Download - VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004
![Page 1: VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004](https://reader031.vdocuments.us/reader031/viewer/2022012922/55154b0a5503465e608b646f/html5/thumbnails/1.jpg)
VDL Mode 4 Cosite Investigations
ACP WG-M 9th Meeting, Agenda item 3
Montreal, October 2004
![Page 2: VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004](https://reader031.vdocuments.us/reader031/viewer/2022012922/55154b0a5503465e608b646f/html5/thumbnails/2.jpg)
13-14/10/04COMT31
Cosite Investigations Plan
Developed with the contribution of several parties at a meeting hosted by EUROCONTROL
Identifies the required activities to complete the investigations
Lays out a strategy for the test cases to be investigated
![Page 3: VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004](https://reader031.vdocuments.us/reader031/viewer/2022012922/55154b0a5503465e608b646f/html5/thumbnails/3.jpg)
13-14/10/04COMT31
EUROCONTROL Work Plan
Cosite Investigations work organised in three phases Phase 1: development of cosite interference testing scenarios
and detailed testing plans (focus of current work); Phase 2: actual testing using the scenarios and tests defined in
Phase 1; Phase 3: evaluation of test results
![Page 4: VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004](https://reader031.vdocuments.us/reader031/viewer/2022012922/55154b0a5503465e608b646f/html5/thumbnails/4.jpg)
13-14/10/04COMT31
Scheduling of work
Q4 2004 Completion of Phase 1 Initiation of test campaign (Phase 2)
Q2 2005 Completion of Phase 2
Q3/Q4 2005 Completion of Phase 3
![Page 5: VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004](https://reader031.vdocuments.us/reader031/viewer/2022012922/55154b0a5503465e608b646f/html5/thumbnails/5.jpg)
13-14/10/04COMT31
Other related activities
voice transmissions profile statistical analysis considering both ATC & AOC current usage of VHF voice radio based on data obtained from a major European airline proposes voice usage profile as input to cosite investigations
voice receptions profile preliminary analysis considering signal levels only analytical-based and derives assumptions based on current airspace regimes
![Page 6: VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004](https://reader031.vdocuments.us/reader031/viewer/2022012922/55154b0a5503465e608b646f/html5/thumbnails/6.jpg)
13-14/10/04COMT31
Current Work: Phase 1
Current Status development of detailed testing scenarios and testing plans Contract with ISA Telecoms to carry out Phase 1
Details will be presented by ISA TELECOMS