 100%Future Cost $249,172.69

This provision provides funding to seal coat the asphalt roads and other asphalt pavements that were constructed in 2007. This component will occur in 2035 after the overlay procedure, per the Association.

The Association provided an area of 715,243 square feet of asphalt roads and 26,528 square feet of other pavements. The cost to seal coat these areas is $148,354, provided by the Association on February 16, 2011.

The useful life is based on estimates established by RS Means and/or the National Estimator.

Streets/Asphalt - Total Current Cost $1,465,146

Page 54: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 54 of 99

Aluminum Powder Coated Fence - Replacement

Asset ID 1048Capital

Fencing/SecurityPlaced in Service January 2007

Useful Life 20Replacement Year 2027

Remaining Life 7

1 Total @ $12,302.03Asset Cost $12,302.03

Percent Replacement 100%Future Cost $14,623.25

This provision provides funding to replace the aluminum powder coated fence.

Schwindt & Company estimated 310 lineal feet of the fence.

The useful life and cost were provided by the Association.

According to the Association, the fence will not be painted.

Gate Hardware - Renew/Replace

Asset ID 1096Capital

Fencing/SecurityPlaced in Service January 2007

Useful Life 30Replacement Year 2037

Remaining Life 17

3 Each @ $29,572.18Asset Cost $88,716.54

Percent Replacement 100%Future Cost $134,992.71

This provision provides funding to replace the gate hardware.

According to the Association, there are 3 gates. The Association provided a cost of $25,000 for each gate and a useful life of 30 years on September 14, 2010.

Tennis Courts: Fencing

Asset ID 1038Capital

Fencing/SecurityPlaced in Service January 2007

Useful Life 25Replacement Year 2032

Remaining Life 12

1 Total @ $30,077.27Asset Cost $30,077.27

Percent Replacement 100%Future Cost $40,450.58

This provision provides funding to replace the chain link fence at the tennis courts.

Page 55: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 55 of 99

Tennis Courts: Fencing continued...

Schwindt & Company estimated 550 lineal feet of the fence.

The cost is based on the installation cost provided by the Association on September 14, 2010.

The useful life is based on estimates established by RS Means and/or the National Estimator.

Wood Fence

Asset ID 1071Capital

Fencing/SecurityPlaced in Service January 2007

Useful Life 30Replacement Year 2037

Remaining Life 17

100 LF @ $35.48Asset Cost $3,548.00

Percent Replacement 100%Future Cost $5,398.70

This provision provides funding to replace the wood fence located at the swimming pool/fitness building.

Schwindt & Company estimated 100 lineal feet of the fence.

The cost is based on a per lineal foot estimate provided by Rick's Custom Fencing & Decking.

The Association will need to obtain bids for this work.

The useful life was provided by the Association on September 14, 2010.

According to the Association, maintenance is funded out of the operating budget.

Fencing/Security - Total Current Cost $134,644

Page 56: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 56 of 99

Audio System - Replacement

Asset ID 1142Capital

EquipmentPlaced in Service January 2000

Useful Life 10Replacement Year 2020

Remaining Life 0

1 Total @ $8,805.00Asset Cost $8,805.00

Percent Replacement 100%Future Cost $8,805.00

This provision is for the replacement of the commerical audio system.

Boiler - Snow Melt System - Replacement

Asset ID 1032Capital

EquipmentPlaced in Service January 2007

Useful Life 20Replacement Year 2027

Remaining Life 7

1 Total @ $79,726.60Asset Cost $79,726.60

Percent Replacement 100%Future Cost $94,769.87

This provision provides funding to replace the boiler - snow melt system.

According to conversations with an Association representative, the boiler is for heating the concrete located at the front doors of the swimming pool/fitness building during the winter time, to help limit accumulation of snow in these areas.

The useful life and cost were provided by the Association on September 14, 2010.

Data Card Printer - Replacement

Asset ID 1136Capital

EquipmentPlaced in Service January 2018

Useful Life 5Replacement Year 2023

Remaining Life 3

1 Total @ $2,096.12Asset Cost $2,096.12

Percent Replacement 100%Future Cost $2,257.29

This provision provides funding to replace the data card printer.

Page 57: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 57 of 99

Data Card Printer - Replacement continued...

This was replaced in 2018 for $2,045.

Discovery Park: Fixtures/Equipment - Repair

Asset ID 1139Non-Capital

EquipmentPlaced in Service January 2007

Useful Life 10Adjustment 2

Replacement Year 2020Remaining Life 0

1 Total @ $2,800.00Asset Cost $2,800.00

Percent Replacement 100%Future Cost $2,800.00

This provision provides funding to repair and paint the rock structure located at the Discovery Park.

Discovery Park: Fixtures/Equipment - Replacement

Asset ID 1036Capital

EquipmentPlaced in Service January 2007

Useful Life 10Adjustment 2

Replacement Year 2030Remaining Life 10

1 Total @ $26,023.53Asset Cost $26,023.53

Percent Replacement 100%Future Cost $33,312.32

This provision provides funding to replace equipment and fixtures located at the Discovery Park.

During Schwindt & Company's 2009 site visit, there were 4 swings, 4 different types of musical equipment, benches, 1 water fountain, and 1 rock water feature. The onsite maintenance personnel indicated that the rock water feature does not need replacement within the next 30 years.

The costs and useful life were provided by the Association on September 14, 2010.

Page 58: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 58 of 99

Discovery Park: Fixtures/Equipment - Replacement continued...

Musical instruments: $14,000

Water fountains: $3,000

Swings: $5,000

Total Cost = $22,000

John Derre - Replacement

Asset ID 1117Capital

EquipmentPlaced in Service January 2007

Useful Life 15Replacement Year 2022

Remaining Life 2

1 Total @ $5,519.06Asset Cost $5,519.06

Percent Replacement 100%Future Cost $5,798.46

This provision is for the replacement of the John Deere.

The cost and useful life assumptions are based on accepted industry estimates as established by RS Means and/or The National Construction Estimator. The Association should obtain a bid to confirm this estimate.

Lake and Streams: Pumps

Asset ID 1008Capital

EquipmentPlaced in Service January 2018

Useful Life 10Replacement Year 2028

Remaining Life 8

3 Each @ $4,100.00Asset Cost $12,300.00

Percent Replacement 100%Future Cost $14,986.36

This provision provides funding to replace the 3 pumps that run the lake and the streams.

According to the Association, the pumps cost approximately $7,000 to $8,000 and a useful life of 10 years. This information was provided in 2009. In 2018 the pumps were rebuilt for 11,957.

Page 59: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 59 of 99

Lake: Pump Station Computer

Asset ID 1006Capital

EquipmentPlaced in Service January 2017

Useful Life 10Replacement Year 2027

Remaining Life 7

1 Total @ $11,828.87Asset Cost $11,828.87

Percent Replacement 100%Future Cost $14,060.81

This provision provides funding to replace the computer in the pump station.

The cost and useful life were provided by the Association on September 14, 2010.

