Revision 0 SCHEDULE 1 SCHEDULE OF RATES Note allocate item no. only to items where a price is to be submitted. RATES SHALL BE EXCLUSIVE OF GST ITEM NO. DESCRIPTION QUANTITY AND UNIT OF MEASUREMENT RATE ($) AMOUNT ($) PROVISION FOR TRAFFIC provisional sum/item LANDSCAPE GENERAL Location of services. provisional sum/item Phytophthora control. item Mundulla Yellows control. item Removal of litter. provisional sum/item EARTHWORKS AND TOPSOILING Clearing and grubbing, refer Clause 3 provisional sum/item Soil preparation. (a) Topsoil stripping …… (± 10%) square metre (b) Minor trimming or levelling of subgrade …… (± 10%) square metre (c) Excavation and removal of unsuitable material …… (± 10%) square metre (d) Deep ripping …… (± 10%) square metre (e) Cultivation and amelioration …… (± 10%) square metre ……………………………. ………………… Tenderer's signature Date DPTI XXCxxx Page 1

Upload: dinhdiep

Post on 10-Mar-2018

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

SCHEDULE 1

SCHEDULE OF RATES

Note allocate item no. only to items where a price is to be submitted.

RATES SHALL BE EXCLUSIVE OF GST

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

PROVISION FOR TRAFFIC provisional sum/item

LANDSCAPE GENERAL

Location of services. provisional sum/item

Phytophthora control. item

Mundulla Yellows control. item

Removal of litter. provisional sum/item

EARTHWORKS AND TOPSOILING

Clearing and grubbing, refer Clause 3 provisional sum/item

Soil preparation.

(a) Topsoil stripping

……(± 10%)

square metre

(b) Minor trimming or levelling of subgrade

……(± 10%)

square metre

(c) Excavation and removal of unsuitable material

……(± 10%)

square metre

(d) Deep ripping

……(± 10%)

square metre

(e) Cultivation and amelioration

……(± 10%)

square metre

(f) Final levelling

……(± 10%)

square metre

Soil testing.provisional sum/item

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 1

DTEI, 31/07/09,
These rows are to appear at the top of each page.
Page 2: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Supply of soil for landscape areas.

(a) DPTI Premium Soil Mix……

(± 10%)cubic metre

(b) General landscape soil 60/40……

(± 10%)cubic metre

(c) General landscape soil 80/20……

(± 10%)cubic metre

(d) Soil from off site……

(± 10%)cubic metre

(e) Topsoil from off site……

(± 10%)cubic metre

(f) Topsoil from on site……

(± 10%)cubic metre

Spreading of soil, refer Clause 7……

(± 10%)cubic metre

Soil additives:

(a) Gypsum……

(± 10%)square metre

(b) Organic compost……

(± 10%)square metre

(c) Other……

(± 10%)square metre

SUPPLY OF PLANT MATERIAL

Supply and delivery of plants.

(a) Tubestock……

(± 10%)number

(b) General nursery stock……

(± 10%)number

(c) Aquatic rubber-lined baskets……

(± 10%)number

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 2

Page 3: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

(d) Aquatic flora-edge strip……

(± 10%)number

(e) Viro-cells……

(± 10%)number

(f) Viro-tubes……

(± 10%)number

Supply and delivery of advanced trees, refer Clause 4:

(a) Containers……

(± 10%)number

(b) Ball and burlapped……

(± 10%)number

(c) Root control bags……

(± 10%)number

Collection and delivery of plants supplied by the Principal:

Tubestock and nursery stock item --

Advanced trees……

(± 10%)number

PLANTING

Weed control……

(± 10%)number/square metre

Planting:

(a) Tubestock:

