TM006: COOLflow4E Force Installation Manual - Fan and Filter
48V DC
Contents:
CTIL COOLflow4E Force Installation Manual – Fan and Filter 48v
Revision History:
Revision 0: Initial Release
www.4energy.co.uk © 4energy Ltd. 2013
COOLflow4E Force Installation
Fan and Filter
48V DC
MAY 2015 TM006
4energy Data- Commercial in Confidence: Confidential
As innovation is our priority, the company reserves the right
to alter the specification at any time without prior notice.
2 of 46 www.4energy.co.uk © 4energy Ltd. 2013
Document Revision History
Ref Title Date Status Change/Approver
TM006
CTIL
COOLflow4E
Force
Installation
Guide
12/05/15 Issue 1
(Revision 0) Stuart Nicholson (author)
Approval Date Status Approver
Pending
© 4energy Ltd. 2013 www.4energy.co.uk 3 of 46
Contents
1. Overview ........................................................................................................... 5
2. Health and Safety ..............................................................................................6
3. Preparation ...................................................................................................... 8
Tools Required for Installation ................................................................................................................. 9
Documentation Requirements for Installation ......................................................................................... 9
Isolate the Power Supply in the Equipment room .................................................................................... 9
Decommission the Existing Cooling System (Where Applicable) ........................................................... 10
Locate a Suitable Position for the COOLflow4E Force Unit ..................................................................... 12
Remove the Filters ................................................................................................................................ 12
4. Install COOLflow4E Force Fan and Filter Unit ...................................................... 13
Cut a Fan Hole in the Equipment Room Wall ......................................................................................... 14
Fit the COOLflow4E Unit and Earth Bonding .......................................................................................... 16
Fit the Filter Module & Sensors ............................................................................................................... 17
Fit the Fan Grille .................................................................................................................................... 18
Fit the Exit Vent(s) ................................................................................................................................. 19
5. Install the eController ....................................................................................... 20
6. Fit the Sensors ................................................................................................. 22
7. Wire the eController to the 48V DC Fan ............................................................. 23
8. Wire the eController to the DC Power Supply ..................................................... 24
9. Wire the eController to an Alarm System ........................................................... 26
10. Commission the eController .............................................................................. 28
Configuration Test ................................................................................................................................ 28
Re-Configure the eController ................................................................................................................ 29
Sensor Test ............................................................................................................................................ 31
Fan Speed Test ....................................................................................................................................... 31
Log Out .................................................................................................................................................. 31
Appendices ............................................................................................................ 33
A.1 Site Specific Settings..................................................................................................................... 34
A.2 Site-Specific Documentation Requirements ................................................................................... 35
A.3 eController Specification ............................................................................................................... 36
A.4 Connections on the eController ...................................................................................................... 37
4 of 46 www.4energy.co.uk © 4energy Ltd. 2013
A.5 COOLflow4E Force Drawings ......................................................................................................... 39
A.6 Wiring Colour Schemes ................................................................................................................. 42
A.7 Wiring Diagrams ........................................................................................................................... 42
© 4energy Ltd. 2013 www.4energy.co.uk 5 of 46
1. Overview
Welcome to the Quick Reference COOLflow4E Force Installation Guide. This document provides a brief
overview of the installation process for COOLflow4E Force units that are installed on the outside of an
equipment room.
Future updates will include information on internal installs.
Please work through the sections of this guide in order:
1. Preparation (see page 8).
2. Install COOLflow4E Force Fan and Filter (see page 13).
3. Install the eController (see page 20).
4. Fit the Sensors (see page 22).
5. Wire the eController to the 48V DC Fan (see page 23).
6. Wire the eController to an Alarm System (see page 26).
7. Wire the eController to the DC Power Supply (see page 24).
8. Commission the eController (see page 28).
6 of 46 www.4energy.co.uk © 4energy Ltd. 2013
2. Health and Safety
4energy take the health and safety of staff and customers very seriously. All 4energy manufacturing and
installation staff are required to complete health and safety training and must follow safe working practices.
All works are to be carried out in accordance with current legislation including, but not limited to:
Health & Safety At Work Act 1974 (statutory)
Electricity At Work Act 1989 (statutory)
The Construction (Design and Management) Regulations 2007
Current Building Regulations (under powers provided in the Building Act 1984)
IET Wiring Regulations (BS 7671 – 17th edition IEE wiring regulations)
IET Guidance Notes 1 through to 7 inclusive plus IEE Code Of Practice - In Service Installation & Test , Electrical Maintenance and On Site Guide
BS EN 62305:2006 (All Sections – Protection Against Lightening)
BS EN 61857:2009 (All Sections – Electrical Insulation Systems)
BS 6423:1983 (Electrical switchgear and control gear of voltages up to 650 volts)
BS EN 61537:2007 (Cable management - Cable tray systems and cable ladder systems)
BS EN 1362 – Specification for General Purpose Fuse Links for Domestic & Similar Purposes
BS EN 60309-2 – Specification for Industrial Plugs, Socket-outlets and Couplers for AC and DC Supplies
BS EN 50085-1:2005 (Cable trunking systems and cable ducting systems for electrical installations.