Lakes Aerators - Replacement

Asset ID 1094Capital

EquipmentPlaced in Service January 2007

Useful Life 5Adjustment 6

Replacement Year 2020Remaining Life 0

3 Each @ $1,774.33Asset Cost $5,322.99

Percent Replacement 100%Future Cost $5,322.99

This provision provides funding to replace the lake aerators.

According to the Association, there are 15 aerators. The Association would like to replace 3 aerators every 5 years.

The cost and useful life were provided by the Association on September 14, 2010.

In 2011, the Association provided that the aerators were repaired along with the spa filter for $1,888. This work was completed by Sunriver Resort, LP. This was delayed to 2018 by the Association in 2015.

Page 60: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 60 of 99

Maintenance Cart - Replacement

Asset ID 1118Capital

EquipmentPlaced in Service January 2007

Useful Life 15Replacement Year 2022

Remaining Life 2

1 Total @ $7,726.69Asset Cost $7,726.69

Percent Replacement 100%Future Cost $8,117.85

This provision is for the replacement of the maintenance cart.

The cost and useful life assumptions are based on accepted industry estimates as established by RS Means and/or The National Construction Estimator. The Association should obtain a bid to confirm this estimate.

Metal Benches - Replacement

Asset ID 1093Capital

EquipmentPlaced in Service January 2007

Useful Life 20Replacement Year 2027

Remaining Life 7

7 Each @ $1,774.33Asset Cost $12,420.31

Percent Replacement 100%Future Cost $14,763.85

This provision provides funding to replace the metal benches.

According to the Association, there are 7 metal benches.

The cost and useful life were provided by the Association on September 14, 2010.

Pavilion Equipment: Renew/Replace

Asset ID 1047Capital

EquipmentPlaced in Service January 2019

Useful Life 10Replacement Year 2029

Remaining Life 9

1 Total @ $18,045.05Asset Cost $18,045.05

Percent Replacement 100%Future Cost $22,535.79

This provision provides funding to replace equipment located at the pavilion.

Page 61: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 61 of 99

Pavilion Equipment: Renew/Replace continued...

During Schwindt & Company's 2009 site visit, there were 4 picnic tables, 1 grill, 1 sink, 4 metal benches, and 1 garbage can.

The cost and useful life were provided by the Association on September 14, 2010.

$15,065 was spent in 2019.

Pick Up Truck - Replacement

Asset ID 1119Capital

EquipmentPlaced in Service January 2007

Useful Life 10Adjustment 5

Replacement Year 2022Remaining Life 2

1 Total @ $38,633.45Asset Cost $38,633.45

Percent Replacement 100%Future Cost $40,589.27

This provision is for the replacement of the pick up truck. This has been delayed to 2022 by the Association.

The cost and useful life assumptions are based on accepted industry estimates as established by RS Means and/or The National Construction Estimator. The Association should obtain a bid to confirm this estimate.

Sable Rock Park: Furniture/Equipment

Asset ID 1044Capital

EquipmentPlaced in Service June 2008

Useful Life 20Adjustment 1

Replacement Year 2029Remaining Life 9

1 Total @ $37,379.24Asset Cost $37,379.24

Percent Replacement 100%Future Cost $46,681.55

This provision provides funding to replace the furniture and equipment located at Sable Rock Park.

According to the Association, there are two 2 swing benches (for a cost of $8,800 each) and

Page 62: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 62 of 99

Sable Rock Park: Furniture/Equipment continued...

playground equipment. The playground equipment is a climbing spider web that costs $14,000. The total cost is $31,600.

The useful life and cost were provided by the Association on September 14, 2010.

Snow Plow: 2014 - Replacement

Asset ID 1120Capital

EquipmentPlaced in Service January 2014

Useful Life 20Replacement Year 2034

Remaining Life 14

1 Total @ $6,622.87Asset Cost $6,622.87

Percent Replacement 100%Future Cost $9,357.94

This provision is for the replacement of the snow plow.

The cost and useful life assumptions are based on accepted industry estimates as established by RS Means and/or The National Construction Estimator. The Association should obtain a bid to confirm this estimate.

Snow Plow: 2016 - Replacement

Asset ID 1129Capital

EquipmentPlaced in Service January 2016

Useful Life 7Replacement Year 2023

Remaining Life 3

1 Total @ $4,092.18Asset Cost $4,092.18

Percent Replacement 100%Future Cost $4,406.83

This provision provides funding for the replacement of the snow plow.

According to the Association, this was installed in 2016 for $3,800.

Page 63: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 63 of 99

Swimming Pool/Fitness Building: Exercise Equipment

Asset ID 1022Capital

EquipmentPlaced in Service January 2007

Useful Life 10Adjustment 5

Replacement Year 2022Remaining Life 2

1 Total @ $47,315.50Asset Cost $47,315.50

Percent Replacement 100%Future Cost $49,710.85

This provision provides funding to replace the exercise equipment in the swimming pool/fitness building.

The cost and useful life were provided by the Association.

During Schwindt and Company's 2009 site visit, there were 2 treadmills, 2 elliptical, 1 bicycle, and 1 full weight set. The treadmills, elliptical, and bike each have their own automated television.

The Association provided an estimated useful life of 10 years and a cost of $40,000 on September 14, 2010.

Swimming Pool/Fitness Building: HVAC

Asset ID 1020Capital

EquipmentPlaced in Service January 2007

Useful Life 15Replacement Year 2022

Remaining Life 2

1 Total @ $39,940.50Asset Cost $39,940.50

Percent Replacement 100%Future Cost $41,962.49

This provision provides funding to replace the HVAC unit servicing the swimming pool/fitness building.

During Schwindt & Company's 2009 site visit, there were 2 HVAC units.

The cost and useful life were provided by the Association in 2009.

Page 64: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 64 of 99

Swimming Pool/Fitness Building: Miscellaneous Equipment

Asset ID 1065Capital

EquipmentPlaced in Service January 2007

Useful Life 20Replacement Year 2027

Remaining Life 7

1 Total @ $7,097.32Asset Cost $7,097.32

Percent Replacement 100%Future Cost $8,436.48

This provision provides funding to replace miscellaneous equipment in the swimming pool/fitness building.

During Schwindt & Company's 2009 site visit, the swimming pool/fitness building had file cabinets, 2 mirrors, and an assortment of wall arts.

The following cost breakdowns were provided by the Association.

File cabinets: $2,000

2 mirrors: $2,000

Wall arts: $2,000

Total Cost: $6,000

The cost and useful life were provided by the Association on September 14, 2010.

Swimming Pool/Fitness Building: Quarry Office Furniture

Asset ID 1024Capital

EquipmentPlaced in Service January 2007

Useful Life 10Adjustment 5

Replacement Year 2022Remaining Life 2

1 Total @ $13,313.49Asset Cost $13,313.49

Percent Replacement 100%Future Cost $13,987.49

This provision provides funding to replace furniture in the quarry office building.

