Download - WG3 – General information on work progress
![Page 1: WG3 – General information on work progress](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815e07550346895dcc5972/html5/thumbnails/1.jpg)
1
WG3 – General information on work progress
R. Vuillermet
12/04/2011
![Page 2: WG3 – General information on work progress](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815e07550346895dcc5972/html5/thumbnails/2.jpg)
2
PP0 area connection
12/04/2011
Common reference and mechanical connection between type 1 services and flex
Flex connectors on discontinuous boardsType 1 connectors on a single board
![Page 3: WG3 – General information on work progress](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815e07550346895dcc5972/html5/thumbnails/3.jpg)
3
Flex in PP0 area
12/04/2011
![Page 4: WG3 – General information on work progress](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815e07550346895dcc5972/html5/thumbnails/4.jpg)
4
Type 1 services in PP0 area
12/04/2011
![Page 5: WG3 – General information on work progress](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815e07550346895dcc5972/html5/thumbnails/5.jpg)
5
VI Beam Pipe Geometry
Component Radial thick[mm]
Outer Diameter [mm]
Alu foil 0.100 55.680Kapton tape 0.120 55.480Aerogel 4.000 55.240Kapton tape 0.120 47.240Heaters 0.200 47.000Beam Pipe 0.800 46.600Beam Pipe ID 45.000
Mark Gallilee
12/04/2011
Use to be 3 mm in
the TDR !
![Page 6: WG3 – General information on work progress](https://reader035.vdocuments.us/reader035/viewer/2022062520/56815e07550346895dcc5972/html5/thumbnails/6.jpg)
6
Construction of the scale one mock-up in building 180
12/04/2011
Week #15 – Survey of the rail system – installation of the central tower of concrete blockWeek#16 – Installation of the minivans – installation of access stairs – installation of hand rails – Installation of central plate on the towerWeek#17 – Installation of Bridge and scaffolding – installation of ITF – Survey and adjustment