The United Kingdom of Great Britain and Northern
Ireland NATIONAL REPORT
PRESENTATION for the
Third Review Meeting11th to 20th May 2009
Vienna
Joint Convention on the Safety of Spent Fuel Management and on the Safety of
Radioactive Waste Management
![Page 2: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/2.jpg)
2
Joint Convention on the Safety of Spent Fuel Management and on the Safety of
Radioactive Waste ManagementPresented byDr Mike WeightmanHM Chief Inspector of Nuclear Installations, Health & Safety Executive
andDr Joe McHughHead of Radioactive Substances Regulation, Environment Agency
![Page 3: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/3.jpg)
3
Presentation StructureMorning• Introduction• Overview of Radioactive Waste and Spent
Fuel Management in the UK• Major Developments since 2006• Action on Challenges from last Review
Meeting• Current Challenges• Significant Events since last Review MeetingAfternoon• Questions and Comments• Planned measures to improve safety• Summary
![Page 4: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/4.jpg)
4
The UK Report
• Prepared from inputs of Government Departments, Regulatory Bodies, and Industry
• Explains how the UK achieves and maintains a high level of safety and environmental protection in spent fuel and radioactive waste management
![Page 5: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/5.jpg)
5
Scope
9Reprocessing X Naturally
occurring radioactive material
X Defence programme waste
![Page 6: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/6.jpg)
6
National Overview
• Regulatory Bodies and overall objectives of National Arrangements
• Overview of:• policy• funding of liabilities• current practices
and • planned practices
![Page 7: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/7.jpg)
7
Regulatory BodiesNationalOverview
• HSE) / Nuclear NII)
• ) or Scottish SEPA)
Health & Safety Executive (Installations Inspectorate (
Environment Agency (EAEnvironment Protection Agency (
![Page 8: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/8.jpg)
8
SafetyEnvironment
Regulatory BodiesNationalOverview
![Page 9: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/9.jpg)
9
Northern IrelandNationalOverview
There are no nuclear installations in Northern Ireland
Northern Ireland has its own regulatory system and bodies that parallel those in the rest of the UK
![Page 10: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/10.jpg)
10
Nature of UK Regulatory Framework• Goal Setting
– Minimisation of risk so far as is reasonably practicable
– ALARP / ALARA / BPEO / BPM• Emphasis in legislation
– Responsibilities and competence of Operators– Robust arrangements– Early, open and transparent engagement
Regulatory FrameworkNationalOverview
![Page 11: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/11.jpg)
11
Nuclear Site LicenceHSE grant this under the Nuclear Installations Act, and can attach conditions:
• In the interests of safety• With respect to handling, treatment
and disposal of nuclear matter
Nuclear Site Licence applies to all people on the site. The site licensee is responsible for ensuring compliance
Regulatory SystemNationalOverview
![Page 12: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/12.jpg)
Regulatory SystemLicence ConditionsGoal setting: “Licensee must make and implement adequate arrangements”“Adequate arrangements” can be tailored to:
• Suit business need• Suit the stage of operation – from
construction to decommissioningCovers various aspects including radioactive waste management and decommissioning
NationalOverview
12
![Page 13: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/13.jpg)
13
Disposal Authorisation• Prior authorisation needed from EA or SEPA
for the discharge and disposal of radioactive waste
• Determining an application involves appropriate consultation with stakeholders e.g. HSE, FSA, Local Authority, public
• Reviewed periodically• Attach conditions to the authorisation
Regulatory SystemNationalOverview
![Page 14: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/14.jpg)
14
Basic PolicySafety and Environment
NationalOverview
UK Government’s basic policy is to ensure adequate statutory powers and other measures to protect people and the natural environment from harmful levels of radioactivity
![Page 15: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/15.jpg)
15
• Must meet LIMITSand
• Reduce further in line with:
ALARP/BPEO/BPM(Taking into account
all relevant factors)
No of Persons >6mSv/y
0
20
40
60
80
100
2000 2001 2002 2003 2004 2005 2006
YEAR