General requirements (AMD Corrigendum 17252)
BS EN 5588-9:1999 – (Fire precautions in the design, construction and use of buildings. Code of practice
for ventilation and air conditioning ductwork (AMD 14993) (No longer current but cited in the Building
Regulations))
Health & Safety Executive Guidance Notes (non-statutory)
BS EN 61010 -1: 2001 – Safety requirements for electrical equipment for measurement, control, and
laboratory use
BS EN 61326 – Electrical equipment for measurement, control and laboratory use. EMC requirements
BS EN 60439 – Low voltage switchgear and control gear
BS EN 61558 – Power transformers, assemblies, power supply units and similar
NRASWA (New Roads and Street Works Act) Code of Practice
BS 5720:1979 – (Code of practice for mechanical ventilation and air conditioning in buildings (No longer
current but cited in Building Regulations))
HSE '6 pack' of legislation (latest issues):
© 4energy Ltd. 2013 www.4energy.co.uk 7 of 46
L21 Management of Health and Safety at Work. (0717624889)
L22 Safe Use of Work Equipment. (9780717662951)
L23 Manual Handling. (071762823X)
L24 Workplace Health, Safety and Welfare. (0717604136)
L25 Personal Protective Equipment at Work. (0717661393)
L26 Work with display screen equipment. (0717625826)
HSE Guidance Note: GS38 Electrical test equipment for use by electricians
RIDDOR – The Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1995.
8 of 46 www.4energy.co.uk © 4energy Ltd. 2013
3. Preparation
Before you install the COOLflow4E Force unit, make sure that you are wearing the correct PPE, have the
appropriate tools for the job, and that the equipment room is clear of any obstacles.
You can then complete these sections, in order:
1. Conduct a risk assessment of the site. You should only begin the installation process if the COOLflow4E
system can be installed safely and appropriately.
2. Make sure you have the Tools Required for Installation (see page 9) and are aware of the Documentation
(see page 9).
3. Isolate the Power Supply in the Equipment room (see page 9).
4. Decommission the Existing Cooling System (Where Applicable) (see page 10).
5. Locate a Suitable Position for the COOLflow4E Force Unit (see page 12).
© 4energy Ltd. 2013 www.4energy.co.uk 9 of 46
Tools Required for Installation
You will need to use the following tools to install the COOLflow4E Force system:
18v Battery drill and drill bits (10mm & 5mm)
Spirit level
Pen/Pencil
Aluminium tape
File
Hacksaw
18v Battery jigsaw and metal blades (Bosch T118A recommended)
Insulated screwdriver
Insulated pliers
Crimping tools and cable cutters (for wiring)
IDC termination tool (for wiring to an external alarm system)
Multi-function tester (Megger MFT 1720 recommended)
You also need various fixings and sealants for the COOLflow4E unit.
Documentation Requirements for Installation
As part of the installation process, you may need to complete various forms, for example, you may need to
complete a Duty of Care Waste Disposal form. The documentation that is required varies, depending on the
policy and regulations in place at the site (and country).
For details on the documentation required for your specific install, see Appendix A.2 Site-Specific
Documentation Requirements on page 35.
Isolate the Power Supply in the Equipment room
To install a COOLflow4E Force system, you will ALWAYS need to isolate the power supply, ensure that it s locked off and the circuit has been proved dead. Prior to any works commencing.
10 of 46 www.4energy.co.uk © 4energy Ltd. 2013
Decommission the Existing Cooling System (Where Applicable)
If the site has an existing cooling system, you will need to remove it before you can install a COOLflow4E Force
Fan and Filter. Prior to any decommissioning of the existing system, the supply should be isolated, locked off
and proven dead. Before proceeding with the following steps:
6. Identify the type of cooling system to be decommissioned:
Split air conditioning
Packaged system, for example, Airedale
Free-air only, for example, 4Energy DAC MK1.
When you identify the type of cooling system, you will be able to determine if refrigerants need to be
removed.
7. Decommission the cooling system by following the relevant Method Statement for the site/type of
system.
8. If the cooling system uses refrigerant, you will need to reclaim the refrigerant before opening the pipes
and removing the system.
WARNING. Wear safety goggles and gloves when decommissioning
air conditioning systems. Exposure to refrigerants can cause physical
harm.
WARNING. Air conditioning systems should only be decommissioned
by FGas registered refrigeration engineers (or local equivalent outside
UK). Incorrect decommissioning of refrigerant systems could result in
equipment damage or failure, injury or death.
WARNING. You must lock off/Isolate the electrical supply and fix an
isolation warning label to the distribution board or point of isolation.
This is to ensure that the supply cannot be re-energised during the
decommissioning process.
© 4energy Ltd. 2013 www.4energy.co.uk 11 of 46
9. Repair any holes that are left in the equipment room as a result of removing the air conditioning system.
To make the repairs on a metal or GRP site, rivet each screw hole and fix pre-cut metal plates over any
pipe holes. Use small-head 5mm rivets for both types of repair. From outside the equipment room, fit
the metal plate so that the coated side is facing you. When fitting a metal plate from inside the cabin,
turn the plate around so that the uncoated side is facing you. Once secured, a silicone seal should be
applied around the edge of the plates, to provide a waterproof seal.
To make the repairs on a brick site, use mortar to fill in the holes. Mix the mortar according to the
mortar manufacturer's instructions and use a trowel to apply the mortar to the wall.
