Transcript
![Page 1: Week 13 Deliverables Team Highlander. Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward](https://reader030.vdocuments.us/reader030/viewer/2022032703/56649f555503460f94c78e65/html5/thumbnails/1.jpg)
Week 13 Deliverables
Team Highlander
![Page 2: Week 13 Deliverables Team Highlander. Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward](https://reader030.vdocuments.us/reader030/viewer/2022032703/56649f555503460f94c78e65/html5/thumbnails/2.jpg)
Modifications from last Mock-Up
• Lever assembly is offset from walker• Ski assembly is now solid• Levers swing upward
![Page 3: Week 13 Deliverables Team Highlander. Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward](https://reader030.vdocuments.us/reader030/viewer/2022032703/56649f555503460f94c78e65/html5/thumbnails/3.jpg)
Working shots
![Page 4: Week 13 Deliverables Team Highlander. Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward](https://reader030.vdocuments.us/reader030/viewer/2022032703/56649f555503460f94c78e65/html5/thumbnails/4.jpg)
Working Shots
![Page 5: Week 13 Deliverables Team Highlander. Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward](https://reader030.vdocuments.us/reader030/viewer/2022032703/56649f555503460f94c78e65/html5/thumbnails/5.jpg)
Working Shots
![Page 6: Week 13 Deliverables Team Highlander. Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward](https://reader030.vdocuments.us/reader030/viewer/2022032703/56649f555503460f94c78e65/html5/thumbnails/6.jpg)
Reasons why old design is better
• Less footprint area• Less parts• More aesthetically pleasing• Handle rotation in constrained by frame; less
complex• No drilling through frame required• Able to collapse
![Page 7: Week 13 Deliverables Team Highlander. Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward](https://reader030.vdocuments.us/reader030/viewer/2022032703/56649f555503460f94c78e65/html5/thumbnails/7.jpg)
To do list for next week
• Contact REAR (Rehabilitation Engineering and Applied Research lab) about design
• Machine the pieces needed for welding (water jet); this includes all the pivot joints
• Begin machining the stopper legs using wood• Finalize CAD drawings