No
of P
erso
ns
2000 2001 2002 2003 2004 2005 2006 2007
0.5
1.0
1.5
2.0
2.5
0
Trends in radioactive discharges to water and air
Weighted discharges relative to 2000
WaterAir
Basic PolicySafety and Environment
NationalOverview
![Page 16: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/16.jpg)
16
Overview - Policies
Specific Policies for:• Spent Fuel
Management• Nuclear Fuel Cycle
and Application Wastes Management
• Decommissioning and
• Disused Sealed Sources
![Page 17: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/17.jpg)
17
Reprocess/not reprocess -commercial judgment of the owners Spent fuel is not waste while the option of reprocessing the fuel remains open The current assumption is that the spent nuclear fuel from new UK reactors will not be reprocessed
Spent FuelOverviewPoliciesSpent Fuel
![Page 18: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/18.jpg)
18
OverviewPoliciesRadwasteManagement
Definition of Waste
Definition of Waste• It is the decision of the owner of any radioactive
material as to whether there is any foreseen use and hence whether it is radioactive waste
• Regulatory control is the same under nuclear licensing whether or not it is declared as waste –hence the type and level of regulatory control does not depend on such decisions by the owners
![Page 19: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/19.jpg)
19
OverviewPoliciesRadwasteManagement
Radwaste Management General
•••
Sustainable development principlesApplication of the waste hierarchyWastes to be safely and appropriately managed, treated, and then disposed of in ways which protect public, workforce and the environment
![Page 20: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/20.jpg)
20
OverviewPoliciesRadwasteManagement
Categorisation
• VLLW– Can be disposed of with ordinary refuse– <400kBq (βγ) in 0.1m3, <40kBq (βγ) per item
• LLW– not exceeding 4GBq/te (α) or 12 GBq/te (βγ)
• ILW– Greater specific activity than LLW but no need
to consider self heating• HLW
– Need to consider self heating
![Page 21: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/21.jpg)
21
OverviewPoliciesRadwasteManagement
Higher Activity Wastes
(HLW, ILW and LLW not suitable for existing LLW disposal facilities)
• Safe and secure interim storage, followed by:– (England and Wales) geological disposal– (Scotland) long term near site near surface
storage• More details later under developments since
2006
![Page 22: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/22.jpg)
22
OverviewPoliciesRadwasteManagement
Low Level Waste
• Priorities– Minimise creation– Greater flexibility than currently exists– Maintain focus on safety and
environmental protection– Create a UK wide strategy
![Page 23: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/23.jpg)
23
OverviewPoliciesRadwasteManagement
Discharges
Based on optimisation: Best Practicable Environmental Option (BPEO) and Best Practicable Means (BPM)Progressive reduction of discharge limits•
![Page 24: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/24.jpg)
24
OverviewPoliciesDecommissioningDecommissioning
•••
Progressive reduction of hazardsAs soon as reasonably practicableDevelopment of Strategies and plans– The objective of a strategy is to get the
best solution overall taking into account the needs of the environment, and safety of workers and the local community
![Page 25: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/25.jpg)
25
Disused Sealed SourcesOverviewPoliciesDisused Sealed Sources
• The holder is responsible for any disused sealed sources until:– returned to supplier– transferred to another holder– sent for storage, disposal or recycling
• The holder is also responsible for security and financial provision
![Page 26: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/26.jpg)
26
Overview - Funding
Funding arrangements etc. for:• General Liabilities• NDA owned sites• New Build Reactors and • Disused Sealed Sources
![Page 27: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/27.jpg)
27
OverviewFunding of LiabilitiesSpent Fuel & Radwaste
General Funding
• It is the responsibility of the waste owners to provide funds for radioactive waste/ spent fuel management and decommissioning
• The published audited accounts of UK operators include details of waste management costs and of the provisions made in order to meet them
![Page 28: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/28.jpg)
28
OverviewFunding of LiabilitiesSpent Fuel & Radwaste
NDA Owned Sites