During Schwindt & Company's 2009 site visit, there were 2 lobby chairs, 2 office chairs, 2 desk chairs, 1 desk, and 1 round table.

Page 65: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 65 of 99

Swimming Pool/Fitness Building: Quarry Office Furniture continued...

The cost and useful life were provided by the Association in 2009.

Water Heater

Asset ID 1083Capital

EquipmentPlaced in Service January 2007

Useful Life 15Replacement Year 2022

Remaining Life 2

2 Each @ $887.17Asset Cost $1,774.34

Percent Replacement 100%Future Cost $1,864.17

This provision provides funding to replace the water heater servicing the swimming pool/fitness building.

According to the Association, there are 2 water heaters. The Association provided a cost of $750 per water heater. This information was provided on September 14, 2010.

The useful life assumption is based on estimates established by RS Means and/or the National Estimator.

Equipment - Total Current Cost $388,783

Page 66: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 66 of 99

Restroom Fixtures - Upgrade

Asset ID 1063Capital

Interior FurnishingsPlaced in Service January 2007

Useful Life 15Replacement Year 2022

Remaining Life 2

1 Total @ $17,743.31Asset Cost $17,743.31

Percent Replacement 100%Future Cost $18,641.56

This provision provides funding to upgrade the restrooms in the swimming pool/fitness building.

During Schwindt & Company's 2009 site visit, there were 2 restrooms. Each restroom has benches, lockers, showers, sinks, and 2 stalls. The Association expects to keep the restrooms in good condition.

The useful life and cost were provided by the Association on September 14, 2010.

Swimming Pool/Fitness Building: Flooring

Asset ID 1023Capital

Interior FurnishingsPlaced in Service January 2007

Useful Life 10Adjustment 5

Replacement Year 2022Remaining Life 2

1 Total @ $7,097.32Asset Cost $7,097.32

Percent Replacement 100%Future Cost $7,456.62

This provision provides funding to replace the fitness room flooring.

Schwindt & Company estimates 648 square feet of flooring.

The cost and useful life were provided by the Association on September 14, 2010.

Interior Furnishings - Total Current Cost $24,841

Page 67: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 67 of 99

Bridge Lighting - Replacement

Asset ID 1115Capital

LightingPlaced in Service January 2011

Useful Life 10Replacement Year 2021

Remaining Life 1

1 Total @ $4,525.63Asset Cost $4,525.63

Percent Replacement 100%Future Cost $4,638.77

This provision provides funding to replace the lights located on the bridge.

Per the Association, there are lights on two stone walls of the entry bridge.

In 2011, the Association provided that lights on the bridge will be replaced for approximately $3,000 to $4,000; however, bids have not been obtained.

The useful life and cost assumptions are based on estimates established on Fannie Mae Expected Useful Life Tables and Forms.

Christmas Lights - Replacement

Asset ID 1108Capital

LightingPlaced in Service March 2014

Useful Life 4Replacement Year 2020

Remaining Life 0

1 Total @ $5,798.47Asset Cost $5,798.47

Percent Replacement 100%Future Cost $5,798.47

This provision provides funding to replace Christmas lights for $5,000 every 4 years per the Association.

Entry/Exterior Lighting - Replacement

Asset ID 1042Capital

LightingPlaced in Service January 2007

Useful Life 10Adjustment 3

Replacement Year 2020Remaining Life 0

1 Total @ $30,960.99Asset Cost $30,960.99

Percent Replacement 100%Future Cost $30,960.99

This provision provides funding to replace the exterior building light fixtures, and street light.

Page 68: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 68 of 99

Entry/Exterior Lighting - Replacement continued...

Schwindt & Company counted 26 light fixtures.

Per the Association, a cost of $30,000 was provided by the Association on September 14, 2010. In 2011, this cost has been reduced by $4,000 for the bridge lighting, which is funded in a separate component.

In 2011, the Association provided that pool lights were replaced for $170 by Tomco Electric, Inc.

The useful life assumption is based on estimates established on Fannie Mae Expected Useful Life Tables and Forms.

Gate Lights - Replacement

Asset ID 1128Capital

LightingPlaced in Service January 2016

Useful Life 10Replacement Year 2026

Remaining Life 6

1 Total @ $12,974.38Asset Cost $12,974.38

Percent Replacement 100%Future Cost $15,046.30

This provision provides funding for the replacement of the gate lights.

According to the Association, this was installed in 2016 for $12,048.

Interior Lighting

Asset ID 1069Capital

LightingPlaced in Service June 2007

Useful Life 20Replacement Year 2027

Remaining Life 7

12 Each @ $118.28Asset Cost $1,419.36

Percent Replacement 100%Future Cost $1,687.17

This provision provides funding to replace the interior building lighting fixtures.

Schwindt & Company counted 12 light fixtures.

The useful life and cost assumptions are based on estimates established on RS Means and/or

Page 69: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 69 of 99

Interior Lighting continued...

the National Estimator. The Association will need to obtain bids for this work.

Pathway Lights - Replacement

Asset ID 1127Capital

LightingPlaced in Service January 2016

Useful Life 10Replacement Year 2026

Remaining Life 6

1 Total @ $12,359.47Asset Cost $12,359.47

Percent Replacement 100%Future Cost $14,333.20

This provision provides funding for the replacement of the pathway lights.

According to the Association, this was installed in 2016 for $11,477.

Lighting - Total Current Cost $68,038

Page 70: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 70 of 99

Pool Covers

Asset ID 1027Capital

Recreation/PoolPlaced in Service January 2008

Useful Life 15Replacement Year 2023

Remaining Life 3

1 Total @ $25,254.64Asset Cost $25,254.64

Percent Replacement 100%Future Cost $27,196.48

This provision provides funding to replace the summer and winter pool covers.

The useful life and cost were provided by the Association on September 14, 2010.

Pool Heater

Asset ID 1066Capital

Recreation/PoolPlaced in Service June 2011

Useful Life 12Replacement Year 2023

Remaining Life 3

1 Total @ $26,650.00Asset Cost $26,650.00

Percent Replacement 100%Future Cost $28,699.14

This provision provides funding to replace the pool heater.

The cost was provided by the Association on September 14, 2010.

In 2011, the Association provided that the pool heater was replaced.

The useful life assumption is based on estimates established by RS Means and/or the National

Estimator. The Association will need to obtain bids for this work.

Pool Resurfacing

Asset ID 1088Capital

Recreation/PoolPlaced in Service June 2007

Useful Life 20Replacement Year 2027

Remaining Life 7

1 Total @ $49,089.82Asset Cost $49,089.82

Percent Replacement 100%Future Cost $58,352.37

This provision provides funding to resurface the swimming pool.

Page 71: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 71 of 99

Pool Resurfacing continued...

According to the Association, the swimming pool does not have a liner. The swimming pool is made out of pebble tech, which has a useful life expectancy of 20 years. It has plastic material with infinity edge, which is funded out of the operating budget for repairs. Water goes off on the edge and disappears.

