HPCL SUPPLY OF WEIGH BRIDGE
Page 1 of 22
HINDUSTAN PETROLEUM CORPORATION LIMITED, E & P DEPTT, 2nd FLOOR, Gresham assurance bldg, Sir P.M.Road, Fort, MUMBAI-1
TENDER DOCUMENT
FOR
SUPPLY OF WEIGH BRIDGE
TO
KADAPA PROJECT SITE
ANDHRA PRADESH
HPCL SUPPLY OF WEIGH BRIDGE
Page 2 of 22
TABLE OF CONTENTS
CHAPTER NO.
DESCRIPTION PAGE NO
I SCOPE OF SUPPLY 3
II TECHNICAL SPECIFICATIONS 5
III QUALITY ASSURANCE PLAN 17
IV SCHEDULE OF QUANTITIES 21
HPCL SUPPLY OF WEIGH BRIDGE
Page 3 of 22
CHAPTER I
SCOPE OF SUPPLY
HPCL SUPPLY OF WEIGH BRIDGE
Page 4 of 22
INTRODUCTION & SCOPE OF SUPPLY
Hindustan Petroleum Corporation Limited, a Government of India Enterprise, is a Global
Fortune 500 Energy Company involved in the business of Refining and Marketing of
Petroleum Products.
SCOPE OF SUPPLY:
This tender envisages procurement of weigh bridge and its installation at Kadapa
project Site in the state of Andhra Pradesh.
Scope of supply is as under :
Design, engineering, manufacturing, testing, inspection, supply, erection,
commissioning and stamping of 60 MT Pit-less Type Electronic Road
Weighbridge complete with Kit, Indicator, Load Cells, Platform, LED display, P.C., Printer, UPS
etc. with Manufacturer’s Test certificates and Third party Inspection as per the technical
specification and technical data sheet . The scope shall also include integration of entire
weighbridge with TAS and providing suitable software for the same. The entire job is to
be undertaken on Turnkey basis covering mechanical, civil & electrical works including
supply of all required material for civil construction & electrical works. Bidder shall possess the requisite manufacturing & testing facilities and experience &
expertise to manufacture and supply the weigh bridge. Address of location where materials are to be supplied is as under: Hindustan Petroleum Corporation Ltd KADAPA Depot Project Site
Village Peddapalli,
Nr. BAKRAPET
Siddhout Mandal
Kadapa-Rajampet Road
YSR District
Andhra Pradesh
Contact: Chf Manager-E&P, B Ramakrishna, +919920825874,
Exe.Proj-Engr- M S Rao - +919997035560
DELIVERY PERIOD:
Delivery period shall be as under: -
Within 06 (six) months from date of Fax of Intent on FOR destination basis.
HPCL SUPPLY OF WEIGH BRIDGE
Page 5 of 22
CHAPTER II
TECHNICAL SPECIFICATIONS
FOR
WEIGH BRIDGE
HPCL SUPPLY OF WEIGH BRIDGE
Page 6 of 22
TECHNICAL SPECIFICATIONS FOR WEIGH BRIDGE
1.0 GENERAL
1.1 VENDOR SHALL SUPPLY WEIGH BRIDGE IN ACCORDANCE WITH THE WEIGH BRIDGE
SPECIFICATION SHEETS ALONG WITH AUXILIARIES, IF ANY , WHEREVER SPECIFIED IN THE
SPECIFICATION SHEETS, SUBJECT NOTES AND OTHER ENCLOSURE TO THE REQUISITION.
1.2 VENDOR SHALL QUOTE IN STRICT ACCORDANCE WITH THE WEIGH BRIDGE TECHNICAL
SPECIFICATIONS AND ALL OTHER ENCLOSURES TO THE
REQUISITIONS. DEVIATIONS TO THE SPECIFICATIONS AND OTHER ENCLOSURES OF THE
REQUISITIONS, IF ANY, SHALL BE SOUGHT BY THE VENDOR AS EXPLAINED IN CLAUSE 2.0.
1.3 ALL CODES AND STANDARDS FOR MANUFACTURE, TESTING, INSPECTION ETC.
SHALL BE OF LATEST EDITIONS.
2.0 DOCUMENTATION
2.1.1 VENDOR SHALL SUBMIT WITH THE OFFER THE FOLLOWING:
2.1.2 MANUFACTURER’S COMPLETE DESCRIPTIVE AND ILLUSTRATIVE CATALOGUE/LITERATURE.
2.1.3 DETAILED DIMENSIONED, CROSS SECTION DRAWING WITH PARTS/MATERIAL LIST, WEIGHT
ETC. FOR THE WEIGH BRIDGE TO MANUFACTURER’S STANDARD.