• Site Licensees may charge radioactive waste & spent fuel management and decommissioning costs to the NDA provided they are incurred in compliance with their contract
• NDA is funded directly from central Government, through its sponsoring Department, DECC
![Page 29: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/29.jpg)
29
OverviewFunding of LiabilitiesSpent Fuel & Radwaste
New Build Reactors
•
•
•
A Funded Decommissioning Programme (FDP), approved by Government, must be in place before constructionThe Nuclear Liabilities Financing Assurance Board (NLFAB) will scrutinise the financing plansArrangements have had the benefit of consultation
![Page 30: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/30.jpg)
30
OverviewFunding of LiabilitiesDisused Sealed Sources
Disused Sealed Sources
High-Activity Sealed Sources (HASS) Regulations require financial provision for disposal or an acceptable alternative (for example, return to supplier) when sources are acquired
![Page 31: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/31.jpg)
31
OverviewFunding of LiabilitiesDisused Sealed Sources
Disused Sealed Sources
Legacy
UK Government funded programme 2004-2008
Contingency funds for removal of orphan sources
![Page 32: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/32.jpg)
32
Overview – Current Practices and Facilities
UK Facilities
![Page 33: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/33.jpg)
33
OverviewCurrent PracticesUK FacilitiesMagnox Stations
![Page 34: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/34.jpg)
34
OverviewCurrent PracticesUK FacilitiesMagnox Stations
• Berkeley • Bradwell• Calder Hall• Chapelcross• Dungeness A• Hunterston A• Hinkley Point A• Sizewell A• Trawsfynydd
• Oldbury• Wylfa
![Page 35: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/35.jpg)
35
OverviewCurrent PracticesUK FacilitiesAGR and PWR Stations
![Page 36: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/36.jpg)
36
OverviewCurrent PracticesUK FacilitiesAGR and PWR Stations
AGR Stations
PWR Station
• Dungeness B• Hartlepool• Heysham I and II• Hinkley Point B• Hunterston B• Torness
• Sizewell B
![Page 37: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/37.jpg)
37
OverviewCurrent PracticesUK FacilitiesResearch Sites
• Dounreay
• Windscale
• Harwell
• Winfrith
![Page 38: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/38.jpg)
38
Overview – Current Practices and Facilities
Spent Fuel Management Facilities
![Page 39: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/39.jpg)
Magnox Stations• Wet storage for at least 90
days - except Wylfa dry storage
AGR Stations
PWR Station
• Wet storage for at least 100 days
• Long term storage in ponds
StorageOverviewCurrent PracticesSpent Fuel
39
![Page 40: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/40.jpg)
40
OverviewCurrent PracticesSpent FuelStorage
Sellafield
Storage in various ponds awaiting reprocessing or for long term storage
![Page 41: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/41.jpg)
41
Sellafield
• Magnox
• Thorp
ReprocessingOverviewCurrent PracticesSpent Fuel
![Page 42: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/42.jpg)
42
Fuel cycle and application waste management
Overview – Current Practices and Facilities
![Page 43: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/43.jpg)
43
OverviewCurrent PracticesFuel Cycles & Application Wastes
Waste Storage
Magnox Stations• Underground vaults • Above ground vaults• Voids • Tanks
• Voids• Wet waste storage tanks • Desiccant storage• Ion exchange resin
storage tanks
AGR and PWR Stations
![Page 44: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/44.jpg)
44
OverviewCurrent PracticesFuel Cycles & Application Wastes
Waste Storage
• Engineered Stores• Vaults and Silos • ILW liquid waste tanks• HLW tanks• Miscellaneous stores
Application Waste
• Decay storage in stainless steel drums
Other Fuel Cycle Sites
![Page 45: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/45.jpg)
45
OverviewCurrent PracticesFuel Cycles & Application Wastes
• Vitrification• Cementation• Decontamination• Compaction• Sorting, segregation
and repacking
Waste Processing
![Page 46: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/46.jpg)
46
OverviewCurrent PracticesFuel Cycles & Application Wastes
Waste Disposal
Low-level waste repository near Drigg, Cumbria
Low level waste disposal to specific facilitiesVery low level waste disposal to landfill sites
![Page 47: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/47.jpg)
47
Overview – Current Practices and Facilities
Decommissioning Liabilities