Schwindt & Company estimated the perimeter to measure 250 feet.

The cost and useful life was provided by the Association on September 14, 2010.

Pool Safety Camera - Replacement

Asset ID 1143Capital

Recreation/PoolPlaced in Service January 2008

Useful Life 10Replacement Year 2020

Remaining Life 0

1 Total @ $1,210.00Asset Cost $1,210.00

Percent Replacement 100%Future Cost $1,210.00

This provision provides funding to replace the pool safety camera.

The useful life and cost were provided by the Association.

Pool Umbrella 2020, 2021

Asset ID 1091Capital

Recreation/PoolPlaced in Service August 2019

Useful Life 1Replacement Year 2020

Remaining Life 0

1 Total @ $6,000.00Asset Cost $6,000.00

Percent Replacement 100%Future Cost $6,000.00

This provision provides funding to replace the umbrellas at the swimming pool.

According to the Association, there are 18 umbrellas total. The umbrellas were replaced in August 2010 for $7,500. This component will occur every 10 years. This information was provided on September 14, 2010.

The Association would like to plan for $1,000 of replacements every year.

Page 72: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 72 of 99

Pool Umbrella 2022+

Asset ID 1144Capital

Recreation/PoolPlaced in Service August 2019

Useful Life 1Adjustment 2

Replacement Year 2022Remaining Life 2

1 Total @ $3,075.00Asset Cost $3,075.00

Percent Replacement 100%Future Cost $3,230.67

This provision provides funding to replace the umbrellas at the swimming pool.

According to the Association, there are 18 umbrellas total. The umbrellas were replaced in August 2010 for $7,500. This component will occur every 10 years. This information was provided on September 14, 2010.

The Association would like to plan for $1,000 of replacements every year.

Pool and Spa Filters

Asset ID 1030Capital

Recreation/PoolPlaced in Service January 2007

Useful Life 15Replacement Year 2022

Remaining Life 2

1 Total @ $33,283.74Asset Cost $33,283.74

Percent Replacement 100%Future Cost $34,968.73

This provision provides funding to replace the pool and spa filters.

The useful life and cost were provided by the Association in 2009.

In 2011, the Association provided that the spa filter was repair with the lake aerator for $1,888. This work was completed by Sunriver Resort, LP.

Page 73: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 73 of 99

Pool and Spa: Other Replacements

Asset ID 1110Capital

Recreation/PoolPlaced in Service January 2017

Useful Life 1Replacement Year 2020

Remaining Life 0

1 Total @ $2,828.52Asset Cost $2,828.52

Percent Replacement 100%Future Cost $2,828.52

This provision provides funding for repairs and replacements of various equipment servicing the swimming pool and spa. In 2011, the Association provided that replacement of parts for the swimming pool and spa costs $16,054. The Association would like to fund $2,500 to occur annually for replacements of various equipment servicing the swimming pool and spa.

Pool: Lounge Chair Cushion - Replacement

Asset ID 1133Capital

Recreation/PoolPlaced in Service June 2018

Useful Life 10Replacement Year 2028

Remaining Life 8

1 Total @ $26,968.77Asset Cost $26,968.77

Percent Replacement 100%Future Cost $32,858.83

This provision provides funding to replace the swimming pool lounge chair cushions.

The cost and useful life are based on information from the Association. This was done in 2018 for $26,311.

Pool: Splash Monitor

Asset ID 1060Capital

Recreation/PoolPlaced in Service January 2014

Useful Life 7Replacement Year 2021

Remaining Life 1

1 Total @ $4,140.11Asset Cost $4,140.11

Percent Replacement 100%Future Cost $4,243.61

This provision provides funding for the replacement of the splash monitor located at the

Page 74: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 74 of 99

Pool: Splash Monitor continued...

swimming pool.

The Association provided a cost of $3,500 for replacement of the splash monitor and a useful life of 7 years on September 14, 2010.

Pool: Spray Pad - Filter Replacement

Asset ID 1085Capital

Recreation/PoolPlaced in Service June 2008

Useful Life 15Replacement Year 2023

Remaining Life 3

1 Total @ $1,478.60Asset Cost $1,478.60

Percent Replacement 100%Future Cost $1,592.29

This provision provides funding to replace the filter for the water spray pad located at the swimming pool.

According to Brad Forcep of SunRise Pools and Spas (541-447-2005), the filter should last

approximately 10 years. An estimated cost of $1,250 was provided for budgetary purposes.

This information was provided in 2009. The Association will need to obtain bids for this

work.

The Association would like this component to occur every 15 years.

Pool: Spray Pad - Heater Replacement

Asset ID 1086Capital

Recreation/PoolPlaced in Service January 2007

Useful Life 15Replacement Year 2022

Remaining Life 2

1 Total @ $3,548.65Asset Cost $3,548.65

Percent Replacement 100%Future Cost $3,728.30

This provision provides funding to replace the heater for the water spray pad located at the swimming pool.

According to Brad Forcep of SunRise Pools and Spas (541-447-2005), the heater should last

approximately 15 years. An estimated cost of $3,000 was provided for budgetary purposes.

Page 75: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 75 of 99

Pool: Spray Pad - Heater Replacement continued...

This information was provided in 2009. The Association will need to obtain bids for this

work.

Pool: Spray Pad - Pump Replacement

Asset ID 1084Capital

Recreation/PoolPlaced in Service June 2019

Useful Life 15Replacement Year 2034

Remaining Life 14

1 Total @ $1,182.89Asset Cost $1,182.89

Percent Replacement 100%Future Cost $1,671.39

This provision provides funding to replace the pump for the water spray pad located at the swimming pool.

According to Brad Forcep of SunRise Pools and Spas (541-447-2005), the pump should last

approximately 15 years. An estimated cost of $1,000 was provided for budgetary purposes.

This information was provided in 2009. The Association will need to obtain bids for this

work.

Pool: Teak Furniture - Replacement

Asset ID 1025Capital

Recreation/PoolPlaced in Service June 2007

Useful Life 20Replacement Year 2027

Remaining Life 7

1 Total @ $130,117.61Asset Cost $130,117.61

Percent Replacement 100%Future Cost $154,668.95

This provision provides funding to replace the swimming pool furniture.

The furniture is made from teak product.

During Schwindt & Company's 2009 site visit, the swimming pool lounges has chairs and tables.

The useful life and cost were provided by the Association on September 14, 2010.

Page 76: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 76 of 99

Pumps Replacement I

Asset ID 1033Capital

Recreation/PoolPlaced in Service January 2007

Useful Life 10Replacement Year 2020

Remaining Life 0

3 Each @ $7,000.00Asset Cost $21,000.00

Percent Replacement 100%Future Cost $21,000.00

This provision provides funding to replace pumps at the swimming pool, 2 spas, slide, waterfall, and spray pad.

According to the Association, there are 6 pumps for a cost of $3,000 each. This component is to occur every 10 years. This information was provided on September 14, 2010. 3 pumps were replaced in 2019 for $21,245.