10. If the existing air conditioning system had any fittings, such as condenser bolts, brackets or cages,
remove them. All decommissioned equipment and associated fixings, must be removed from site. Thus
eliminating potential hazards.
11. Prepare the cooling system for removal from site, in accordance with the Method Statement for the
site.
12. Complete any required documentation (waste disposal forms, etc.). For details, see Appendix A.2 Site-
Specific Documentation Requirements, on page 35.
Uncoated Coated
12 of 46 www.4energy.co.uk © 4energy Ltd. 2013
Locate a Suitable Position for the COOLflow4E Force Unit
You need to position the COOLflow4E Force unit so that it is on a clear section of the equipment room wall,
where there is enough room for a complete COOLflow4E Force. If you are fitting a COOLflow4E Force Fan and
Filter, you should still allow enough space for the larger COOLflow4E Full System as this will make it easier to
upgrade in the future. The CTIL cooling calculator / Survey document, should also be adhered to when
positioning the system.
Ideally, you should aim for a total space of 2m. The COOLflow4E Force Fan and Filter unit needs a minimum of
0.3m space below the filter module, and the Fan and Filter unit is approximately 1.55m in height.
You also need to consider:
Is there enough space for the eController? The eController needs to be installed inside the equipment
room and has to be wired to the power supply, the fan, and any other systems or devices (alarm systems,
actuators, etc.). We recommend that you position the eController above the COOLflow4E Force fan or to
the side of it.
Are there struts or supports in the equipment room wall? In metal and GRP equipment rooms, it is
possible to saw through the struts using a jigsaw, but we recommend that you avoid supports where
possible.
Where is the vent grille going to be fitted? COOLflow4E systems in the UK require two 295 x 295mm vents
to be fitted in a high position on another wall of the equipment room. For best results, the vent should be
on the opposite wall to the COOLflow4E Force unit, but in some equipment rooms can be fitted to an
adjacent wall. It should never be fitted to the same wall as the COOLflow4E Force unit. The CTIL cooling
calculator, should be taken into account during this process.
Remove the Filters
The COOLflow4E Force unit contains one maintenance free filter, which is rated to F7 standard. You need to
remove this filter before you install the unit, so that you can reach inside and secure the fixings.
© 4energy Ltd. 2013 www.4energy.co.uk 13 of 46
4. Install COOLflow4E Force Fan and Filter Unit
To install a COOLflow4E Force unit on an external wall of an equipment room, complete the following sections
in order:
1. Cut a Fan Hole in the Equipment Room Wall (see page 14).
2. Fit the COOLflow4E unit and Earth Bonding (see page16).
3. Fit the Filter Modules (see page 17).
4. Fit the Fan Grille (see page 18).
5. Fit the Exit Vent(s (see page 19).
14 of 46 www.4energy.co.uk © 4energy Ltd. 2013
Cut a Fan Hole in the Equipment Room Wall
Use the supplied COOLflow4E Force template to create the hole in the equipment room wall. The hole is
needed for the fan.
1. From inside the equipment room, estimate the centre of the area where the COOLflow4E unit will be
positioned. From that central position, use a tape measure to measure from the floor to a height of
1000mm. Use a pencil to make a mark at 1000mm.
2. Use a spirit level and pencil to draw a level, horizontal line at 1000mm from the floor. The line should be
at least 600mm in length (300mm each side of the central mark you made in step 1).
3. Using the line you have drawn as the bottom of the rectangle, draw a rectangle that is 210mm high and
535mm wide. Use the spirit level to make sure the lines are level.
4. Use a drill with 10mm bit to drill a hole in each corner of the rectangle you have drawn. The drill holes
should be inside the rectangle and need to go all of the way through the wall of the equipment room.
5. Take the COOLflow4E Force template and remove at least two of the three cut-outs above the fan hole
cut-out. We recommend that you remove the central cut-out hole where possible. These cut-out holes
will be used for feeding the cables from the COOLflow4E Force unit into the equipment room, and the
eController should be positioned close to it (within 2m, but ideally, above or to the side of the hole).
Choose the cut-out that is in the most appropriate position in relation to the inside of the equipment
room.
6. From outside the equipment room, place the template on the wall so that the inner corners of the fan
hole cut-out align with the holes you drilled from inside. Place the template on the wall so that the fan
hole cut-out is closer to the left-hand side (as shown above).
7. Use a pen or pencil to mark the:
Inner side of the fan hole cut-out
Screw positions
Cut-out position.
8. From inside the equipment room, use an 18v jigsaw and blade to cut along the lines of the rectangle.
You should cut through the inner skin and the insulation if possible.
9. From outside the equipment room, drill out:
The cut-out for the cables
10. Cut along the edge of the fan cut-out.
© 4energy Ltd. 2013 www.4energy.co.uk 15 of 46
For metal equipment rooms, use a jigsaw to cut along the edges of the marked cut-out area. When you
have cut along all of the edges, you can remove the cut-out.
11. Use a file to smooth down the edges of the hole.
12. Fit the metal insert provided, within the cut out. Ensuring the lip is secured to the external wall of the
cabin, using a 5mm rivet, at the centre point of each edge.
13. Apply aluminium tape around the internal edges of the hole, so that it doesn t have any sharp edges. Sharp edges could cause cables to become frayed (if they come into contact with the edges).