![Page 48: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/48.jpg)
48
OverviewCurrent PracticesDecommissioningMagnox Stations
• Berkeley• Bradwell• Calder Hall• Chapelcross• Dungeness A• Hinkley Point A• Hunterston A• Sizewell A• Trawsfynydd
![Page 49: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/49.jpg)
49
OverviewCurrent PracticesDecommissioningResearch Sites
Sites being decommissioned
• Dounreay
• Windscale
• Harwell
• Winfrith
![Page 50: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/50.jpg)
50
OverviewCurrent PracticesDecommissioningUK Decommissioned Sites
Fully Decommissioned Sites
Research Reactors at:
• Scottish Universities
• Northern Universities
• ICI Billingham
![Page 51: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/51.jpg)
51
OverviewPlanned FacilitiesPlanned Facilities
Fuel Cycle Wasteunder construction for reprocessing wasteDecommissioning Liabilities – 5 facilities under construction at three sites Sellafield, Harwell and Dounreay . Others to be constructed as the decommissioning challenge progressesDisused Sealed Sources – future location identified as the Geological Disposal Facility
– One additional store is
(GDF)
![Page 52: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/52.jpg)
52
Major Developments since 2006
Dr M Weightman– Nuclear Safety Policy– Organisational – Nuclear Safety Guidance
Dr J McHugh– Environmental Policy – Organisational– Environmental Guidance
![Page 53: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/53.jpg)
53
Major Developments since 2006Nuclear Safety Policy
White Papers Energy/nuclear power• Government confirmed nuclear power option
as part of energy strategy
New Build• Legislative arrangements to secure financing
arrangements for decommissioning and waste management costs
![Page 54: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/54.jpg)
54
Major Developments since 2006Government and Regulator
DECC • departmental reorganisations
HSE• OCNS and Safeguards joined• merger of Executive and Commission• change of status of NII – independent
nuclear regulatory body
![Page 55: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/55.jpg)
55
Licensee restructuring & PBOsSite(s) Licensee PBO
Sellafield, Calder Hall, Windscale, Capenhurst
Sellafield Ltd Nuclear Management Partners Ltd (NMP) [from 24/11/2008]
Chapelcross, Hunterston A, Trawsfynydd, Wylfa, Oldbury
Magnox North Ltd Energy Solutions (to be competed)
Berkeley; Bradwell; Dungeness A; Hinkley Point A & Sizewell A
Magnox South Ltd Energy Solutions (to be competed)
Dounreay Dounreay Site Restoration Ltd
UKAEA ltd (to be competed)
Harwell, Winfrith Research Sites Restoration Ltd
UKAEA ltd (to be competed)
LLW repository LLW Repository Ltd UK Nuclear Waste Management Ltd (UKNWM Ltd) [from 1/4/2008]
Springfields Springfields fuels Ltd. Westinghouse Electric UK Ltd (to be competed)
LicenseesMajor Developments since 2006
![Page 56: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/56.jpg)
56
Major Developments since 2006Nuclear Safety Guidance
HSE’s Safety Assessment Principles (SAPs)• Revision of the SAPs based on IAEA safety
standards was finalised in 2006
Joint Guidance• management of higher-activity wastes on
nuclear licensed sites
![Page 57: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/57.jpg)
57
Major Developments since 2006
Geological disposal policy, June 2008
Policy covers HLW, ILW and some LLW
MRWS Policy
![Page 58: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/58.jpg)
58
Major Developments since 2006MRWS Policy
Policy is based on:• geological disposal• safe and secure interim storage• R&D – optimised implementation
Programme timing is flexible• need to maintain momentum
recognised
![Page 59: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/59.jpg)
59
Major Developments since 2006Geological Disposal Policy
Site selection process based on partnership with volunteer communities
Invitations to local authorities to express an interest in hosting a facility
– 3 local authorities expressed interest (April 09)
![Page 60: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/60.jpg)
60
Major Developments since 2006
Geological Disposal PolicySite Selection Process
Stage 1:Invitation issued and
expression of interest from communities
Stage 4:Desk-based studies in
participating areas
Stage 5:Surface investigations on
remaining candidates
Stage 6:Underground operations
Stage 3:Community consideration
leading to decision to participate
Advise community not suitable
Unsuitable
Potentially suitable
Stage 2:Consistently applied ‘sub-surface unsuitability’ test