Pumps Replacement II

Asset ID 1138Capital

Recreation/PoolPlaced in Service January 2019

Useful Life 10Replacement Year 2029

Remaining Life 9

3 Each @ $7,000.00Asset Cost $21,000.00

Percent Replacement 100%Future Cost $26,226.12

This provision provides funding to replace pumps at the 1 cirrculaton, 1 vanishing endge and 1 spray pad.

According to the Association, there are 6 pumps for a cost of $3,000 each. This component is to occur every 10 years. This information was provided on September 14, 2010. 3 pumps were replaced in 2019 for $21,245.

Page 77: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 77 of 99

Spa A Controller - Replacement

Asset ID 1125Capital

Recreation/PoolPlaced in Service January 2016

Useful Life 10Replacement Year 2026

Remaining Life 6

1 Total @ $4,888.00Asset Cost $4,888.00

Percent Replacement 100%Future Cost $5,668.58

This provision provides funding to replace the spa a controller.

The useful life and cost were provided by the Association in 2016.

Spa Heater A

Asset ID 1082Capital

Recreation/PoolPlaced in Service January 2016

Useful Life 5Replacement Year 2021

Remaining Life 1

1 Total @ $7,265.00Asset Cost $7,265.00

Percent Replacement 100%Future Cost $7,446.62

This provision provides funding to replace the spa heaters.

During Schwindt & Company's 2009 site visit, there were 2 spas.

The cost was provided by the Association on September 14, 2010.

The useful life assumption is based on estimates established by RS Means and/or the National Estimator.

Spa Heater B

Asset ID 1137Capital

Recreation/PoolPlaced in Service January 2019

Useful Life 5Replacement Year 2024

Remaining Life 4

1 Total @ $7,265.00Asset Cost $7,265.00

Percent Replacement 100%Future Cost $8,019.20

This provision provides funding to replace the spa heaters.

Page 78: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 78 of 99

Spa Heater B continued...

During Schwindt & Company's 2009 site visit, there were 2 spas.

The cost was provided by the Association on September 14, 2010.

The useful life assumption is based on estimates established by RS Means and/or the National Estimator.

Spa Resurfacing

Asset ID 1092Capital

Recreation/PoolPlaced in Service June 2007

Useful Life 15Replacement Year 2022

Remaining Life 2

2 Each @ $5,914.43Asset Cost $11,828.86

Percent Replacement 100%Future Cost $12,427.70

This provision provides funding to resurface the spas.

During Schwindt & Company's 2009 site visit, there were 2 spas.

The cost and useful life were provided by the Association on September 14, 2010.

Tennis Courts: Nets

Asset ID 1132Capital

Recreation/PoolPlaced in Service January 2018

Useful Life 10Replacement Year 2028

Remaining Life 8

1 Total @ $525.31Asset Cost $525.31

Percent Replacement 100%Future Cost $640.04

This provision provides funding to replace the tennis court nets.

The cost is based on the information provided by the Association.

The useful life is based on estimates established by RS Means and/or the National Estimator.

Page 79: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 79 of 99

Recreation/Pool - Total Current Cost $388,601

Page 80: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 80 of 99

Access Control: Gates Card Readers - Replacement

Asset ID 1134Capital

Grounds ComponentsPlaced in Service January 2018

Useful Life 10Replacement Year 2028

Remaining Life 8

1 Total @ $25,753.12Asset Cost $25,753.12

Percent Replacement 100%Future Cost $31,377.68

This provision provides funding for the replacement of the gates card readers.

According to the Association, there are 3 gates. In 2018 the card readers will be changed from transponders to chip readers. This was done in 2018 for $25,125.

Access Control: Gates Renew/Replace

Asset ID 1045Capital

Grounds ComponentsPlaced in Service January 2017

Useful Life 10Adjustment 1

Replacement Year 2028Remaining Life 8

3 Each @ $28,389.29Asset Cost $85,167.87

Percent Replacement 100%Future Cost $103,768.78

This provision provides funding for the replacement of the gates.

According to the Association, there are 3 gates. The gates are maintained by Mike's Fence.

According to Rob of Mike's Fence, the gates will last greater than 30 years. However, the equipment associated with the gates will need to be replaced every 10 to 12 years. The equipment that needs replacements are gate operators, telephone entry system, card readers, and safety devices. The cost to replace this equipment is $24,000 per gate. This information was obtained in 2009. The Association will need to obtain bids for this work.

Page 81: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 81 of 99

Bike Racks - Replacement

Asset ID 1070Capital

Grounds ComponentsPlaced in Service January 2007

Useful Life 20Replacement Year 2027

Remaining Life 7

3 Total @ $591.44Asset Cost $1,774.32

Percent Replacement 100%Future Cost $2,109.11

This provision provides funding for the replacement of the metal bike racks.

According to the Association, there are 3 sets of circular bike racks. The cost was provided by the Association on September 14, 2010.

The useful life assumption is based on estimates established on RS Means and/or the National Estimator.

Bridge - Wood

Asset ID 1009Capital

Grounds ComponentsPlaced in Service January 2007

Useful Life 30Replacement Year 2037

Remaining Life 17

1 Total @ $133,135.02Asset Cost $133,135.02

Percent Replacement 100%Future Cost $202,580.68

This provision provides funding to replace the wood bridge.

Schwindt & Company estimated 846 square feet of the bridge.

The cost and useful life were provided by the Association in 2009. The cost includes rails, logs, and decking.

Page 82: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 82 of 99

Concrete Pavers - Partial Replacement

Asset ID 1068Non-Capital

Grounds ComponentsPlaced in Service January 2007

Useful Life 30Replacement Year 2037

Remaining Life 17

1,561 SF @ $18.09Asset Cost $14,119.24

Percent Replacement 50%Future Cost $21,484.10

This provision provides funding for partial replacement of the concrete pavers. Partial replacement of 50% assumes that most of the pavers will be in good enough condition that a full replacement is not needed.

Schwindt & Company estimated 1,561 square feet of concrete pavers.

The cost is based on a per square foot estimate established on the National Estimator. The Association will need to obtain bids for this work.

The useful life assumption is based on estimates established on RS Means and/or the National Estimator.

Exterior Concrete - Partial Replacement

Asset ID 1029Non-Capital

Grounds ComponentsPlaced in Service January 2007

Useful Life 30Replacement Year 2037

Remaining Life 17

1 Total @ $266,270.00Asset Cost $133,135.00

Percent Replacement 50%Future Cost $202,580.65

This provision provides funding to partially replace the exterior concrete at the swimming pool/fitness building and the pavilion. Partial replacement is based on the expectation that most concrete areas will be in good enough condition that a full replacement is not needed.

According to the Association, the exterior concrete will require sealing, which is funded in the operating budget.

Schwindt & Company estimated 10,218 square feet of concrete area.

The cost and useful life was provided by the Association in 2009.