16 of 46 www.4energy.co.uk © 4energy Ltd. 2013
Fit the COOLflow4E Unit and Earth Bonding
The COOLflow4E Force unit uses a fan to draw in cool air. The rear of the fan module has an open rectangle
that should match the size of the hole you created in the equipment room wall. The rear also has three cut-
outs, which you will use to feed cables from the COOLflow4E Force unit into the equipment room. You will
need to fit a 25mm open grommet to each cable cut-out you use, so that the cable is protected from the edge
of the metal.
You also need to fit supplementary earth bonding between the base of the fan module and the main earthing
terminal in the equipment room. Following the steps below:
1. Fit self-adhesive pre-compressed seal to the rear of the COOLflow4E
unit (the side with the fan cut-out).
2. Fit M10 bolts to the upper section of the mounting holes. The bolts need
to protrude from the cabin around 5mm, to allow the unit to be hung.
While the remaining fixings are made to secure the unit to the cabin.
Once all fixings are present fully tighten the M10 bolts, to complete
hanging.
3. Inside the equipment room, fit a 25mm open grommet to the cable cut-
out hole in the wall. Do not fit a grommet on the outside of the wall.
4. Take a correctly sized length of supplementary bonding cable to reach
from the Fan Module to the main earthing terminal in the equipment room. Which must be
clipped/cable tied throughout its length.
5. Fit ring crimps to both ends of the supplementary bonding cable.
Attach it to a pre-drilled hole on the base (around which the
powder coating should be removed, exposing bare metal), of the
fan module. This should then be labelled. The supplementary
bonding should always be made, in the same location. To
maintain continuity of installation. See right.
6. Reach inside the fan module and fit a 25mm open grommet to
the cable-cut out. When pressed into position, it should cover
the edge of the cable cut-out on the fan module and the cable cut-out on the exterior wall of the
equipment room.
7. Feed the fan cables and the supplementary bonding (housed in copex) through one of the cable cut-out
hole in the equipment room wall.
8. Use tamper-proof screws or rivets to attach the rear of the fan unit to the equipment room wall. If you
are installing onto a brick or concrete wall, you will need to use wall plugs.
9. Attach the supplementary bonding cable to the main earth terminal in the equipment room.
© 4energy Ltd. 2013 www.4energy.co.uk 17 of 46
Fit the Filter Module & Sensors
COOLflow4E systems have filter modules that contains 4Energy s patented filtration system. You need to fit
the filter variation that you removed earlier at the bottom of the COOLflow4E Force unit
To install the filter module and sensors follow these steps:
1. The external temperature sensor and pressure tubing should be fed through the holes in the left and
right of the under-tray of the unit respectively
2. Once the sensors are secure the COOLfilter4E can be placed back in the unit. And unit panels reattached.
Diagram shown is for the Unifilter variant, Maintenance free version doesn t require differential pressure sensor.
IMPORTANT. Make sure that the sensor will not rest on any other
part of the COOLflow4E unit. If the sensor comes into contact with the
unit, its readings may be inaccurate and so will affect the
performance of the COOLflow4E Force.
18 of 46 www.4energy.co.uk © 4energy Ltd. 2013
Fit the Fan Grille
When you have fitted the COOLflow4E Force unit and sealed it to the wall, you need to fit the grille over the fan
inside the equipment room. The grille helps protect the fan from debris and also prevents engineers and
cables coming into contact with the fan accidentally.
From inside the equipment room:
1. Place the grille over the fan cut-out hole. Use a spirit-level to make sure it is level.
2. Use 5mm screws to secure the fan grille in place.
© 4energy Ltd. 2013 www.4energy.co.uk 19 of 46
Fit the Exit Vent(s)
COOLflow4E Force systems need to have an exit vent installed on a wall that is opposite or adjacent to the
COOLflow4E unit (The engineer should always follow the CTIL cooling calculator/survey document, for
guidance). The vent allows warm air to be directed out of the equipment room and should be positioned high
up the wall (as the warm air will be at the top of the equipment room).
On some sites, more than one exit vent may be required. Please refer to the site documentation for
information on how many exit vents are needed. If you need to install multiple vents, position them on the
wall opposite or adjacent to the COOLflow4E unit, as far apart as possible.
To fit an exit vent:
1. Choose a suitable position for the exit vent. The engineer should always follow the CTIL cooling
calculator, for guidance.
Where possible, we recommend that the vent is fitted to the wall that is opposite to the COOLflow4E
Force unit. If this is impractical, you can use walls that are adjacent to the COOLflow4E Force unit
instead. But do not fit the exit vent to the same wall as the COOLflow4E Force unit as this will affect the
air flow.
2. From inside the equipment room, measure and draw a 295mm × 295mm rectangle for the position of
the exit vent. Use a spirit level to make sure the rectangle is level.
3. Use a drill fitted with a 10mm bit (metal or GRP equipment rooms) to drill out the corners of the
rectangles. Make sure that for each hole, the entire hole is inside the edges of the rectangle.
4. From outside the equipment room, use a spirit level and marker to draw the rectangle on the outside of
the wall.
5. Cut out the rectangle (use a good quality jigsaw for metal or GRP equipment rooms. Note that low
quality jigsaws will struggle to cut through the inner and outer shell of a metal or GRP equipment room.
6. Fit the metal insert, into the hole, ensuring the lip is on the
internal wall of the cabin. Secure it in place using a small head
aluminium rivet in the centre of each insert lip.