![Page 61: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/61.jpg)
61
Major Developments since 2006
Nuclear Decommissioning Authority (NDA)
NDA Radioactive Waste Management Directorate
– set up to deliver a geological disposal facility
– incorporates UK Nirex – provides advice on conditioning and
packaging of radioactive waste
![Page 62: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/62.jpg)
62
Major Developments since 2006
Committee on Radioactive Waste Management (CoRWM)
CoRWM has been reconstituted
Provides independent scrutiny and advice to UK Government
Open and consultative approach
![Page 63: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/63.jpg)
63
Major Developments since 2006Low Level Radioactive Waste
Plastic/rubber (13%)
Miscellaneous (1%)
Cellulose (16%)
Metal scrap (30%)
Types of material in LLW inventory
Cement/ concrete
(6%)
Graphite (1%)
Rubble/soil (33%)
Plastic/rubber (13%)
Miscellaneous (1%)
Cellulose (16%)
Metal scrap (30%)
Types of material in LLW inventory
Cement/ concrete
(6%)
Graphite (1%)
Rubble/soil (33%)
Low-level radioactive waste (LLW) policy, March 2007
Policy covers generation, management and regulation of solid LLW
Policy applies across the UK
![Page 64: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/64.jpg)
64
Major Developments since 2006LLW Categories
LLW is defined as not exceeding 4000 MBq/te αor 12000 MBq/te βγTwo sub-categories recognised:
• High volume very low level waste (HV-LLW)Maximum activity of 4 MBq/Te; controlled disposal
• Low volume very low level waste (LV-VLLW)Activity <0.4 MBq (or <4 MBq H-3 or C-14) per 0.1m3; safe for disposal with other wastes
![Page 65: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/65.jpg)
65
Major Developments since 2006LLW Repository
Low Level Waste Repository (LLWR) at Drigg
– principal route for disposal of solid LLW disposal
Revised authorisation in May 2006
– allows disposal in current disposal area to continue
Low Level Waste Repository at Drigg
![Page 66: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/66.jpg)
66
Major Developments since 2006LLW Repository
Planning permission for new disposal area granted January 2008
New disposal area will need authorisation
• Review of site radiological capacity and disposal limits
Updated Environmental Safety Case required by May 2011
Low-level waste repository near Drigg, Cumbria
![Page 67: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/67.jpg)
67
Major Developments since 2006Regulatory Guidance
Updated ‘Guidance on Requirements for Authorisation’published February 2008 for:• Near-surface disposal
facilities• Geological disposal
Principles and requirements for long-term protection of people and the environment
![Page 68: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/68.jpg)
68
Draft ‘UK Strategy for Radioactive Discharges 2006-2030’, published June 2008Includes aerial and liquid discharges from:• nuclear industry • non-nuclear sector (e.g. hospitals,
universities and research laboratories)• decommissioning as well as operational
activities
Radioactive DischargesMajor Developments since 2006
![Page 69: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/69.jpg)
69
Major Developments since 2006Radioactive Discharges
Expect progressive reductions in:• radioactive discharges• concentrations of radionuclides in the marine
environment - by 2020, should add close to zero to historic levels
• human exposures to ionising radiation resulting from radioactive discharges
![Page 70: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/70.jpg)
70
Major Developments since 2006Environmental Principles
Environment Agency’s draft Radioactive Substances Regulation Environmental Principles’ (REPs) published June 2008
Standardised framework for regulatory decision-making
Require operators to apply BAT
![Page 71: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/71.jpg)
71
Action on Challenges from last Review Meeting
The UK has made, and will continue to make,
progress on many of the issues highlighted in the second review meeting
Notably -
![Page 72: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/72.jpg)
72
Action on ChallengesComplete Review of Options
for Very Low Level Waste
Completed in March 2007Priorities:
• Minimise creation• Greater flexibility• Maintain focus on safety
etc.• create a UK wide strategy• NDA tasked with delivery
![Page 73: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/73.jpg)
73
Action on ChallengesReview the classification
system for radioactive waste
