Yokogawa Electric Corporation
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Yokogawa Upstream SolutionsOct 29, 2004
Yokogawa Upstream Industry SolutionsPage.2
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Upstream
Downstream
Various upstream applications
Offshore
Onshore
Pipeline
Yokogawa Upstream Industry SolutionsPage.3
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Customer Challenges
Do you need to reduce investment?– Integration of commercial and industrial systems– Appropriate network fit for purpose
Our Solutions• Control system with proven open architecture• Fieldbus technology reduces wiring and transmitters• Robust and flexible communication between SCADA and
controller
Does high operation cost trouble you?– More effective production, more accurate metering– Avoid failure or accidents in operation
Our Solutions• Remote operation and remote maintenance • Digital sensing, multi variable sensing• Emergency shutdown system• Integrated safety and control system• PRM Asset Management System
Yokogawa Upstream Industry SolutionsPage.4
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Upstream Market Strategy
Oil & Gas Market Demands More Competition– Move forward to improve upstream rather than downstream.
Increased Demands For More Efficient Operation– Move forward to secured, autonomous operation.
Our commitment is to help you succeed in meeting market demands““ ””
► Pipeline ► Onshore Production ► Offshore Installation
Yokogawa Upstream Industry SolutionsPage.5
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
► Various Field Instruments
► Remote Diagnosis
► Fail-over Communication
► Network Flexibility
► Event Driven
Communication
► Gas Flow Measurement
► Gas Analysis System
► Security
► Flow Calculation
► Composition Analysis
► Compressor Control
► Monitoring the Metering Station
► Blocked Impulse Line Detection
Pipeline
Application Proof
► Sakhalin II
* Click ► to see more details
► For Pipeline
Yokogawa Upstream Industry SolutionsPage.6
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
► Various Field Instruments
► Remote Diagnosis
► Fail-over Communication
► Network Flexibility
► Gas Analysis System
► Integrated Safety System
► Gas Lift Optimization (Injection Control)
– Thermal Recovery
► Composition Analysis
► Pumping Unit Maintenance
Onshore Production
Application Proof
► Wellhead for Shell Nigeria
► Wellhead for PDO
► Enraf Tank Gauge Application
* Click ► to see more details
► For Onshore Production
Yokogawa Upstream Industry SolutionsPage.7
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
– Control System
► Various Field Instruments
► Gas Analysis System
► Integrated Safety System
– SCADA – Safety Operation
Offshore Installation
► Gas Lift Optimization (Injection Control)
– Thermal Recovery
► Composition Analysis
– Gas Separation
– Offshore Platform Level Control
– Steam Generation
Application Proof
► FPSO for Vanguard SPC
► FPSO
► Subsea Equipment
* Click ► to see more details
► For Offshore Installation
Yokogawa Upstream Industry SolutionsPage.8
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Applications Adopted In Upstream Industry
Yokogawa Upstream Industry SolutionsPage.9
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Flow Calculation
Support AGA Calculation– Orifice plate (Flange taps or Pipe taps) metering of natural gas : AGA3, AGA8– Turbine metering of natural gas : AGA7, AGA8– Historian : 35 days daily average data
Pressure and DifferentialPressure for AGA3
Full digital calculation
Gas ChromatographYokogawa GC1000
Gas CompositionFor AGA8
FF-H1(Redundant)
Modbus
Differential Pressure TransmitterYokogawa EJX
Control System
► For Pipeline
Yokogawa Upstream Industry SolutionsPage.10
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Composition Analysis
Robust– FM approved (Class1 Division 1)– Drip proof, Dust proof design (NEMA3R IP52)– Wide operation condition (-10 to 50 Deg)
Unique and Reliability– Accurate and low air consumption air bath oven – Reliable and easy maintenance sample valves– Stable carrier gas flow because of the regulator in the oven
High Sensitivity TCD and Wide Range Application Capability– Can cover FID application– PIONA (ASTM D5134) – Simdis (ASTM D3710)
Upstream composition analysis requires the suitable gas chromatograph for its location.