7. Clear out any debris from the hole and then fit a 295mm ×
295mm gravity grille into the hole. From outside to in. Secure it
in place with screws or small-headed aluminium rivets. And seal
using a clear silicone.
8. Repeat steps 2-7 inclusive for any additional exit vents that are
required for the site.
20 of 46 www.4energy.co.uk © 4energy Ltd. 2013
5. Install the eController
The eController has a plastic casing with removable panels. To mount the eController to the equipment room
wall, you will need to remove the top and bottom panels and then fix screws:
1. Identify a suitable position for the eController on the equipment room wall. It needs to be mounted on a
flat surface and within 2m of the COOLflow4E Force fan module.
We recommend that you try to fit the eController above the COOLflow4E fan inside the equipment
room. If this is impractical, try and fit the eController to the side of the fan.
When planning the location, you need to consider the route for the wiring from the DC power supply to
the eController, access, operation and maintenance.
For details on the eController s dimensions and specification, see A.3 eController Specification, on page
36.
2. Use a cross-head screwdriver to remove the screws in the centre of the top and bottom panels.
3. Remove the top and bottom plates by gently pulling the rear of the side section of the panel away from
the eController and then slide the panel off.
WARNING. Do not remove the central panel. Incorrect removal of the
central panel could damage the eController and affect its operation.
© 4energy Ltd. 2013 www.4energy.co.uk 21 of 46
4. Use a power drill, with 25mm core cutter, to drill holes to allow fan cables, earth bonding and
temperature sensor to enter the controller. Take care not to damage the eController.
5. Make appropriate openings to install an un-switched fused spur, to allow local isolation.
6. Place the eController on the equipment room wall, at the position you have identified. And secure with
appropriate fixings.
7. Feed the power supply and sensor cables through, a length of flexible conduit (finishing 2-3mm inside
the controller). Then through the cable glands and into the eController box. For tidiness, you can feed
the sensor cables through the cable channel at the side of the eController.
WARNING. Do not allow the screws to make direct contact with the
printed circuit board. The metal screws could cause an electrical short
and may cause equipment damage, physical injury or death.
IMPORTANT. Route the power supply cables through a different hole
than the sensor cables. If both sets of cables are fed through the same
hole, this could cause interference and your COOLflow system may
not function correctly.
This diagram shows all of the
recommended positions for
cable holes. Choose the
positions that are suitable for
the equipment room and the
position of the eController (you
do not need to drill all of the
holes).
22 of 46 www.4energy.co.uk © 4energy Ltd. 2013
6. Fit the Sensors
To function as designed, the COOLflow4E Force system needs to be connected to an internal temperature
sensor and an external temperature sensor. These are the minimum requirements, as the eController needs to
use the temperature inside the equipment room and the ambient temperature outside in its calculations. You
can attach the internal and external temperature sensors to the RJ45 terminals in the top section of the
eController. You can also attach a Frost sensor and Humidity sensor, although these are optional (whereas the
temperature sensors must be installed).
1. Plug the sensor cables into the appropriate RJ45 terminals.
2. Position the sensors:
Position the Internal temperature sensor close to the ceiling, in the middle of the equipment room.
The External temperature sensor should already be in position.
Position the Humidity sensor next to the internal temperature sensor. (if installed)
Frost sensors are not used on COOLflow4E Fan and Filter systems.
Internal Temperature
External Temperature
Frost
Humidity
© 4energy Ltd. 2013 www.4energy.co.uk 23 of 46
7. Wire the eController to the 48V DC Fan
The eController needs to be wired to the fan so that it can control its speed. The eController will use its internal
logic programs to calculate the appropriate speed for the fan, depending on the temperature in the equipment
room and the temperature outside.
To wire the eController to a 48V DC fan, connect the fan to the eController s terminals as described in the table below.
Fan Cable Colour Controller Terminal Cable
Red (Positive) DC Fan 1 Out + 1.5mm2 core
Blue (Ground/Negative) DC Fan 1 Out - 1.5mm2 core
White (Tacho) TACH1 1.5mm2 core
Yellow (Control) CTRL1 1.5mm2 core
24 of 46 www.4energy.co.uk © 4energy Ltd. 2013
8. Wire the eController to the DC Power Supply
As part of the install process for a COOLflow4E Force 48V DC system, you need to connect the eController to a
DC power supply in the equipment room.
In this section, we explain the basic method of connection, which is connecting an eController directly to a
breaker in the DC power supply. For all installations within the CTIL estate, the COOLflow4E system, must
always be fed from the PRIORITY LOAD of the PSU distribution.
WARNING. Only qualified electricians (Who have undertaken and
passed the PSU training course DELTA and/or ELTEK) should wire the
eController to the power supply. Always follow electrical safety
standards (see Health and Safety on page 6). Failure to follow electrical
safety standards could result in equipment damage, physical injury or
death.
Basic Method of DC Power Supply to eController Connection:
3. Remove the cover to the DC power supply unit s distribution board and ensure that the protective cover
of the bus bar is in place. If the protective cover is missing, live working is required. Take the necessary
precautions for live working (please refer to the relevant Method Statement for live working).
4. Select an appropriately sized MCB in the PSU. If the PSU does not have an appropriate MCB available,
install a new one. The new MCB must always be from the same manufacturer Make and Model as the
other breakers in the DC power supply.