2.1.4 DRAWINGS FOR WEIGH BRIDGE WITH ACCESSORIES LIKE LOAD CELLS, PLATFORM GIVING MAJOR
SALIENT DIMENSIONS.
2.1.5 ONE COPY OF THE ENTIRE SPECIFICATIONS OF THIS SPECIFICATIONS FOR WEIGH BRIDGE SIGNED
AS “ACCEPTED “ BY THE MANUFACTURER WITH ALL DEVIATIONS MARKED CLEARLY.
2.1.5 IF THE WEIGH BRIDGE SPECIFICATION IS REGRETTED OR HAS NO DEVIATION, VENDOR HAS
TO MENTION AS REGRET OR NO DEVIATION RESPECTIVELY. ACCORDINGLY, THE MANUFACTURER
SHALL WRITE CLEARLY ON WEIGH BRIDGE SPECIFICATION SHEETS AS: “REGRET” OR “NO DEVIATION”.
2.1.6 FOR SUBJECT NOTES, IF THERE IS ANY DEVIATION THE SAME SHALL BE QUALIFIED
CLAUSE WISE, EVEN CLAUSES WHICH ARE ACCEPTABLE SHALL BE CATEGORICALLY CONFIRMED AS
“ACCEPTED”.
2.1.7 UPON FAILURE TO SUBMIT DOCUMENT AS SPECIFIED IN CLAUSES 2.1.3 TO 2.1.5
ABOVE, THE OFFER IS LIKELY TO BE REJECTED.
2.1.8 SUBMISSION OF QAP/ITP AS INDICATED IN CH.III
2.2 UPON PLACEMENT OF FOI/ PURCHASE ORDER, WHICHEVER IS EARLIER, VENDOR SHALL
HPCL SUPPLY OF WEIGH BRIDGE
Page 7 of 22
SUBMIT DRAWINGS FOR APPROVAL MENTIONED IN ITEM NO 2.1.3 AND 2.1.4 BEFORE START OF
MANUFACTURE.
2.3.1 TEST REPORTS SHALL BE PREPARED & PROVIDED FOR ALL MANDATORY TESTS AS PER THE
APPLICABLE CODE AND QAP/ITP DULY APPROVED BY HPCL.
2.3.2 MATERIAL TEST CERTIFICATES (PHYSICAL PROPERTIES, CHEMICAL
COMPOSITION & HEAT TREATMENT REPORT) PARTS SHALL BE FURNISHED IN ADHERENCE TO
APPLICABLE CODES/ STANDARDS AND QAP/ITP DULY APPROVED BY HPCL FOR
THE WEIGH BRIDGE SUPPLIED. MATERIAL TEST CERTIFICATES FOR THE OTHER PARTS SHALL
ALSO BE FURNISHED FOR VERIFICATION IN ACCORDANCE WITH HPCL APPROVED QAP/ITP DURING
THIRD PARTY INSPECTION.
3.0 DESIGN AND CONSTRUCTION
3.1 WEIGH BRIDGE SHALL BE DESIGNED, MANUFACTURED, TESTED INSPECTED AND MARKED AS
PER THE MANUFACTURING STANDARD, DESIGN CODE AND STANDARDS (LATEST EDITION)
INDICATED IN THE WEIGH BRIDGE SPECIFICATION SHEETS. ANY CONFLICT
BETWEEN THE REQUISITION, ENCLOSURE, SPECIFICATION SHEETS AND REFERRED STANDARD
CODES SHALL BE BROUGHT TO THE NOTICE OF THE PURCHASER FOR CLARIFICATION, BUT
GENERALLY SPEC SHEETS AND ENCLOSURES OF THE REQUISITION INCLUDING SUBJECT NOTES SHALL
GOVERN. NO DEVIATION TO SPECIFICATION / STDS SHALL BE PERMITTED THROUGH VENDOR
DRAWING APPROVAL. APPROVAL OF DRAWING SHALL BE VALID ONLY FOR DESIGN FEATURES.
