Wide-frame view on Saclay LCTPC activities
P. Colas
![Page 2: Wide-frame view on Saclay LCTPC activities P. Colas](https://reader036.vdocuments.us/reader036/viewer/2022062905/5a4d1ae37f8b9ab059978257/html5/thumbnails/2.jpg)
LCTPC Saclay 2
• 2008-2011 : single-module tests of Micromegas panels with resistive anode. Selection of the resistive bulk technique with Carbon-loaded kapton.
• 2011 : first tests of a fully integrated module• 2012 : in July, pilot run with 6 modules
10/01/2013
![Page 3: Wide-frame view on Saclay LCTPC activities P. Colas](https://reader036.vdocuments.us/reader036/viewer/2022062905/5a4d1ae37f8b9ab059978257/html5/thumbnails/3.jpg)
LCTPC Saclay 3
Results
(b): After alignmentdf= 2.9 , 2.1 and 2.2 mrad dx = 47 µm, -43 µm and -52 µm
Row Number: 3 x 24 = 72 Displacement in mm(a): Before alignment
Multi-module (x residual in mm)
single-module60 micron resolution at z=0 with 3mm pads
10/01/2013
![Page 4: Wide-frame view on Saclay LCTPC activities P. Colas](https://reader036.vdocuments.us/reader036/viewer/2022062905/5a4d1ae37f8b9ab059978257/html5/thumbnails/4.jpg)
LCTPC Saclay 4
GDsP
A lot of interest : CMS muon chambers, ALICE dimuon chambers, ALICE TPC, LC TPC, but 75% of the group concentrate on a crash program for LS1 implementation of a prototype• For the amplifier part, silicon to be submitted
next month. • LCTPC meeting on this soon
10/01/2013
![Page 5: Wide-frame view on Saclay LCTPC activities P. Colas](https://reader036.vdocuments.us/reader036/viewer/2022062905/5a4d1ae37f8b9ab059978257/html5/thumbnails/5.jpg)
LCTPC Saclay 5
Octopuce
• Data analysis (from December 2010 DESY run, TimePix+MUROS) presented at LCWS Arlington (M. Titov) and RD51 (A. Chaus)
• Next Octopuce detector in preparation.
10/01/2013
![Page 6: Wide-frame view on Saclay LCTPC activities P. Colas](https://reader036.vdocuments.us/reader036/viewer/2022062905/5a4d1ae37f8b9ab059978257/html5/thumbnails/6.jpg)
LCTPC Saclay 6
Test benchUse a 55Fe source to scan, calibrate, study uniformity, E resol, disconnected channels
10/01/2013
![Page 7: Wide-frame view on Saclay LCTPC activities P. Colas](https://reader036.vdocuments.us/reader036/viewer/2022062905/5a4d1ae37f8b9ab059978257/html5/thumbnails/7.jpg)
LCTPC Saclay 7
Projects• Perform Feb. 2013 tests and continue analysis• Adapt the 2pCO2 cooling• Try a single module with a new technology (Piggy-back, ceramics with
ruthenium oxide resistive coverlay)• Test a large module with smaller pads• Perform power-pulsing tests• Measure effect of an ‘ion sheet’ produced by a UV lamp, and a gating grid.• Saclay delivered more than 250 presentations since 2001http://irfu.cea.fr/Spp/ILC-TPC/home/talks/• All this in collaboration
– Carleton, Bruxelles, Kolkata,… for pads– RD51 and AIDA for general studies– Nikhef for octopuce– KEK, Tsinghua, DESY for software and analysis, etc…
10/01/2013