For a direct connection between the eController and DC power supply, a B10 or C10 breaker is required.
(You will need to calculate the appropriate breaker size if wiring via an isolator. The load of the
eController is included in Appendix A.3 eController Specification, on page 36).
5. An un-switched fused spur must be installed adjacent to the eController, to allow local isolation. On all
systems.
If you are installing two COOLflow systems, you need to use a
separate MCB (in the DC Power Supply) for each system.
6. Wire the eController to the 48V DC power supply. You need to use correctly sized cable, according to
country standards.
© 4energy Ltd. 2013 www.4energy.co.uk 25 of 46
7. Wire the eController to the DC power supply:
If you are wiring a -48V DC power supply to the eController:
Connect the -48V DC wire to the DC FAN 1 IN- terminal on the eController
Connect the 0V DC wire to the DC FAN 1 IN+ terminal on the eController
Use plastic Copex to keep the cables neat and tidy, terminating around 100mm inside the PSU.
8. All system labelling should be completed according to CTIL document SDN5016.
9. Complete the required documentation (as outlined in the relevant Method Statement).
10. Complete any further testing required for the site (as detailed in the relevant Method Statement).
26 of 46 www.4energy.co.uk © 4energy Ltd. 2013
9. Wire the eController to an Alarm System
The eController can output alarm signals to external alarm systems, such as an alarm system in an equipment
room. Typically, the alarms are monitored remotely, usually from a control center, and if an alarm condition is
detected, operators in the control center can arrange for engineers to investigate.
To wire the eController to an alarm circuit, you will wire to the RL2 relay on the eController. The types of alarm
that the eController can output via RL2 include:
Power failure (supply or internal eController power)
Fan failure
Smoke alarm input (if a smoke alarm signal is received by the eController, it will output an alarm via
RL2).
To wire the eController to an external alarm system:
1. Make sure the eController has power, but is not switched on (see Wire the eController to the DC Power
Supply, on page 24).
2. Open the alarm system connection box in the equipment room.
3. Prepare an appropriate cable for connecting the eController to the alarm connection box.
4. Run the cable from the eController to the alarm box, but do not connect it to any terminals at this stage.
5. Connect the cable to RL2 NO and C on the eController
.
IMPORTANT. Use a multimeter to test the NO and NC terminals on
the eController PCB before connecting to the relays. Some
eControllers may have their NO and NC terminals labelled incorrectly
on the circuit board.
RL2 for AC
and Alarm
© 4energy Ltd. 2013 www.4energy.co.uk 27 of 46
6. Use the multimeter to perform a continuity test on the cable.
i. With the cable connected to the eController (RL2 NO and C), connect a multimeter to the opposite
end of the cable. Take care not to damage the cable. Connect the multimeter s red lead to one conductor (cable) and the black lead to the other conductor.
ii. Keep the eController turned off, and use the multimeter to perform a continuity test. The test
should show that there is an open circuit.
iii. Restore the power supply to the eController so that it turns on. Perform the continuity test again.
The test should show that there is a short circuit (indicating RL2 is energised).
Please refer to the multimeter manufacturer s documentation for details on how to perform a continuity test.
If the cable passes the test, you can proceed to step 7.
If the cable fails the test, replace the cable and then repeat the tests starting from step 4.
7. Connect the other end of the cable to the designated terminals in the alarm box (according to SDN5042)
you need to use an IDC termination tool to connect the cable to the terminals.
For brief details on the terminals that can be used in the alarm equipment, see Appendix A.1 Site Specific
Settings, on page 34.
8. All system labelling should be completed according to SDN5016.
9. Replace the alarm box cover.
Further Information
Wiring diagrams are included in Appendix A.6 Wiring Colour Schemes (see page 42).
For further guidance and detail on alarm connections please refer to document SDN5042 & RICP 004-37.
28 of 46 www.4energy.co.uk © 4energy Ltd. 2013
10. Commission the eController
When you have fitted and wired up the eController to the power supply, fan, and any other systems (heater,
alarm, etc.), you need to set up the eController:
1. Restore the power supply to the equipment room.
2. Perform a Configuration Test (see page 28).
3. If the configuration needs to be changed, Re-Configure the eController (see page 28).
4. Perform a Sensor Test, (see page 31).
5. Perform a Fan Speed Test, (see page 31).
6. Log Out (see page 31).
Configuration Test
The eController is pre-configured with set points and other settings. When you have installed it, you need to
check that the pre-configured settings match the settings that are needed for the site (see Appendix A.1 Site
Specific Settings, see page 34).
To check the settings:
1. Power up the eController. When the LCD shows a series of readings, press the OK button to access the
Main Menu.
2. Use the Keypad to select the Diagnostics option. The pre-configured settings for the eController are
shown in a list. You can use the Keypad to scroll up and down the list. Compare the settings to those
required for the site.
If the settings match, ignore the remaining steps of this section and proceed to: Sensor Test (see page
31).
If the settings do not match, you will need to report this to 4energy. You may need to Re-Configure the
eController (see page 29).
© 4energy Ltd. 2013 www.4energy.co.uk 29 of 46
Re-Configure the eController
There are two ways to change the configuration of the eController.
Using the wizard
Using the Advanced Settings.
