SYLLABUS CONTENT
December Edition2013
MINISTRY OF EDUCATION, MALAYSIAVOCATIONAL COLLEGE STANDARD CURRICULUMCOURSE INFORMATIONCOURSE NAME:BRICKWORKS
CODE NAME:WTP 202
LEVEL:1 SEMESTER 2
CREDIT UNIT:3.0
CONTACT HOUR:FACE TO FACE:5.0 HOURS/WEEK
NON FACE TO FACE:
COURSE TYPE:VOCATIONAL
PREREQUISITE:-
CORE REQUISITE:-
COURSE OUTCOMES:
At the end of the course , the students should be able to:-
1. identify and select materials
2. prepare mortar according to proportions
3. construct stretcher, English and Flemish bond wall in various forms with pointing and jointing
4. construct door and window opening on brick wall with rough and axe arches are constructed horizontally5. dismantle formwork
6. construct isolated piers and attached piers with the erection of coping and capping
7. construct paver, block and slab paver8. construct hollow block walls
9. lay off damp proof course in brickwork
COURSE DESCRIPTIONThis course is designed to give knowledge how to construct the building structures as brick walls in various form , arches , isolated and attached piers, construct brick paver , hollow block walls and slab paver.It also to explain what is the correct method how to construct and to select the suitable material. CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
1 SELECT MATERIALS 1.1 Establish proper materials for brick wall
1.1.1 List out the types of bricks according to work specification.1.1.2 Recognise proper types of bricks according to the specification using proper techniques
1.2 Evaluate the quality of materials
1.2.1 Test the quality of bricks according to the specification
1.3 Conduct testing of materials
1.3.1 Carry out testing of bricks according to the specification using proper techniques and methods
1.4 Conduct grading of materials
1.4.1 Carry out grading and testing of bricks according
to job specification
1.5 Organise materials for brick wall
1.5.1 Store the bricks in a safe place and condition according to the standard operating procedures1.5.2 Managed the bricks in accordance with manufacturer's instruction and specification
CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
2 PREPARE MORTAR
2.1 Identify types of mortar
2.1.1 Select the types of mortar required according to proportions
2.2 Identify materials for mortar
2.2.1 List out the materials for mortar according to work specification.2.2.2 Select the materials for mortar as required by drawing plan according to Job specification. 2.2.3 Describe the usage of the selected materials in accordance with manufacturer's instruction and specification
2.3 Confirm place for mixing
2.3.1 Select suitable place and proper method for mixing
2.4 Compose the required proportion
2.4.1 Measure the required proportion by weight and volume according to job specification
2.5 Compose mortar according to mixing ratio
2.5.1 Carry out mixing mortar by using hand and machine according to job specification
CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
3 CONSTRUCT STRETCHER,
ENGLISH AND FLEMISH BOND WALL IN
VARIOUS FORMS WITH POINTING AND JOINTING
3.1 Identify types of bonds
3.1.1 List out types of bonds according to work specification.3.1.2 Select the proper types of bonds required
according to job specification
3.2 Prepare required materials
3.2.1 Select the materials for brick wall as required by drawing plan according to Job specification. 3.2.2 Mix required mortar by proper procedures in accordance with manufacturer's instruction and the "Product Manual
3.3 Lay bricks in dry bonding3.3.1 Carry out dry bonding for brick wall by proper method according to job specification.
3.4 Mark the position of bricks with joint 3.4.1 Carry out marking position of bricks with joint as required according to job specification
3.5 Cut bricks where it is necessary
3.5.1 perform cutting bricks using proper tools and
equipment according standard procedure
.
3.6 Lay the first course of brick bonding and it consecutive layers up to the required height
3.6.1 Perform spreading , buttering and grouting of
mortar on bricks by proper technique and tools according to job specification
3.6.2 Carry out laying the first course of brick bonding and it consecutive layers up to the required height according to standard operational procedure
3.7 Measure level , plumb , gauge ,square and range
3.7.1 Carry out checking level , plumb gauge ,
square and range by using proper equipment
according to standard operational procedure
3.8 Maintain perpendicular joints and its
thickness
3.8.1 Carry out maintaining perpendicular joints and its thickness according to standard operational procedure
3.9 Identify types of pointing and jointing3.9.1 List out types of pointing and jointing according to work specification.3.9.2 Select pointing and jointing according to blue print / drawing plan
3.10 Maintain good finishing and
cleanliness
3.10.1 Acquire good finishing and cleanliness of the brick bonding according to standard operational procedure
CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
5. CONSTRUCT ROUGH
AND AXE ARCHES
5.1 Recognize Rough and axe arches5.1.1 Define arches and their functions according to manual specification .5.1.2 Describe types af arches and terms according to manual specification .5.1.3 Define Rough and axe according to standard requirement.
5.2 Specify the position of an arch
5.2.1 Mark the position of an arch by proper method
using approprite tools and equipment according to
job specification
5.3 Erect centering
5.3.1 Define centering and its functions according to manual specification .5.3.2 Fabricate the centering by proper material, method and tools according to job specification5.3.3 Erect temporary support for centering according to standard procedure.5.3.4 Place the centering into position by using wedges as required by drawing plan.
