![Page 1: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/1.jpg)
UNECE Safety Guidelines and Good Practices for Tailings Management Facilities and lessons learned from past tailings accidents in the UNECE
region, including in view of NaTech risks
Pavel DANIHELKA
VUBP Prague, & Technical University of Ostrava CZECH REPUBLIC
Mail: [email protected] 2019, Almaty 1
![Page 2: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/2.jpg)
Motto
Satellite imagery has lead us to the realization that tailings facilities are probably the largest man-made structures on earth.
Their safety, for the protection of life, the environment and property is an essential need in today’s mining operations.
These factors, and thev elatively poor safety record revealed by the numbers of failures in tailings dams have led to an increasing awareness of the need for enhanced safety provisions in the design and operation of tailings dams.
ICOLD 2001
TAILINGS 2019, Almaty 2
![Page 3: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/3.jpg)
History of major tailing dams accidents
TAILINGS 2019, Almaty 3
![Page 4: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/4.jpg)
Some examples and case studies in Europe
• Kolontár (Aika) 2010
• Stava 1985
• Baia Mare 2000
• Los Frailes 1998
• Atik 2000
TAILINGS 2019, Almaty 4
![Page 5: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/5.jpg)
Kolontár (Ajka), Hungary 4.10.2010: "Redsludge" tragedy
TAILINGS 2019, Almaty 5
On 4 October 2010, a “red mud” spill had occured following a tailings pond
failure at an aluminum processing plant in Hungary.
Red mud driven by the pond water flooded downstream 2 villages and
travelled through a creek leading to the Danube River, approx. 160 km.
Source: Dr. C. Zanbak, TCMA report
Before accident
![Page 6: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/6.jpg)
Kolontár (Ajka), Hungary
TAILINGS 2019, Almaty 6
after
![Page 7: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/7.jpg)
Kolontár (Ajka), Hungary
TAILINGS 2019, Almaty 7
Effect of sludge
![Page 8: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/8.jpg)
Lessons learned from Ajka accident
• The information that content of the tailing is not characterized as „hazardous“ does not assure safety
• Behaviour of sludge as pH, particulates, viscosity, inertial force etc. must be evaluated as well
• Signs of coming accidents were overviewed and neglected
• Without real emergency plan, efficiency of accident mitigation may be very limited
TAILINGS 2019, Almaty 8
![Page 9: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/9.jpg)
Case study: STAVA
On July 19, 1985, a fluorite
tailings dam of Prealpi
Mineraia failed at Stava,
Trento, Italy. 200,000 m3 of
tailings flowed 4.2 km
downstream at a speed of up
to 90 km/h, killing 268 people
and destroying 62 buildings.
The total surface area
affected was 43.5 hectares.
TAILINGS 2019, Almaty 9
![Page 10: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/10.jpg)
Stava accident
• The tailings dam consisted of two basins built on a slope. The failure with a collapse of the up-slope basin. The inflow of the released material caused the overtopping and subsequent collapse of the lower basin.
• Dams were constructed with an unacceptably low factor of safety and that the failure probably was triggered by a blocked decant pipe located within the tailings.
TAILINGS 2019, Almaty 10
![Page 11: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/11.jpg)
Stava lessons learned
• Tailing location had been badly chosen in view of the vulnerability of the downstream town and hotels.
• Bad safety management
TAILINGS 2019, Almaty 11
![Page 12: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/12.jpg)
BAIA MARE
January 30, 2000 in Baia Mare (Romania)
the biggest freshwater disaster in Central
and Eastern Europe.
Nearly 100,000 m3 of cyanide and heavy
metal-contamined liquid spilled into the
Lupus stream, reaching the Szamos, Tisza,
and finally Danube rivers and killing
hundreds of tones of fish and poisoning the
drinking water of more than 2 million
people in Hungary.
Case study:
TAILINGS 2019, Almaty 12
![Page 13: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/13.jpg)
VARIABILITY OF CAUSES OF ACCIDENT
• Inadequate management• Lack of control of hydraulical system• Error in site selection and investigation• Unsatisfactory foundation, lack of stability of downstream
slope• Seepage • Overtoping• Earthquake• Landsliding
MAIN ROOT CAUSE:
RISK ANALYSIS AND MANAGEMENT NEGLECTEDTAILINGS 2019, Almaty 13
![Page 14: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/14.jpg)
Distribution of causes of tailing dams accidents
Source: ICOLD Bulletin 121
TAILINGS 2019, Almaty 14
![Page 15: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/15.jpg)
VARIABILITY OF CONSEQUENCES
1. Flooding, wave of slurry
2. Contamination of surface water, living organismsintoxication
3. Drinking and irrigation surface water contamination
4. Drinking and irrigation underground water contamination
5. Soil contamination
6. As consequence of 2),3),4)ad.5 : Food chain contamination
» FREQUENTLY INVOLVES TRANSBOUNDARY EFFECT
TAILINGS 2019, Almaty 15
![Page 16: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/16.jpg)
CONSEQUENCES II:
• Consequences to human lives, health and well being.Evaluation of consequences with stakeholders necessary
• Direct costs (remediation, compensation, ...)
