What is True BIM
![Page 2: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/2.jpg)
Ir C K Ng
BSc/Civil 1980 MSc/GIS 1998
Civil/Information
Senior Resident EngineerEngineer FM Programmer
![Page 3: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/3.jpg)
1. True BIM
2. True BIM Process – Everyday BIM
3. True BIM Project
4. BIM is not a utopia
5. BIM is not a bunch of Standards
6. BIM is not a way to get others to do your work
7. Learn from UK BIM Approach - Digital
What is True BIM?
![Page 4: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/4.jpg)
1. 5D enabled models must be accurate
2. Consistency of Models and 2D Drawings
i i i 5D QTO
1. True BIM
![Page 5: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/5.jpg)
Combined Services Model
![Page 6: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/6.jpg)
Combined Services Drawing from BIM Models
![Page 7: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/7.jpg)
2. True BIM Process – Everyday BIM
Professionals use BIM, modellers operate BIM
![Page 8: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/8.jpg)
ContractBIM ICT
3. True BIM Project
![Page 9: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/9.jpg)
Contract
3. True BIM Project
(CIOB/CPC2013, PPC2000, NEC3 x12, ConsensusDoc301, AIA208)
![Page 10: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/10.jpg)
4. BIM is not a UTOPIA
![Page 11: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/11.jpg)
3DVisualization
Clash Analysis
4DConstruction sequencing
Virtual Construction
(3D plus time element)
5DEstimating
QTO
(3D plus cost element)
6DForensic analysis
(3D plus analysis element)
7DFacilityManagement
(3D plus O&M element)
4. nD BIM
![Page 12: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/12.jpg)
4. BIM Use Matrix
BIM is not a Utopia
Some BIM Uses are conflicting with each others
Define EIR
![Page 13: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/13.jpg)
5. BIM is not A Bunch of Standards
Use if the standard is beneficial, or forget it
![Page 14: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/14.jpg)
5. BIM Standards
There are only THREE Standards in BIM
1. NBIMS-USTM - National BIM Standard, US
e.g. Minimum BIM Requirements in line with the Capability Maturity Model.
2. IFC – Industry Foundation Class
3. Classification of materials and equipment
Others are guidelines, practice, sample/template, protocol
![Page 15: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/15.jpg)
![Page 16: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/16.jpg)
6. BIM is not A WAY TO GET OTHERS TO DO YOUR WORK
![Page 17: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/17.jpg)
Planner
GIS
MapGuideArchitect
CodeChecking
Solibri ePlan Specialist
EnergyAnalysis
EcoTect
Client
Visualization
Lumion
StructuralEngineer
QTO
Etab/Robot
MEP Engineer
QS
CostX
StructuralAnalysis
Contractor
Fabricator/Manufacturer
Estimator
ClashAnalysis
2D Drg/SpecPO
GeometricalData
Parameters
SiteINFO
Glue/Navisworks
Scheduling
SolidWork
COBie
FacilityManager
Programmer
SequenceP6/Navisworks
6. Architects must determine the door, window, finishes asap for QS
Every participant has a duty to provide updated information to BIM for others to use
![Page 18: What is True BIM?](https://reader031.vdocuments.us/reader031/viewer/2022021815/588456e01a28ab903b8b6257/html5/thumbnails/18.jpg)
UK BIM Documents specify Information Management far more than BIM process
7. UK BIM Strategy - Digital
Digital Built Britain - Level 3 Construction 2025