dr. jae-hyoun park lng fgss & bunkering equipment test

2
LNG FGSS & BUNKERING EQUIPMENT TEST FACILITY The First Mover to Lead the Future of the Shipbuilding Industry 435, Haeyang-ro, Yeongdo-gu, Busan, Republic of Korea Tel 82.51.400.5000 Fax 82.51.400.5091 www.komeri.re.kr JAE-HYOUN PARK JI-HYUN JUNG Senior Researcher Busan Mieum Headquarters Tel. +82-51-400-5467 E-mail. [email protected] Headquarter Division Manager Busan Mieum Headquarters Tel. +82-51-400-5400 E-mail. [email protected] Dr. Jae-Hyoun Park W e C a n O f f e r Y o u t h e B e s t L N G T e s t C e r t i f i c a t i o n W i t h T e c h n o l o g y a n d R e l i a b i l i t y

Upload: others

Post on 16-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

LNG FGSS & BUNKERING EQUIPMENTTEST FACILITY

The First Mover to Lead the Future of the Shipbuilding Industry

435, Haeyang-ro, Yeongdo-gu, Busan, Republic of KoreaTel 82.51.400.5000 Fax 82.51.400.5091 www.komeri.re.kr

JAE-HYOUN PARK JI-HYUN JUNGSenior ResearcherBusan Mieum HeadquartersTel. +82-51-400-5467 E-mail. [email protected]

Headquarter Division ManagerBusan Mieum HeadquartersTel. +82-51-400-5400 E-mail. [email protected]

Dr. Jae-Hyoun Park

We Can Offer You the Best LNG Test Certification

With Technology and Reliability

LNG FGSS TEST FACILITY

LNG TankCapacity : 60m3

IMO Type CHorizontal

LP LNG PumpCapacity : 7.5ton/h X 2Discharge. Press. : 20bargSubmerged Barrel Centrifugal

HP PumpCapacity : 7.5ton/h X 2Fluid : LNG/LN2Discharge Press. : 320bargReciprocating

LP VaporizerCapacity : 15ton/h In/Out : -196°C/-80°CFluid : LNG/LN2Shell&Tube

BOG CompressorCapacity : 3.4ton/h Discharge Press. : 16bargReciprocating

LN2 TankCapacity : 60m3 X 2IMO Type CHorizontal

LP LN2 PumpCapacity : 7.5ton/h X 2

Submerged Barrel Centrifugal

HP VaporizerCapacity : 5ton/h X 3In/Out : -196°C/+40°CFluid : LNG/LN2Shell&Tube

Gas HeaterCapacity : 15ton/h In/Out : -110°C/+40°CFluid : NG/N2Shell&Tube

Cryogenic Test Mode Low Pressure Test Mode High Pressure Test Mode

Fluid LN2/N2 LNG/LN2/NG/N2 LNG/LN2/NG/N2

Pressure Range Up to 320barg Up to 20barg Up to 320barg

Capacity - Max 15ton/h Max 15ton/h

Available EquipmentAll LNG Fueled Ship Equipment

LNG Equipment for DFDE, X-DF Engine

LNG Equipment for ME-GI Engine

Discharge. Press. : 20barg

Re-Liquefaction UnitCapacity : 15ton/h Shell & Tube Re-CondenserLN2(Refrigerant) PumpCold Insulation

LNG FGSS & BUNKERING EQUIPMENT TEST FACILITY OVERVIEW

LNG FGSS & BUNKERING EQUIPMENT TEST FACILITY OBJECTIVE

LNG FGSS & Bunkering

Equipment TestFacility

Establishment of LNG FGSS & Bunkering Equipment Safety /Performance Certification System

Engineering Consultingfor LNG FGSS & Bunkering

Equipment Design of LNGFueled Shipbuilding

Industry

Research & Development for LNG FGSS & Bunkering Equipment and Mechanical Equipment

Technical Supportfor LNG FGSS & Bunkering

Equipment ThroughRisk Assessment

Test Infrastructure Facilities for LNG FGSS & Bunkering Equipment Safety / Performance Certification andTechnical Engineering Support Service

