Partnership Contracts
08
28
Exploration
Development
Exploitation
Ø
§
§
Ø
§
§
§
§
contracts under exploration phase :
02 concluded under Law 86-14
06 concluded under Law 05-07
contracts under development & exploitation phase:
24 Production Sharing Contracts (PSC)
01 Risk Service Contract (RSC)
02 Participation Contracts
01 contract concluded under Law 05-07
The portfolio of projects in Partnership consists of thirty six (36) contracts: Eight (8) contracts are under the
exploration phase and twenty eight (28) under the development and exploitation phase.
![Page 3: Upstream Joint Venture Projects - energy.gov.dz · Upstream Joint Venture Projects. 2 Partnership Contracts 08 28 Exploration ... Gas lift Injection Capacity : 2,2 MM CM/D & 3,2 MM](https://reader031.vdocuments.us/reader031/viewer/2022013008/5ca20fdf88c9932f098d5c46/html5/thumbnails/3.jpg)
3
National Mining Domain
![Page 4: Upstream Joint Venture Projects - energy.gov.dz · Upstream Joint Venture Projects. 2 Partnership Contracts 08 28 Exploration ... Gas lift Injection Capacity : 2,2 MM CM/D & 3,2 MM](https://reader031.vdocuments.us/reader031/viewer/2022013008/5ca20fdf88c9932f098d5c46/html5/thumbnails/4.jpg)
4
Partners
![Page 5: Upstream Joint Venture Projects - energy.gov.dz · Upstream Joint Venture Projects. 2 Partnership Contracts 08 28 Exploration ... Gas lift Injection Capacity : 2,2 MM CM/D & 3,2 MM](https://reader031.vdocuments.us/reader031/viewer/2022013008/5ca20fdf88c9932f098d5c46/html5/thumbnails/5.jpg)
5
History record of joint operated projects which came on stream since 1995
1995 Sonatrach / Eni Bir RebaaSonatrach / Total Hamra
1996Sonatrach / BP Rhoude El BaguelSonatrach / Cepsa Rhoude el KhroufSonatrach/ Petrocanada Tamadanet
1998 Sonatrach / Anadarko / Eni / Maersk BerkineSonatrach / Repsol / Samsung / Inchon Tifernine
1999 Sonatrach / Total / Repsol Tin Fouye Tabankort2000 Sonatrach / Hess El Gassi, Agreb et Zotti
2002 Sonatrach / Cepsa/ Anadarko / Eni / Maersk / Conocophillips / Talisman Ourhoud
2003Sonatrach / Conocophillips / Talisman Menzel Ledjmet NordSonatrach / Sinopec ZarzaitineSonatrach / Bhpbilliton Ohanet
2004 Sonatrach / Eni / Bhpbilliton ROD & SatellitesSonatrach / BP / Statoil In Salah
2006 Sonatrach / BP / Statoil In AmenasSonatrach / CNPC Touat
2013 Sonatrach / FCP MLESonatrach / Anadarko / Eni / Maersk / Conocophillips / Talisman El Merk
Year Joint venture Perimeters
Major Milestones
![Page 6: Upstream Joint Venture Projects - energy.gov.dz · Upstream Joint Venture Projects. 2 Partnership Contracts 08 28 Exploration ... Gas lift Injection Capacity : 2,2 MM CM/D & 3,2 MM](https://reader031.vdocuments.us/reader031/viewer/2022013008/5ca20fdf88c9932f098d5c46/html5/thumbnails/6.jpg)
6
OURHOUD, EL GASSI, BERKINE
Ourhoud El Gassi Berkine
Main Oil Facilities
Processing Capacity: 230 x103 BOPD
Water Injection Capacity : 54 800 CM/D
Gas lift Injection Capacity : 2,2 MM CM/D & 3,2 MM CM/D reinjection