Planting……

(± 10%)number

Fertiliser……

(± 10%)number

Marker stakes……

(± 10%)number

Tree guards……

(± 10%)number

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 3

Page 4: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Weed mats……

(± 10%)number

Mulch……

(± 10%)number

(b) General nursery stock

Planting……

(± 10%)number

Fertiliser……

(± 10%)number

Marker stakes……

(± 10%)number

Tree guards……

(± 10%)number

Weed mats……

(± 10%)number

Mulch……

(± 10%)number

Tree ties……

(± 10%)number

(c) Aquatic rubber-lined baskets

Planting……

(± 10%)number

Fertiliser……

(± 10%)number

Marker stakes……

(± 10%)number

Mulch……

(± 10%)number

(d) Aquatic flora-edge strip

Planting……

(± 10%)number

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 4

Page 5: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Fertiliser……

(± 10%)number

Marker stakes……

(± 10%)number

Mulch……

(± 10%)number

(e) Viro-cells

Planting……

(± 10%)number

Fertiliser……

(± 10%)number

Marker stakes……

(± 10%)number

Tree guards……

(± 10%)number

Weed mats……

(± 10%)number

Mulch……

(± 10%)number

(f) Viro-tubes

Planting……

(± 10%)number

Fertiliser……

(± 10%)number

Marker stakes……

(± 10%)number

Tree guards……

(± 10%)number

Weed mats……

(± 10%)number

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 5

Page 6: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Mulch……

(± 10%)number

(g) Advanced trees - Containers:

Planting……

(± 10%)number

Fertiliser……

(± 10%)number

Tree stakes……

(± 10%)number

Mulch……

(± 10%)number

Root control……

(± 10%)number

Soil mix……

(± 10%)number

Drainage coil……

(± 10%)number

Tree ties……

(± 10%)number

(h) Advanced trees - ball and burlapped:

Planting……

(± 10%)number

Fertiliser……

(± 10%)number

Tree stakes……

(± 10%)number

Mulch……

(± 10%)number

Root control……

(± 10%)number

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 6

Page 7: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Soil mix……

(± 10%)number

Drainage coil……

(± 10%)number

Tree ties……

(± 10%)number

(i) Advanced tree root control bags:

Planting……

(± 10%)number

Fertiliser……

(± 10%)number

Tree stakes……

(± 10%)number

Mulch……

(± 10%)number

Root control……

(± 10%)number

Soil mix……

(± 10%)number

Drainage coil……

(± 10%)number

Tree ties……

(± 10%)number

Native Revegetation Area signsnumber

LAWN ESTABLISHMENT

Weed control.……

(± 10%)square metre

Ground and soil preparation.……

(± 10%)square metre

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 7

Page 8: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Soil testing.……

(± 10%)square metre

Supply of soil.……

(± 10%)square metre

Spreading of soil.……

(± 10%)square metre

Soil additives.……

(± 10%)square metre

Fertiliser.……

(± 10%)square metre

Supply of seed.……

(± 10%)kg

Supply of turf.……

(± 10%)square metre

Installation of seed or turf (including establishment).……

(± 10%)square metre

Watering.……

(± 10%)square metre

PALM TRANSPLANTING/RELOCATION

Frond preparation.……

(± 10%)palm

Root preparation.……

(± 10%)palm

Root excavation.……

(± 10%)palm

Transport.……

(± 10%)palm

Planting.……

(± 10%)palm

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 8

Page 9: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Supply and place imported soil.……

cubic metre(provisional quantity)

Fertiliser and/or soil additive.……

(± 10%)palm

Palm support.……

(± 10%)palm

Mulch.……

(± 10%)palm

Watering.……

(± 10%)palm

Antitranspirants.……

(± 10%)palm

Reinstatement. item

TREE TRANSPLANTING/RELOCATION

Root preparation.……

(± 10%)tree

Root excavation.……

(± 10%)tree

Transport. item

Planting.……

(± 10%)tree

Backfill.……

(± 10%)cubic metre

Watering basin.……

(± 10%)tree

Soil testing. item

Mulch.……

(± 10%)cubic metre

Watering.……

(± 10%)number

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 9

Page 10: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Antitranspirants.……

(± 10%)number

Reinstatement of site. item

Maintenance.……

month

HYDROSEEDING

Supply of seed. item

Weed control.……

(± 10%)square metre

Setting out. item

Seed sowing, including fertiliser and/or other additives.