3.2 TECHNICAL SPECIFICATION OF ELECTRICALLY OPERATED WEIGH BRIDGE (AUTOMATION TYPE)
HPCL SUPPLY OF WEIGH BRIDGE
Page 8 of 22
TECHNICAL DATA SHEET PRECISION LOAD CELL
CAPACITY MINIMUM 20 TONS
MINIMUM NO. OF LOAD CELL MINIMUM 6 (SIX) NOS
EXCITATION DIGITAL:10-12 AC/DC , ANALOG-5V DC
INPUT RESISTANCE 560-620 OHM
OUTPUT RESISTANCE 480 OHM NOMINAL
RATED OUTPUT 1.75mV/V to 2mV/V
ZERO BALANCE 1% OF RATED OUTPUT
COMBINED ERROR 0.02% OF RATED OUTPUT
REPEATABILITY 0.010% OF RATED OUTPUT
RETURN TO ZERO AFTER 30 MINUTE CREEP
PREIOD AT RATED OUTPUT
0.015% OF RATED OUTPUT
TEMPERATURE EFFECT ON RATED OUTPUT
(-100C to +550C)
0.0010% / 0C OF RATED OUTPUT
TEMPRATURE EFFECT ON ZERO BALANCE (-100C
to +550C)
0.0009% / 0C OF RATED OUTPUT
INSULATION RESISTANCE (MINIMUM ) 5000 MEGA OHMS
OVERLOAD RATING WITHOUT AFFECTING
PERFORMANCE
150% OF RATED CAPACITY
OVERLOAD RATING(ULTIMATE) >225% RATED OUTPUT
RESISTANCE TO DIRT &MOISTURE HERMETICALLY SEALED CONFORMS TO IP
68,69, WELDED , FILLED WITH INERT GAS
MATERIAL STAINLESS STEEL
NON-LINEARITY < 0.01
HYSTERESIS < 0.0165
HPCL SUPPLY OF WEIGH BRIDGE
Page 9 of 22
3.4 TECHNICAL SPECIFICATIONS
WEIGH BRIDGE INDICATOR
Microprocessor based system
• Display
� Type
Blue backlit LED, graphics up to 64x240 pixels, display upto 8 digits, minimum
character size 17mm x 10mm
� Annunciators
Balance (Gross zero),Motion Preset Tare , Semi-automatic Tare , Net, Kg., print,3 off
Trip indicators , Minus (below net zero) , Scale 1,Scale 2 ,Peak, Print, OP1,OP2,OP3
count
� Unit of Measure
Kg, T
• Tare
> 100% subtractive
> Semi- auto (push button )tare
> Pre-set( key board) tare
> Stored tare
• Keypad
> 28 keys addressing with tactile feedback
> Five soft function keys and dedicated function key and operational key(Zero, Tare,
Slect, Print, Units, Totals, Scale, PLU,Stand by ,enter, escape ,clear, text)
• Real time clock
Battery backup, real time clock
• Connection
6 core technique
• Serial interface
Two bi-directional asynchronous serial interface card(RS 232 /485/ 422 or RS 232/
20mA current loop) for remote display, RTU modbus.
HPCL SUPPLY OF WEIGH BRIDGE
Page 10 of 22
• Parallel Port
Parallel data interface for printer connection.
• Trips
Upto 16 input & output trips rated at TLL level & 240 V and 2 A resply.
• Digital input
Connects to load cells, require junction box and digital option card
• IP Rating
IP 67rated stainless steel housing
• Housing
Panel type(front panel) or stainless steel housing
• Mounting
Wall/desk
• Electrical power input
110V AC / 230V +10%-15% @ 460mA,50/60 Hz
• Operating temperature
(-)10°C to + 40°C
• Analog Input Range
0 mV to 20 mV
• Analog to Digital converter
> Type -delta sigma
> Rate -120 per second
> Display update -1,2,5,10 second
• Filter
> Programmable FIR &Dynamic Filtering
> Harmonizer digital filter
• Balance/zero
> Setting - Keyboard push button
> Range - Normally 2 % upto 100%
HPCL SUPPLY OF WEIGH BRIDGE
Page 11 of 22
> Zero Tracking- Configurable
> Motion detection - Configurable
• Calibration
> Full digital ten point calibration
• Performance
> Internal Resolution:-16,777,216
> Repeatability
+/-0.01% of full scale
> Span drift
+/-50ppm / year max.
+/-4ppm/°C typical
> Warm up time: immediate
> Self diagnostics: Graphic display
Keys, PS/2 keyboard
A2D(x2) Serial test (3) Network inter face Ethernet port BCD Out
Analogue out
Pulse in
Memory - back up of 6 months
Tally roll
Internal I/O - fully configurable
External I/O - fully configurable
• Digital optional card to provide additional serial port
• Modbus/profibus/device net/control net interface
• Ethernet 10/100TCP /IP interface for data transfer
• Analogue option card to provide second analogue scale input &two analogue
output 4-20mA.
