APPLICATION OF ASSIGNMENT MODEL IN PRECAST INDUSTRY
FOR OPTIMIZING RAW MATERIAL PROCUREMENT COST
[1]Urvashi Kshirsagar, [2] M. P. Kadam, [3] S. M. Waysal
[1] P.G. Student: Civil Department, [2] Head of Department: Civil Department, [3]
Assistant Professor: Civil Department
A large capital cost is required and involved with construction industry where in there is cast-
in-situ construction. To optimize this cost, now-a-days an approach of precast construction is
being introduced in industry. The paper aims to optimize raw material procurement cost by
different dealers/suppliers, using assignment model which is used to allocate suppliers/dealers
for procuring material.
Previously, study was carried out by various researchers on assignment model, its theory,
method of solving this problem, allocations etc. Best Candidate Method (BCM) is applied to
linear assignment problems.[1] Also, allocations of partially multi-skilled workforce to reduce
labour cost, jobs/tasks to machine is done for better and faster production, crew allocation to
masonry industry according to their skills, capabilities & personalities and teachers to courses,
etc. were done.[2-5]
The study is done to assign raw material procurement for precast industry to respective
dealers/suppliers to optimize procurement cost. Thus, Hungarian method gives optimum results
& also lays down its significance in precast industry for construction.
The objective of this article depicts identification of the problems faced by precast industry for
procurement of raw materials from suppliers /dealers, studying various optimization techniques
for optimizing initial raw material procurement cost using assignment model by allocating it to
different suppliers / dealers.
Precast Industry is set up precast concrete, a construction product by casting concrete is
reusable moulds cured during a controlled environment, transport to development site & lifted
up to place. Such products are manufactured by precast industry.
Assignment Model is used to allocate available no it respectively to an equal number of
activities. This allocation is done on one to one basis to optimize total costs of performing tasks
3
at a hand or maximize total profit of allocation.[6] In 1955, Mr. Koning of Hungary suggested
of the Hungarian method.[7] “Given n facilities and n jobs and given the effectiveness of each
facility for each job, the problem is to assign each facility to one and only one job so as to
optimize the given measure of effectiveness.”[8]
For data collection, many visits where conducted at precast industry. Also material used and
required for production of precast items was listed. The industry manufactures various
products, which includes RCC spun pipes, sloted pipes, V-type gutters, septic tanks, compound
poles, mosaic benches, tiled benches, Chainage stones, Km stones, paving blocks. Data was
collected by conducting a market survey. Rates and quotations were taken from different
dealers of material listed. The materials considered are cement, steel, anticorrosive chemicals
and aggregates. Different sizes of steel bars and different sizes of aggregates were considered
required at precast industry. Also different types of anticorrosive material were considered and
that too of different companies. It happened that dealers for different materials were either
sometimes different or same for same for some materials too. Matrix of these data was formed.
Separate matrix was formed each material, i.e. four matrices were formed for cement, steel,
anticorrosive chemicals and aggregates respectively. These matrices were then analysed using
assignment model.
The concluding remarks of the work are as follows:
1. The study shows that assignment model can be applied while procuring materials
from suppliers /dealers which are helpful for precast industry to make decision
while allocating building material suppliers / dealers.
2. Hungarian method gives best optimal results for allocation of material supplier /
dealer by formulation of assignment problem. Thus, it carries more weightage while
its introduction in precast industry.
3. The above used assignment problem techniques will be helpful for industry to carry
out allocations of material to particular suppliers / dealers in future.
References:
[1] H. A. Ahmad, “The best candidates method for solving optimization problems,” J.
Comput. Sci., vol. 8, no. 5, pp. 711–715, 2012.
[2] J. E. Gomar, ; Carl, T. Haas, and D. P. Morton, “Assignment and Allocation
Optimization of Partially Multiskilled Workforce.”
4
[3] F. Fadhil and K. Al-Abdulhameed, “A linear Programming Formulation of Assignment
Problems.”
[4] L. Florez, “Crew Allocation System for the Masonry Industry,” Comput. Civ.
Infrastruct. Eng., vol. 32, no. 10, pp. 874–889, 2017.
[5] P. I. Tillett, “An operations research approach to the assignment of teachers to courses,”
Socioecon. Plann. Sci., vol. 9, no. 3–4, pp. 101–104, 1975.
[6] S. Singh, G. C. Dubey, and R. Shrivastava, “A Comparative Analysis of Assignment
Problem,” 2012.