Page 83: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 83 of 99

Irrigation - VFD Replacement

Asset ID 1126Capital

Grounds ComponentsPlaced in Service January 2016

Useful Life 10Replacement Year 2026

Remaining Life 6

1 Total @ $7,753.61Asset Cost $7,753.61

Percent Replacement 100%Future Cost $8,991.81

This provision provides funding to replace the irrigation vfd.

The useful life and cost were provided by the Association in 2016.

Irrigation System - Repairs

Asset ID 1041Non-Capital

Grounds ComponentsPlaced in Service January 2019

Useful Life 10Replacement Year 2029

Remaining Life 9

1 Total @ $5,125.00Asset Cost $5,125.00

Percent Replacement 100%Future Cost $6,400.42

This provision provides funding to repair the irrigation system.

According to the Association, a Toro computer runs the irrigation system. The lake pump system is part of the irrigation system. The Association provided a cost of $3,000 for repairs and a useful life of 15 years, on September 14, 2010. In 2018 $5,000 was spent and in 2019, $5,691 was spent.

Lake: Liner and Stream Repair

Asset ID 1004Non-Capital

Grounds ComponentsPlaced in Service January 2007

Useful Life 30Replacement Year 2037

Remaining Life 17

1 Total @ $177,433.10Asset Cost $177,433.10

Percent Replacement 100%Future Cost $269,985.44

This provision provides funding for repairs to the liner in the lake and streams.

Page 84: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 84 of 99

Lake: Liner and Stream Repair continued...

According to the Association, the liner does not need replacement within the next 30 years.

The cost and useful life were provided by the Association on September 14, 2010.

The Association provided a cost of $100,000 to repair the lake liner and stream liner with an additional of $50,000 as a contingency.

Pool: Fire Pit - Rebuild

Asset ID 1114Capital

Grounds ComponentsPlaced in Service January 2013

Useful Life 7Replacement Year 2020

Remaining Life 0

1 Total @ $3,000.00Asset Cost $3,000.00

Percent Replacement 100%Future Cost $3,000.00

This provision provides funding to rebuild the fire pit unit located at the swimming pool.

In 2011, the Association provided that the logs were replaced by Blue Flame Specialties (541-420-3592). Jeep of Blue Flame Specialties provided a cost of $1,500 to replace the gas fireplace unit and a useful life of 5 to 7 years. Jeep provided that the gas fireplace unit will need replacement in the next 2 to 3 years. The Association will need to obtain bids for this work.

Sports Courts: Resurfacing

Asset ID 1040Capital

Grounds ComponentsPlaced in Service January 2017

Useful Life 10Replacement Year 2027

Remaining Life 7

1 Total @ $7,291.34Asset Cost $7,291.34

Percent Replacement 100%Future Cost $8,667.11

This provision provides funding to resurface the tennis courts.

Schwindt & Company estimated the tennis court to be 120' x 120’ or 14,400 square feet.

The cost and useful life assumptions were provided by the Association in 2009.

Page 85: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 85 of 99

Grounds Components - Total Current Cost $593,688

Page 86: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 86 of 99

Common Area Signage

Asset ID 1089Capital

SignsPlaced in Service January 2007

Useful Life 20Replacement Year 2027

Remaining Life 7

1 Total @ $118,288.72Asset Cost $118,288.72

Percent Replacement 100%Future Cost $140,608.12

This provision provides funding to replace common area signage. Common area signs include street signs, entrance signs, quarry signs, property signs, exit signs, and building signs.

The Association provided the following costs on September 14, 2010:

Quarry Signs: $20,000

Street Signs: $35,000

Pathways/Trail Signs: $35,000

A cost of $90,000 was provided with $10,000 additional for contingency.

In 2011, the Association provided that an existing sign was replaced for $5,678.

The Association provided a useful life expectancy of 20 years.

Street Signs: Repair

Asset ID 1112Non-Capital

SignsPlaced in Service January 2019

Useful Life 1Replacement Year 2020

Remaining Life 0

1 Total @ $2,101.25Asset Cost $2,101.25

Percent Replacement 100%Future Cost $2,101.25

This provision provides funding for repair of the street signs.

In 2011, the Association provided that all the street signs are showing wear. A cost of $630 was spent to powder coat one sign. The Association would like to fund $2,000 every year to powder coat the street signs.

2019 - $3,160 spent

Page 87: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 87 of 99

Signs - Total Current Cost $120,390

Page 88: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 88 of 99

Glass Doors Replacement

Asset ID 1076Capital

Doors and WindowsPlaced in Service January 2007

Useful Life 30Replacement Year 2037

Remaining Life 17

14 Each @ $1,182.89Asset Cost $16,560.46

Percent Replacement 100%Future Cost $25,198.70

This provision provides funding to replace the glass doors.

Schwindt & Company counted 14 glass doors.

In 2011, the Association provided that the door on the Quarry Building was repaired in 2011. There are 6 surge suppressors that were replaced for $686.20. This cost includes material and labor.

The useful life was provided by the Association.

The cost assumption is based on estimates established by RS Means and/or the National Estimator. The Association will need to obtain bids for this work.

Windows Replacement

Asset ID 1075Capital

Doors and WindowsPlaced in Service January 2007

Useful Life 30Adjustment 1

Replacement Year 2038Remaining Life 18

33 Each @ $1,182.89Asset Cost $39,035.37

Percent Replacement 100%Future Cost $60,881.85

This provision provides funding to replace the windows.

Schwindt & Company estimated 33 windows.

The useful life was provided by the Association on September 14, 2010.

The cost assumption is based on estimates established by RS Means and/or the National

Estimator. The Association will need to obtain bids for this work.

Page 89: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 89 of 99

Doors and Windows - Total Current Cost $55,596

Page 90: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 90 of 99

Building Envelope Inspection

Asset ID 1122Non-CapitalInspections

Placed in Service January 2007Useful Life 7Adjustment 6

Replacement Year 2020Remaining Life 0

1 Total @ $8,076.68Asset Cost $8,076.68

Percent Replacement 100%Future Cost $8,076.68

This provision is for a building envelope inspection. Generally the life of the building envelope is greater than 30 years. We recommend the Association perform an inspection to determine the current condition of the system. Once the condition is known the reserve study should be updated.Industry specialists recommend a building envelope inspection every 5-10 years.

Electrical Inspection

Asset ID 1124Non-CapitalInspections

Placed in Service January 2007Useful Life 25

Replacement Year 2032Remaining Life 12

1 Total @ $8,076.68Asset Cost $8,076.68

Percent Replacement 100%Future Cost $10,862.24

This provision is for an electrical inspection. Generally the life of the electrical system is greater than 30 years. We recommend the Association perform an inspection to determine the current condition of the system. Once the condition is known the reserve study should be updated.

Page 91: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Sunriver, Oregon Detail Report by Category

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 91 of 99

Plumbing Inspection

Asset ID 1123Non-CapitalInspections

Placed in Service January 2007Useful Life 25

Replacement Year 2032Remaining Life 12

1 Total @ $8,076.68Asset Cost $8,076.68

Percent Replacement 100%Future Cost $10,862.24

This provision is for a plumbing inspection, including water supply and sewer system. Generally the life of the plumbing system is greater than 30 years. We recommend the Association perform an inspection to determine the current condition of the system. Once the condition is known the reserve study should be updated.