► For Pipeline
► For Onshore Production
► For Offshore Installation
Yokogawa Upstream Industry SolutionsPage.11
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Composition Analysis - Example
GC1000
Component Range
N2 0-10%
CO2 0-10%
methane 0-100%
ethane 0-10%
propane 0-5%
butane 0-2%
isobutane 0-2%
pentane 0-1%
isopentane 0-1%
neopentane 0-1%
C6+ 0-1%
► For Pipeline
Yokogawa Upstream Industry SolutionsPage.12
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Compressor Control
For Efficient Compressor Control– Control compressor number according to the gas or oil demands.– Control the speed by throttling, diverting the outflow.
For Stable Supply– Control gas supply from the underground tank to meet the
demands in the wintertime.– Control gas storage to store surplus gas to underground tank in the
summertime.
Control SystemSCADA
► For Pipeline
Yokogawa Upstream Industry SolutionsPage.13
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Monitoring the Metering Station
Metering StationMetering Station
Metering StationMetering Station
SCADA Controller as a Remote Monitoring unit
Recorder
Integrated monitoring of quite a few metering station in the geographically distributed area.
– Distributed metering station in every 10 miles– Slow communication environment in the hazard area– Recording the data of unmanned station.
Differential pressure transmitter
► For Pipeline
Yokogawa Upstream Industry SolutionsPage.14
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Blocked Impulse Line Detection
More than 30% of trouble related with Orifice flow meter is caused by the blocked impulse legs.
– The blocked impulse lines slows down the transmitter’s response time.– The blocked impulse lines cause the change of the fluctuation signals.– The blocked impulse lines can be detected by watching the fluctuation.
Impulse lines flow
Online Diagnosis for Impulse Line Blocking– Accurate Diagnosis is completed by comparing
the present state with the reference state.– Efficient Diagnosis helps saving maintenance
costs providing diagnostic functions through analyzing the statistical values of the fluctuation.
PL
PH
For Accuracy and Safety Measurement
► For Pipeline
Yokogawa Upstream Industry SolutionsPage.15
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Gas Lift Optimization (Injection Control)
Remote Diagnose
– Monitor the injection pressure from remote site– Change the FF transmitter parameter from remote site– Optimize the injection pressure from remote site
FI TI
PI
Oil & Gas out
High Pressure Gas in
InjectionPressure
Optimization
Metering Flow Calculation
PI
FI
Remote Diagnosis
Production Sand
Control SystemDifferential pressure transmitter
► For Onshore Production
► For Offshore Installation
Yokogawa Upstream Industry SolutionsPage.16
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Pumping Unit Maintenance
Maintenance of the Mechanical Parts– Preventive maintenance – Emergency notice– Analyze the breakdown
Avoid the Pump Damage– Monitor the motor speed and the current– Control motor speed– Stop the pump in emergency
Control SystemFIF Monitoring Package
► For Onshore Production
Yokogawa Upstream Industry SolutionsPage.17
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Various Field Instruments
For Tank Level Control
For Orifice Pipeline
Different pressure andpressure transmitter
Coriolis Meter
Vortex Flow Meter
Gas Lift
Ultrasonic Flow Meter
Various Field Instruments for Various Applications► For Pipeline
► For Onshore Production
► For Offshore Installation
Yokogawa Upstream Industry SolutionsPage.18
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Plant Resource Manager (PRM)
Reduction of maintenance cost contributes further reduction of TCO.– Diagnostic information extends maintenance cycle.– Computerizing maintenance data and operations
improves efficiency of maintenance management.
PRM supports unmanned and/or remote operation. (e.g. Off-shore application)– Various diagnostic information enables remote
diagnosis of field devices.– PRM supports maintenance work schedule settings.
PRM realizes a total asset management system.– Vertical Integration from Sensor Level to ERP can be
offered.
Yokogawa Upstream Industry SolutionsPage.19
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Remote Diagnosis
The multiple and distributed pipeline devices are managed from remote
– Calibration management– Alarm and status notification– Loop diagnostics– Preventive maintenance
Asset Management System
Diagnosis Data• Total cycle count of stem• Total travel distance of stem• Total open / close time
Fieldbus Alert•High / Low alarm•Sensor failure•Cycle count exceeds limit
Ethernet
FF-H1
Cellular / PDAMail server
Alarm notification via e-mail
► For Pipeline
► For Onshore Production
Yokogawa Upstream Industry SolutionsPage.20
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Upstream network is not reliable – The communication is easily affected by the weather or other
environment.– The network device has low band– The network devices are sometimes not good quality.