[7] X. Y. Ma, “Application of assignment model in PE human resources allocation,” in
Energy Procedia, 2011, vol. 16, no. PART C, pp. 1720–1723.
[8] D. S. Hira, “OPERATIONS.”
5
APPLICATION OF ASSIGNMENT MODEL FOR COST
OPTIMIZATION IN THE CONSTRUCTION INDUSTRY
[1]N. More [2] S. M. Waysal
[1] P.G. Student: Civil Department, [2] Assistant Professor: Civil Department
The optimization in mathematics, computer science, economics, and other fields, refers to
choosing the best element from some set of available alternatives [1]. Assignment problems
are the application of linear programming and this is particularly important in the theory of
decision making [2]. Assignment problems arise in diverse situations, where one needs to
determine an optimal way to assign 𝑛 subjects to 𝑚 subjects in the best possible way [3]. The
objective is to make assignments that minimize the total assignment cost or maximize the total
associated gain [4].
There is a need to study the application of cost optimization techniques in the construction
industry to cut down construction costs because the construction business is highly competitive
and associated with huge investments. The objective of this study is to minimize the cost of
materials by considering the problem of material supplier allocation to a construction project.
After reviewing the literature, a need of employing an assignment model in the construction
sector is identified. This study seeks to propose a new application of assignment problems in
the construction industry. In this study, the assignment model is applied to the construction
project in Nashik city. The application of the assignment model is elaborated through the
supplier allocation problem in a construction firm. The cost is minimized by preparing the
assignment model for the supplier of materials and the rates quoted by them. Optimum
allocation of building material suppliers is obtained by solving the cost matrix using the
Hungarian algorithm.
Hungarian method: The most widely used method for solving assignment problems is the
Hungarian method [4]. In this research article, the Hungarian method is applied in assigning
materials to the suppliers. The Hungarian algorithm deals with the optimal allocation of various
productive resources, especially for material suppliers who have different rates for materials.
6
A live project of CPM Realty in Nashik is undertaken as a case study for this work with a built-
up area of 6317.4 m2, which consists of Parking/Ground+7 floor building with 112 number of
flats and 6 commercial shop units. Application of the assignment model in a construction
project is carried out using a collection of data in the form of estimates, quantities of different
items with their rates quoted by different suppliers as an example. From the collected data, 4
assignment models are developed to optimize the cost of material.
Case 1: 6 building material suppliers are selected for the analysis those are supplying cement,
steel, coarse aggregate, fine aggregate, 4” bricks, and 6” bricks.
Case 2: 4 paint suppliers are selected for the analysis those are supplying luster paint, cement
paint, wall putty, and oil paint.
Case 3: 4 tile suppliers are selected for the analysis those are supplying 2’ x 2’ vitrified tile,
32’’ x 32’’ vitrified tile, glazed tile, and parking tile.
Case 4: 5 electrical item suppliers are selected for the analysis those are supplying the ceiling
fan, exhaust fan, tube light, foot lamp, and bell push.
The rates quoted by different suppliers are presented in the form of a matrix and are solved
using the Hungarian method.
The results are presented with the allocation of suppliers with the respective item. The total
amount is calculated using a unit rate and the quantity required for the project.
Case 1: Fine aggregate is assigned to supplier 1, coarse aggregate is assigned to supplier 2, 4”
bricks are assigned to supplier 3, cement is assigned to supplier 4, 6” bricks are assigned to
supplier 5, and steel is assigned to supplier 6.
Case 2: Wall putty is assigned to supplier 1, cement paint is assigned to supplier 2, luster paint
is assigned to supplier 3, and oil paint is assigned to supplier 4.
Case 3: Glazed tile is assigned to supplier 1, 32” x 32” vitrified tile is assigned to supplier 2,
2’ x 2’ vitrified tile is assigned to supplier 3 and parking tile is assigned to supplier 4.
Case 4: Bell push is assigned to supplier 1, the ceiling fan is assigned to supplier 2, the exhaust
fan is assigned to supplier 3, tube light is assigned to supplier 4, and foot lamp is assigned to
supplier 5.
Cost comparison: The total cost is calculated by adding the costs of all 4 cases which consists
of the cost of material obtained with and without the use of the assignment model.
Total cost with use of assignment model = Rs. 4,02,62,275.5/-
Total cost without the use of assignment model = Rs. 4,10,46,287.5/-
7
We plotted the graph as shown below. The graph shows the detailed comparison of the cost
involved in construction materials with and without using the assignment model.