BACKGROUND AND NECESSITY

Marine Industry Has Seen Growing Interest in the Use of Alternative Fuels Such as LNG to Meet StricterInternational, Regional, National, and Local air Emissions LegislationThese Techniques are Primarily Aimed at Meeting the IMO Annex VI Requirements for Nitrogen OxideEmissions From Diesel Engines and Sulfur Oxide Emissions From All Fuel-Burning Equipment on BoardAs of 2018 Existing ECAs Include the Baltic Sea and North Sea, the North American Sea Including Most of USand Canadian Coast and ECAs are Expanding to the Globally to Marine Environmental Protection

Technology and Trust

LNG BUNKERING TEST FACILITY

LNG TankCapacity : 300m3 IMO Type CHorizontal

LNG Bunkering PumpCapacity : 100 ~ 1,200m³/hEquipment : 300m³/h X 4Discharge Press. : 4~10bargSubmerged Barrel, Centrifugal

Bunkering Transfer SystemCapacity :

6 DOF Motion Unit x 2Operation : ±3,000mm, ±30degPayload : 3ton(Dynamic)

Cryogenic Test Mode Liquid Test Mode Vapor Test Mode

Fluid LN2/N2 LNG NG

Pressure Range Up to 10barg Up to 10barg Up to 10barg

Capacity - Max 1,200m3/h Max 4,800m3/h

Available EquipmentAll LNG BunkeringVessel Equipment

LNG Pump, Flexible Hose, Loading Arm, QC/DC, ERC

Flexible Hose, Loading Arm,QC/DC, ERC, Instrument

WHAT CAN WE DO!1. Safety Evaluation2. Performance Evaluation3. Simulation for Sea State4. Engineering Support

Risk AssessmentLNG EducationOperator Training(OTS)

Line Definition

LP LNG

LP LN2

LP NG/N2

HP LNG/LN2

HP NG/N2

: LNG ~ 1,200m³/h: NG ~ 4,800Nm³/h

Component: Flexible Hose for LNG, NG: QC/DC for LNG, NG: PERC Module System: ESD Module System

LNGTANK

LN2TANK

LN2TANK

HP Pump

HP Vaporizer Gas Heater

HP Vaporizer

LP LN2 Pump

HP LNG Pump

LP PumpTest Area

LNG Fuel GasEquipmentTest Area

FGSS SkidTest Area

& BunkeringFixed Test Area

Receiving ShipManifold Equipment

6 DOF Test Area

Terminal/BunkerShip Manifold

Equipment

6 DOF Test Area

Re-LiquefactionUnit

Gas CombustionUnit

LNGTANK

Gas

Hea

ter

QC / DCTEST

QC / DCTEST

FLEXIBLEHOSE TEST

QC / DCTEST

QC / DCTEST

FLEXIBLEHOSE TEST

QC

/ DC

TEST

QC

/ DC

TEST

FLEXIBLE

HO

SE TES

T

QC

/ DC

TEST

QC

/ DC

TEST

FLEXIBLE

HO

SE TES

T

LP L

N2

LP L

NG

HP

NG

/N2

LP N

G/N

2(C

old)

LP L

NG

HP

LN

G/L

N2

LP NG/N2 (Warm)

LP NG (Cold)

To Vent

To LNG Tank

BOGCOMP.

Mis

tS

epar

ator

LNG FGSS TEST FACILITY

LNG TankCapacity : 60m3

IMO Type CHorizontal

LP LNG PumpCapacity : 7.5ton/h X 2Discharge. Press. : 20bargSubmerged Barrel Centrifugal

HP PumpCapacity : 7.5ton/h X 2Fluid : LNG/LN2Discharge Press. : 320bargReciprocating

