ETCS Level 2 Operational Concept
in Austria11th UIC ERTMS World Conference - Istanbul
April 2014Dr. Ruth HIERZER / Thales
Manfred PISEK / ÖBB-Infrastruktur AG
Ground Transportation SystemsGround Transportation Systems
Thales in Transportatio
n
A specialistin IT-based critical systems for Transport
Ground Transportation SystemsGround Transportation Systems
3 /
15% traction energy savings with optimised train management, equivalent to 100 family homes power consumption
15,754 km of track equipped with the Thales ETCS solutions
219,949 Thales rail field equipment installed worldwide
Thales Transportation Systems by the numbers
Ground Transportation SystemsGround Transportation Systems
4 /
Up to 500,000 control points supervised from a single OCC
Real-time video surveillance transmission to OCC from all transport modes
Over 50 million ticketing transactions in 100 cities processed daily by Thales
Thales Transportation Systems by the numbers
Ground Transportation SystemsGround Transportation Systems
5 / Strategic Targets Infrastructure Operations OeBB
Target network 2025+ represents a capable infrastructure for more trains, passengers, goods, and synchronised traffic.
Key Figures – Network 2012
5000 km of railroads
6500 trains per day
224 million passengers per year
113 million tons of goods per year
142 million km covered by trains
Key Figures – Network 2025+(according to traffic forecasts)
~ 4800 km of railroads
~ 9000 trains per day
~ 300 million passengers per year
~ 142 million tons of goods per year
~ 198 million km covered by trains
Reduced headway times - Efficient use of infrastructure Higher train speeds Synchronised traffic with well linked connections Energy efficiency
Source: N.Pausch, ÖBB-Inrastruktur AG
Ground Transportation SystemsGround Transportation Systems
6 /
Automatisation
Centralisation
ETCS deployment
Continued Electronic Interlocking rollout
Civil works related network adaptations and improvements
Main Pillars of Strategy Implementation
Ground Transportation SystemsGround Transportation Systems
7 / Integrated Operations - Automatisation
Timetabling
Process visualizationForecastingConflict detection
Automated operationCustomer informationAutomated shunting… and more
Safe & Secure Remote ControlRoute Control – Interlocking Work site protectionTrain Control – ETCS
Ground Transportation SystemsGround Transportation Systems
8 / Integrated Operations - Centralisation
5 Operation Control Centers (OCC) are responsible for the control and dispatching of the complete core network of the ÖBB
Increasingproductivity
Assuring the highest level of safety
Enhancing quality
Ground Transportation SystemsGround Transportation Systems
9 / Longterm Investment Strategy for Integrated Operations
2032 Objective: The operation control-strategy has
been implemented for the whole network
• the implementation is linked to projects within the future network 2025+
2012 The operation control-strategy is being implemented
• 1 integrated traffic management centre• 5 operation control centres
2005 Decision to implement the operation strategy at ÖBB
In 2032• approx. 1,700 employees
in network operations• Approx. 94 staffed local
operation sites• Approx. 145,000 Train km
covered per employee
In 2012• 3,170 employees
in network operations• 310 staffed local operation
sites • 51,000 Train km covered
per employee
Initial Position• 4,455 employees
in network operations• 530 staffed local operation
sites • 37,000 Train km covered per
employee
Source: N.Pausch, ÖBB-Infrastruktur AG
Ground Transportation SystemsGround Transportation Systems
10 / Austrian ERTMS/ETCS deployment strategy
ETCS Status 2014
Source: OeBB Infrastruktur AG
Ground Transportation SystemsGround Transportation Systems
11 / Austrian ERTMS/ETCS deployment strategy
Deployment Train Control – Target 2025
Source: OeBB Infrastruktur AG
Deployment ETCS under discussion
Deployment ETCS L2 decided
Rail Network OeBB
Ground Transportation SystemsGround Transportation Systems
12 / First ETCS Level 2 Project in Austria
First ETCS L2 implementation for Austrian Railways with two line sections on main railway corridor
Project duration: May 2009 – Dec 2012
First Putting into operation ETCS L2 in AustriaDecember 9th, 2012
Ground Transportation SystemsGround Transportation Systems
13 / OeBB‘s Operations Experience - Major Achievements
Significant travel time reduction: Vienna – Salzburg 2:20 h
2013: 1 Million Train KMs reached
Up to 270 trains/day with
speeds up to 230 km/h
2013: less than 200 delayminutes/month caused by ETCS
Ground Transportation SystemsGround Transportation Systems
14 /
o Involve experts with practical background from the very beginning
o Set a clear target with corresponding timeline and let them work – without intervention!
o Cooperate with suppliers as close as you can
o Necessity of clear and detailed operational and technical specifications
o Supplementary integrations lab for early system testing
Experience and recommendations