Fail-Over Communication
The data is never lost– The precious data is stored in the controller.– Data is sent to SCADA when the communication recovers.– SCADA system shows them as sequential data
However
► For Pipeline
► For Onshore Production
Yokogawa Upstream Industry SolutionsPage.21
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Communication system of upstream application have wide variety.– Region’s infrastructure– Companies infrastructure– Commodity network
GSM
Microwave Radio
Satellite
Wireless LAN
Internet / Intranet
Public telephone line
Network Flexibility
The data is sent via any network
However
► For Pipeline
► For Onshore Production
Yokogawa Upstream Industry SolutionsPage.22
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Event Driven Communication
Event driven communication benefits:– No event, no communication– Low bandwidth communication lines can be used– Tune communication to requirements and availability of bandwidth
Four different types of operation:– Digital:
• No event, no communication at all times• No event, yet every fixed period of time data transmitted to FAST/TOOLS
SCADA
– Analog:• Data changes within bandwidth, no update at all times• Data changes within bandwidth, yet every fixed period of time data
transmitted to FAST/TOOLS SCADA
► For Pipeline
Yokogawa Upstream Industry SolutionsPage.23
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Gas Flow Measurement
Requirements for Application– High Accuracy under actual application conditions
• Temperature change : -10 to 50 ℃• Static Pressure change: 0 to 350kgf/cm2
Solution– DP Harp EJA130A, high static differential pressure
transmitter
Static Pressure and Temp. Effect (Zero Error)
► For Pipeline
EJA EJX
Yokogawa Upstream Industry SolutionsPage.24
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Gas Analysis System
Unique and Reliable Hardware– Accurate and low air consumption air bath oven – Reliable and easy maintenance sample valves– Stable carrier gas flow because of the regulator in the oven– Low TCO because of highly reliable hardware
High Sensitivity TCD – Can cover FID application– Save utility gases and easy maintenance
Wide Range Application Capability– PIONA (ASTM D5134) – Simdis(ASTM D3710)
Process Gaschromatograph GC1000 has stable and wide range temperature oven , highly sensitivity detectors and high reliable valves.
► For Pipeline
► For Onshore Production
► For Offshore Installation
Yokogawa Upstream Industry SolutionsPage.25
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Security
Necessity of Security Management of Pipeline Stations
– Threats• Intruders• Robbery and burglary• Accidents/Emergency• Fire• Natural disasters
“Surveillance Camera” is our Solution– Video data monitoring / recording– Alarming / Paging– Camera control to preset positions by intruder detection
• Microwave sensor, Infrared sensor• Electric field/electromagnetic field sensor• Taut wire sensor, Trap sensor• Mercury switch sensor/ Vibration sensor• Piezoelectric sensor• Video sensor, image data processing
► For Pipeline
Yokogawa Upstream Industry SolutionsPage.26
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Integrated Safety System
Monitoring and operation of control and safety system are integrated with FAST / TOOLS
Prosafe-PLCSIL 1-3
Prosafe-SLSSIL 3-4
Safety System
CS3000
Different Pressure & Pressure TransmitterSIL2
Stardom
Control System
► For Onshore Production
► For Offshore Installation
Yokogawa Upstream Industry SolutionsPage.27
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Case Studies
Yokogawa Upstream Industry SolutionsPage.28
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Success Story: FPSO for Vanguard SPC
Customer Challenges– Several tasks in parallel during detailed engineering. – Modification without interrupting the production.
Customer: TotalFinaElf Project : GIRASSOL FPSO Completion: Dec., 2001Application: FPSO
Customer: TotalFinaElf Project : GIRASSOL FPSO Completion: Dec., 2001Application: FPSO
The ability to perform modifications on-line is an essential factor in ensuring uninterrupted production.
Results– With Yokogawa’s intelligent system architecture, modifications was carried out online and single
modifications downloaded without stopping production.
System Configuration– DCS: CENTUM CS– Vortex Flow Meter: YEWFLO
► For Offshore Installation
Yokogawa Upstream Industry SolutionsPage.29
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Case Study: Offshore Platform
Customer Challenges– Complete Yokogawa’s solution covering from procurement to lifetime
maintenance– The integration of safety shutdown system and control system
Application: FPSOApplication: FPSO
Complete Yokogawa’s solution to FPSO using FOUNDATION Fieldbus technology and integration of control and safety system.