HPCL SUPPLY OF WEIGH BRIDGE
Page 12 of 22
3.5 TECHNICAL SPECIFICATION WEIGH BRIDGE
a. Weighbridge Type: PITLESS, fully Electronic Road Weigh Bridge b. Capacity: 60 MT.
c. Least count: 10 Kg.
d. Platform Size: 16 m x 4m
e. Platform Construction: Fully welded module type M.S. structure to meet Indian
Standard IS: 800, 2062 comprising of RS joists, transoms and plates for example main
beam ISMB 500 - 2 Nos., Cross beam ISMB- 250 Across wheel path - 4 Nos., ISMB-200.No
joint to be used in the beams to avoid sagging of the structure. 12mm thick antiskid to
be provided. M.S. checkered plate on top.
f. Painting of structure: EPOXY to meet IS:2074.
g. Load Cell : Up to 10 Nos. as per attached data sheet. Hermetically Sealed Unit, Capacity
- 20 Tons. each, Ambient temp. - 55oC max. Safe load - 125% of capacity. Ultimate Load -
300% of capacity. Destructive Load - 500% of capacity
h. Indicator: as per attached data sheet for same
i. Junction Box & Cable: Stainless steel with IP65 protected and required length
of steel breaded, 6 Core, Load Cell Cable from power panel and load cells to Junction Box
& Junction Box to Indicator.
j. Computer: 1 No. PC, P-IV, 1 GB RAM, 160 GB HDD,DVD COMBO/WRITER, 22”
Colour LCD Monitor With Windows Xp operating system, Key board(Recent
edition) & cordless Mouse.
Make -HP, COMPAQ or as approved by EIC.
k. Printer : 2 Nos. Model LX 300 +, Type Dot Matrix with 80 Columns, one for Indicator
& other for P.C. Make - HP
l. UPS : 1 No. 1000 VA, with 2.00 Hr. battery backup, Make - Exide.
m. Software for Weighbridge Management:
Complete weighbridge management user friendly Software for processing data date
wise, truck wise, challan wise, shift wise, customer wise etc. for generation of daily /
Weekly & monthly report. Preparing Transport Permit, Invoice etc. as per our
requirement. All the required information for developing the Software shall be provided
by us. Provision for connecting with other weighbridges /server computer by LAN &
sharing the common data base. The software should be compatible for integrating with
Terminal Automation System software and migration of data.
HPCL SUPPLY OF WEIGH BRIDGE
Page 13 of 22
n. Civil Job : Civil job shall include total civil foundation with M-25 RCC as per the
drawing for the platform, approach Ramps and other equipments. Construction of Weigh
House is excluded from the Scope of Work.
o. Electrical Job : All electrical connection from weigh bridge to our automation
control room or as adviced by EIC HPCL and laying of the cables for complete integration of
the Weighbridge. Providing all required socket, switch, cable, junction box of good quality
to be used for weigh bridge.
p. Earthing :Providing earthing as per IS-3043.
q. Supervision of erection,Stamping & Commissioning of the Weighbridge:
Supervision & execution of civil work, erection and Commissioning, liaisoning with the
inspector of Legal metrology department (Weight and Measure Deptt), Govt. of
Jharkhand for verification and Stamping of Weigh Bridge and also paying the
required fee to Legal Metrology of WM department.
r. Drawings and Manual: The supplier must provide three sets each of the
following manuals and drawings along with soft copies in pen drives and CDs.
i. Operation Manual: Three sets of operation manual must be provided by the
supplier which must cover, interalia, the principal features of the machine, the control
philosophy used, prestarting checks, starting procedures, operation procedure,
DOs and DONTs, trouble shooting, emergency procedures, safety trips etc.
ii. Maintenance Manual : Three sets of maintenance Manual must be provided by
the Supplier which include maintenance procedure, preventive
maintenance schedule and tolerance limit etc.The maintenance manual should
contain dismantling and assembling procedures.
iii. Spare parts Manuals: The manual must contain, interalia, spare part details such
as drawing no., part no. and technical specification of all the mechanical and electronic
equipments.
iv. Three sets of drawings showing foundation details and
general arrangement should be supplied within 15 days of LOI .