LP VaporizerCapacity : 15ton/h In/Out : -196°C/-80°CFluid : LNG/LN2Shell&Tube

BOG CompressorCapacity : 3.4ton/h Discharge Press. : 16bargReciprocating

LN2 TankCapacity : 60m3 X 2IMO Type CHorizontal

LP LN2 PumpCapacity : 7.5ton/h X 2

Submerged Barrel Centrifugal

HP VaporizerCapacity : 5ton/h X 3In/Out : -196°C/+40°CFluid : LNG/LN2Shell&Tube

Gas HeaterCapacity : 15ton/h In/Out : -110°C/+40°CFluid : NG/N2Shell&Tube

Cryogenic Test Mode Low Pressure Test Mode High Pressure Test Mode

Fluid LN2/N2 LNG/LN2/NG/N2 LNG/LN2/NG/N2

Pressure Range Up to 320barg Up to 20barg Up to 320barg

Capacity - Max 15ton/h Max 15ton/h

Available EquipmentAll LNG Fueled Ship Equipment

LNG Equipment for DFDE, X-DF Engine

LNG Equipment for ME-GI Engine

Discharge. Press. : 20barg

Re-Liquefaction UnitCapacity : 15ton/h Shell & Tube Re-CondenserLN2(Refrigerant) PumpCold Insulation

LNGTANK

LN2TANK

LN2TANK

HP Pump

HP Vaporizer Gas Heater

HP Vaporizer

LP LN2 Pump

HP LNG Pump

LP PumpTest Area

LNG Fuel GasEquipmentTest Area

FGSS SkidTest Area

& BunkeringFixed Test Area

Receiving ShipManifold Equipment

6 DOF Test Area

Terminal/BunkerShip Manifold

Equipment

6 DOF Test Area

Re-LiquefactionUnit

Gas CombustionUnit

LNGTANK

Gas

Hea

ter

QC / DCTEST

QC / DCTEST

FLEXIBLEHOSE TEST

QC / DCTEST

QC / DCTEST

FLEXIBLEHOSE TEST

QC

/ DC

TEST

QC

/ DC

TEST

FLEXIBLE

HO

SE TES

T

QC

/ DC

TEST

QC

/ DC

TEST

FLEXIBLE

HO

SE TES

T

LP L

N2

LP L

NG

HP

NG

/N2

LP N

G/N

2(C

old)

LP L

NG

HP

LN

G/L

N2

LP NG/N2 (Warm)

LP NG (Cold)

To Vent

To LNG Tank

BOGCOMP.

Mis

tS

epar

ator

KOMERI FGSS TEST FACILITY HISTORY

2016.04 Industry and Energy for KOMERI FGSS Test Facility Establishment

2017.11 Fire & Explosion Damage Simulation with KOGAS for KOMERI FGSS Test Facility Test Facility AIP Approval from ABS

2019.08 LNG FGSS & Bunkering

2016.07-2018.06 FGSS Basic/Detail Engineering Design with KOGAS-Tech

2017.06 Risk Assessment(HAZID/HAZOP) Meeting with DNV-GL for KOMERI FGSS Test Facility

2017.10 LNG FGSS Test Site Foundation Construction

Engineering Review, General CEO-ATT-01446 - Rev.1 Page 1 of 1 CEO-PRO-00047

APPROVAL IN PRINCIPLE

Date of Issuance: 26 August 2019

Certificate Number: T1899034

as requested by:

Korea Marine Equipment Research Institute

ABS has reviewed the documentation as specified in the ABS letter dated 26 August 2019 (Task No.

T1899034) in accordance with the ABS 2017 Guidance Notes on Review and Approval of Novel

Concepts, and considers that the conceptual engineering as proposed is feasible for the intended

application, and the facilities as presented are, in principle, in compliance with the applicable

requirements of 2018 Korea Gas Safety Code FP112, 2019 ABS Rules for Building and Classing Steel

Vessels and IMO Resolution MSC.391 (95) Adoption of the International Code of Safety for Ships

using Gases or Other Low-Flashpoint Fuels. (IGF Code).

Facility: LNG FGSS TEST BED

Description: Process Flow Diagram for testing of LNG and LN2 related components or equipment

New Technology Maturity Level:

[Subsystem A – Feasibility Stage]

Note: This certificate evidences compliance with one or more of the Rules, Guides, standards or other criteria of American Bureau of Shipping or a statutory, industrial or manufacturer’s standards and is issued solely for the use of the Bureau, its committees, its clients or other authorized entities. Any significant changes to the aforementioned product without ABS approval will result in this certificate becoming void. This certificate is governed by the terms and conditions in the ABS Rules.

Roy H. Bleiberg Vice President of Engineering, ABS

By:

Yongjin Lee Senior Managing Principal Engineer, ABS