Transcript

Desig

n

Ph

ase

Op

era

tion

al

Ph

ase

Towards a Collaborative Energy Management

System for BuildingsLara KALLAB

Nobatek, France

[email protected]

+33 5 59 03 61 29

Pierre BOURREAU

Nobatek, France

[email protected]

+33 5 59 03 61 29

Richard CHBEIR

LIUPPA, France

[email protected]

+33 5 59 57 43 37

Context and Problems

Building Simulator Operational Building

Inaccurate simulations

Poor quality of constructions

Inadequate, rushed or incomplete commissioning of systems

Inadequate exploitations of buildings

Limited data analysis

Impact of user behavior

Field

Interoperability

Management

InteroperabilityMiddleware

Interoperability

Modularity

Advanced

processing

and

Analysis

Genericity

Scalability

1

Solution

Requirements

Field Interoperability

Middleware Interoperability

Management Interoperability

BMS Technical Challenges

System Architecture Overview

The HIT2GAP project (Highly Innovative building control

Tools Tackling the energy performance GAP) has received

funding from the European Union’s Horizon 2020 research

and innovation program under grant agreement N° 680708

http://www.hit2gap.eu

GAP

Gap Sources

Requirements of the Solution

Top Related