Inspections - Total Current Cost $24,230

Page 92: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Category Detail Index

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 92 of 99

Asset IDDescription Replacement Page

Roofing1019 Swimming Pool/Fitness Building: Roof Replacement 2037 42 of 99

Painting1105 Asphalt Edges - Paint 2020 43 of 991109 Bridge & Dock: Paint/Seal 2020 43 of 991111 Pool and Spa: Artificial Rocks - Paint 2021 44 of 99

Building Components1074 Exterior Stone Siding - Partial Replacement 2032 45 of 991073 Exterior Stone Siding - Repoint 2032 45 of 991072 Exterior Stone Siding - Sealing 2021 46 of 991067 Quarry & Harper's Outpost Wood - Sealing 2023 46 of 991140 Quarry Wood - Sealing(2020) 2020 47 of 991081 Siding, Wood - Partial Replacement 2032 47 of 99

Gutters and Downspouts1077 Gutters and Downspouts - Partial Replacement 2037 49 of 99

Streets/Asphalt1131 Crack Sealing Roads & Paths 2021 50 of 991101 Paths: Asphalt Overlay 2026 50 of 991099 Paths: Asphalt Sealcoat 2023 50 of 991102 Roads: Asphalt Overlay I 2028 51 of 991121 Roads: Asphalt Overlay II 2029 51 of 991141 Roads: Asphalt Patching Unfunded 52 of 991057 Roads: Asphalt Sealcoat Phase (I) Unfunded 52 of 991104 Roads: Asphalt Sealcoat Phase (II) 2035 53 of 99

Fencing/Security1048 Aluminum Powder Coated Fence - Replacement 2027 54 of 991096 Gate Hardware - Renew/Replace 2037 54 of 991038 Tennis Courts: Fencing 2032 54 of 991071 Wood Fence 2037 55 of 99

Page 93: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Category Detail Index

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 93 of 99

Asset IDDescription Replacement Page

Equipment1142 Audio System - Replacement 2020 56 of 991032 Boiler - Snow Melt System - Replacement 2027 56 of 991136 Data Card Printer - Replacement 2023 56 of 991139 Discovery Park: Fixtures/Equipment - Repair 2020 57 of 991036 Discovery Park: Fixtures/Equipment - Replacement 2030 57 of 991117 John Derre - Replacement 2022 58 of 991008 Lake and Streams: Pumps 2028 58 of 991006 Lake: Pump Station Computer 2027 59 of 991094 Lakes Aerators - Replacement 2020 59 of 991118 Maintenance Cart - Replacement 2022 60 of 991093 Metal Benches - Replacement 2027 60 of 991047 Pavilion Equipment: Renew/Replace 2029 60 of 991119 Pick Up Truck - Replacement 2022 61 of 991044 Sable Rock Park: Furniture/Equipment 2029 61 of 991120 Snow Plow: 2014 - Replacement 2034 62 of 991129 Snow Plow: 2016 - Replacement 2023 62 of 991022 Swimming Pool/Fitness Building: Exercise Equipm.. 2022 63 of 991020 Swimming Pool/Fitness Building: HVAC 2022 63 of 991065 Swimming Pool/Fitness Building: Miscellaneous Eq..2027 64 of 991024 Swimming Pool/Fitness Building: Quarry Office Fur..2022 64 of 991083 Water Heater 2022 65 of 99

Interior Furnishings1063 Restroom Fixtures - Upgrade 2022 66 of 991023 Swimming Pool/Fitness Building: Flooring 2022 66 of 99

Lighting1115 Bridge Lighting - Replacement 2021 67 of 991108 Christmas Lights - Replacement 2020 67 of 991042 Entry/Exterior Lighting - Replacement 2020 67 of 991128 Gate Lights - Replacement 2026 68 of 991069 Interior Lighting 2027 68 of 991127 Pathway Lights - Replacement 2026 69 of 99

Page 94: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Category Detail Index

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 94 of 99

Asset IDDescription Replacement Page

Recreation/Pool1027 Pool Covers 2023 70 of 991066 Pool Heater 2023 70 of 991088 Pool Resurfacing 2027 70 of 991143 Pool Safety Camera - Replacement 2020 71 of 991091 Pool Umbrella 2020, 2021 2020 71 of 991144 Pool Umbrella 2022+ 2022 72 of 991030 Pool and Spa Filters 2022 72 of 991110 Pool and Spa: Other Replacements 2020 73 of 991133 Pool: Lounge Chair Cushion - Replacement 2028 73 of 991060 Pool: Splash Monitor 2021 73 of 991085 Pool: Spray Pad - Filter Replacement 2023 74 of 991086 Pool: Spray Pad - Heater Replacement 2022 74 of 991084 Pool: Spray Pad - Pump Replacement 2034 75 of 991025 Pool: Teak Furniture - Replacement 2027 75 of 991033 Pumps Replacement I 2020 76 of 991138 Pumps Replacement II 2029 76 of 991125 Spa A Controller - Replacement 2026 77 of 991082 Spa Heater A 2021 77 of 991137 Spa Heater B 2024 77 of 991092 Spa Resurfacing 2022 78 of 991132 Tennis Courts: Nets 2028 78 of 99

Grounds Components1134 Access Control: Gates Card Readers - Replacement 2028 80 of 991045 Access Control: Gates Renew/Replace 2028 80 of 991070 Bike Racks - Replacement 2027 81 of 991009 Bridge - Wood 2037 81 of 991068 Concrete Pavers - Partial Replacement 2037 82 of 991029 Exterior Concrete - Partial Replacement 2037 82 of 991126 Irrigation - VFD Replacement 2026 83 of 991041 Irrigation System - Repairs 2029 83 of 991004 Lake: Liner and Stream Repair 2037 83 of 991114 Pool: Fire Pit - Rebuild 2020 84 of 991040 Sports Courts: Resurfacing 2027 84 of 99

Page 95: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFTCaldera Springs Owners' Association, Inc.

Category Detail Index

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 95 of 99

Asset IDDescription Replacement Page

Signs1089 Common Area Signage 2027 86 of 991112 Street Signs: Repair 2020 86 of 99

Doors and Windows1076 Glass Doors Replacement 2037 88 of 991075 Windows Replacement 2038 88 of 99

Inspections1122 Building Envelope Inspection 2020 90 of 991124 Electrical Inspection 2032 90 of 991123 Plumbing Inspection 2032 91 of 99

Total Funded Assets 89Total Unfunded Assets 2Total Assets 91

Page 96: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 96 of 99

Additional Disclosures

Levels of ServiceThe following three categories describe the various types of Reserve Studies, from exhaustive to minimal.

