CORRECTIONS / MODIFICATION IN TOR FOR GEVRA OPENCAST PROJECT (41.00MTPA TO 45.00 MTPA)
G M ENVT SECL <[email protected]> Mon, Mar 6, 2017 at 5:10 PMTo: [email protected], [email protected], Purushottam ramdas Sakhare <[email protected]>
Dear Sir,
In reference to the above stated subject matter, this is to inform you that the proposal of Gevra Opencast Coalmine from 41 MTPA to 45 MTPA in ML area of 4184.486 ha was considered by the 4th EAC on 30/31.01.2017.
In view of the above, Terms of Reference (ToR) was granted vide your letter no J-11015/85/2010.IA.II (M) dated28.02.2017. This is to bring to your kind notice that there is some typographic error in the ToR which needs to becorrected. The errors have been highlighted and the corrections given as Annexure-1 (with supporting documents).
You are requested to kindly issue the corrected/modified ToR
Submitted for your kind perusal.
Regards.
S.S. Sinha
GM (Envt & Forests)
SECL, Bilaspur.
2 attachments
letter for ToR correction.pdf 1047K
supporting documents.pdf 4570K
G M ENVT SECL <[email protected]>
Sub,: Correction in ToR issued for Gevra OC Expansion project from 41.00 MTPA to45.00 MTPA (Phase-1) in ML area of 4184.486 Ha and 70.00 MTPA (Phase-2) in MLarea of 4781.788 Ha of M/s South Eastern Coalfields Limited, dist. Korba(Chhattisgarh)
G M ENVT SECL <[email protected]> Thu, Apr 20, 2017 at 3:38 PMTo: [email protected], Purushottam ramdas Sakhare <[email protected]>, AISHWARYA CHANDRA SHEKHAR<[email protected]>, Vinita Arora <[email protected]>, Rajiv Kumar Garg <[email protected]>,Niranjan Das <[email protected]>, Amit Saxena <[email protected]>
Ref: Our earlier request letter no. SECL / BSP / ENVT / Gevra OC _70 /17 /6610 dtd.20.04.2017
Dear Sir,
With reference to our above referred request letter on the subject matter, this is to inform you that the proposal ofGevra Opencast Coal mine from 41.00 MTPA to 45.00 MTPA (Phase-1) in ML area of 4184.486 Ha and 70.00 MTPA(Phase-2) in ML area of 4781.788 Ha was considered by the 4th EAC on 30/31.01.2017.
In view of the above, Terms of Reference (ToR) was granted vide MoEF&CC letter no J-11015/85/2010.IA.II (M)dated 28.02.2017. This is to bring to your kind notice that there is some typographic error in the ToR which needs to becorrected. The errors have been highlighted and the corrections given as Annexure-1 (with supporting documents).
Submitted for your kind perusal and issuance of corrected ToR.
Regards.
GM (Envt & Forests)
SECL, Bilaspur.
2 attachments
Gevra oc ToR correction requested 20.4.2017.docx 28K
supporting documents.pdf 4463K
G M ENVT SECL <[email protected]>
Basic information in respect of Gevra OpenCast Exp. Project (From 41.00MTPA to45.00MTPA)
G M ENVT SECL <[email protected]> Fri, May 26, 2017 at 12:14 PMTo: [email protected], Purushottam ramdas Sakhare <[email protected]>
Dear Sir
Please find attached herewith the details of proposal & basic information/ checklist (in word format and signed copy in pdf format) inrespect of Gevra OpenCast Expansion Project (41.00 MTPA to 45.00 MTPA). Proposal for TOR Amendment is to be considered in11th EAC meeting scheduled on 31.05.2017. Submitted for your kind perusal.
Regards
(S Shrivastava),
General Manager (Environment & Forests)
SECL, Bilaspur
4 attachments
Gevra Checklist Final revised.pdf 11516K
checklist Gevra 45MTPA.doc 202K
request letter for tor correction.pdf 1807K
supporting documents.pdf 4463K