![Page 1: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/1.jpg)
İsmail ERGÜNEŞCengiz, Kolin, Limak OGGYönetim Kurulu Üyesi
![Page 2: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/2.jpg)
10.04.2023 2
Agenda• Company Profile• Market Approach• Policy and Priorities of Non-Technical Losses• AMR • Information Systems
![Page 3: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/3.jpg)
10.04.2023 3
Company Profile
• 38.billion KiloWatts of consumption• 10 million / 33 million subscribers
![Page 4: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/4.jpg)
10.04.2023 4
Market Approach• Distribution
o We want to measure ..• Quality of our services (SAIDI and SAIFI)• Our customer satisfaction• Performance of our workers• Technical losses
o Technical losses from all layers within distribution systemso so that we will be the role model for distribution companies around the
globe.
• Retailo We want to convert ourselves from a subscriber oriented structure to a
customer oriented one.
![Page 5: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/5.jpg)
10.04.2023 5
Policy and Priorities of Non-Technical
Losses• Policy
o To monitor the distribution system from it first sources to the farthest end points, collecting meaningful data from each node of the network.
o Analyzing the combined data warehouse to find root causes for non-technical losses
• Prioritieso To measure consumption of free consumers via AMRo it is not feesable to monitor the line for all customers, instead a
network based modelling for residential consumers is required
![Page 6: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/6.jpg)
10.04.2023 6
AMR• Information Systems Infrastructure
o Separated systems established o 60.000 modem can be connected to the systemo Up to 2.000.000 modems can be managed by the system with parallel
expansiono 8 different meter make/model can be reado Telemetry information can be transferred via 2 different modem
make/models• Tests are still in progress on different modem brands
• Field Statuso One of the fastest field installations has been achieved with about 200
modem installations per weeko More then 3000 modems has already been installed
• Problems encounteredo Communication infrastructure problems (Mobile network coverage problem)o Integration of data read from the field into the CIS system
![Page 7: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/7.jpg)
10.04.2023 7
AMR• Current Status
o Live data transfer from more than 3000 modems• Consumption %30
o 9000 modes will be added in 2013• Consumption %70
![Page 8: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/8.jpg)
10.04.2023 8
Information Systems• Our vision
o A Dynamic management approach based on processes and datao Maximum use of information systems and technologies to improve
performance and measurability
• Our IS Visiono continuously communication and interaction
• Software systems• Automation systems
o Automation systems which will be part of the unified solution
![Page 9: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/9.jpg)
10.04.2023 9
Which systems do we need?
![Page 10: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/10.jpg)
10.04.2023 10
• Where are we now?o We have revised processes by answering the question how an EDAŞ
should be run?. o Continue purchasing process
![Page 11: U.S - Turkey Smart Grid Workshop - İsmail Ergüneş](https://reader036.vdocuments.us/reader036/viewer/2022082916/549771b8b479596f4d8b5159/html5/thumbnails/11.jpg)
10.04.2023 11
Thank You