HPCL SUPPLY OF WEIGH BRIDGE
Page 14 of 22
SCOPE OF THIRD PARTY INSPECTION
INSPECTION AND TESTING
EVERY WEIGH BRIDGE, ITS COMPONENTS AND AUXILIARIES SHALL BE
SUBJECTED BY THE MANUFACTURER TO ALL THE MANDATORY TESTS AND CHECKS CALLED FOR IN
THE RESPECTIVE CODES/SPECIFICATIONS AND HPCL APPROVED QUALITY ASSURANCE
PLAN (TO BE SUBMITTED BY THE MANUFACTURER AFTER AWARD OF
PO). THOUGH THE EXTENT OF INSPECTION BY PURCHASER OR HIS AUTHORISED REPRESENTATIVE
SHALL BE AS UNDER BUT THE EXACT EXTENT OF HOLD POINTS SHALL BE MUTUALLY DECIDED BY
THE PURCHASER OR MANUFACTURER AND RECORDED IN THE INSPECTION TEST PLAN (TO BE
SUBMITTED BY THE MANUFACTURER AFTER AWARD OF PO):
THE SCOPE OF THIRD PARTY INSPECTION SHALL INCLUDE THE FOLLOWING AS A MINIMUM
REQUIREMENTS. ALL THE BELOW TESTS SHALL BE WITNESSED BY TPI-100% :
THE LIST OF SUCH TESTS SHALL INCLUDE THE FOLLOWING AS A MINIMUM :
1.0 PHYSICAL & VISUAL INSPECTION OF ALL COMPONENTS & PARTS OF WEIGH BRIDGE - 100 %
2.0 DIMENSIONAL INSPECTION OF WEIGH BRDIGE - 100 % 3.0 ALL WEIGH BRIDGE SHALL BE TESTED AS PER TECHNICAL SPECIFICATIONS. 4.0 PHYSICAL CHECKING OF OPERATION OF THE WEIGH BRIDGE. 5.0 OPERATION TIME.
6.0 VERIFYING THE TEST CERTIFICATES. 7.0 READINGS OF LOAD IN DISPLAY UNIT & MEMORY BACK UP IN PC. 8.0 MEASUREMENT OF PLATFORM LENGTH 9.0 OPERATION OF LOAD CELLS 10.0 OPERATIONS OF THE WEIGH BRIDGE
11.0 THICKNESS OF SHEET USED FOR CONTROL PANEL 12.0 CONTROL PANEL WIRING WITH STANDARD WIRING 13.0 REVIEW OF ROUTINE TEST REPORT OF SUPPLIER. 14.0 REVIEW OF MANUFACTURER’S TEST CERTIFICATES FOR THE LOAD CELLS.
15.0 AFTER ASSEMBLY, THE WEIGH BRIDGE SHALL BE SUBJECT TO THE FOLLOWING TESTS:
a. PERFORMANCE /FUNCTIONAL TEST:
HPCL SUPPLY OF WEIGH BRIDGE
Page 15 of 22
ON APPLICATION OF LOAD ON THE PLATFORM & TRANSMISSION TO LOAD CELLS IN THE FOLLOWING
SEQUENCE:
100% OF CAPACITY
125% OF CAPACITY
300% OF CAPACITY QUANTUM OF CHECK :100 %
b. MANUFACTURER TEST CERTIFICATE OF THE WEIGH BRIDGE & ITS VARIOUS COMPONENTS,
INDICATING DETAILS OF MATERIALS FOR INDIVIDUAL ITEMS & SCOPE OF INSPECTION INDICATED
ABOVE , SHALL BE PROVIDED ALONG WITH SUPPLIES.ALSO VERIFICATION OF MATERIAL OF
CONSTRUCTION (THROUGH MILL TEST REPORT )
QUANTUM OF CHECK :100 %
c. CYCLIC LOAD TEST ON LOAD CELLS & STRESS /FATIGUE ANALYSIS OF EACH TYPE SHALL BE
DONE WHICH WILL BE WITNESSED BY TPIA & THE CERTIFICATES SHALL BE OFFERED FOR
VERIFICATION DURING INSPECTION.
QUANTUM OF CHECK :100%
d. BENDING MOMENT TEST FOR PLATFORM SHALL BE DONE & WITNESSED BY TPIA.THE
CERTIFICATES SHALL BE OFFERED FOR VERIFICATION DURING INSPECTION
QUANTUM OF CHECK : 100%.
e. CERTIFICATE FOR CHEMICAL ANALYSIS OF LOAD CELLS & PLATFORM MATERIALS
QUANTUM OF CHECK : 100%
g. ANY OTHER MANDATORY OR SUPPLEMENTRY TESTS
16.0 THIRD PARTY INSPECTION AGENCIES
16.1 PURCHASER’S AUTHORISED REPRESENTATIVE (THIRD PARTY INSPECTION AGENCY)
16.2 ANY ONE OF THE FOLLOWING AGENCIES CAN BE SELECTED AND SHALL BE EITHER OF THE
FOLLOWING :
(i) IRS (II) DNV (III) LLYODS (IV) BV (V) SGS (VI) CEIL
17.0 OPERATION:ALL THE OPERATIONAL CHECKS TO BE SATISFACTORILY DONE AT FACTORY
AND SITE.
