YSGOL GYFUN GWYNLLYW
DESIGN BROCHURE
urban designarchitecture
interior design
(Presented 12th October 2009)
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
This document has been prepared by:
Dr Antony DaviesAssociatePowell Dobson ArchitectsCharterhouseLinks Business ParkSt MellonsCardiff CF3 0LT
Tel. 029 2079 9699Email [email protected]
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
CONTENTS
SECTiON 01:Assessment
1.1 Existing Site Plan
1.2 Existing Site Section
1.3 Building Concept
SECTiON 02:Evaluation
2.1 Constraints & Opportunities
2.2 Site Concept / Building Concept
3.1 Proposed Site Plan
3.2 Proposed Site Axonometric
3.3 Proposed Site Sections
3.4 Dining Hall Plans
3.5 Teaching Block Plans
SECTiON 03:Design Proposals
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Existing Site Plan
G2616 (SK) 22
Sports Facility
Staff Parking
Lilian Jones Block
Main Building
Science Block
N
Playing Fields
ProposedHard Playing Area
Refurbished All Weather Area ?
Existing Hard Play Area
ProposedCoach Park
107.8
97.5
97.5
93.1
96.4
92.0
95.0
90.0
Aerial view
Temporary accomodation
Lilian Jones Building
Main Building
Science Block
Main Hall
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Existing Site Sections
G2616 (SK) 23
92.0
85.0
93.1
97.5107.8
107.8
97.595.0
90.0
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Outline Brief
In order to create a school capable of catering for 1100 pupils, the following alterations need to take place to closer match accommodation scheduled out in BB 98.
· Creation of new coach park (by Torfaen CBC).
· Creation of new teaching accommodation in two new build blocks (Phase Two Teaching & Phase 3 Dining blocks).
· Refurbishments of existing facilities to bring existing accommodation (including possibly re roofing).
· Create new dining facility.
· Create new examination areas.
· Improve community use.
· Improve existing main entrance.
· Improve DDA access in central school campus area.
· Create separate Staff / Visitor & Pupil Entrance.
All the above aspiration to be met.-
· To an approved budget
· To relevant BREEAM standards.
· To an agreed timescale.
Building Concepts
G2616 (SK) 25
Teaching Core
Core Dining
Entry
Service
Teaching Core
EntryLilian Jones Block
Main Building
Science
Teaching BlockDining Block
Teaching
Core
Teaching
Teaching
Primary Circulation
Courtyard(Grass)
New Dining Block
New Teaching Block
Secondary Entrances
StaffParking
MainEntrances
Hard Play Area
Drop off / Visitor Parking
Proposed
KEY
Existing
Open Air Secondary Route
Covered Secondary Route
Primary Circulation Route
Entrance
Social Space / Focus
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Phase 1 - By Torfaen CBC
Kiers Scope of Works:
Phase 2 - Teaching Block. April 2011
Phase 3 - Dining Block. April 2012
Phase 4 - Existing Building Refurbished April 2013
Existing Building - No action
Phasing
G2616 (SK) 25
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Proposed Site Plan Level 1/2 Scale 1:500
G2616 (SK) 53
ramp
Lilian Jones Ground floor
Main BuildingGround floor
Science BlockLower ground floor
New Teaching Block Ground Floor
MainEntrance
Playing Fields
New Car Park(by others)
Lower floor
Proposed Coach Park(by others)
97.5
N
Existing Car Park
Science BlockGround floor
Entrance
Hall
New
cov
ered
lin
k
Existing
Proposed
KEY
97.0
97.5
98.5
96.4
97.5
94.0
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Proposed Site Plan Level 3 Scale 1:500
G2616 (SK) 54
ramp
Lilian Jones First floor
Main BuildingFirst floor
Science BlockLower ground floor
New Teaching Block First Floor
Entrance
Playing Fields
New Car Park(by others)
Upper floor
Proposed Coach Park(by others)
N
Existing Car Park
Science BlockFirst floor
Courtyard
Hall Roof
New
cov
ered
lin
k
Existing
Proposed
KEYNew Car Park
Proposed “Village”(by others)
To all weatherPlay areas
New Dining Block
97.5
97.0
97.5
98.5
96.4
97.5
94.0
100.0
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Proposed Site Plan Level 4 Scale 1:500
G2616 (SK) 55
Lilian Jones roof
Main Buildingroof
Science BlockLower ground floor
New Teaching Block roof
Playing Fields
New Car Park(by others) Proposed Coach
Park(by others)
100.0
97.4.75
93.1
103.0
N
Existing Car Park
Science Blockroof
Courtyard
Hall Roof
Existing
Proposed
KEYNew Car Park
Proposed “Village”(by others)
New Hard standing
New Dining BlockFirst floor
Existing Bowden Centre
Energycentre
New Car Park
Bin store
Lay by/deliveries
Possible location for temp accomodation
Possible location for temp accomodation
New path to Hard standing
To all weathercourts
Possible new path to Bowden Centre
Exis
ting
rig
ht o
f w
ay?