Fig. 1. Detail comparison of cost of the material with and without the use of assignment
model
We concluded that,
This study demonstrates that the efficacious application of the assignment model to the
construction project consequences in substantial cost reduction.
From the results of the research conducted, it is concluded that the allocation of material
supplier of the construction project was not optimal. After using the Hungarian algorithm, the
optimum results of the assignment are concluded with considerable cost savings of Rs.
7,84,012/- which is almost 2% of total cost considered in the example.
This new application is proved to be more efficient than traditional methods used by the
construction firm to select the suppliers. The proposed system is going to help builders and
contractors to allocate material suppliers which will help them to reduce the construction cost
of their future projects.
References
[1] H. A. Ahmad, “The Best Candidates Method for Solving Optimization Problems,” J.
Comput. Sci., vol. 8, no. 5, pp. 711–715, 2012.
45
92
250
20
34
240
19
01
182.5
10
24
0000
53
68
65
15
47
0000
58
44
40
20
30
00
96
07
00
11
20
0
66
30
75
38
50
0
25
43
175
36
33
00
14
56
0
59
70
00
14
00
00
94
00
0
58
80
0
45
92
250
20
34
240
18
16
685.5
99
20
000
53
68
65
15
30
0000
56
90
60
19
60
00
92
37
50
11
20
0
56
83
50
35
00
0
25
43
175
36
33
00
14
56
0
55
72
00
13
44
00
90
24
0
56
00
0
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
16000000
18000000
To
tal
Co
st (
Rs.
)
Materials
Total cost without using
assignment modelTotal cost using assignment
model
Y- axis
X- axis
8
[2] H. Basirzadeh, “Ones Assignment Method For Solving Traveling Salesman Problem,”
J. Math. Comput. Sci., vol. 10, pp. 258–265, 2014, doi: 10.22436/jmcs.010.04.04.
[3] S. Faudzi, S. Abdul-Rahman, and R. Abd Rahman, “An Assignment Problem and Its
Application in Education Domain: A Review and Potential Path,” Adv. Oper. Res., vol.
2018, pp. 1–19, 2018, doi: 10.1155/2018/8958393.
[4] P. K. Gupta and D. S. Hira, OPERATIONS RESEARCH, Seventh Re. New Delhi: S.
Chand & Company PVT. LTD., 2014.
9
CHANGES AND CHALLENGES AFTER PANDEMIC (CIVID-19) IN AN
INFRASTRUCTURE DEVELOPMENT
[1]Ajay Shelorkar
[1] Assistant Professor: Civil Department
Abstract: The COVID–19 Pandemic outbreak directly influenced the growth of infrastructure
and the global economy. There is a continuing international response to the rapid disruption of
critical infrastructure sectors and industries. Pandemic COVID–19 affected water and
sanitation, waste, logistics, electricity, global communication, and airport. In a few exceptions,
the COVID-19 pandemic expected to delay global water sector investments. It has also made
operational reliability more critical due to the cost of disruption. These organizational
challenges arise from changes in market trends, fluctuations in supply, and the numerous
emergency measures used by governments to deal with the pandemic. Research founded on to
date, COVID-19 does not tend to propagate across the waste supply chain. The SWM market,
however, has felt impacts. Lockdown initiatives have substantially lowered the demand for
electricity in both the commercial and industrial sectors over the past few months. Many
telecommunications players – from broadband to mobile to data center operators - have
benefited from a surge in data and voice traffic. As a result, the telecoms market performs well
in comparison with other sub-sectors of infrastructure. COVID-19 had immediate and drastic
effects on airport traffic and revenue. In the immediate aftermath, the economic downturn
which follows the pandemic continues to cause lower demand for air travel. The building,
infrastructure, and real estate segments are the country's second-largest employment providers
after agriculture. The infrastructure and building sectors are highly responsible for driving the
overall development of India and need to focus more ruled the country's timely establishment
of world-class infrastructure.
Keywords: COVID-19, Water and sanitation, Waste sector, Logistics, Power
I. Introduction
COVID-19 Pandemic is an unpresidential situation for everyone living in the world.
Infrastructure development playing a significant role in the economy of any country and
shows the progress of the country. As per the National Statistical Commission headed by
Dr C. Rangarajan, attempted to identify infrastructure based on some characteristics. The
10
following composition of infrastructures. 1. Electricity generation 2. transmission and
distribution 3. Gas generation and distribution through pipes 4. Water works and supply 5.
