BGR ENERGY SYSTEMS LTD Customer: THERMAL POWERTECH CORPORATION INDIA LTD PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam Field Quality Record LIQUID PENETRANT EXAMINATION REPORT Contractor Name: PMPL Report No: TPCIL/BGRESL/PMPL/LP/01 Drawing & Rev. No.: 114N5125 Job No.: B-74 FQAP & Rev. No.: DEC-T-FQP-BOILER-001 Area / Location : ESP-1 Package: S.No. Description Area Joint No. Welder No. Final Run Clearance with Date PMPL BGRESL TPCIL PMPL BGRESL TPCIL 1 B-74 BOILER 1 FILLET SW-01 AS WELDED Manufacturer / Brand Batch No. & Expiary Date Cleaner : CHECKMATE Cl-C-07-11-220 Penetrant : CHECKMATE 0211-73-P-94 Dwell Time: 5-1 Developer : CHECKMATE 0211-71-D-92 PMPL BGRESL Type of Joint Surface Condition Root Run / Back Gouging Clearance with Date Surface Temperatur

Upload: kannagi198

Post on 31-Jan-2016

20 views

Category:

Documents


0 download

DESCRIPTION

ndt

TRANSCRIPT

Page 1: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/01

Drawing & Rev. No.: 114N5125 Job No.: B-74

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : ESP-1 Unit No: 1

Package: Date:

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 B-74 BOILER 1 FILLET SW-01

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

AS WELDED

Surface Temperature: 25 0C

Page 2: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/02

Drawing & Rev. No.: 114N5128 Job No.: B-20

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 02.05.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 B-20 BOILER 1 SW-02

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

FILLUP &GRINDI

NG

AS WELDED

Surface Temperature: 25 0C

Page 3: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/03

Drawing & Rev. No.: 114N5134 Job No.: B-104

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 18.05.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 B-104 BOILER 1 FILLET SW-02

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

AS WELDED

Surface Temperature: 25 0C

Page 4: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/04

Drawing & Rev. No.: 114N5133 Job No.: C-7,C-8,C-9

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 20.07.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 COLUMN RIB PLATE(C7) BOILER 1 FILLET SW-10

2 COLUMN RIB PLATE(C8) BOILER 1 FILLET SW-01

3 COLUMN RIB PLATE(C9) BOILER 1 FILLET SW-02

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

AS WELDED

AS WELDED

AS WELDED

Surface Temperature: 25 0C

Page 5: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/05

Drawing & Rev. No.: 114N5133 Job No.: C-12,C-13

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 25.07.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 COLUMN RIB PLATE(C12) BOILER 1 FILLET SW-02

2 COLUMN RIB PLATE(C13) BOILER 1 FILLET SW-02

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

AS WELDED

AS WELDED

Surface Temperature: 25 0C

Page 6: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/06

Drawing & Rev. No.: 114N541 Job No.: B-2(CELING GIRDER TOP)

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 26.07.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 HOOK 1 BOILER 1 FILLET SW-02

2 HOOK 2 BOILER 1 FILLET SW-01

3 HOOK 3 BOILER 1 FILLET SW-02

4 HOOK 4 BOILER 1 FILLET SW-01

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

AS WELDED

AS WELDED

AS WELDED

AS WELDED

Surface Temperature: 25 0C

Page 7: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/07

Drawing & Rev. No.: 114N541 Job No.: C16,C17

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 30.07.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 COLUMN RIB PLATE(C16) BOILER 1 FILLET SW-02

2 COLUMN RIB PLATE(C17) BOILER 1 FILLET SW-02

3

4

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

AS WELDED

AS WELDED

Surface Temperature: 25 0C

Page 8: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/08

Drawing & Rev. No.: 114N541 Job No.: B-3 GIRDER TOP

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 02.08.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 HOOK 1 BOILER 1 SW-02

2 HOOK 2 BOILER 1 SW-02

3 HOOK 3 BOILER 1 SW-02

4 HOOK 4 BOILER 1 SW-02

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

FILLET+ GROOVE

AS WELDED

FILLET+ GROOVE

AS WELDED

FILLET+ GROOVE

AS WELDED

FILLET+ GROOVE

AS WELDED

Surface Temperature: 25 0C

Page 9: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/09

Drawing & Rev. No.: 114N541 Job No.: B-4 GIRDER TOP

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 04.08.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 HOOK 1 BOILER 1 SW-02