5.4 Set up wall with opening up to
springing level
5.4.1 Carry out wall construction with opening up to springing level according to job specification
5.4 Set up skew back where required
5.4.1 Erect skew back where required by proper method according to job specification
5.5 Perform voussiors sizing
5.5.1 Determine size of voussiors according
the drawing.
5.5.2 Cut voussiors to required size by proper
tools and equipment according to job specification
5.6 Set out the position of voussiors on centering
5.6.1 Carry out marking position of voussiors on centering according to standard procedure.
5.7 Lay voussiors in position using V shape joint with correct thickness
5.7.1 Carry out laying voussiors using V shape joint as required by drawing plan.
5.8 Maintain good finishing and cleanliness5.8.1 Acquire good finishing and cleanliness of the brick arches according to standard operational procedure
CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
6 DISMANTLE FORMWORK
6.1 Strip off bracing, strut and props to formwork
6.1.1 Carry out stripping off bracing, strut and props to formwork by using proper tools and equipment by referring to working schedule in sequence
6.2 Strip off formwork to any constructed structure
6.2.1 Carry out stripping off formwork to any constructed structure by referring to working schedule in sequence
6.3 Clean and stack for proper storage
6.3.1 Carry out cleaning and stacking for proper storage according to manufacture instruction
6.4 Clean working area from debris
6.4.1 Carry out cleaning working area from debris according to standard requirement.
CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
7 CONSTRUCT
ISOLATED PIERS
7.1 Recognize Isolated Pier7.1.1 Define Isolated Pier according to manual specification
7.2 Specify the position of Isolated Pier
7.2.1 Mark the position of an arch by proper method using approprite tools and equipment according to job specification
7.3 Lay bricks in dry bonding
7.3.1 Carry out dry bonding for Isolated Pier by proper method according to job specification.
7.4 Lay the first course of Isolated Pier and it consecutive layers up to the required height
7.4.1 Carry out spreading , buttering and grouting of
mortar on bricks by proper technique and tools according to job specification.
7.4.2 Carry out laying the first course of Isolated Pier and it consecutive layers up to the required height in required bond according to the standard operational procedure
7.5 Lay the consecutive courses up the
required height
7.5.1 Carry out laying the consecutive courses up the required height by using proper tools in required bond according to the standard operational procedure .
7.6 Measure level , plumb , gauge ,square and range
7.6.1 Carry out checking level , plumb gauge , square and range by using proper equipment according to standard operational procedure
7.7 Maintain good finishing and cleanliness
7.7.1 Acquire good finishing and cleanliness of the brick bonding according to standard operational procedure
CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
8. CONSTRUCT
ATTACHED PIERS
8.1 Recognise attached Pier8.1.1 Define attached Pier according to manual specification
8.2 Specify the position of attached Pier
8.2.1 Mark the position of an arch by proper method using approprite tools and equipment according to job specification
8.3 Lay bricks in dry bonding
8.3.1 Carry out dry bonding for attached Pier by proper method according to job specification.
8.4 Lay the first course of Isolated Pier and it consecutive layers up to the required height
8.4.1 Carry out spreading , buttering and grouting of
mortar on bricks by proper technique and tools according to job specification.
8.4.2 Carry out laying the first course of Isolated Pier and it consecutive layers up to the required height in required bond according to the standard operational procedure
8.5 Lay the consecutive courses up the
required height
8.5.1 Carry out laying the consecutive courses up the required height by using proper tools in required bond according to the standard operational procedure .
8.6 Measure level , plumb , gauge ,square and range
8.6.1 Carry out checking level , plumb gauge , square and range by using proper equipment according to standard operational procedure
8.7 Maintain good finishing and cleanliness
8.7.1 Acquire good finishing and cleanliness of the brick bonding according to standard operational procedure
CONTENT AND LEARNING STANDARDSPROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
9. ERECT COPING AND CAPPING ON BRICKWORK9.1 Recognise coping and capping
9.1.1 Define coping and capping and their functions according to manual specification .
9.1.2 Describe types of coping and 9.1.2 capping according to manual specification
9.2 Identify type of coping and capping
for a given wall and pier
9.2.1 Select type of coping and capping according to
drawing plan
9.3 Specify the position of coping and capping
9.3.1 Mark the position of coping and capping by proper
method using approprite tools and equipment according to job specification
9.4 Bond the bricks to their required formation 9.4.1 Perform bonding the bricks to their required formation with mortar by using proper materials , tools and equipment according to job requirement.