Results– Yokogawa offers complete solution covering from procurement to
lifetime maintenance – Yokogawa offers FOUNDATAION Fieldbus devices.– Yokogawa integrates the emergency shutdown system and control
system with SCADA.
System Configuration– SCADA: FAST/TOOLS
Controller: Stardom FCN (Redundant System)Emergency Shutdown System: Prosafe100Mbps Redundant Fiber Optics Network
Yokogawa Upstream Industry SolutionsPage.30
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Application Detail
System Capability– Yokogawa provided the integrated system of control and
emergency shutdown system.– Yokogawa provided the FOUNDATAION Fieldbus connection.– The Yokogawa solutions provide process, facilities and
safety control for the FPSO
Project Capability– Total system supply enables the customer ease of
procurement, engineering and maintenance.
► For Offshore Installation
Yokogawa Upstream Industry SolutionsPage.31
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Case Study: Subsea Equipment
Customer Challenges– FF technology in the field of subsea as the “Field of Future”
Application: Subsea MeteringApplication: Subsea Metering
The world’s first sub sea Foundation Fieldbus project
Results– This system is becoming the showcase for the
customer.
System Configuration– Controller: Stardom FCJ– Differential pressure and pressure transmitters: EJA
Yokogawa Upstream Industry SolutionsPage.32
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Application Detail
The worlds first sub sea Foundation Fieldbus project – Robust controller and FF device combination guides the
customer to the next generation advanced metering solutions.
Yokogawa’s products are highly suitable to the extreme location: – Since the oil & gas companies are going to explore more and
more extreme locations, facilities like control, metering and safety are also pushed into these extreme locations and the more robust products are required.
– Application reusability is required.
The formulas based on years of experience are encapsulated and ported from a PC platform into the Yokogawa’s controller. – This encapsulated formulas can be re-used as a library without
engineering.
► For Offshore Installation
Yokogawa Upstream Industry SolutionsPage.33
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Success Story: Wellhead for Shell Nigeria
Customer Challenges– Open architecture system incorporating FOUNDATION Fieldbus– Remote monitoring and control on a corporate LAN– New technology such as notifying an alarm via e-mail
For the Shell Petroleum Development Company of Nigeria (SPDC), STARDOM is playing a significant role in optimizing their oil production system and accounts for more than 50 percent of the country's oil and gas production.
Results– Open System Architecture, which incorporates FOUNDATIONTM Fieldbus, Java
technology and a Web-based operation interface. – Field is controlled from a remote location such as a PC on a corporate LAN,
incorporation of the FOUNDATION fieldbus interface.– System status and other information are notified to operator by e-mail.
System Configuration– Controller: Stardom FCN– SCADA: Web-based SCADA VDS
Customer: Shell Petroleum Development Company of Nigeria (SPDC) Application: Gas Lift Optimization
Customer: Shell Petroleum Development Company of Nigeria (SPDC) Application: Gas Lift Optimization
Yokogawa Upstream Industry SolutionsPage.34
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Field DevicesCustomized Function
Blocks
Alert e-mail Notification
E-mail ServerField Network
ALERT
FCN
Remote Operation & Monitoring
Alert e-mail Notification
On Web Browser
Operation & Monitoring
Office
Remote Operation &
MonitoringOn Web Browser
Headquarter
Site
STARDOM is fully compliant with Thin Client Technology
So, No special software is required for remote operation and monitoring.
On Web Browser
Web Based SCADA /
VDSData Acquisition & Saving
• Remote Control (unmanned operation)• e-Mail notification • Java
System Configuration in SPDC Nigeria
Yokogawa Upstream Industry SolutionsPage.35
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Testimonial
A process automation system provides operational flexibility, which also serves as an enabler for minimum intervention strategies, remote diagnostics capabilities, unmanned operations and a seamless integration with management information systems. The open technology allows SPDC to customize their process automation system without fearing integration problems and premature obsolescence, providing a scalable system to nurture the migration into an integrated oil/gas operation within SPDC. It is our firm belief that the systems architecture espoused is representative of best practices across the industry, taking into account enabling technologies using commodity type components in a world of competitive opportunities. Thus the benefits, attraction and appeal of applying open system architecture within SPDC are plainly evident and will result in the breakthrough performance stan
dards we aspire to achieve.
