DAILY REPORTFROM SITE

DAILYREPORTFROM SITE

S.No:45 Date 25.02.2013Site: M/s Baldev alloys pvt. LTD.Vwta020,VWHA052,053,054

1.Details of communications received on (E-mail, Fax, Courier, Post, by hand etc.,):Nil.

2.Details of communications sent to HO on:Nil.

3.Details of consignments / materials received from HO / others:Nil.

4.Details of payments received from HO / others:Nil.

5.Attendance with details

5.1Staff (VEESONS):MR.M.E.MANIKANDAN(2141)Mr. DINESH KUMAR.S (1832)

5.2Contract Workers (Contractor wise):Utkal Engineers: Boiler: Supervisor:01 IBR Welder -00;Fitter-05;Welder-06; Riger-05;grinder-0 Helper-07(Total=24)

6.Important brief feedback about Fabrication / Erection / Commissioning (delay with reference to schedule, major problems etc.,):1.contractor man power shortage2. Radiography film required from contractor.3.customer side insert plates

7.Materials, documents, payments urgently required from HO with details:

8.Any urgent / important site complaints: UTKAL Engineering Should be increasing his manpower. Utkal engineering tools & tackles Shortage.(welding machine & cutting set, Grinding machine)

Site status:VWTA020 BOILER:

Work started time: 08-00AM work end time: 8-00PM1) Roof truss purlin material shifting work u/p.2) Temporary supports cutting work u/p.3) Non IBR drain piping fit up work u/p.4) Air heater casing balance stretch welding completed.

ESP; 1) ESP sealing roof erection work u/p.2) Field alignment checking work U/P.

Prepared by (Name): M.E.MANIKANDANSignature:Staff No : 2141

Checked & Approved by (Name) :M.E.MANIKANDANSignature:Staff No. :2141