Storage Capacity: 3 x 37 970 CM
Shipment Capacity: 3 x 945 CM/H
Production Capacity : 75 x103 BOPD
Injection Capacity of miscible gas :6 MM CM/D
Water Injection Capacity : 60 x 103 BWPD
Storage Capacity: 22 000 CM
Shipment Capacity: 80 000 BOPD
Production Capacity: 285 x103 BOPD
Gas Injection Capacity : 16 million CM/D
Water Injection Capacity: 325 000 BWPD
Storage Capacity : 3 x 90 000 Barrels
Shipment Capacity: 375 000 BOPD
Features of main surface facilities
![Page 7: Upstream Joint Venture Projects - energy.gov.dz · Upstream Joint Venture Projects. 2 Partnership Contracts 08 28 Exploration ... Gas lift Injection Capacity : 2,2 MM CM/D & 3,2 MM](https://reader031.vdocuments.us/reader031/viewer/2022013008/5ca20fdf88c9932f098d5c46/html5/thumbnails/7.jpg)
7
Features of the main surface facilities
Oil:98 307 BOPD
Condensate:28 825 Barrels / D
Gas:575 MM Scf/d
Water:183 000 BWPD
LPG:31 079 Barrels / D
Oil:2 x 21 961 CM
Condensate:2 x 11 700 CM
Oil:100 000 BOPD
Condensate:55 000 Barrels / D
LPG:30 000 Barrels / D
LPG:2 X 500 CM
Production capacity: Injection capacity Storage capacity Shipping capacity
El Merk First Oil 03/2013
![Page 8: Upstream Joint Venture Projects - energy.gov.dz · Upstream Joint Venture Projects. 2 Partnership Contracts 08 28 Exploration ... Gas lift Injection Capacity : 2,2 MM CM/D & 3,2 MM](https://reader031.vdocuments.us/reader031/viewer/2022013008/5ca20fdf88c9932f098d5c46/html5/thumbnails/8.jpg)
8
MAIN GAS PROJECTS: IN AMENAS, GTFT, IN SALAH
In Amenas TFT In Salah
Main Gas Facilities
Processing Capacity : 29,9 x106 CM/D
Production Capacity: 24,7 x106 CM/D
Condensate Production Capacity:4 460 Tons/D
LPG Production Capacity:2 630 Tons/D
Processing Capacity: 21,4 x 106 CM/D
Storage Capacity :Condensate : 14 000 CM
¨LPG : 1 500 CMShipment Capacity:
Gas : 18,6 x 106 CM/D Condensate : 2 812 Tons/D
LPG : 2 606 Tons/D
Gas Production Capacity30,87 x 106 CM/D
CO2 Injection Capacity : 1,6 x 106 CM/D
Shipment Capacity: 30 x 106 CM/D
Features of the main surface facilities
![Page 9: Upstream Joint Venture Projects - energy.gov.dz · Upstream Joint Venture Projects. 2 Partnership Contracts 08 28 Exploration ... Gas lift Injection Capacity : 2,2 MM CM/D & 3,2 MM](https://reader031.vdocuments.us/reader031/viewer/2022013008/5ca20fdf88c9932f098d5c46/html5/thumbnails/9.jpg)
9
Gas Treatment capacity:
8,9 x 106 CM/D
Crude oil Treatment capacity:
32 000 BOPD
CondensateTreatment capacity:
9 600 Barrels/D
Water Treatment capacity:
18 000 BWPD
LPGTreatment capacity:
14 360 Barrels/D
Features of the main surface facilities
MLE First Gas 01/2013
![Page 10: Upstream Joint Venture Projects - energy.gov.dz · Upstream Joint Venture Projects. 2 Partnership Contracts 08 28 Exploration ... Gas lift Injection Capacity : 2,2 MM CM/D & 3,2 MM](https://reader031.vdocuments.us/reader031/viewer/2022013008/5ca20fdf88c9932f098d5c46/html5/thumbnails/10.jpg)