Wake
Franklin
3571
5103
1926
3530
4520
1171
4555
1933
4598
20144590
1982
2137
3600
4592
1956
5748
4524
3532
5720
1987
2000
4516
4429
4569
2197
2135
3547
35075150
2046
4408
35433542
4577
1928
4490
4554
1979
3568
44094525
2115
4424
1794
4527
1990
5704
5777
4523
5700
4597
2132
5107
2108
45171734
5780
1986
45101717
1923
4413
1962
2134
1135
4519
2030
2179
4578
1946
1976
5762
1978
2042
2183
5151
51044521
4423
1974
2012
4513
2006
4514
5175
5756
20411972
1968
4588
1945
2002
2015
4526
4576
2052
5167
1994
2044
45181923
2001
4583
1924
1971
2136
2013
4568
5173
4428
4580
2006
3577
2000
4560
1969
1932
2041
2006
2044
5703
1930
1925
2133
5172
2011
2162
2012
4599
3555
4581
1967
1926
1927
2213
1922
1137
4462
2045
4463
1929
1923
1909
1912
4509
3514
2152
2181
2000
1991
1909 4529
19312043
2000
1156
1922
U-5307A
U-5307BU-5307CU-5307D
§̈¦540
§̈¦540
§̈¦540
UV98
UV98
UV98
£¤1
£¤1
£¤401
£¤1
£¤1
£¤401
£¤1
£¤1
£¤1
£¤1
Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c)OpenStreetMap contributors, and the GIS User Community
PROJECTBREAKDOWN
MAP
PRO
JEC
TS S
CH
EDU
LES
AND
CO
STS
ARE
ACC
UR
ATE
AS O
F D
ATE
SHO
WN
μ U-5307 WAKE COUNTYUS 1
UPDATED - 12/15/2020
STIP DESCRIPTION DIVISION LENGTH (MI) COMMENT ROW/UTILITY LET ROW COST UTILITY COST CON COST
U‐5307AI‐540 TO NORTH OF SR 2006 (DURANT ROAD) IN
RALEIGH.5 1.6
DESIGN‐BUILD PROJECT
FY 2025 FY 2025 $37,600,000 $4,500,000 $82,600,000
U‐5307BNORTH OF SR 2006 (DURANT ROAD) IN RALEIGH TO NORTH OF SR 2045 (BURLINGTON MILLS ROAD) IN
WAKE FOREST.5 2.1 FY 2025 FY 2027 $25,000,000 $2,700,000 $92,400,000
U‐5307CNORTH OF SR 2045 (BURLINGTON MILLS ROAD) TO
SOUTH OF NC 98 BUSINESS IN WAKE FOREST.5 3.1 FY 2025 FY 2027 $30,000,000 $3,000,000 $95,100,000
U‐5307DSOUTH OF NC 98 BUSINESS TO SR1909 (PURNELL
ROAD) / SR 1931 (HARRIS ROAD) IN WAKE FOREST.5 2.1 FY 2029 UNFUNDED $40,100,000 $3,700,000 $56,400,000