Transcript
Page 1: U.S. Department of Transportation

U.S. Department of TransportationU.S. Department of TransportationFederal Highway AdministrationFederal Highway Administration

THE

PERFECT STORMTHE

PERFECT STORM

Mary PetersMary PetersAdministratorAdministratorFederal Highway AdministrationFederal Highway Administration

National Stone, Sand and Gravel AssociationNational Stone, Sand and Gravel AssociationJanuary 24, 2004January 24, 2004

Page 2: U.S. Department of Transportation

U.S. Department of TransportationU.S. Department of TransportationFederal Highway AdministrationFederal Highway Administration

THE

PERFECT STORMTHE

PERFECT STORM

Mary PetersMary PetersAdministratorAdministratorFederal Highway AdministrationFederal Highway Administration

National Stone, Sand and Gravel AssociationNational Stone, Sand and Gravel AssociationJanuary 24, 2004January 24, 2004

Page 3: U.S. Department of Transportation
Page 4: U.S. Department of Transportation

2020

Page 5: U.S. Department of Transportation

0

5

10

15

20

25

30

35

40

45

1980 2000 2020

Mil

lio

ns

of

Lan

e M

iles 4

3

2

1 Tri

llio

ns

of

Veh

icle

Mil

es T

rave

led

VMT

Lane Miles

VMT Double 2020

Page 6: U.S. Department of Transportation

Truck Tonnage

Freight Tonnage

Double 2020

Page 7: U.S. Department of Transportation

• Increased Safety Funding • Strong Infrastructure• Improved Operations• Long Range Planning• Environmental Stewardship

Page 8: U.S. Department of Transportation

• Increased Safety Funding• Strong Infrastructure• Improved Operations• Long Range Planning• Environmental Stewardship

Page 9: U.S. Department of Transportation

• Highways for LIFE• Safety• Quality• Research• Work Zones

Ongoing Efforts

Page 10: U.S. Department of Transportation

• Highways for LIFE• Safety• Quality• Research• Work Zones

Ongoing Efforts

Page 11: U.S. Department of Transportation

7 Biggest Cost Items:

PavementsStructuresMajor ProjectsCorridor ProjectsInterchangesWideningNew Highways

Page 12: U.S. Department of Transportation

Building Blocks• Know the Impacts of Decisions

• Plan Long Range

• Collect the Right Data

• Use Economic Tools

• Focus on National Highway System

• Prepare for Future Reauthorizations

Page 13: U.S. Department of Transportation

“CHARGE”

In order to deal with the PRESENTPRESENT and provide for the FUTUREFUTURE, we must turn the page of history and do some heavy lifting.


Top Related