Transcript
Page 1: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Water Level Management on Mississagua Lake Chain Winter and

Spring 2013/2014

Ted Spence CCRAI Representative to Coalition for Equitable

Water Flow (CEWF) and Member of the CEWF Executive Committee

Cewf.ca

Page 2: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

TSW Marine Assets

2

Page 3: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Consider the Extremes of Our Reservoir Water level Experience in Recent Years

• 2009- normal year except for very high water as ice went out causing shore damage

• 2010- very little spring runoff and reservoirs did not fill until late July or early Aug.

• 2012- much lower than average water levels beginning in late May

• 2013 – very high spring and late fall levels from rainfall events.

• 2014 – 200%+ of normal snowpack, late ice out date, and very high spring runoff on River.

3

Page 4: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Mississagua Lake Levels 2014Dam Height with 8 Logs 2.44 m, Winter set 2 logs,

Avg Ann Fluct 1.35 m.

4

Page 5: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Mississagua Levels 2014

Page 6: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Mississagua Dam April 18, 2014

Page 7: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Mississagua Dam Friday 1:30 pmApril 19, 2014

Page 8: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Mississagua Dam Friday 1:30 pmApril 19, 2014

Page 9: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Mississagua Dam Friday 1:30 pmApril 19, 2014

Page 10: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Mississagua Dam Friday 1:30 pmApril 19, 2014

Page 11: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Our Intrepid Leader

Page 12: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Lou Phillips Rd Washout 1:30 pm Friday April 18, 2014

Page 13: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Friday Afternoon 3 Logs Replaced

Page 14: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

9:30am Saturday

Page 15: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Next Steps for CCRAI and CEWF

• Develop a “Preferred Water Level” submission to CEWF as part of enhanced information for TSW

• Present a draft “Preferred Water Level” proposal to CCRAI AGM in August for approval.

Page 16: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Preferred Water Levels Example

16

Page 17: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014

Important Link

CEWF.ca for links to Parks Canada TSW water level site

and TSW information

TSW is also now on Facebook


Top Related