18.0 SUPERVISION OF INSTALLATION AND COMMISSIONING:
THE VENDOR TO SEND THEIR TECHNICAL EXPERT DURING INSTALLATION AND COMMISSIONING OF
HPCL SUPPLY OF WEIGH BRIDGE
Page 16 of 22
WEIGH BRIDGE WITHIN 48 HOURS OF INTIMATION FROM HPCL ON READINESS OF SITE.
VENDOR WILL SUBMIT 4 COPIES OF ALL THE TEST CERTIFICATES AS FOLLOWS:
2 COPIES - MATERIAL DESPATCH LOCATION WITH ORIGINAL COPY OF TEST REPORT
1 COPY - TO HPCL E&P DEPARTMENT, 2ND FLOOR ,GRESHAM HOUSE.
1 COPY - TO BE SUBMITTED TO COMMERCIAL DEPARTMENT,GRESHAM HOUSE ALONG WITH BILLS.
19.0 SPARE PARTS
RECOMMENDED SPARE PARTS SHALL BE LISTED SEPARATELY.
20.0 GAURANTEE
SUPPLIER SHALL PROVIDE FULL GUARANTEE AGAINST ANY MANUFACTURING DEFECTS / POOR WORK
MANSHIP / INFERIOR DESIGN OR QUALITY ETC. FOR A PERIOD OF 12 MONTHS FROM THE DATE OF
COMMISSIONING OR 18 MONTHS FROM THE DATE OF DELIVERY WHICHEVER IS EARLIER.DURING THIS
PERIOD , SUPPLIER WILL ARRANGE TO REPAIR / REPLACE ANY DEFECTIVE PART FREE OF COST OR
REPLACE COMPLETE ITEM AS REQUIRED . SUPPLIER SHALL GUARANTEE THAT ALL THE MATERIALS
SHALL BE SUPPLIED IN BRAND NEW CONDITION.
21.0 DESPATCH
21.1 WEIGH BRIDGE SHALL BE DRY, CLEAN AND FREE FROM MOISTURE, DIRT AND LOOSE FOREIGN
MATERIALS OF ANY KIND.
21.2 WEIGH BRIDGE SHALL BE PROTECTED FROM RUST,CORROSION AND ANY MECHANICAL
DAMAGE DURING TRANSORTATION, SHIPMENT AND STORAGE.
23.0 NOTE :
THE SUCCESSFUL BIDDER IS REQUIRED TO SUBMIT THE CONSTRUCTION DRAWINGS AS PER THE ABOVE
SPECIFICATIONS FOR H.P.C.L’S APPROVAL WITHIN 10 DAYS OF PLACEMENT OF LOI/PO.THE DRAWINGS
SHALL BE APPROVED BY HPCL WITHIN ONE WEEK OF THE SUBMISSION OF THE DRAWINGS BY THE
PARTY.
HPCL SUPPLY OF WEIGH BRIDGE
Page 17 of 22
CHAPTER III
1.1] QA PLAN
1.2] ITP
QUALITY ASSURANCE PLAN
1.3] DRAWING SCHEDULE
1.4] PROGRESS REPORT AND SCHEDULE
1.5] WAIVER AND DEVIATION
1.6] PROCUREMENT OF BOUGHT OUT MATERIALS
1.7] CALIBRATION RECORDS
1.8] INSPECTION TEST STATUS
1.9] QUALITY RECORDS
1.10] IDENTIFICATION AND TRACEABILITY
1.11] VENDOR DOCUMENT FOR REVIEW AND RECORDS
1.12] DOCUMENTS UNDER REVIEW CATEGORY.
1.13] FINAL DOCUMENTS
HPCL SUPPLY OF WEIGH BRIDGE
Page 18 of 22
QUALITY ASSURANCE PLAN AND INSPECTION & TESTING PLAN
REQUIREMENTS
1.1] QA PLAN
VENDOR DURING BIDDING STAGE SHALL SUBMIT HIS QUALITY ASSURANCE PLANS (QAP) CONSISTING OF
RELEVANT PROCEDURES COVERING VARIOUS ACTIVITIES LIKE DESIGN AND ENGINEERING, MATERIAL
PROCUREMENT , MANUFACTURE INSPECTION AND TESTING, DOCUMENTATION, DISPATCH TO SITE ,
ERECTION AND COMMISSIONING WHEREVER APPLICABLE AND MAINTENANCE OF QUALITY RECORDS
IN THE POST ORDER STAGE. THE VENDOR SHALL SUBMIT THE QAP TO THE SITE ENGINEER FOR
APPROVAL WITHIN 2 WEEKS FROM THE DATE OF RECEIPT OF LOI/PO WHICHEVER IS EARLIER. THE
QAP SHALL BE APPROVED BY THE AUTHORIZED REPRESENTATIVE OF HPCL WITHIN A WEEK OF
SUBMISSION
1.2] ITP
VENDOR SHALL SUBMIT INSPECTION AND TEST PLAN FOR APPROVAL WITHIN 2 WEEKS OF LOI/PO
AND BEFORE COMMENCEMENT OF MANUFACTURE TO THE SITE ENGINEER AS WELL AS TO THE
THIRD PARTY INSPECTION AGENCY (TPIA) THAT THE VENDOR WISHES TO APPOINT FOR CARRYING
OUT INSPECTION AND TESTING. THIS DOCUMENT SHOULD CLEARLY SPECIFY THE NAME, DESIGNATION
OF THE PERSON CONCERNED (WITH TELEPHONE/MOBILE NO AND EMAIL) AND COMMUNICATION
ADDRESS OF THE TPI.