UK classification has been modified for VLLW to distinguish low and high volumes• Low Volume VLLW:
to an unspecified destination <400kBq (total) and <40kBq (single items)
• High Volume VLLW can be disposed of to specified
safely disposed of
waste <4MBq/te facilities
![Page 74: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/74.jpg)
74
Action on ChallengesFinalise Contaminated Land
Regulations
The Radioactive Contaminated Land Regulations 2006, as amended in 2007, were introduced to put into place certain requirements of the Basic Safety Standards Directive in England and Wales
Similar enactments apply in Scotland and Northern Ireland
![Page 75: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/75.jpg)
75
Contaminated land on nuclear sites regulated under licensing regimeNumber of non nuclear affected sites is uncertainThe person who caused the contamination will be responsible for remediation - if they cannot be found the owner or occupier of the land will be responsibleThe relevant environment agency will regulate remediation
Identify contaminated land sites requiring remediation
Action on Challenges
![Page 76: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/76.jpg)
76
Complete review of remaining capacity of the LLW repository
near Drigg (3 – 5 years)
Action on Challenges
Work is ongoing
Target for completion of national LLW operational strategy is December 2009
![Page 77: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/77.jpg)
77
NDA has carried out an initial review of spent fuel management as described in UK’s third national report
Complete the evaluation of options for management of spent
fuel (2007)
Action on Challenges
![Page 78: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/78.jpg)
78
Current Challenges
![Page 79: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/79.jpg)
79
Current ChallengesLarge amount of
decommissioning – e.g.MAGNOX Reactors Decomm. Progress
Ceased Generation
Fuel removed
Bradwell Y YCalder Hall Y NChapelcross Y NDungeness A Y NHinkley Point A Y YHunterston A Y YOldbury N NSizewell A Y NTrawsfynydd Y YWylfa N N
![Page 80: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/80.jpg)
80
Current Challenges
NDA conducting reviews of:• Radioactive waste storage• Spent fuel management• U and Pu disposition
Strategy for all materials
![Page 81: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/81.jpg)
81
Magnox and Oxide operating plans– Magnox reprocessing until ~2016– AGR reprocessing until ~2015
AGR fuel storage:– Wet storage for fuel not being reprocessed– Fuel drying and dry storage being
evaluated
Spent Fuel ManagementCurrent Challenges
![Page 82: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/82.jpg)
82
HA Evaporators and Storage Tanks• New evaporators /storage tanks being
procured to ensure adequate capacity when the current plant ends its service life
• Controls are in place to ensure that HAL arisings do not exceed the capacity of the site to manage them
High Active Liquid WasteCurrent Challenges
![Page 83: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/83.jpg)
83
LLW Disposal Capacity
• Calder Landfill Extension Segregated Area – application expected which will more than
double the available space• Clifton Marsh Disposal Facility
– The future, after 2012, is uncertain -depends operator’s business plans
• Dounreay LLW disposal facility– On-site facility for LLW disposal closed in
2005– a new LLW near-surface facility is planned
Current Challenges
![Page 84: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/84.jpg)
84
Significant Events since last Review Meeting
![Page 85: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/85.jpg)
85
– Leakage of ~83,000 litres liquor in 8 months prior to 20 April 2005
– Cat ‘3’ on INES– Cause was motion induced fatigue– Sellafield Ltd prosecuted by HSE and fined
by the court– Learning Points
• Attention needed to maintaining barriers• Adequate safety culture is important
THORP Clarification Cell Event
Significant Events
![Page 86: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/86.jpg)
86
Answers to Questions Received
142 Questions receivedfrom
22 CountriesWritten answers have
been provided to all questions
![Page 87: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/87.jpg)
87
Answers to Questions Received
Cannot present all questions and answersKey themes in questions presented (where not covered elsewhere in the presentation)
![Page 88: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/88.jpg)
88
How does the UK maintain consistency across devolved administrations?