Non-conventional energy generation and distribution 6. Railway tracks, signaling system
and stations 7. Roads and bridges, runaways and other airport facilities 8. Telephone lines
and telecommunications network 9. Pipelines for water, crude oil, slurry, etc.10.Waterways
11. Port facilities 12. Canal networks for irrigation. All above twelve identified sectors of
infrastructure development, out of this sector some sectors are affected more and some less,
as per the data availability some sectors are described under following given chapter.
II. Objective
The following are the objective of present paper
1) To study the impact of unpresidential situation pandemic COVID 19 on infrastructure
development.
2) To evaluate and accept changes after pandemic COVID 19.
3) To study challenges after pandemic COVID 19.
III. The impact of pandemic COVID 19 on infrastructure development
The lockdown resulted in numerous infrastructure building sites staring at closure because it is
primarily due to an impact on labor movement due to the shutdown and also due to supply
chain disturbances that could contract further as more states implement COVID-19 lockdown.
The fiscal situation for both the Center and states in the construction sector is already
worsening, and continued financing of infrastructure capital spending would be a problem
shortly. However, many of these problems would be further compounded by the aid programs
being rolled out by several states to offset the loss of revenue caused by the lockdowns. It will
further underline the willingness of the government to spend on infrastructure over the next
one to two years, further dampening the construction and development segment. Figure 1.
Shows that representative photograph of lockdown during pandemic COVID -19. The most
destitute in the world received the COVID-19 shock in addition to the significant deficits in
existing urban water and sanitation services, all pointing to a potentially overwhelming burden
to contain the virus. Throughout developing countries, poor access, accessibility, and quality
of water, sanitation, and hygiene (WASH) pose risks. Big towns also face threats from
population density and details. A conducted by the world bank tool to recognize contagion
"hotspots" pointed to the city's cramped living conditions and inadequate public services,
11
especially inadequate environmental services and sanitation, as significant risk sources for
infection in large developing market cities such as Cairo and Mumbai.
The COVID-19 pandemic has reduced worldwide passenger traffic. The disruption started in
Asia-Pacific, but the rapid spread of the virus and the containment measures implemented in
response, such as government recommendations to avoid travel and airport closures, resulted
in a 22.9 % drop in global air traffic in February and 53.1 %drop in ACI's 2 March.
Fig.1.Representative photo of Pandemic COVID-19
In sharp contrast to many other sectors, because it is recognized as an essential service, the
telecommunications sector has usually been exempted from significant COVID-19-related
limitations, such as stay-at-home orders and quarantine provisions. Several
telecommunications providers have been boosted by the short-term increase in data traffic and
expanded usage of broadband networks, as more people are working from home and rely on
video conferencing to hold meetings. Traffic growth has demonstrated an increased reliance
on connectivity and digital services. payments restrict distribution companies' ability to pay
power producers under long-term, take-or-pay power purchase (PPAs) agreements. Many
electrical distribution enterprises need significant and immediate liquidity support. This is a
significant concern for investors who rely on power purchase agreements (PPAs) to recover
and make a return on the investment. In more liberalized markets, the drop-in demand has
resulted in the collapse of electricity market prices, hurting power generation companies.
IV. Evaluate and accept changes after pandemic COVID 19
Investment contracts may be stopped given the large initial expenditure required and this will
likely lead to liquidity problems during and after the pandemic. Projects expected to start may
This Photo by Unknown Author is licensed under CC BY-SA-
NC
This Photo by Unknown Author is licensed under CC
byBY-NCBY-SA
12
not see the light of day, as they may take a back seat and linger even after the pandemic, as
investors try to manage the existing range or portfolio. Investors who typically have leveraged
exposure are more likely to be affected by the pandemic, with defaults in repayment
responsibilities by the investee establishments. We assume to see infrastructure funds and
investors diversify their portfolios from traditional infrastructure assets to telecommunications,
data centers and utilities, as most of the above-mentioned can be considered necessities. In
addition, the following point considered and accept changes after pandemic COVID -19.
1. The infrastructure sector develops personnel and equipment (mainly fixed costs), so
businesses and contractors with high debt rates and low cash reserves can face a liquidity
disaster.
2. Supply chain failures are likely to occur, impacting the suitability of the parts and equipment,
and potentially impact projects.