1.3] DRAWING SCHEDULE
VENDOR SHALL SUBMIT A TOTAL INDEX OF DRAWINGS AND DOCUMENTS REQUIRED FOR
APPROVAL/REVIEW/RECORDS ALONG WITH THE SCHEDULED DATE OF
SUBMISSION OF EACH DRAWING/DOCUMENT WITHIN 2 WEEKS FROM DATE OF ISSUE OF LOI/ PO
WHICHEVER IS EARLIER.
1.4] PROGRESS REPORT AND SCHEDULE
VENDOR SHALL SUBMIT MONTHLY PROGRESS REPORT AND UPDATE PROCUREMENT ENGINEERING
AND MANUFACTURING SCHEDULE EVERY MONTH STARTING FROM 2
WEEKS FROM DATE OF ISSUE OF FOI/PO WHICHEVER IS EARLIER.
1.5] WAIVER AND DEVIATION
VENDOR SHALL STRICTLY COMPLY WITH THE PO STIPULATIONS AND NO DEVIATIONS SHALL BE
PERMITTED.
1.6] PROCUREMENT OF BOUGHT OUT MATERIALS
ALL CRITICAL MATERIALS SUCH AS CASTING, FORGING, FITTING, PRESSURE HOLDING PARTS ELECTRICAL
AND INSTRUMENT ACCESSORIES ETC. SHALL BE PURCHASED BY THE VENDOR FROM SUB- VENDORS
HAVING BV, LRIS OR CEIL APPROVAL. VENDOR SHALL SUBMIT A LIST OF BOUGHT OUT MATERIALS
FOR HPCL APPROVAL WITHIN 2WEEKS FROM THE DATE OF ISSUE OF FOI/PO WHICHEVER IS EARLIER.
HPCL SUPPLY OF WEIGH BRIDGE
Page 19 of 22
1.7] CALIBRATION RECORDS
VENDOR SHALL USE ONLY CALIBRATED MEASURING AND TEST INSTRUMENTS AND MAINTAIN
CALIBRATION RECORDS. VENDOR SHALL FURNISH RECORDS OF
CALIBRATION OF MEASURING AND TEST INSTRUMENTS INCLUDING RECALIBRATION RECORDS TO
THIRD PARTY INSPECTION AGENCY ON DEMAND.
1.8] INSPECTION TEST STATUS
INSPECTION AND TEST STATUS OF PRODUCTS SHALL BE IDENTIFIED BY USING MARKINGS.
AUTHORIZED STAMPS, TAGS, ROUTE CARDS, INSPECTION CARDS ETC. DURING THE COURSE OF
MANUFACTURE TO CLEARLY INDICATE ACCEPTANCE/ REJECTION OF TESTS/STAGES OF
INSPECTION PERFORMED DURING ITS MANUFACTURING CYCLE. THE IDENTIFICATION OF TEST
STATUS SHALL BE MAINTAINED AND RECORDS SUBMITTED AS AND WHEN DEMANDED BY
HPCL/TPIA.
1.9] QUALITY RECORDS
VENDOR SHALL MAINTAIN QUALITY RECORDS AS PER HIS PROCEDURES. INSPECTION REPORTS & TEST
RECORDS COPIES SHALL BE FURNISHED TO HPCL/TPIA.
1.10] IDENTIFICATION AND TRACEABILITY
VENDOR SHALL ESTABLISH AND MAINTAIN A STANDARD WRITTEN PROCEDURE FOR IDENTIFYING THE
PRODUCTS FROM APPLICABLE DRAWING SPECIFICATIONS OR OTHER DOCUMENTS DURING ALL STAGES
OF PRODUCTION DELIVERY AND INSTALLATION. A COPY OF THIS STANDARD PROCEDURE SHALL BE
MADE AVAILABLE TO HPCL/TPIA. THE VENDOR SHALL ENSURE THAT EACH PRODUCT WHICH IS GOING
IN THE PROCESS OF FABRICATION / MANUFACTURE / CONSTRUCTION
/ ERECTION HAS PROPER IDENTIFICATION THROUGHOUT THE PROCESS INCLUDING
THE FINAL OUTPUT.
1.11] VENDOR DOCUMENT FOR REVIEW AND RECORDS
GENERAL
1] ALL DOCUMENTS SHALL BE IN ENGLISH LANGUAGE AND SI SYSTEM OF UNITS.
2] REVIEW OF THE VENDOR DRAWING BY THIRD PARTY INSPECTION AGENCY / HPCL
WOULD BE ONLY TO REVIEW THE COMPATIBILITY WITH BASIC DESIGN AND CONCEPTS AND IN NO WAY
ABSOLVE THE VENDOR OF HIS RESPONSIBILITY TO COMPLY WITH PO REQUIREMENTS, APPLICABLE
CODES, SPECIFICATIONS AND STATUTORY RULES/REGULATIONS.
3] SUBMISSION OF DOCUMENTS FOR REVIEW/RECORDS SHALL COMMENCE WITHIN 2 WEEKS
FROM THE DATE OF ISSUE OF FOI/PO
4] THE VENDOR SHALL SUBMIT ALL DRAWINGS AND DOCUMENTS IN THREE COPIES AS
HPCL SUPPLY OF WEIGH BRIDGE
Page 20 of 22
STIPULATED IN THE VENDOR DATA REQUIREMENT ALONG WITH DOCUMENTS INDEX. THE DOCUMENTS
SHALL ALSO BE SUBMITTED IN SOFT COPIES TO EXPEDITE THE PROCESS OF APPROVAL/REVIEW.
VENDOR SHALL ENSURE THAT EACH DRAWING SHALL CONTAIN THE FOLLOWING INFORMATION:
PO NO NAME OF EQUIPMENT, TAG NO., NAME OF PROJECT, CLIENT, DRAWING/DOCUMENT TITLE,
DRAWING NO., REVISION AND DATE.
THE DRAWING DOCUMENT SHALL BE CHECKED APPROVED AND DULY SIGNED STAMPED BY THE VENDOR
REVISIONS AND DATE.
1.12] DOCUMENTS UNDER REVIEW CATEGORY.
FOLLOWING REVIEW CODES SHALL BE USED FOR REVIEW OF VENDOR DOCUMENTS / DRAWINGS.
AFI: APPROVED FOR INSPECTION
AFM: APPROVED FOR MANUFACTURING / FABRICATION AS PER COMMENTS VENDOR SHALL RESUBMIT
THE SAME AFTER INCORPORATING THE COMMENTS BEFORE CARRYING OUT FINAL INSPECTION BY TPIA
AND DESPATCH.
NOT APPROVED: RESUBMISSION REQUIRED IN CASES OF MAJOR NON- CONFORMITIES WITH RESPECT
TO PO SPECIFICATIONS.
1.13] FINAL DOCUMENTS
FINAL DRAWINGS/DOCUMENTS CONSISTING OF TECHNICAL DATA MANUAL AS A COMPILATION OF
AS-BUILT CERTIFIED DRAWING AND MANUFACTURING DATA AND TEST RECORDS DULY CERTIFIED
BY HPCL/TPIA SHOULD BE SUBMITTED IN THREE SETS ALONG WITH SOFT COPY OF THE SAME WITH
THE ORIGINAL COPY OF REPORTS TO SITE.
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS OF THE
MATERIAL/EQUIPMENTS (WHEREVER APPLICABLE) SHALL ALSO BE SUBMITTED IN THREE SETS
AND IN SOFT FORMAT.
HPCL SUPPLY OF WEIGH BRIDGE
Page 21 of 22
CHAPTER IV
SCHEDULE OF QUANTITIES
HPCL SUPPLY OF WEIGH BRIDGE
Page 22 of 22
SCHEDULE OF QUANTITIES
ITEM
NO.
DESCRIPTION QTY UNIT
1. SUPPLY OF 16m x 4m OF 60MT PITLESS TYPE
ELECTRONIC ROAD WEIGHBRIDGE COMPLETE WITH
REQUIRED COMPONENTS NAMELY, KIT, INDICATOR,
LOAD CELLS, PLATFORM, LED DISPLAY, P.C.PRINTER,
UPS ETC AS PER ATTACHED TECHNICAL
SPECIFICATIONS & SCOPE OF SUPPLY
1 EACH
2. SUPERVISION,CONSTRUCTION OF FOUNDATION,
INSTALLATION, CALIBRATION, STAMPING &
COMMISSIONING OF WEIGH BRIDGE
1 EACH