……(± 10%)

square metre

Native Revegetation Area signs. number

DIRECT SEEDING

Supply of seed and seed pre-treatment. item

Weed control.……

(± 10%)square metre

Setting out, refer Clause 4 item

Seed sowing, including fertiliser and other additives.……

(± 10%)square metre

Native Revegetation Area signs. number

PLANT RESCUE AND MAINTENANCE

Plant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial watering, initial fertiliser and antitranspirants.

……(± 10%)number

Setting out. item

Marker stakes.……

(± 10%)number

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 10

Page 11: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Tree guards.

……(± 10%)number

Weed mats.……

(± 10%)number

Mulch.……

(± 10%)number

Seed collection. item

Vegetative cutting. item

Watering.……

(± 10%)number

Weed control.……

(± 10%)square metre

Pest/disease control. item/provisional sum

Marker stakes.……

number± 10%

Tree guards.……

(± 10%)number

Weed mats.……

(± 10%)number

Mulch. provisional sum

Follow-up fertiliser.……

(± 10%)number

Removal of marker stakes. item

IRRIGATION

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 11

Page 12: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

TREE HOLLOW RELOCATION

Inspection and identification for tree hollows.……tree

± 10%

Tree hollow harvesting.

……number

(provisional quantity)

Tree hollow relocation installation.

……number

(provisional quantity)

Whole tree relocation.

……number

(provisional quantity)

Removal of material from site. item

Maintenance.

……number

(provisional quantity)

TREE PRUNING AND REMOVAL

Tree removal.

(a) Large trees (greater than ….m diameter)……

number± 10%

(b) Medium trees (….m - …m diameter)……

number± 10%

(c) Small trees (less than ….m diameter)……

number± 10%

Tree pruning.

(a) Thinning……

number± 10%

(b) Deadwooding……

number± 10%

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 12

Page 13: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

(c) Selective pruning…...

number± 10%

(d) Formative pruning of young trees……

number± 10%

(e) Reduction pruning……

number± 10%

(f) Crown lifting……

number± 10%

(g) Pollarding……

number± 10%

(h) Remedial pruning……

number± 10%

Retention of cut branches or limbs.

……number

(provisional quantity)

Retention of tree hollows.

……number

(provisional quantity)

Disposal of excess cut material. item

Stump removal.……

number± 10%

Prevention of suckering and regrowth.……

number± 10%

Removal of material from site. item

BUSHCARE

Weed control. NOTE: weed control may be an item

(a) Cut and swab, cut and frill……

number± 10%

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 13

Page 14: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

(b) Cut only……

number± 10%

(c) Hand pull……

square metre± 10%

(d) Spot spray……

square metre± 10%

(e) Wiping……

square metre± 10%

(f) Frilling only……

number± 10%

(g) Ringbarking……

number± 10%

Disposal of cut material (at a licensed waste depot). item

Native Revegetation Area signs. number

HERBACEOUS AND WOODY WEED CONTROL

Herbaceous weed control. NOTE: weed control may be an item

(a) Slash only……

square metre± 10%

(b) Slash and spray……

square metre± 10%

(c) Spot spray……

square metre± 10%

(d) Hand pull……

square metre± 10%

Woody weed control. NOTE: weed control may be an item

(a) Cut and swab……

number± 10%

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 14

Page 15: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

(b) Cut only……

number± 10%

(c) Hand pull……

square metre± 10%

(d) Spot spray……

square metre± 10%

(e) Stem injection……

number± 10%

Disposal of cut material.