I. Full: A Reserve Study in which the following five Reserve Study tasks are performed: ■ Component Inventory ■ Condition Assessment (based upon on-site visual observations) ■ Life and Valuation Estimates ■ Fund Status ■ Funding Plan

II. Update, With-Site-Visit/On-Site Review: A Reserve Study update in which the following five

Reserve Study tasks are performed: ■ Component Inventory (verification only, not quantification) ■ Condition Assessment (based on on-site visual observations) ■ Life and Valuation Estimates ■ Fund Status ■ Funding Plan

III. Update, No-Site-Visit/Off Site Review: A Reserve Study update with no on-site visual observa-

tions in which the following three Reserve Study tasks are performed: ■ Life and Valuation Estimates ■ Fund Status ■ Funding Plan

Terms and Definitions CASH FLOW METHOD: A method of developing a Reserve Funding Plan where contributions to the

Reserve fund are designed to offset the variable annual expenditures from the Reserve fund. Different

Reserve Funding Plans are tested against the anticipated schedule of Reserve expenses until the

desired Funding Goal is achieved.

Page 97: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 97 of 99

COMPONENT: The individual line items in the Reserve Study, developed or updated in the Physical

Analysis. These elements form the building blocks for the Reserve Study. Components typically are: 1)

Association responsibility, 2) with limited Useful Life expectancies, 3) predictable Remaining Useful Life

expectancies, 4) above a minimum threshold cost, and 5) as required by local codes.

COMPONENT INVENTORY: The task of selecting and quantifying Reserve Components. This task

can be accomplished through on-site visual observations, review of association design and organiza-

tional documents, a review of established association precedents, and discussion with appropriate

association representative(s) of the association or cooperative.

COMPONENT METHOD: A method of developing a Reserve Funding Plan where the total contribu-

tion is based on the sum of contributions for individual components. See “Cash Flow Method.”

CONDITION ASSESSMENT: The task of evaluating the current condition of the component based on

observed or reported characteristics.

CURRENT REPLACEMENT COST: See “Replacement Cost.”

DEFICIT: An actual (or projected) Reserve Balance less than the Fully Funded Balance. The

opposite would be a Surplus.

EFFECTIVE AGE: The difference between Useful Life and Remaining Useful Life. Not always

equivalent to chronological age, since some components age irregularly. Used primarily in

computations.

FINANCIAL ANALYSIS: The portion of a Reserve Study where current status of the Reserves (meas-

ured as cash or Percent Funded) and a recommended Reserve contribution rate (Reserve Funding

Plan) are derived, and the projected Reserve income and expense over time is presented. The Finan-

cial Analysis is one of the two parts of a Reserve Study.

FULLY FUNDED: 100% Funded. When the actual (or projected) Reserve balance is equal to the

Fully Funded Balance.

Page 98: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 98 of 99

FULLY FUNDED BALANCE (FFB): Total Accrued Depreciation. An indicator against which Actual (or

projected) Reserve balance can be compared. The Reserve balance that is in direct proportion to the

fraction of life “used up” of the current Repair or Replacement cost. This number is calculated for each

component, then summed together for an association total. Two formulae can be utilized, depending

on the provider’s sensitivity to interest and inflation effects. Note: Both yield identical results when

interest and inflation are equivalent.

FFB = Current Cost X Effective Age / Useful Life

or

FFB = (Current Cost X Effective Age / Useful Life) + [(Current Cost X Effective Age /

Useful Life) / (1 + Interest Rate) ^ Remaining Life] - [(Current Cost X Effective Age /

Useful Life) / (1 + Inflation Rate) ^ Remaining Life]

FUND STATUS: The status of the reserve fund as compared to an established benchmark such as

percent funding.

The Association appears to be adequately funded as the threshold method.

FUNDING GOALS: Independent of methodology utilized, the following represent the basic categories

of Funding Plan goals:

Baseline Funding: Establishing a Reserve funding goal of keeping the Reserve cash balance

above zero.

Full Funding: Setting a Reserve funding goal of attaining and maintaining Reserves at or near

100% funded.

Statutory Funding: Establishing a Reserve funding goal of setting aside the specific minimum

amount of Reserves required by local statues.

Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above

a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or

less conservative than “Fully Funding.”

FUNDING PLAN: An association’s plan to provide income to a Reserve fund to offset anticipated

expenditures from that fund.

FUNDING PRINCIPLES: ■ Sufficient Funds When Required ■ Stable Contribution Rate over the Years ■ Evenly Distributed Contributions over the Years ■ Fiscally Responsible

LIFE AND VALUATION ESTIMATES: The task of estimating Useful Life, Remaining Useful Life,

and Repair or Replacement Costs for the Reserve components.

Page 99: DRAFT - 3o5cqu3f85rc1t3vas1sokiv-wpengine.netdna-ssl.com · Roofing 42 of 99 Painting 43 of 99 Building Components 45 of 99 ... the representative in charge of this report, is a designated

DRAFT

SCHWINDT & CO. RESERVE STUDY SERVICES

PAGE 99 of 99

PERCENT FUNDED: The ratio, at a particular point of time (typically the beginning of the Fiscal Year),

of the actual (or projected) Reserve Balance to the Fully Funded Balance, expressed as a percentage.

PHYSICAL ANALYSIS: The portion of the Reserve Study where the Component Inventory, Condition

Assessment, and Life and Valuation Estimate tasks are performed. This represents one of the two

parts of the Reserve Study.

REMAINING USEFUL LIFE (RUL): Also referred to as “Remaining Life” (RL). The estimated time, in

years, that a reserve component can be expected to continue to serve its intended function. Projects

anticipated to occur in the initial year have “zero” Remaining Useful Life.

REPLACEMENT COST: The cost of replacing, repairing, or restoring a Reserve Component to its orig-

inal functional condition. The Current Replacement Cost would be the cost to replace, repair, or restore

the component during that particular year.

RESERVE BALANCE: Actual or projected funds as of a particular point in time that the association has

identified for use to defray the future repair or replacement of those major components which the

association is obligated to maintain. Also known as Reserves, Reserve Accounts, Cash Reserves.

Based upon information provided and not audited.

RESERVE PROVIDER: An individual that prepares Reserve Studies.

RESERVE STUDY: A budget planning tool which identifies the current status of the Reserve fund and

a stable and equitable Funding Plan to offset the anticipated future major common area expenditures.

The Reserve Study consists of two parts: the Physical Analysis and the Financial Analysis. “Our

budget and finance committee is soliciting proposals to update our Reserve Study for next year’s

budget.”

RESPONSIBLE CHARGE: A reserve specialist in responsible charge of a reserve study shall render

regular and effective supervision to those individuals performing services which directly and materially

affect the quality and competence rendered by the reserve specialist. A reserve specialist shall main-

tain such records as are reasonably necessary to establish that the reserve specialist exercised regular

and effective supervision of a reserve study of which he was in responsible charge. A reserve specialist

engaged in any of the following acts or practices shall be deemed not to have rendered the regular and

effective supervision required herein: