Water Level Management on Mississagua Lake Chain Winter and
Spring 2013/2014
Ted Spence CCRAI Representative to Coalition for Equitable
Water Flow (CEWF) and Member of the CEWF Executive Committee
Cewf.ca
![Page 2: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/2.jpg)
TSW Marine Assets
2
![Page 3: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/3.jpg)
Consider the Extremes of Our Reservoir Water level Experience in Recent Years
• 2009- normal year except for very high water as ice went out causing shore damage
• 2010- very little spring runoff and reservoirs did not fill until late July or early Aug.
• 2012- much lower than average water levels beginning in late May
• 2013 – very high spring and late fall levels from rainfall events.
• 2014 – 200%+ of normal snowpack, late ice out date, and very high spring runoff on River.
3
![Page 4: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/4.jpg)
Mississagua Lake Levels 2014Dam Height with 8 Logs 2.44 m, Winter set 2 logs,
Avg Ann Fluct 1.35 m.
4
![Page 5: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/5.jpg)
Mississagua Levels 2014
![Page 6: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/6.jpg)
Mississagua Dam April 18, 2014
![Page 7: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/7.jpg)
Mississagua Dam Friday 1:30 pmApril 19, 2014
![Page 8: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/8.jpg)
Mississagua Dam Friday 1:30 pmApril 19, 2014
![Page 9: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/9.jpg)
Mississagua Dam Friday 1:30 pmApril 19, 2014
![Page 10: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/10.jpg)
Mississagua Dam Friday 1:30 pmApril 19, 2014
![Page 11: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/11.jpg)
Our Intrepid Leader
![Page 12: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/12.jpg)
Lou Phillips Rd Washout 1:30 pm Friday April 18, 2014
![Page 13: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/13.jpg)
Friday Afternoon 3 Logs Replaced
![Page 14: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/14.jpg)
9:30am Saturday
![Page 15: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/15.jpg)
Next Steps for CCRAI and CEWF
• Develop a “Preferred Water Level” submission to CEWF as part of enhanced information for TSW
• Present a draft “Preferred Water Level” proposal to CCRAI AGM in August for approval.
![Page 16: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/16.jpg)
Preferred Water Levels Example
16
![Page 17: Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014](https://reader035.vdocuments.us/reader035/viewer/2022062222/568158b9550346895dc60291/html5/thumbnails/17.jpg)
Important Link
CEWF.ca for links to Parks Canada TSW water level site
and TSW information
TSW is also now on Facebook