2 HOOK 2 BOILER 1 SW-02

3 HOOK 3 BOILER 1 SW-02

4 HOOK 4 BOILER 1 SW-02

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

FILLET+ GROOVE

AS WELDED

FILLET+ GROOVE

AS WELDED

FILLET+ GROOVE

AS WELDED

FILLET+ GROOVE

AS WELDED

Surface Temperature: 25 0C

Page 10: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/10

Drawing & Rev. No.: 114N541 Job No.: C20,C21

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 16.08.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 COLUMN RIB PLATE(C20) BOILER 1 FILLET SW-02

2 COLUMN RIB PLATE(C21) BOILER 1 FILLET SW-01

3

4

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

AS WELDED

AS WELDED

Surface Temperature: 25 0C

Page 11: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/11

Drawing & Rev. No.: 114N541 Job No.: C25

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 07.09.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 COLUMN RIB PLATE(C25) BOILER 1 FILLET SW-02

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

AS WELDED

Surface Temperature: 25 0C

Page 12: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/12

Drawing & Rev. No.: 114N541 Job No.: C24,C26

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1

Package: STEEL STRUCTUR Date: 10.09.12

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 COLUMN RIB PLATE(C24) BOILER 1 FILLET SW-01

2 COLUMN RIB PLATE(C26) BOILER 1 FILLET SW-01

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

AS WELDED

AS WELDED

Surface Temperature: 25 0C

Page 13: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

LIQUID PENETRANT EXAMINATION REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/01

Drawing & Rev. No.: Job No.:

FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : ESP-1 Unit No: 1

Package: Date:

S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL

1 ESP-1 SW-

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.

Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL DEC TPCIL

Type of Joint

Welder No.

Surface Condition

Root Run / Back Gouging Clearance with Date

Final Run Clearance with Date

AS WELDED

Surface Temperature: 25 0C

Page 14: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

DRY PENETRANT TEST REPORT

Contractor Name: PMPL Report No: 73

Drawing & Rev. No.: Unit No: 2

Area / Location : ESP Date: /04/201

S.No. Description Area100% Weld visual Clearance 10% DPT Clearance

Results RemarksPMPL BGRESL DEC TPCIL PMPL BGRESL DEC TPCIL

1 BUTT

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE Cl-C-07-11-220

Penetrant : CHECKMATE 0211-73-P-94

Dwell Time: 5-10 minutes.Developer : CHECKMATE 0211-71-D-92

PMPL BGRESL DEC TPCIL

Type of Joint

Surface Condition

BOTTOM BEAM( 1 to 9 FIELDS)

ESP-2(PASS-B)

AS WELDED

Surface Temperature: 25 0C

Page 15: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

WELD VISUAL& DPT REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/01

Drawing & Rev. No.: 114N2141,114N2142,114N2143/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(OUT SIDE)

FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1

Package: BTG Date: 19-9-13

S.No. Description AreaWELD VISUAL DPT(10%)

RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL

1 FRONT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED

2 REAR ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED

3 RIGHT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED

4 LEFT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE CL-C-06-251/MAY-2015

Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.

Developer : CHECKMATE CL-D-06-253/JUN-2015

PMPL BGRESL DEC TPCIL

ELEVATION(MM)

Type of Joint

Surface Conditio

n

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

Surface Temperature: 30-400C

Page 16: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

WELD VISUAL& DPT REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/02

Drawing & Rev. No.: 114N1111,114N1112/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(OUT SIDE)

FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1

Package: BTG Date: 20-9-13

S.No. Description AreaWELD VISUAL DPT(10%)

RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL

1 FRONT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED

2 LEFT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED

3 RIGHT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE CL-C-06-251/MAY-2015

Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.

Developer : CHECKMATE CL-D-06-253/JUN-2015

PMPL BGRESL DEC TPCIL

ELEVATION(MM)

Type of Joint

Surface Conditio

n

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

Surface Temperature: 30-400C

Page 17: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

WELD VISUAL& DPT REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/03

Drawing & Rev. No.: 114N1131,114N1132,114N1134,114N1133,114N112/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(OUT SIDE)

FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1

Package: BTG Date: 20-9-13

S.No. Description AreaWELD VISUAL DPT(10%)

RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL

1 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED

2 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED

3 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED

4 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE CL-C-06-251/MAY-2015

Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.