Mr. Dick WismeijerCorp. Head Instrumentation/ControlShell Petroleum Development Co.
A process automation system provides operational flexibility, which also serves as an enabler for minimum intervention strategies, remote diagnostics capabilities, unmanned operations and a seamless integration with management information systems. The open technology allows SPDC to customize their process automation system without fearing integration problems and premature obsolescence, providing a scalable system to nurture the migration into an integrated oil/gas operation within SPDC. It is our firm belief that the systems architecture espoused is representative of best practices across the industry, taking into account enabling technologies using commodity type components in a world of competitive opportunities. Thus the benefits, attraction and appeal of applying open system architecture within SPDC are plainly evident and will result in the breakthrough performance stan
dards we aspire to achieve.
Mr. Dick WismeijerCorp. Head Instrumentation/ControlShell Petroleum Development Co.
””
““► For Onshore Production
Yokogawa Upstream Industry SolutionsPage.36
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Case Study: Wellhead for PDO
Customer Challenges– Fit in to existing communication infrastructure– Acquisition enough information for FF-H1 device maintenance using SCADA from miles and
miles away– System integration – Safety, Controller and other devices on the same network
Customer: Petroleum Development Oman (PDO) Project: Harweel oilfield development project Customer: Petroleum Development Oman (PDO) Project: Harweel oilfield development project
Yokogawa’s total solution provides the integrated information from safety system, control system and field devices to the operator via existing communication infrastructure.
Results– Data acquisition via redundant optical fiber network which is the existing communication infrastructure.– With FAST/TOOLS(SCADA), the information from Prosafe-PLC(Safety System) and STARDOM FCN(Control
System) is integrated.– Information for FF-H1 device maintenance is managed with PRM
System Configuration– Controller as RTU: Stardom FCN– HMI and SCADA: FAST/TOOLS– Safety System: Prosafe-PLC– Asset Management: PRM
Yokogawa Upstream Industry SolutionsPage.37
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
PDO Head OfficePDO Head Office
Overview
Wellhead Remote Manifold Harweel Station
New Field
BV Station
Expansion of existing station
Bibra
Corporation Network
PRM
Yokogawa Upstream Industry SolutionsPage.38
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
ESD (Emergency Shudown System)and F&G system (Fire and Gas Safety System)
ProSafe-PLC
Field instruments
Asset ManagementPRM
Interface to existing EMS via OPC
Yokogawa Solution for PDO
SCADA integrating control system and safety system
FAST/TOOLS
Control SystemStardom FCN
•Fiber Optic connection to Harweel station
•Connection to PDO LAN through Firewall and FO converter
•Redundant Control & Safety networks
•Fiber Optic connection to Harweel station
•Connection to PDO LAN through Firewall and FO converter
•Redundant Control & Safety networks
Yokogawa Upstream Industry SolutionsPage.39
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
HMI Screen and The Actual Control Nest
Yokogawa Upstream Industry SolutionsPage.40
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Testimonial
STARDOM is a rugged control solution that can be used without cooling, provides a suite of remote capabilities like predictive maintenance and is simple to maintain.
By using STARDOM, we are able to save costs in maintenance and operation by minimizing the visits to wellheads, thus reducing HSE exposure for our operations staff.
Shihab Al-BarwaniEngineering Manager
Petroleum Development Oman
STARDOM is a rugged control solution that can be used without cooling, provides a suite of remote capabilities like predictive maintenance and is simple to maintain.
By using STARDOM, we are able to save costs in maintenance and operation by minimizing the visits to wellheads, thus reducing HSE exposure for our operations staff.
Shihab Al-BarwaniEngineering Manager
Petroleum Development Oman ””
““► For Onshore Production
Yokogawa Upstream Industry SolutionsPage.41
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Case Study: Pipeline in Sakhalin
Customer Challenges– Remote operating a pipeline under extreme ambient conditions– Avoid travel in these conditions as much as possible– Requires full remote operability of the control systems and high reliability &
availability
Results– Full scale FOUNDATAION Fieldbus technology– Integrated HMI environment with PCS system; Same Look and Feel– Set up local support base in Sakhalin island for training, commissioning and
maintenance work, involving Russian resources which will contribute to both business and the community.
