dpt report - u1
DESCRIPTION
ndtTRANSCRIPT
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/01
Drawing & Rev. No.: 114N5125 Job No.: B-74
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : ESP-1 Unit No: 1
Package: Date:
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 B-74 BOILER 1 FILLET SW-01
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/02
Drawing & Rev. No.: 114N5128 Job No.: B-20
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 02.05.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 B-20 BOILER 1 SW-02
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
FILLUP &GRINDI
NG
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/03
Drawing & Rev. No.: 114N5134 Job No.: B-104
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 18.05.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 B-104 BOILER 1 FILLET SW-02
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/04
Drawing & Rev. No.: 114N5133 Job No.: C-7,C-8,C-9
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 20.07.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 COLUMN RIB PLATE(C7) BOILER 1 FILLET SW-10
2 COLUMN RIB PLATE(C8) BOILER 1 FILLET SW-01
3 COLUMN RIB PLATE(C9) BOILER 1 FILLET SW-02
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
AS WELDED
AS WELDED
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/05
Drawing & Rev. No.: 114N5133 Job No.: C-12,C-13
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 25.07.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 COLUMN RIB PLATE(C12) BOILER 1 FILLET SW-02
2 COLUMN RIB PLATE(C13) BOILER 1 FILLET SW-02
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
AS WELDED
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/06
Drawing & Rev. No.: 114N541 Job No.: B-2(CELING GIRDER TOP)
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 26.07.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 HOOK 1 BOILER 1 FILLET SW-02
2 HOOK 2 BOILER 1 FILLET SW-01
3 HOOK 3 BOILER 1 FILLET SW-02
4 HOOK 4 BOILER 1 FILLET SW-01
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
AS WELDED
AS WELDED
AS WELDED
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/07
Drawing & Rev. No.: 114N541 Job No.: C16,C17
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 30.07.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 COLUMN RIB PLATE(C16) BOILER 1 FILLET SW-02
2 COLUMN RIB PLATE(C17) BOILER 1 FILLET SW-02
3
4
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
AS WELDED
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/08
Drawing & Rev. No.: 114N541 Job No.: B-3 GIRDER TOP
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 02.08.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 HOOK 1 BOILER 1 SW-02
2 HOOK 2 BOILER 1 SW-02
3 HOOK 3 BOILER 1 SW-02
4 HOOK 4 BOILER 1 SW-02
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
FILLET+ GROOVE
AS WELDED
FILLET+ GROOVE
AS WELDED
FILLET+ GROOVE
AS WELDED
FILLET+ GROOVE
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/09
Drawing & Rev. No.: 114N541 Job No.: B-4 GIRDER TOP
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 04.08.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 HOOK 1 BOILER 1 SW-02
2 HOOK 2 BOILER 1 SW-02
3 HOOK 3 BOILER 1 SW-02
4 HOOK 4 BOILER 1 SW-02
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
FILLET+ GROOVE
AS WELDED
FILLET+ GROOVE
AS WELDED
FILLET+ GROOVE
AS WELDED
FILLET+ GROOVE
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/10
Drawing & Rev. No.: 114N541 Job No.: C20,C21
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 16.08.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 COLUMN RIB PLATE(C20) BOILER 1 FILLET SW-02
2 COLUMN RIB PLATE(C21) BOILER 1 FILLET SW-01
3
4
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
AS WELDED
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/11
Drawing & Rev. No.: 114N541 Job No.: C25
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 07.09.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 COLUMN RIB PLATE(C25) BOILER 1 FILLET SW-02
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/12
Drawing & Rev. No.: 114N541 Job No.: C24,C26
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : BOILER Unit No: 1
Package: STEEL STRUCTUR Date: 10.09.12
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 COLUMN RIB PLATE(C24) BOILER 1 FILLET SW-01
2 COLUMN RIB PLATE(C26) BOILER 1 FILLET SW-01
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
AS WELDED
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
LIQUID PENETRANT EXAMINATION REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/LP/01
Drawing & Rev. No.: Job No.:
FQAP & Rev. No.:DEC-T-FQP-BOILER-001 Area / Location : ESP-1 Unit No: 1
Package: Date:
S.No. Description Area Joint No. Results RemarksPMPL BGRESL TPCIL PMPL BGRESL TPCIL
1 ESP-1 SW-
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94Dwell Time: 5-10 minutes.
Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL DEC TPCIL
Type of Joint
Welder No.
Surface Condition
Root Run / Back Gouging Clearance with Date
Final Run Clearance with Date
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
DRY PENETRANT TEST REPORT
Contractor Name: PMPL Report No: 73
Drawing & Rev. No.: Unit No: 2
Area / Location : ESP Date: /04/201
S.No. Description Area100% Weld visual Clearance 10% DPT Clearance
Results RemarksPMPL BGRESL DEC TPCIL PMPL BGRESL DEC TPCIL
1 BUTT
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE Cl-C-07-11-220
Penetrant : CHECKMATE 0211-73-P-94
Dwell Time: 5-10 minutes.Developer : CHECKMATE 0211-71-D-92
PMPL BGRESL DEC TPCIL
Type of Joint
Surface Condition
BOTTOM BEAM( 1 to 9 FIELDS)
ESP-2(PASS-B)
AS WELDED
Surface Temperature: 25 0C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/01
Drawing & Rev. No.: 114N2141,114N2142,114N2143/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(OUT SIDE)
FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1
Package: BTG Date: 19-9-13
S.No. Description AreaWELD VISUAL DPT(10%)
RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL
1 FRONT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED
2 REAR ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED
3 RIGHT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED
4 LEFT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE CL-C-06-251/MAY-2015
Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.
Developer : CHECKMATE CL-D-06-253/JUN-2015
PMPL BGRESL DEC TPCIL
ELEVATION(MM)
Type of Joint
Surface Conditio
n
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
Surface Temperature: 30-400C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/02
Drawing & Rev. No.: 114N1111,114N1112/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(OUT SIDE)
FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1
Package: BTG Date: 20-9-13
S.No. Description AreaWELD VISUAL DPT(10%)
RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL
1 FRONT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED
2 LEFT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED
3 RIGHT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE CL-C-06-251/MAY-2015
Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.
Developer : CHECKMATE CL-D-06-253/JUN-2015
PMPL BGRESL DEC TPCIL
ELEVATION(MM)
Type of Joint
Surface Conditio
n
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
Surface Temperature: 30-400C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/03
Drawing & Rev. No.: 114N1131,114N1132,114N1134,114N1133,114N112/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(OUT SIDE)
FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1
Package: BTG Date: 20-9-13
S.No. Description AreaWELD VISUAL DPT(10%)
RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL
1 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED
2 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED
3 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED
4 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE CL-C-06-251/MAY-2015
Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.
Developer : CHECKMATE CL-D-06-253/JUN-2015
PMPL BGRESL DEC TPCIL
ELEVATION(MM)
Type of Joint
Surface Conditio
n
FRONT MIDDLE& LOWERWATER WALL
FILLET &BUTT
AS WELDED
REAR MIDDLE& LOWERWATER WALL
FILLET &BUTT
AS WELDED
RIGHT MIDDLE& LOWERWATER WALL
FILLET &BUTT
AS WELDED
LEFT MIDDLE& LOWERWATER WALL
FILLET &BUTT
AS WELDED
Surface Temperature: 30-400C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/04
Drawing & Rev. No.: 114N2141,114N2142,114N2143/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(IN SIDE)
FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1
Package: BTG Date: 20-4-14
S.No. Description AreaWELD VISUAL DPT(10%)
RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL
1 FRONT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED
2 REAR ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED
3 RIGHT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED
4 LEFT ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED
5 MIDDLE ENCLOSURE WALL BACK PASS 77300-56400 ACCEPTED ACCEPTED
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE CL-C-06-251/MAY-2015
Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.
Developer : CHECKMATE CL-D-06-253/JUN-2015
PMPL BGRESL DEC TPCIL
ELEVATION(MM)
Type of Joint
Surface Conditio
n
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
Surface Temperature: 30-400C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/05
Drawing & Rev. No.: 114N1111,114N1112/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(IN SIDE)
FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1
Package: BTG Date: 20-5-14
S.No. Description AreaWELD VISUAL DPT(10%)
RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL
1 FRONT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED
2 LEFT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED
3 RIGHT WATER WALL WATER WALL 77300-55126.2 ACCEPTED ACCEPTED
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE CL-C-06-251/MAY-2015
Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.