Developer : CHECKMATE CL-D-06-253/JUN-2015

PMPL BGRESL DEC TPCIL

ELEVATION(MM)

Type of Joint

Surface Conditio

n

FRONT MIDDLE& LOWERWATER WALL

FILLET &BUTT

AS WELDED

REAR MIDDLE& LOWERWATER WALL

FILLET &BUTT

AS WELDED

RIGHT MIDDLE& LOWERWATER WALL

FILLET &BUTT

AS WELDED

LEFT MIDDLE& LOWERWATER WALL

FILLET &BUTT

AS WELDED

Surface Temperature: 30-400C

Page 18: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

WELD VISUAL& DPT REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/04

Drawing & Rev. No.: 114N2141,114N2142,114N2143/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(IN SIDE)

FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1

Package: BTG Date: 20-4-14

S.No. Description AreaWELD VISUAL DPT(10%)

RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL

1 FRONT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED

2 REAR ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED

3 RIGHT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED

4 LEFT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED

5 MIDDLE ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE CL-C-06-251/MAY-2015

Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.

Developer : CHECKMATE CL-D-06-253/JUN-2015

PMPL BGRESL DEC TPCIL

ELEVATION(MM)

Type of Joint

Surface Conditio

n

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

Surface Temperature: 30-400C

Page 19: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

WELD VISUAL& DPT REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/05

Drawing & Rev. No.: 114N1111,114N1112/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(IN SIDE)

FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1

Package: BTG Date: 20-5-14

S.No. Description AreaWELD VISUAL DPT(10%)

RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL

1 FRONT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED

2 LEFT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED

3 RIGHT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE CL-C-06-251/MAY-2015

Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.

Developer : CHECKMATE CL-D-06-253/JUN-2015

PMPL BGRESL DEC TPCIL

ELEVATION(MM)

Type of Joint

Surface Conditio

n

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

FILLET &BUTT

AS WELDED

Surface Temperature: 30-400C

Page 20: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

WELD VISUAL& DPT REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/06

Drawing & Rev. No.: 114N1131,114N1132,114N1134,114N1133,114N112/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(IN SIDE)

FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1

Package: BTG Date: 20-5-14

S.No. Description AreaWELD VISUAL DPT(10%)

RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL

1 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED

2 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED

3 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED

4 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE CL-C-06-251/MAY-2015

Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.

Developer : CHECKMATE CL-D-06-253/JUN-2015

PMPL BGRESL DEC TPCIL

ELEVATION(MM)

Type of Joint

Surface Conditio

n

FRONT MIDDLE& LOWERWATER WALL

FILLET &BUTT

AS WELDED

REAR MIDDLE& LOWERWATER WALL

FILLET &BUTT

AS WELDED

RIGHT MIDDLE& LOWERWATER WALL

FILLET &BUTT

AS WELDED

LEFT MIDDLE& LOWERWATER WALL

FILLET &BUTT

AS WELDED

Surface Temperature: 30-400C

Page 21: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

WELD VISUAL& DPT REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/13

Drawing & Rev. No.: 114N541-2,114N541-3,114N541-4/REV.0 Job No.:

FQA & Rev. No.: DEC-T-FQP-BOILER-001/REV.0 Area / Location : BOILER Unit No: 1

Package: BTG Date: 10/12/2013

S.No. Description Area QUANTITYWELD VISUAL DPT(10%)

RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL

1 CELING GIRDER ANGLES B2 GIRDER 102 FILLET ACCEPTED ACCEPTED

2 CELING GIRDER ANGLES B3 GIRDER 84 FILLET ACCEPTED ACCEPTED

3 CELING GIRDER ANGLES B4 GIRDER 80 FILLET ACCEPTED ACCEPTED

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE CL-C-06-251/MAY-2015

Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.

Developer : CHECKMATE CL-D-06-253/JUN-2015

PMPL BGRESL DEC TPCIL

Type of Joint

Surface Conditio

n

AS WELDED

AS WELDED

AS WELDED

Surface Temperature: 30-400C

Page 22: Dpt Report - U1

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION INDIA LTD

PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam

Field Quality Record

WELD VISUAL& DPT REPORT

Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/07

Drawing & Rev. No.: 114N1111 Job No.: FRONT WATER WALL

FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1

Package: BTG Date: 30-3-15

S.No. Description Area

WELD VISUAL DPT(10%)

RemarksRESULT PMPL DEC TPCIL RESULT PMPL DEC TPCIL

1 21 MTR ACCEPTED ACCEPTED

Manufacturer / Brand Batch No. & Expiary Date

Cleaner : CHECKMATE CL-C-06-251/MAY-2015

Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.

Developer : CHECKMATE CL-D-06-253/JUN-2015

ELEVATION(MM)

Type of Joint

Surface Conditio

n

DEC PUNCH POINT UPDATED ON 28-3-15 IN S.NO-19

FRONT WATER WALL DAMGED TUBE BELOW BURNER NO-3(ELE

21 MTR)

FILLET &BUTT

AS WELDED

Surface Temperature: 30-400C