– Devolved administrations in Scotland, Wales (and Northern Ireland)
– UK Parliament responsible for legislation on Health and Safety and on Nuclear Safety
– Scotland and Wales have powers over environmental matters
• Policy can be different
Regulatory ControlAnswers to Questions
![Page 89: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/89.jpg)
89
Staged regulation of geological disposal• UK Government planning to implement under
Environmental Permitting Regulations (EPR)• EPR will replace Radioactive Substances Act
1993 in England and Wales– New powers for regulation of geological
disposal from start of intrusive site investigation
– EPR will not apply in Scotland but existing regulatory control will continue to apply
Regulatory ControlAnswers to Questions
![Page 90: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/90.jpg)
90
Radioactive Substances Regulation Environmental Principles (REPS)
• Take account of legislation and Government policy
• Framework for technical assessments and judgements – Complementary to HSE’s Safety
Assessment Principles• REPs revised to reflect consultation comments
- publish later in 2009
Regulatory ControlAnswers to Questions
![Page 91: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/91.jpg)
91
Licence and Authorisation Conditions to govern nuclear sites
• Licence and Authorisation Conditions have legal status - non-compliance is a criminal offence
• Effect similar to regulations • Benefit: easier to change Conditions than regulations
– can react to changing needs without amending legislation
Regulatory ControlAnswers to Questions
![Page 92: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/92.jpg)
92
Answers to QuestionsLow Level Waste Disposal
Capacity• National LLW strategy being implemented
– includes planning for future capacity • LLW Repository: potential capacity to 2020
– capacity under review • Dounreay: new disposal facility planned
– on-site disposal ceased in 2005• VLLW – policy allows more disposal options
– disposal of high volume VLLW to specified landfills
![Page 93: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/93.jpg)
93
Waste acceptance criteria• Responsibility of disposal facility operator • Regulatory control through authorisations of
waste producers and disposal facility operator• Disposal of VLLW – control through waste
producers’ authorisations– Authorisation required for specialised
VLLW disposal facility
Low Level Waste DisposalAnswers to Questions
![Page 94: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/94.jpg)
94
Institutional control• 2002 safety case for LLW Repository – put no
reliance on institutional control beyond 2150 – ~100 years after expected closure
• No parameters for deciding when to withdraw control specified in regulatory guidance– Reasonable arrangements must be in
place to fund closure– Unlikely to accept period longer than ~ 300
years
Low Level Waste DisposalAnswers to Questions
![Page 95: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/95.jpg)
95
Answers to QuestionsUK Discharge Strategy
2000 2001 2002 2003 2004 2005 2006 2007
0.5
1.0
1.5
2.0
2.5
0
Wei
ghte
d di
scha
rges
re
lativ
e to
200
0
WaterAirWaterAir
• Data for nuclear industry in England and Wales
![Page 96: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/96.jpg)
Beach MonitoringAnswers to Questions
DounreaySand grain sized particles of irradiated fuel released with liquid effluent from 1963 to 1984
SellafieldOver 600 finds recovered from 4.4 km2 (April ’09)
– Two groups: α-rich (Pu, Am) and β-rich (Cs-137)
Monitoring vehicle
96
![Page 97: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/97.jpg)
97
Answers to QuestionsDisused Radioactive Sources
‘Surplus Source Disposal Programme’
0
Hos
pita
l
Uni
vers
ity
Mus
eum
s
Orp
han
Oth
ers
Scho
ols
&
colle
ges
Number of sources by institution
500
1000
1500
2000
2500
3000
3500
Num
ber o
f sou
rces
0
Hos
pita
l
Uni
vers
ity
Mus
eum
s
Orp
han
Oth
ers
Scho
ols
&
colle
ges
Number of sources by institution
500
1000
1500
2000
2500
3000
3500
0
Hos
pita
l
Uni
vers
ity
Mus
eum
s
Orp
han
Oth
ers
Scho
ols
&
colle
ges
Number of sources by institution
500
1000
1500
2000
2500
3000
3500
Num
ber o
f sou
rces
Purpose: Removal to secure long-term storage, recycling or disposal sitesDuration: 2004-2008Cost: £7.14M (~ US $10.4M) – UK GovernmentOver 11,000 sources removed
– Total activity >850 TBq
![Page 98: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/98.jpg)
98
The Plant Safety Review process -• At all times safety must be substantiated and
documented (Safety Case)• major reviews of safety • normally carried out every ten years• identify shortfalls against modern standards• leads to a programme of reasonably
practicable improvements
HSE assesses on a sample basis