When you use the wizard , you make a series of choices, based on the type of system you are installing. From
these choices, the eController is able to put preset configuration settings in place. These preset settings are
often, but not always, suitable for the site. You will need to compare the default settings to the settings
required for the site (see Appendix A.1 Site Specific Settings on page 34). If they do not match, you will need to
configure the Advanced Settings separately on the eController.
To use the wizard:
1. Press OK and then press the down key until the cursor is on the Setup option.
2. Press OK and use the keypad to enter the password at the prompt (contact 4energy support if password
required).
3. Select the option for the type of COOLflow4E system you have installed.
Fan Only
Fan and Site A/C
Fan + 4Energy A/C
4. Press OK.
5. Select Target Temperature.
6. Set the temperature you want the COOLflow4E system to try and maintain in the equipment room. Use
the left and right keys to move the cursor between the digits; use the up and down keys to increase and
decrease the values. Press OK when you have entered the value.
7. Select Fan Mode and press OK.
8. Choose Variable Speed Mode or 100% Mode. (Variable Speed Mode allows the eController to manage
the fan speed automatically, whereas 100% Mode sets the fan to run at full speed at all times). Press OK
when you have made your choice.
9. Select START and press OK.
10. Define whether the fan has Tacho Enabled or Tacho Disabled (if the fan has the tacho wire connected
to the eController, choose Tacho Enabled). Press OK.
The eController now runs with the default settings for your choices in place. You will need to compare
the settings to those required for the site (see Appendix A.1 Site Specific Settings, on page 34). You can
view the default settings by pressing OK on the Home page and then selecting the Diagnostics option.
If you need to adjust the settings so that they match the site requirements, you will need to use the
Advanced Settings.
30 of 46 www.4energy.co.uk © 4energy Ltd. 2013
To use the Advanced Settings:
1. Display the Home page, and then press the OK button to display the Main Menu.
2. Select the Advanced Settings option and then log on. If you do not have a password, contact your local
technical support.
3. Use the options in the Advanced Settings menu to apply the required configuration.
For more details on the options, see the eController manual.
4. Repeat the Configuration Test (see page 28).
© 4energy Ltd. 2013 www.4energy.co.uk 31 of 46
Sensor Test
You need to complete the sensor test to make sure that the sensors are working correctly (and are being read
correctly by the eController).
1. Use a thermometer to take the temperature at a position close to the internal sensor and a position
close to the external sensor. Write down your measurements as you will need them in the next step.
2. Compare the temperature measurements you took in step 1 to the Internal Temperature and External
Temperature readings shown on the Home page of the LCD display (you can display the Home page by
pressing the Home button).
If the temperatures are within 4°C of the measurements you took, the sensors are working correctly.
If there is a significant difference between the measurements you took and the temperatures shown,
there may be a fault. There are usually differences between the measurements of different sensors, but
they should only differ by 1-4 degrees.
If the temperatures are not within 4°C of your measurements, replace the sensor(s) and repeat the
sensor test. If the new sensors also result in large differences, the eController may be faulty. Try using
new sensors again, but if this fails, replace the eController and then repeat the commissioning process
after install.
Fan Speed Test
The fan speed should increase when the temperature rises and decrease when the temperature falls. To test
the fan speeds up and slows down correctly:
1. Heat the internal sensor with a heating device, such as a hairdryer. Care should be taken not to burn the
sensor or yourself.
2. Observe the fan speed. As the temperature of the sensor increases, the fan should spin faster.
3. Cool the internal sensor with a freeze spray.
4. Observe the fan speed. As the temperature of the sensor decreases, the fan should slow down.
If the sensors passed the Sensor Test (see page 31) and the fan speed did not increase/decrease as expected,
the eController may be faulty. Replace the eController and contact 4energy to arrange the return of the faulty
eController.
If the fan increased speed and decreased speed as expected, the eController fan speed test process is
complete.
Log Out
When you have configured the eController to meet the requirements for the site, you need to log out. This
helps to prevent unauthorised users from gaining access to the configuration options.
32 of 46 www.4energy.co.uk © 4energy Ltd. 2013
1. Press the Home button to return to the home page and then press OK.
2. Select the Log Out option. You are now logged out and will need to enter your password again if you
wish to change any configuration settings.
The eController s configuration can now only be altered by someone who logs on and enters the
appropriate password.
The installation of the eController is now complete.
© 4energy Ltd. 2013 www.4energy.co.uk 33 of 46
Appendices
The following appendices contain supplementary information about the wiring and operation of the
eController.
A.1 Site Specific Settings (see page 34)
A.2 Site-Specific Documentation Requirements (see page 35)
A.3 eController Specification (see page 36)
A.4 Connections on the eController (see page 37)
A.5 COOLflow4E Force Drawings (see page 39)
A.6 Wiring Colour Schemes (see page 42)
A.7 Wiring Diagrams (see page 42).
34 of 46 www.4energy.co.uk © 4energy Ltd. 2013
A.1 Site Specific Settings
CTIL Sites
eController Set Points and Configuration
Enter the following values in the eController configuration:
eController Setting Required Value
Windmill T 18
Windmill S 22%
Ramp Start 22
Pid Offset 2
AC On 35
AC Speed 0%
Panic Temp 35
Alarm System Wiring
eController Terminal Alarm Box Terminal
RL2 NO (Normally Open) K2-9a or K2-9b
RL2 C (Common) K2-9a or K2-9b (do not use the same K terminal that you used for the Normally Open
connection).