Customer: Chiyotec Limited.Project: Sakhalin IILocation: Sakhalin Island, RussiaThe onshore oil and gas pipelines will run from Piltun in the north of Sakhalin Island via the Onshore Processing Facility. The two pipeline systems will each cover a distance of over 800 km.
Customer: Chiyotec Limited.Project: Sakhalin IILocation: Sakhalin Island, RussiaThe onshore oil and gas pipelines will run from Piltun in the north of Sakhalin Island via the Onshore Processing Facility. The two pipeline systems will each cover a distance of over 800 km.
SAKHALIN ENERGY awarded the big order to Yokogawa with the combination of STARDOM and Fast/Tools
Yokogawa Upstream Industry SolutionsPage.42
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Sakhalin II Location
OnshoreStabilization
Facility
Oil & Gas Export
TerminalGas Pipeline
Oil Pipeline
Russia
Japan
Sakhalin
Piltun
Annual Production Capacity of 9.6 million tons
Location: Sakhalin Island, RussiaThe onshore oil and gas pipelines will run from Piltun in the north of Sakhalin Island via the Onshore Processing Facility. The two pipeline systems will each cover a distance of over 800 km.
Yokogawa Upstream Industry SolutionsPage.43
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Sakhalin II System Configuration
POMSserver
EWS 1LDS
communicationbackbone
GDTRTU(1)
Local PCS systems- LUN-A - PA-B- BS#2 - LNG- OPF - PA-A
RTUtype 1(68)
RTUtype 2(39)
RTUtype4/5 (2)
Dual screenHIS
ExaOPC
FCS
Integrated HMI environment
EWS 2
PA-AOS
ExaOPC
FCS
printer
SEOCC
OPF
PA-ABlock valve stations
*
* *
Dual screenHIS
HMIEWS
FCS Dual screenOS
LNG
POMS scope
Redundant hardware
Simplex connection
Redundant connection
*
Out of POMS scope
BCV*
communicationbackbone
*
*
*
*
► For Pipeline
Yokogawa Upstream Industry SolutionsPage.44
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Case Study: Enraf Tank Gauge Application
Customer Challenges– The customer’s current communication & interface
product portfolio between tank gauging instruments and control room didn’t gather to control and open automation needs and needed completion
ENRAF has chosen STARDOM as the platform for open tank gauging systems for a number of typical applications within tank terminal automation and inventory management.
WW Headquarters: Delft - NL, subsidiary of Delft InstrumentsCurrent position: WW market leader in tank storage managementWorldwide: 11 regional offices, present in 60+ countriesApplication: Inventory Management, Communication Module
WW Headquarters: Delft - NL, subsidiary of Delft InstrumentsCurrent position: WW market leader in tank storage managementWorldwide: 11 regional offices, present in 60+ countriesApplication: Inventory Management, Communication Module
ResultsThe seamless combination of TCP/IP based open networks, various field networks such as FF-H1 and Modbus and OPC functionality of STARDOM meets the new market demandsIt enabled Enraf to realize flexible and advanced tank terminal automation solutions with major improvements on functionality and performance as well as connectivity and integration Back
► For Onshore Production
Yokogawa Upstream Industry SolutionsPage.45
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
First to MarketFirst to Market
Reduce Investmentwith combination of industrial and commercial products and system, more open and flexible system meets your desired application.
Best Quality, Best Productivity, Best ROI
Yokogawa provides the best solutions and knowledge for your upstream field, and Yokogawa can make you first to market.
Improve safetyby good combination of safety and control system through lifecycle operation make your system more safety than ever imagined.
Reduce Operational Costwith integration from MES to field instruments, operation efficiency will be dramatically improved.
Benefits as experienced by Yokogawa’s Upstream customers:
“Bottom line of upstream operation is safety. With combination of Yokogawa’s safety and control system, I can run my upstream field more relaxed and trusted.”
“Environment of upstream field is extreme and infrastructure is limited. Integrated system, which adopt to the existing infrastructure, fits our requirements.”
“The biggest benefit of Yokogawa, that I have never experienced, is the lifecycle service to run to the hazard upstream filed.”
Yokogawa Upstream Industry SolutionsPage.46
BMD-D0008Copyright © Yokogawa Electric CorporationOct 29, 2004
Thank you for your attention.