9.5 Fix tiles
9.5.1 Carry out tiling work as protective material to cover wall and piers as specify in drawing plan.
9.6 Check for straightness
9.6.1 Carry out checking for straightness by using proper
materials ,tools and equipment according to job requirement
9.7 Maintain good finishing and
cleanliness9.7.1 Acquire good finishing and cleanliness of the brick bonding according to standard operational procedure
CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
10. CONSTRUCT PAVIOR10.1 Recognize Paver10.1.1 Define Paver and their functions according to manual specification .10.1.2 Describe types of Paver according to manual specification
10.2 Identify suitable bricks to be used
10.1.3 10.2.1 Select suitable bricks to be used as
Specified in drawing plan
10.3 Plan the area to be paved10.3.1 Set out the area to be paved according
to the drawing plan
10.4 Lay a layer of sand
10.4.1 Carry out laying a layer sand using appropriate materials ,tools and equipment according to specification
10.5 Lay bricks in with lean mortar
required bonding pattern10.5.1 Carry out laying bricks with lean mortar according to the required bonding pattern using appropriate materials , tools and equipment according to job specification
10.6 Confirm the bricks are laid evenly10.6.1 Carry out checking to ensure the bricks are laid evenly according to job specification
10.7 Check for evenness by proper method10.7.1 Carry out checking for evenness using straight
edge and line according to job requirement
10.8 Maintain good finishing and
appearance10.8.1 Acquire good finishing and cleanliness of the brick bonding according to standard operational procedure
CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
11. CONSTRUCT BLOCK
AND SLAB PAVIOR
11.1 Recognize block and slab paver
11.1.1 Define Block and Slab Paver and their functions according to manual specification .11.1.2 Describe types of Block and Slab Paver according to manual specification
11.2 Identify suitable block and slab paver
11.2.1 Select suitable block and slab paver according to job requirement
11.3 Set out the area to be paved11.3.1 Perform setting out the area to be paved according to the drawing plan
11.4 Spread a layer of coarse sand
11.4.1 Carry out spreading a layer of coarse sand using appropriate materials ,tools and equipment according to job requirement
11.5 Lay bricks with lean mortar
11.5.1 Carry out laying block and slab pavior with lean mortar using appropriate materials, tools and
equipment according to the required bonding pattern
11.6 Ensure the bricks are laid by proper
method11.6.1 Carry out checking to ensure the bricks are laid evenly according to job specification
11.7 Check for evenness by proper
method 11.7.1 Carry out checking for evenness using straight
edge and line according to job requirement
11.8 Maintain good finishing and
appearance11.8.1 Practice and maintain good finishing and appearance effectively
CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
12 CONSTRUCT HOLLOW BLOCK WALLS
12.1 Identify type of bond and blocks 12.1.1 Select type of bond as specified in drawing plan12.1.2 List down types of blocks according to current market12.1.3 Select types of blocks according to job specification
12.2 Set out wall in the required form
12.2.1 Perform setting out wall in the required form according to the drawing plan
12.3 Lay bricks in dry bonding
12.3.1 Carry out dry bonding for attached Pier by proper method according to job specification.
12.4 Specify the position of block with
joints
12.4.1 Mark the position of block by proper method using approprite tools and equipment according to job specification
12.5 Cut block where it is necessary
12.5.1 Perform cutting bricks using proper tools and equipment according standard procedure
12.6 Lay the first course and it
consecutive layers up to the required height
12.6.1 Perform spreading , buttering and grouting of
mortar on bricks by proper technique and tools according to job specification.12.6.2 Carry out laying the first course of brick bonding and it consecutive layers up to the required height according to standard operational procedure
12.7 Measure level , plumb , gauge ,
square and range
12.7.1 Carry out checking level , plumb gauge , square and range by using proper equipment according to standard operational procedure
12.8 Maintain perpendicular joints and
its thickness
12.8.1 Carry out maintaining perpendicular joints and its thickness according to standard operational procedure
12.9 Identify type of pointing and jointing12.9.1 List out types of pointing and jointing according to work specification.12.9.2 Select pointing and jointing according to blue print / drawing plan
12.10 Maintain good finishing and
cleanliness
12.10.1 Acquire good finishing and cleanliness of the brick bonding according to standard operational procedure
CONTENT AND LEARNING STANDARDS
PROGRAMME:CONSTRUCTION TECHNOLOGY
COURSE NAME:BRICKWORKS
CODE NAME:WTP 202
CONTENT STANDARDLEARNING STANDARDPERFORMANCE CRITERIA
13 LAY OFF DAMP PROOF
COURSE IN
BRICKWORK
13.1 Recognize damp proof coure13.1.1 Define Block and Slab Paver and their functions according to manual specification .13.1.2 Describe types of Block and Slab Paver according to manual specification
13.2 Identify type of damp proof
materials
13.2.1 Select type of damp proof material as required by drawing plan
13.3 Spread mortar on bricks bonding
13.3.1 Carry out spreading mortar according to job requirement
13.4 Lay damp proof course in their proper position
13.4.1 Carry out laying damp proof course in their proper position according to job requirement
13.5 Lay mortar over damp
proof course13.5.1 Carry out laying mortar over damp proof
course according to job specification
13.6 Ensure the damp proof material
not damage and fully covered
the entire surface of the course
13.6.1 Carry out checking to ensure damp proof material is not damage and fully covered the entire surface of the course according to job specification and standard procedure.
Last Edited10-13 November 2013
Module Page22/20Document Page22
22