© 4energy Ltd. 2013 www.4energy.co.uk 35 of 46
A.2 Site-Specific Documentation Requirements
CTIL Sites
The following documentation is required when installing on a CTIL site:
Document Stage of Installation Process
Booking In (VF Site Diary) When you arrive on site, you need to book in via text message.
Please contact 4energy if you need more information.
Hazardous Waste Regulations 2005:
Consignment Note – Mirror Note
To be completed for each site where refrigerant is removed. This has to be completed
before transportation of the refrigerant.
The original mirror note is to be kept with the commissioning documents and
returned to 4energy as part of the commissioning documents for the site.
A photocopy of the mirror note is to be kept with the reclaim cylinder (used for the
removal of the refrigerant from the site).
Hazardous Waste Regulations 2005:
Consignment Note
To be completed for each reclaim cylinder, when full.
Attach the two copies of the consignment note to the photocopy of the mirror notes
for the full reclaim cylinder.
Duty of Care: Waste Transfer Note To be completed before the air conditioning is removed from site.
Booking Out (VF Site Diary) When you leave site, you need to book out via text message.
Please contact 4energy if you need more information.
36 of 46 www.4energy.co.uk © 4energy Ltd. 2013
A.3 eController Specification
Physical Properties of eController
Length/Width/Depth (mm) 233/255/47
Net Weight Less than 1kg
Power Usage (W) 19V to 72V (6W)
© 4energy Ltd. 2013 www.4energy.co.uk 37 of 46
A.4 Connections on the eController
The eController s terminals are located behind the top cover panel and the bottom cover panel. The
connections on the top side of the eController are as follows:
Board ID Purpose
COMM The COMM connection allows add-in cards to be fitted to the eController. The eController supports RS 485 and RS
232 add-in cards (the RS 485 card can also be used for RS 422). These connections are intended for use when
debugging the eController. In future, COMM will also be used for communications with devices that use the Modbus
protocol.
RJ45 The RJ45 ports are for connecting internal temperature, external temperature, frost temperature, and humidity
sensors.
Digital
Inputs
The digital inputs are for connecting the eController to alarm-capable devices, such as a smoke alarm. Aux is for
connecting the eController to an actuator which is used with a damper.
GND is a common ground for all of the digital inputs.
RL3/RL4 RL3 is for outputting a high temperature alarm. COM and NO are most commonly used for these connections.
RL4 is for outputting a low temperature alarm to another device, such as an RTU or PLC. It is also used for
connecting an external heater to the eController.
COMM is for connecting add-in cards
that support RS 485 or RS 232
communications.
RJ45 Ports for connecting sensors to the
eController
Digital inputs for smoke alarm,
actuator, etc. Relays for high temperature and low
temperature alarm outputs to RTUs/PLCs. Also
used for connecting an external heater.
38 of 46 www.4energy.co.uk © 4energy Ltd. 2013
Board ID Purpose
RL1 Use for connecting an air conditioning unit (A/C) to the eController. COM and NO are most commonly used for this
connection.
RL2 Use for a general signal alarm. Typically, the COM and NO are wired to an A/C alarm.
DC Fan 2 Use for connecting a secondary DC fan (via the OUT+ and OUT- terminals)
AC Fan 2 Use for connecting a secondary AC fan (via the LOUT, E, and N terminals).
AC IN Use for connecting an AC power supply (via the N, E and LIN terminals).
AC Fan 1 Use for connecting a primary AC fan (via LOUT, E, N, TACH1, and CTRL).
DC Fan 1 Use for connecting a primary DC fan (OUT+, OUT-) and DC power supply (IN+, IN-).
RL1 for ACU RL2 for AC
and Alarm
DC Fan 2
for
secondary
DC fan
DC Fan 1 for DC
power supply and
DC primary fan
AC FAN 2 for
secondary AC fan AC IN for AC
Power Supply
AC FAN 1 for
primary AC fan
© 4energy Ltd. 2013 www.4energy.co.uk 39 of 46
A.5 COOLflow4E Force Drawings
This section contains the drawings for the COOLflow4E Force unit. They are shown on separate pages
(landscape orientation).
© 4energy Ltd. 2013 www.4energy.co.uk 40 of 46
41 of 46 www.4energy.co.uk © 4energy Ltd. 2013
42 of 46 www.4energy.co.uk © 4energy Ltd. 2013
A.6 Wiring Colour Schemes
In this appendix, we provide information about the wiring colour schemes that are relevant to COOLflow4E
products, within the CTIL estate. Using SDN5016 as a guide.
DC Wiring Colour Schemes (2-Wire Earthed)
Purpose IEC Wiring Colour
Positive of positive
earthed circuit (M)
Blue
Negative of positive
earthed circuit (L-)
Grey
A.7 Wiring Diagrams
This section contains the wiring diagram for the COOLflow4E Force eController when used with a 48V DC fan.
It is shown on a separate page (landscape orientation).
43 of 46 www.4energy.co.uk © 4energy Ltd. 2013
44 of 46 www.4energy.co.uk © 4energy Ltd. 2013
45 of 46 www.4energy.co.uk © 4energy Ltd. 2013