![Page 1: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/1.jpg)
Work Package 9 Task 9.5:Granular Calorimeter Studies
Infrastructure
Felix Sefkow
AIDA Kick-off MeetingCERN, February 17, 2011
![Page 2: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/2.jpg)
2
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Outline
• Proposal– Partners– Deliverables and Milestones– Description of work
• Sub-tasks
• Look ahead– fill it with life
• Meeting and reporting
![Page 3: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/3.jpg)
3
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Proposal
• WP 9: Infrastructure for detector R&D, 2.6M out of 8M• Calorimetry 0.75M, cf EUDET: 1.99M of 7M total
• Much smaller budget, but still aim at integrating all active European partners
• Enlarged community: DHCAL effort grown after EUDET start
• AIDA is only a small part of CALICE and FCAL activities
• Proposal kept vage and general
![Page 4: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/4.jpg)
4
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Partners
• CERN
• UCL - Louvin
• IPASCR - Prague
• CNRS– IPNL Lyon– LAL Orsay– LAPP Annecy– LLR Palaiseau– LPC Clemront– LPSC Grenoble
• DESY• UHEI (third party)
• MPG-MPP Munich• Wuppertal
• TAU Tel Aviv
• UIB Bergen
• AGHUST Kracow• IFJPAN Kracow
• CIEMAT Madrid (3rd p)18 groups, 10k/y
![Page 5: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/5.jpg)
5
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Deliverables
• D 9.7: Integrated infrastructure for highly granular calorimeters– Due month 40 (May 2014), lead DESY
• D 9.9: Adequation of Geant 4 simulation of hadronic showers in different media (report)– Due month 46 (Nov 2014), lead DESY
• In WP 9.1, but probably requesting input: • D 9.8: Infrastructure performance and utilization (report)
– Due month 46 (Nov 14), lead CSIC
![Page 6: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/6.jpg)
6
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Milestones
• MS 42 Gas system, control and bench structure– due month 24 (Jan 2013), lead CNRS-LAPP
• MS 43 3rd generation fast read-out chips – due month 30 (Jul 2013), lead CNRS-LAL
• MS 44 Multilayer tungsten structure with position control and monitoring for forward calorimeters– due month 30 (Jul 2013), lead DESY-Z
• MS 45 Calibration and power supply system– due month 36 (Jan 2014), lead UIB
• MS 46 Electromagnetic calorimeter of at least 18x18cm2 area– due month 36 (Jan 2014), lead CNRS-LLR
• MS 47 Multichannel readout ASICs for luminosity detector – due month 40 (May 2014), lead AGH-UST
![Page 7: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/7.jpg)
7
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Description of Work
• Mechanical structure to place and move elements – CERN, DESY, UCL, CIEMAT
• Lumical structure, W radiator and ASICs– DESY, TAU, AGH-UST, IFJPAN
• ECAL extension of the EUDET module– IPASCR, CNRS-LAL, -LPSC, -LLR
• Hadronic structure with tungsten radiator and services– CERN, DESY, Wuppertal, MPG-MPP, IPASCR, CNRS-LAL, -IPNL, -
LAPP, -LPC, UIB, UCL, CIEMAT
![Page 8: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/8.jpg)
8
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Sub-tasks
• ECAL: Daniel Jeans– LLR, LPSC, IPASCR
• AHCAL: Erika Garutti– CERN, DESY, MPG-MPP, IPASCR, UIB, Wuppertal
• DHCAL: Imad Laktineh– LAPP, IPNL, LPC, CIEMAT, UCL
• FCAL: Wolfgang Lohmann– CERN, DESY, AGH-UST, IFJPAN, TAU
• FEE: Nathalie Seguin-Moreau– LAL, UHEI
• TBM: Erik van der Kraaij– CERN, DESY, UCL, CIEMAT
![Page 9: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/9.jpg)
9
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
ECAL
R.Poeschl
![Page 10: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/10.jpg)
10
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
ECAL
![Page 11: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/11.jpg)
11
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
ECAL plans
![Page 12: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/12.jpg)
12
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
AHCAL
E.Garutti
![Page 13: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/13.jpg)
13
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
AHCAL
![Page 14: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/14.jpg)
14
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