(a) Stockpile on site item

(b) Spread on site item

(c) Remove from site item

(d) Burning item

(e) Phytophthora areas item

INSTALLATION OF PERMEABLE PAVING FOR TREES

Site preparation, including establishment of Tree Protection Zone and excavation. item

Tree root care. Provisional Sum

Load support.……

square metre/item±10%

Paving.……

square metre±10%

MAINTENANCE OF PLANTS

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 15

Page 16: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Watering (….operations).……

number± 10%

Weed control (….operations).……

number± 10%

Pest/disease control. provisional sum/item

Maintenance of marker stakes.……

number± 10%

Maintenance of tree guards.……

number± 10%

Maintenance of tree stakes.……

number± 10%

Maintenance of tree ties.……

number± 10%

Maintenance of weed mats.……

number± 10%

Maintenance of mulch.……

number± 10%

Formative pruning.……

number± 10%

Follow-up fertiliser (….operations).……

number± 10%

Removal of marker stakes and tree guards.……

number± 10%

MAINTENANCE OF HYDROSEEDED AND DIRECT SEEDED AREAS

Weed control (....operations).……

number± 10%

Pest/disease control. provisional sum/item

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 16

Page 17: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Grass slashing.……

square metre± 10%

MAINTENANCE OF SEEDED AREAS AND LAWNS

Weed control (…operations).……

square metre± 10%

Pest/disease control. provisional sum/item

Cutting of lawn or seeded areas (…operations).……

square metre± 10%

Follow-up fertiliser.……

square metre± 10%

Lawn renovation.……

square metre± 10%

(a) Vertical mowing……

square metre± 10%

(b) Coring……

square metre± 10%

(c) Slicing……

square metre± 10%

(d) Topdressing……

square metre± 10%

MAINTENANCE OF NATIVE GRASSES

Watering (….operations).……

number± 10%

Weed control (….operations).……

number± 10%

Slashing.……

number± 10%

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 17

Page 18: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

ITEM NO. DESCRIPTION QUANTITY AND UNIT

OF MEASUREMENTRATE

($)AMOUNT

($)

Seed collection.……kg

±10%

Pest/disease control. provisional sum/item

Maintenance of marker stakes.……

number± 10%

Maintenance of tree guards.……

number± 10%

Maintenance of weed mats.……

number± 10%

Maintenance of mulch.……

number± 10%

Follow-up fertiliser (….operations).……

number± 10%

Removal of marker stakes and tree guards.……

number± 10%

TOTAL $

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 18

Page 19: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

SCHEDULE 2

WORKING TIME

I/We propose to observe the following working days and hours, vide Clause "Working Days and Hours of Work".

Working Days and Hours

Number of days to be worked per week ..............................

Number of hours to be worked per day,

Monday to Friday ..............................

Saturday ..............................

Sunday ..............................

Starting Time

Monday to Friday .........................a.m.

Saturday .........................a.m.

Sunday .........................a.m.

Finishing Time

Monday to Friday .........................p.m.

Saturday .........................p.m.

Sunday .........................p.m.

Rostered Days Off ..............................

..............................

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 19

Page 20: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

SCHEDULE 4

SCHEDULE OF RATES FOR VARIATIONS

ALL RATES SHALL BE EXCLUSIVE OF GST.

ITEMNo.

DESCRIPTION UNIT OF MEASUREMENT

RATE($)

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 20

DTEI, 31/07/09,
This may be Schedule 3 in some contracts.
Page 21: dpti.sa.gov.au · Web viewPlant relocation, including weed control, root preparation, preparation of planting holes, root excavation, backfill and soil additives, watering basin, initial

Revision 0

SCHEDULE 5

SCHEDULE OF RATES FOR DAYWORK

ALL RATES SHALL BE EXCLUSIVE OF GST.

Tenderer to list (examples shown below only).

PLANTTenderer to list (examples shown below only).

ITEM DESCRIPTION(MAKE, YEAR, MODEL)

RATE($) PER HOUR

NOTE: All Plant rates to be inclusive of operator(s)

LABOURTenderer to list (examples shown below only).

CLASSIFICATIONRATE

($) per hour

Supervisor

Leading Hand

Labourer

……………………………. …………………Tenderer's signature Date

DPTI XXCxxx Page 21

DTEI, 31/07/09,
This may be Schedule 4 in some contracts.