Damien VUILLET Technical and sales meeting – April 2012
Technical and sales meeting
Vaux le Vicomte Castle
![Page 2: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/2.jpg)
Damien VUILLET Technical and sales meeting – April 2012
Main specifications :-Renovation of the main dome with no support on it
-Castle opened to the visitors
-Access of the working site above the river
-Scaffold with canopy on each face
-Keder roof at the top
![Page 3: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/3.jpg)
Damien VUILLET Technical and sales meeting – April 2012
3D view
![Page 4: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/4.jpg)
Damien VUILLET Technical and sales meeting – April 2012
3D view with only steel deck
![Page 5: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/5.jpg)
Damien VUILLET Technical and sales meeting – April 2012
The footbridge access
-Length of 19m
-Assembled on ground then put in by crane
-7T500 of ballast for the stability
![Page 6: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/6.jpg)
Damien VUILLET Technical and sales meeting – April 2012
Principle of the scaffold
Creation of 4 scaffolds beams
Top view
![Page 7: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/7.jpg)
Damien VUILLET Technical and sales meeting – April 2012
Front view Middle view
No support on the dome
![Page 8: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/8.jpg)
Damien VUILLET Technical and sales meeting – April 2012
Rear view
Fixation on the wooden skeleton
![Page 9: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/9.jpg)
Damien VUILLET Technical and sales meeting – April 2012
Section in the middle of the dome
Fixation on the wooden skeleton Last level of anchoring (3 plugs)
![Page 10: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/10.jpg)
Damien VUILLET Technical and sales meeting – April 2012
![Page 11: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/11.jpg)
Damien VUILLET Technical and sales meeting – April 2012
![Page 12: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/12.jpg)
Damien VUILLET Technical and sales meeting – April 2012
![Page 13: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/13.jpg)
Damien VUILLET Technical and sales meeting – April 2012
![Page 14: Vaux le vicomte](https://reader034.vdocuments.us/reader034/viewer/2022042701/55a203dc1a28ab38268b48b6/html5/thumbnails/14.jpg)
Damien VUILLET Technical and sales meeting – April 2012
-150t of LAYHER scaffold system
-760kg of wind force by plug
-1160kg on each wooden fixation
-Maximum load per standard : 3580kg