Page 1: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Upgrade of SM18 Infrastructure

on behalf of BE/RF-KCA section

Page 2: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Contents

• Cryogenics– Vertical test stand V3– Horizontal bunker M7

• Klystron• Wave guides

• Status and timescale

Page 3: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Cryogenics– Vertical test stand V3

Yesterday

Page 4: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Old separated lines

Warm up bath for pumping

Page 5: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Tomorrow

Welded connection

Common insulation vacuum

Integrated pumping

New cryostat with active screening and earth magnetic field compensation

Page 6: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Internal tubing with exchanger and valves

Surrounded by superinsulation

Page 7: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

4 Cryo service modules in workshop oct.12

Internal section of the distribution line.Cold He return make screening of the liquid He delivery

Page 8: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section
Page 9: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

V3,4,5,6 Cryo service modules welded in SM18

Page 10: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Cryogenics– Horizontal bunker M7

CCDTL

Dismantling old lines

Page 11: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section
Page 12: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Klystron• Operating frequency f0 : 704.4 MHz • Peak output power at saturation and load VSWR ≤ 1.05 ≥ 1.5 MW • Average output power at saturation and load VSWR ≤ 1.05 ≥ 150

kW • Operating point, below klystron saturation ≤ -1.5 dB • Saturated gain ≥ 40dB • Drive power max 200 Watts • Peak cathode voltage (Ub) at rated output power ≤ 115 kV • Peak cathode current (Ib) at rated output power ≤ 25 A • HV pulse duration 2 ms • HV rise & fall time (each) 80 - 150 μs • RF pulse duration (plateau) 1.7 ms 300 μs(LLRF)+1400 μs(Beam)• Repetition rate 50 Hz

Page 13: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Wave Guides• Integration in M7 well advanced (BE/RF, EN/MME (drawing office))

• Power distribution• Cryomodule (incl. slope)• New standard 2 kelvin service module

• Still to be done:• Detailed integration of cryomodule repair scenarios

• (i.e. how to lift the top cover of the CM?)

• Cabling (RF and Cryo)• SPL valve box to build

Page 14: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

• Adaptation of Wave guides to module change of tilt

• Tests at 0% and 2 (4?) % slope:• Will require WG distribution modifications (1-2 hours)• CM lifting device to be defined

Page 15: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Status & timescale (1)• Procurement of equipment:

• Klystron (1x): 1.5 MWp ordered, delivery end Summer ‘13

• Circulator (1x): ordered, delivery Summer ’14 (on purpose, for budget reasons)

• RF loads (3x): 1.5MWp ordered, delivery January ’13

• Waveguides: special pieces (magic tees, bends, bellows) ordered at Mega Industries (USA) (≈50 k$) all straight parts from Spain (≈50 kEuros)

• Modulator: delivery expected by Fall’13 (tbc by D. Nisbet)

• Electrical power: 3*400V 300A reserved with 400A upgrade on ERD2/M18

Page 16: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Status & timescale (2)

• Key dates:

• Now -> March ‘13: SM18 Cryo distribution replacement • March -> End Summer ‘13: CCDTL tests (Linac 4) • September -> December ’13: SPL HPRF system installation

• Providing the L4 RF tests are moved in Bld150 (3 MeV test stand)? (tbc by F. Gehrig)

• Controls:

• HPRF controls: re-use the PLC system developed and installed for L4 test stand• Cryomodule:

• RF controls expected to be ready by 2014 ( L. Arnaudon )• Cryo controls to be defined ( TE/CRG ) Attention LS1 !

• Low level ?

Page 17: Upgrade of SM18  Infrastructure on behalf of  BE/RF-KCA section

Thanks for your attention

• Live visit of SM18 site this afternoon