AHCAL plans
![Page 15: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/15.jpg)
15
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
DHCAL
I.Laktineh
![Page 16: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/16.jpg)
16
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
DHCAL
![Page 17: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/17.jpg)
17
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
DHCAL plans
![Page 18: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/18.jpg)
18
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
DHCAL plans
![Page 19: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/19.jpg)
19
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
FCAL
![Page 20: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/20.jpg)
20
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
FCAL
![Page 21: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/21.jpg)
21
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
FCAL plans
![Page 22: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/22.jpg)
22
AIDA Kick Off meeting: WP9.5 FEE
Second generation ASICs for EUDET
• Auto-trigger, analog storage, digitization and token-ring readout
• Power pulsing : <1 % duty cycle• Optimize commonalities within EUDET
(readout, DAQ…)• Dedicated run produced in March 2010
– 25 wafers received in June– 20 000 chips packaged in the US
FLC_PHY3(2003)
HARDROC2SDHCAL RPC64 ch 20 mm2
SKIROC2ECAL Si64 ch. 65 mm2
SPIROC2AHCAL SiPM36 ch 32 mm2
G.Martin
![Page 23: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/23.jpg)
23
AIDA Kick Off meeting: WP9.5 FEE
WP9.5: electronics readout
• 1st year: – Characterization of the 2nd generation ROC chips– Testbench/testbeam measurements
• Prototyping of the 3rd generation of ROC chips. • Main modifications:
– New Slow Control with I2C link• For all the ROC chips
– New digital part: • Independent channels (all chips ?)• Read-Out, BCID management • New TDC (step=1 ns, no dead time):
– For SKIROC3 and SPIROC3• New SCA:
– For SPIROC3 and SKIROC3• Circular memory for HARDROC3 ?
– Analog part• Preamp modifications for SPIROC3
HARDROC2SDHCAL RPC64 ch 20 mm2
SKIROC2ECAL Si64 ch. 65 mm2
SPIROC2AHCAL SiPM36 ch 32 mm2
![Page 24: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/24.jpg)
24
AIDA Kick Off meeting: WP9.5 FEE
MILESTONES and SCHEDULE• Milestones: Report in 30 months (August 2013)
• AIDA budget for 3rd generation of electronics: – 78 k€ (equipment) => 2 chip submissions (Hardroc3 and Spiroc3)– 30 ppm
• Cost:– Multi Project runs (MPW): 1k€/mm2– Packaging: $3500– Test-board: 1500 €
• Schedule– 1st chip : SPIROC3
• Submission March 2012• Reception June 2012 • 1 year for tests and report
– 2nd chip : HARDROC3• Submission March 2013• Reception June 2013• 1 year for tests
HARDROC2SDHCAL RPC64 ch 20 mm2
SKIROC2ECAL Si64 ch. 65 mm2
SPIROC2AHCAL SiPM36 ch 32 mm2
![Page 25: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/25.jpg)
25
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
TBM
E. van der Kraaij
![Page 26: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/26.jpg)
26
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
TBM plans
![Page 27: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/27.jpg)
27
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Meetings
• The sub-task structure just reflects the more global LC R&D organization, no new structures
• Projects will be followed in CALICE and FCAL– technical meetings as necessary
• Expect AIDA annual meetings few months before reports– WP 9.5 parallel session
• Suggest regular task leader phone meetings to stay in touch– milestone reports
![Page 28: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/28.jpg)
28
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Reporting
![Page 29: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/29.jpg)
29
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Summary
• Excellent starting point from EUDET
• Transition ensured
• Clear project structure
• Tantalizing visions
• Let’s make it a success!
![Page 30: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/30.jpg)
30
Back-upslides
![Page 31: Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011](https://reader033.vdocuments.us/reader033/viewer/2022061305/55145e09550346494e8b5791/html5/thumbnails/31.jpg)
31
MC
WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011
Budget