3. Counterparty risk causing current assets to default over the inability to continue operations.
4. Should insurance policies be taken on these properties; defrayals can be enabled.
5. Owing to the lock-down, there was a downward trend in demand and usage of major
infrastructure assets, such as transportation. This can still influence demand even after COVID-
19, as well as revenues.
6. Projects initially executed in foreign currency face the risk of conversation rate fluctuations,
and these present assets that take a toll for the lower, unless previously avoided or planned.
7. Force Majeure clauses may be enabled if it is understood that the section applies to particular
related events and also depends on whether the list of events is complete or not.
8. Opportunity of claims resulting from failure by appropriate contracting parties to abide by
the terms of the contract.
V. Challenges after pandemic COVID 19
The following question are arising in the form of challenge in an infrastructure development
1. Are projects in the development phase still feasible and bankable given changes in the
monetary and social environment?
13
2. How much will project planning pre-financial close be affected? Will the assets generate
enough revenue to cover the costs and risk of the investments?
3. How will the pandemic affect private sector contribution in infrastructure development and
financing going forward?
4. For assets in operations, will investors be able to recover funds invested as well as expected
returns?
5. How long can the public sector honor signed agreement(s)?
VI. Conclusion
The following conclusion are drawn on above discussion of pandemic Covid-19: One can
expect that infrastructure funding will take a downward drop in the short to medium term.
Though, once the pandemic is positively contained, the attention will prerequisite to move from
disaster management to supporting to sufficiently invest in infrastructure for development, as
well as preventing and qualifying the influence of future outbreaks contractually.
References
[1] Rajesh Sinha, James D. Michelsen, Elcin Akcura and Lamin Njie “Impact on the Waste
Sector” International Finance Corporation (IFC), a member of the World Bank Group.2020
[2] George Butler, Rogerio G. Pilotto, Youngki Hong and Emelly Mutambatsere “The Impact
of COVID-19 on the Water and Sanitation Sector” International Finance Corporation
(IFC), a member of the World Bank Group.2020
[3] Ian Twinn, Navaid Qureshi, Maria López Conde, Carlos Garzón Guinea, Jiayuan Luo, and
Harsh Gupta “The Impact of COVID-19 on Logistics” International Finance Corporation
(IFC), a member of the World Bank Group.2020
[4] Tonci Bakovic, Roy Kroese, Nuru Lama, and Elcin Akcura “The Impact of COVID-19 on
the Power Sector” International Finance Corporation (IFC), a member of the World Bank
Group.2020
[5] Natasha Veligura Karl Ka-Ki Chan, Ferdinand van Ingen, and German Cufre “COVID-
19’s Impact on the Global Telecommunications Industry” International Finance
Corporation (IFC), a member of the World Bank Group.2020
14
[6] Ian Twinn, Navaid Qureshi, Daniel Sebastian Perea Rojas and Maria Lopez Conde “The
Impact of COVID-19 on Airports: An Analysis” International Finance Corporation (IFC),
a member of the World Bank Group.2020
[7] Dr. C. Rangarajan National Statistical Commission 5th Sept,2001
[8] Evaluating the Impact of COVID-19 on the Demand for Construction Equipment in India
by 2025 - ResearchAndMarkets.com
[9] The-Sustainable-Development-Goals-Report-2019
[10] Temitope Odukoya, Akinola Akinboboye, Bamigbetan Oladotun and Margaret
Oghumu “The Impact of COVID-19 on infrastructure projects and assets” Deloitte,2020
15
USE OF RUBBER AS AGGREGATE IN CONCRETE
[1]Sakshi Chopada [2] Sejal Gholap[3] Anvay Kale [4] Dr. Pranita Balve
[1] , [2], [3] TE Civil Students, Civil Department, [4] Assistant Professor: Civil
Department
Concrete is one of the main components in any concrete masonry construction & one of the
largest consumers of natural resources. In order to make concrete industry sustainable, it is
necessary to introduce waste material to serve the purpose.
Tyre rubbers are widely used in day to day life. It has been recognized that tyre rubbers go
to waste on large scale. The land filling of waste tyre rubbers is undesirable because they are
not environment friendly.
Unit weight of concrete block decreases with increase in rubber percentage in concrete. This
will act as a light weight concrete. If cost comparatively study taken into consideration, then
cost can be saved as more as possible with increase in percentage of rubber in concrete. But
there is limitation for using rubber in concrete because of it's effect on strength which could be
overcome.
Thus, we would like to state that rubber could be used as aggregate, which makes the waste
to be best.