Developer : CHECKMATE CL-D-06-253/JUN-2015
PMPL BGRESL DEC TPCIL
ELEVATION(MM)
Type of Joint
Surface Conditio
n
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
FILLET &BUTT
AS WELDED
Surface Temperature: 30-400C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/06
Drawing & Rev. No.: 114N1131,114N1132,114N1134,114N1133,114N112/REV.0 Job No.: FIN TO FIN AND FIN TO TUBE WELD(IN SIDE)
FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1
Package: BTG Date: 20-5-14
S.No. Description AreaWELD VISUAL DPT(10%)
RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL
1 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED
2 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED
3 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED
4 WATER WALL 55126.2-10300 ACCEPTED ACCEPTED
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE CL-C-06-251/MAY-2015
Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.
Developer : CHECKMATE CL-D-06-253/JUN-2015
PMPL BGRESL DEC TPCIL
ELEVATION(MM)
Type of Joint
Surface Conditio
n
FRONT MIDDLE& LOWERWATER WALL
FILLET &BUTT
AS WELDED
REAR MIDDLE& LOWERWATER WALL
FILLET &BUTT
AS WELDED
RIGHT MIDDLE& LOWERWATER WALL
FILLET &BUTT
AS WELDED
LEFT MIDDLE& LOWERWATER WALL
FILLET &BUTT
AS WELDED
Surface Temperature: 30-400C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/13
Drawing & Rev. No.: 114N541-2,114N541-3,114N541-4/REV.0 Job No.:
FQA & Rev. No.: DEC-T-FQP-BOILER-001/REV.0 Area / Location : BOILER Unit No: 1
Package: BTG Date: 10/12/2013
S.No. Description Area QUANTITYWELD VISUAL DPT(10%)
RemarksRESULT PMPL BGRESL TPCIL RESULT PMPL BGRESL TPCIL
1 CELING GIRDER ANGLES B2 GIRDER 102 FILLET ACCEPTED ACCEPTED
2 CELING GIRDER ANGLES B3 GIRDER 84 FILLET ACCEPTED ACCEPTED
3 CELING GIRDER ANGLES B4 GIRDER 80 FILLET ACCEPTED ACCEPTED
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE CL-C-06-251/MAY-2015
Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.
Developer : CHECKMATE CL-D-06-253/JUN-2015
PMPL BGRESL DEC TPCIL
Type of Joint
Surface Conditio
n
AS WELDED
AS WELDED
AS WELDED
Surface Temperature: 30-400C
BGR ENERGY SYSTEMS LTD
Customer: THERMAL POWERTECH CORPORATION INDIA LTD
PROJECT : 2 X 660 MW, Supercritical Power Project, Krishnapatnam
Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name: PMPL Report NoTPCIL/BGRESL/PMPL/DPT/07
Drawing & Rev. No.: 114N1111 Job No.: FRONT WATER WALL
FQA & Rev. No.: DEC-T-FQP-BOILER-002/REV.0 Area / Location : BOILER Unit No: 1
Package: BTG Date: 30-3-15
S.No. Description Area
WELD VISUAL DPT(10%)
RemarksRESULT PMPL DEC TPCIL RESULT PMPL DEC TPCIL
1 21 MTR ACCEPTED ACCEPTED
Manufacturer / Brand Batch No. & Expiary Date
Cleaner : CHECKMATE CL-C-06-251/MAY-2015
Penetrant : CHECKMATE CL-P-01-246/MAY-2015Dwell Time: 5-10 minutes.
Developer : CHECKMATE CL-D-06-253/JUN-2015
ELEVATION(MM)
Type of Joint
Surface Conditio
n
DEC PUNCH POINT UPDATED ON 28-3-15 IN S.NO-19
FRONT WATER WALL DAMGED TUBE BELOW BURNER NO-3(ELE
21 MTR)
FILLET &BUTT
AS WELDED
Surface Temperature: 30-400C