RegulatorsAnswers to Questions
![Page 99: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/99.jpg)
99
How are stakeholders views taken on board?Examples• The planning application process• Site Stakeholder Groups (SSGs)• National Stakeholder Group (NSG)• Community Siting Partnership for geological
disposal
StakeholdersAnswers to Questions
![Page 100: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/100.jpg)
100
National Skills Academy for Nuclear (NSAN)• training to foundation degree level and
apprenticeships• HSE is a member of NSAN as an employer -
no legal responsibilityNational Nuclear Laboratory (NNL) • identify and preserve key nuclear skills and
facilities• lead UK's strategic technology programmes
SkillsAnswers to Questions
![Page 101: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/101.jpg)
101
Ageing Profile in HSE/NII• 70% over 50 (8%>60) - experienced regulatory
inspectors• challenges and opportunities include:
– Knowledge Retention and Transfer – Leadership and Management Gaps
• need: – targeted recruitment activities– measures to enhance retention
HSE’s Nuclear Directorate moving to “Statutory Corporation” status – more flexibility to address these issues
SkillsAnswers to Questions
![Page 102: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/102.jpg)
102
Siting rules for radioactive waste management facilities vs. new reactors
– 2008 HSE demographics methodology for all types of nuclear facilities
– based on UK long standing nuclear siting policies updated to reflect international good practice
SitingAnswers to Questions
![Page 103: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/103.jpg)
103
Spent Fuel from new reactors• Planning assumption - spent fuel stored until
a disposal route becomes available• Requesting Parties commissioned work to
assess the 'disposability' of spent fuel• Disposability assessments are not complete -
no indication that the new reactor fuel will raise unique disposability issues
Spent FuelsAnswers to Questions
![Page 104: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/104.jpg)
104
‘Exotic’ Spent Fuel• NDA is developing disposition options for its
non-standard fuels, commonly referred to as ‘Exotics’
• Storage regime dependent on – the physical properties of the fuel– length of storage period required
Spent FuelsAnswers to Questions
![Page 105: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/105.jpg)
105
Planned measures to improve safety
Planned measures to improve safety
![Page 106: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/106.jpg)
106
Planned measures to improve safetyEnvironmental Improvements
• UK discharge strategy• Environmental Permitting
![Page 107: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/107.jpg)
107
Planned measures to improve safetySafety Improvements
• Progress in decommissioning• Focus on high hazard plants
![Page 108: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/108.jpg)
108
Planned measures to improve safetyInstitutional Improvements
• Institutional changes to facilitate improvements
![Page 109: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/109.jpg)
109
Summary
The UK has made, and will continue to make, progress on many of the issues highlighted in the second Review Meeting, notably :
![Page 110: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/110.jpg)
110
Summary
Review of Policy• geological disposal plus safe and secure
storageOrganisational changes• Nirex integrated into NDA – to progress GDF• NDA restructured its estate and early PBO
contracts awarded• Nuclear Skills Academy established
![Page 111: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/111.jpg)
111
Summary
Progress in DecommissioningSuccessful progress in:
– safe shutdown, defuelling and decommissioning of Magnox Power Reactor fleet
– decommissioning of research sites
– decommissioning legacy plant at Sellafield
![Page 112: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/112.jpg)
Summary
Progress in Radioactive Waste ManagementSuccessful progress in:
– reducing liquid HLW stocks through vitrification
– repackaging PCM to modern standards
– treating active sodium from PFR
112
![Page 113: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/113.jpg)
113
Summary
Learning from the past to better address
today’s issues and address future
challenges
![Page 114: UK Spent Fuel Management Facilities - HSE](https://reader031.vdocuments.us/reader031/viewer/2022021008/6203a5fcda24ad121e4bd8c8/html5/thumbnails/114.jpg)
114
Joint Convention on the Safety of Spent Fuel Management and on the Safety of
Radioactive Waste Management
The United Kingdom of Great Britain and Northern
Ireland NATIONAL REPORT
PRESENTATION for the
Third Review Meeting11th to 20th May 2009
Vienna