• Social disturbance
• Consequence to environment – short time and long time impacts
• Economical consequences and operability
• Indirect costs
TAILINGS 2019, Almaty 16
![Page 17: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/17.jpg)
Costs of TMF Failures
Physical failure: recent large failures $30 to $100 millions in direct costs
Environmental failure: some recent clean-up liabilities to several $100’s of millions
Closure liability: some recent examples in $ 500 milon to $ 4 billion range
Industry/investor impacts: Shareholder value losses and industry imposed constraints and costs amounting to many billions of dollars
TAILINGS 2018, Astana 17
![Page 18: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/18.jpg)
Emergency preparedness needs
• Preparedness to accident, even with low probability
• Early warning system necessary
• Training and not only desktop one
• Information of all subjects potentially involved
• Crisis management including training
• Open and honest communication with municipalities, emergency response teams, government bodies (inspection…)
• Communication with media
TAILINGS 2018, Astana 18
![Page 19: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/19.jpg)
What is needed in the case of accident ?
TAILINGS 2018, Astana 19
![Page 20: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/20.jpg)
One mythus:
We will manage accident by
improvisation…
![Page 21: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/21.jpg)
![Page 22: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/22.jpg)
![Page 23: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/23.jpg)
![Page 24: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/24.jpg)
![Page 25: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/25.jpg)
GREEN PHILIPPINES 2009
![Page 26: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/26.jpg)
GREEN PHILIPPINES 2009
![Page 27: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/27.jpg)
![Page 28: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/28.jpg)
Another mythus:„We operate it long time without any accident, so safety is prooved“
TAILINGS 2018, Astana 28
Lassing Talk Mine,
Austria 1998
Aberfan, Wales (UK)
1966
![Page 29: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/29.jpg)
What is it „NATECH“?
Natural hazard triggered technological accident
Fire
Toxic Release
Environmental
contamination
Explosion
Flood
Earthquake
Lightning
Landslide
Wind
Tsunami
Etc.
Source: JRC IspraTAILINGS 2019, Almaty 29
![Page 30: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/30.jpg)
NATECHs and TMF accidents
example: Baia Mare
.
Toxic Release
Environmental
contamination
.
Flood
Earthquake
.
Landslide
.
Tsunami
Etc.
Source: JRC IspraTAILINGS 2019, Almaty 30
![Page 31: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/31.jpg)
©Kansas Wing of the Civil Air Patrol
Hurricane, USA, 2005 Floods, Czech Republic, 2002
Flood, 2007
Earthquake, 2011
Hurricane, 2005
Landslide, 2013 Source: JRC IspraTAILINGS 2019, Almaty 31
![Page 32: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/32.jpg)
• Represent about 5% of the known industrial accidents in France
• The BARPI lists 920 NaTech accidents between 1992 et 2012 in its ARIA database.
French experience – dabase BARPI /MoE
Lightning: 17%
Wind: 7%
Snow: 4%
Extremetemperatur
es: 17%
Heavy rain & floods:
52%
Earthquakes & landslides: 3% TAILINGS 2019, Almaty 32
![Page 33: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/33.jpg)
Near-miss: Ostramo waste deposit
TAILINGS 2019, Almaty 33
![Page 34: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/34.jpg)
Some international actions• The OECD Guiding Principles on Chemical Accident Prevention,
Preparedness and Response: Chapter 18 Natechs (2nd Addendum 2015)
• UNDRR (formely UNISDR)
actions
TAILINGS 2019, Almaty 34
![Page 35: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/35.jpg)
Exchange of experiences and good practices
Seminar on Land-Use Planning & Industrial Safety16-17th May 2018 in Mechelen, Belgium. Co-organized by UNECE, the government of Flanders (Belgium) and the EIB, with participation by UNISDR.
Seminar on Risk Assessment Methodologies underthe Convention on the Transboundary Effects of Industrial Accidents 4th December 2018. Organized by UNECE, with participation by UNISDR.
TAILINGS 2019, Almaty 35
![Page 36: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/36.jpg)
Development of UNECE guidance materialsavailable usually in Russian language as well
▪ Safety Guidelines and Good Practices for Tailings Management Facilities ▪ Improving the safety of industrial tailings management facilities based on the example of
Ukrainian facilities▪ Guidance on Land-Use Planning, the Siting of Hazardous Activities and related Safety Aspects▪ Overview of Methodologies for Hazard Rating of Industrial Sites▪ Sectoral Checklist for Preparation and Inspection of a Safety Report▪ Guidelines (to the Sectoral Checklist) for Preparation and Inspection of a Safety Report
TAILINGS 2019, Almaty 36
![Page 37: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/37.jpg)
• Tailing facilities are necessary for industrial development, but without proper safety management they can cause major accidents
• To ensure safety, overall process of risk management including bothprevention and preparedness should be applied and continuously improved
• International experience sharing, good practices exchange and cooperation is one from keys for success
TAILINGS 2019, Almaty 37
Conclusions
![Page 38: UNECE Safety Guidelines and Good Practices for Tailings ... · •Early warning system necessary •Training and not only desktop one •Information of all subjects potentially involved](https://reader034.vdocuments.us/reader034/viewer/2022042402/5f121229b3fd032ddf667d0b/html5/thumbnails/38.jpg)
Thank you for your kind attention
TAILINGS 2019, Almaty 38