97.5
97.0
97.5
98.5
96.4
97.5
94.0
105.0
108.0
104.0
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Proposed Site Axonometric - Public Space
G2616 (SK) 26
New Teaching Block
New Dining Block
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Proposed Site Sections
G2616 (SK) 27
92.0
85.0
93.1
97.5107.8
107.8
97.595.0
90.0
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Courtyard Option B 1:200
G2616 (SK) 35
Existing Lilian Jones Building
To Playing Fields
New Dining Block
Entr
ance
Ramp
From Car Park?
Exi
t
Existing DiningExisting Main Block
Axi
s of
Ver
tica
l Circu
lation a
nd
Exi
stin
g E
ntr
ance
Link
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Teaching Block - Ground Floor 1:200
G2616 (SK) 47
GIA: 1021 m2
Total: 2062 m2
Incoming services
Staff WC
Hygiene
57 m2
Dis
57 m2
Teach
57 m2 57 m2
Science
90 m2
C/C
St.
Year Head
Potential Ramp
Staff WC
St.
Teach Teach Teach
Year HeadTeach Teach Teach
57 m2 57 m2 57 m2
Exit / Entrance26 Linear Meters of Lockers
void above void abovevoid above
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Teaching Block First Floor 1:200
G2616 (SK) 48
GIA: 1021 m2
Total: 2062 m2
Year Head
Senco
30 Linear Meters of Lockers
SenGroup
Staff WC
Hygiene
57 m2Dis
57 m2
Teach
57 m2 57 m2
Science
90 m2
C/C
St. Staff WC
St.
Teach Teach Teach
Teach Teach Teach
57 m2 57 m2 57 m2
void voidvoid
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Dining Block Ground Floor 1:200
G2616 (SK) 49
GIA: 858 m2
Total: (2060 m2)
Dept. St.
Year Head
Year Head
Dept. St.57 m2 57 m2
Teach
90 m2
106 m2
Teach
Art
Tech Food
Riser Riser
100 m2
Art
St.
Dark
Inc
St.
Kilm
Pupil Toilet
Pupil Toilet
DisToilet
YSGOL GYFUN GWYNLLYW
urban designarchitecture
interior design
Dining Block First Floor 1:200
G2616 (SK) 50
GIA: 1175 m2
Total: (2060 m2)
63 m2
106 m2
Music
Tech Resilient Materials
Void
135 m2
Kitchen
St. Staff Toilet
Chair St.20 m2
Staff Toilet
Pupil Toilet
Pupil Toilet
20 m2
242 m2
Dining
90 m2
Drama
St.
25 m2
C/C
90 m2
Tech Graphics
63 m2
Music
20 m2
MusicSt.
MusicPractice
MusicPractice
MusicPractice