WindBarriers -Project overview
Dorina IugaEuropean Wind Energy Association
21 October, Sofia
![Page 2: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/2.jpg)
Agenda Introduction to the project
Short description of the methodology
Project results
Some recommendations
Conclusions
![Page 3: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/3.jpg)
Introduction to the project
![Page 4: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/4.jpg)
IEE funded project (December 2008 – November 2010),
Obtain quantifiable data on: 1. Administrative barriers (building consent, etc),2. Grid access barriers (lead time, capacity of grid infrastructure,
etc),
Find best practices and reveal existing issues and bottlenecks,
Propose recommendations on how to overcome these barriers,
Raise awareness amongst decision-makers at local, regional, national and European level.
WindBarriers objectives
![Page 5: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/5.jpg)
Supports the implementation of the :
2009 Renewable Energy Directive, particularly Art. 13 and Art 16;
National Renewable Action Plans (NREAPs)
European political added value
![Page 6: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/6.jpg)
Project consortiumCoordinator: EWEA - European Wind Energy Association• Fraunhofer - Institute for Systems and Innovation Research ISI• DWIA - Danish Wind Industry Association• AEE- Spanish Wind Energy Association• PSEW – Polish Wind Energy Association• MSZET - Hungarian Wind Energy Association• Dong Energy• Iberdrola• Austrian Wind PowerCooperation with: • National wind energy associations,• Project developers.
![Page 7: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/7.jpg)
Methodology
![Page 8: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/8.jpg)
Methodology illustration
5 – Recommendations
4 – EU-27 analysis & country overview
1 - Indicators 2 - Questionnaires
3 – National samples- 2008 onlineprojects
![Page 9: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/9.jpg)
Project Results
![Page 10: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/10.jpg)
Desk-research resultsProject website: www.windbarriers.eu,
List of references on administrative and grid access barriers at EU, national and regional level,
Research on perceived administrative and grid access barriers at EU and national level,
Indicators and 1 questionnaire (33 targeted questions) to collect concrete information enabling the analysis of administrative and grid access barriers.
![Page 11: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/11.jpg)
Final results Publication (August 2010), containing:
Analysis (both qualitative and quantitative) of the barriers
Inter-comparison of countries, Recommendations for improving administrative and
grid connection procedures in EU-27. Dissemination workshops :• Poland• Romania• Hungary• Denmark• Spain
![Page 12: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/12.jpg)
Recommendations
![Page 13: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/13.jpg)
Most frequent barriers at administrative level for EU
![Page 14: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/14.jpg)
Recommendations for administrative procedures at EU level Better EU average administrative lead
time (2008: onshore: 42 months, offshore: 18 months),
Clear requirements for EIA’s, Develop spatial planning, Reduce the number of direct and
indirect authorities to be contacted (now onshore: 9 direct and 9 indirect, offshore: 7 direct and 16 indirect)
![Page 15: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/15.jpg)
Recommendations for administrative procedures at EU levelImplement “the one stop shop”
approach in all Member States,Improve transparency at EU level,Set deadline for all procedures and
improve the dissemination of information (developers and local authorities).
![Page 16: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/16.jpg)
Most frequent administrative barriers for Bulgaria
![Page 17: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/17.jpg)
Recommendations for administrative procedures for Bulgaria Provide project developers with clear
rules on the EIA, Implement spatial planning, Improve the transparency of the
decision-making process for obtaining the building consent,
![Page 18: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/18.jpg)
Most frequent barriers to thegrid connection procedures at EU level
![Page 19: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/19.jpg)
Recommendations for grid procedures at EU level Improve the EU average for grid connection lead time
(2008: onshore: 25.8 months, offshore: 14 months), Lower the EU average for the grid connection time, Set deadlines for grid processes (next stage), Develop the grid infrastructure, Reduce the number of number of involved ST &
other parties : Onshore: 0.85 System operators (ST), 24 other parties (land users, technical questions etc), Offshore: 0.92 System operators (ST), 4.4 Other parties
![Page 20: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/20.jpg)
Recommendations for grid procedures at EU level
Implement the “one-stop-shop” approach in all EU MS,
Set deadlines for the grid connection process,
Clarify and streamline the decision-making process.
![Page 21: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/21.jpg)
Most frequent barriers to grid procedures for Bulgaria
![Page 22: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/22.jpg)
Recommendations for grid procedures for Bulgaria
Realistic plan for the construction and extension of the grid ( too many demands compared to the current capacity of the grid),
Clarify the grid connection requirements,Centralised decision-making process,TSO and DSO to commit to completing
grid upgrades as scheduled;
![Page 23: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/23.jpg)
Recommendations for grid procedures for Bulgaria
Avoid discrimination against those developers not directly linked to electrical companies through ownership unbundling between electricity generation, transport and distribution.
![Page 24: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/24.jpg)
Conclusions
"If you want to build a ship, don't drum up the people to gather wood, divide the work, and give orders. Instead, teach them to yearn for the vast and endless sea."- Antoine De Saint-Exupery
Motivation - sell the good idea
Good legislation Political
support/Motivating support schemes
Adequate grid infrastructure
![Page 25: WindBarriers - Project overview](https://reader034.vdocuments.us/reader034/viewer/2022051700/56815d9c550346895dcbc287/html5/thumbnails/25.jpg)
Thank you for your attention