VICINITY MAP
The Trion Towers is located in Eighth Avenue cor. McKinley Parkway, Bonifacio Global City
NEARBY ESTABLISHMENTS
• Schools & Offices
– British Embassy
– Net Cube
– British School Manila
– International School Manila
• Hospital
– St. Luke’s Medical Center
• Museums
– The Mind Museum
• Leisure and Entertainment areas
– Manila Golf Club
– Bonifacio High Street
– The Fort Strip
– S&R
– Burgos Circle
• Events Place
– NBC Tent
SITE DEVELOPMENT PLAN
TOWER 2
TOWER 1
TOWER 3
•1 –hectare residential property
•3 residential towers
•Total of 2,103 units for the 3
towers
•Tower 1 =736 units
•Tower 2 =728 units
• Tower 1 – 49 storeys
•Tower 2 - 50 storeys
• 5 level basement parking
• Ground floor commercial units
THEME/ARCHITECTURAL DESIGN
• Modern Tri-axial architectural design which promotes:
• Natural Ventilation
• Maximized Views
• Building Stability
• Flat design concept
• Concrete façade with glass windows
BUILDING DETAILS(TOWER 2)
Typical Residential Floors (3rd – 48th floor)
Garden units (2nd floor)
Driveway & Commercial (lower ground)
Basement parking
Amenities & Commercial (upper ground)
Penthouse (49th – 50th floor)
BUILDING DETAILS
TOWER 2
TOWER 1
TOWER 3
TOWER DISTANCE (IN METERS)
Tower 1 to Tower 2 Approx. 15.63 m
Tower 2 to Tower 3 Approx. 11.90 m
Tower 3 to Tower 1 Approx. 11.85 m
BUILDING DETAILS
• Architectural : ASYA DESIGN
• Structural : SY2 + ASSOCIATES
• Plumbing, Sanitary & Fire : F.L. FIGUEROA & ASSOCIATES
• Electrical : M.A. ALIX & PARTNERS
• Mechanical : L.R. PUNZALAN & ASSOCIATES
• Landscape : E.A. AURELIO
BUILDING FACILITIES
•Entrance lobby with reception/ security counter•Four (4) passenger elevators for each tower•CCTV monitoring of selected common areas•Automatic heat/ smoke detection and fire sprinkler system•Annunciator panel with emergency speaker at all floors•Elevated water tank and underground cistern•Standby power generator for common areas and selected outlet in each unit
Electrical outlets covered by emergency power generator:
- One ceiling light for all rooms- One convenience outlet for Living/Dining Area- One convenience outlet for Refrigerator- 100% for Life Safety System of the Building
•Individual mail boxes •Central garbage room•Intercom per unit connected to the Security/Reception counter•Balconies at selected units•Building Administration Office located at Tower 1•Fire Exits
BUILDING FACILITIES
•Entrance lobby with reception/security counter•Four (4) passenger elevatorsfor each tower•CCTV monitoring of selectedcommon areas•Automatic heat/ smokedetection and fire sprinklersystem•Annunciator panel withemergency speaker at all floors•Elevated water tank andunderground cistern
BUILDING FACILITIES
•Standby power generator for common areas and selected outlet in each unit•Electrical outlets covered by emergency power generator:- One ceiling light for all rooms- One convenience outlet for Living/Dining Area- One convenience outlet for Refrigerator- 100% for Life Safety System of the Building•Individual mail boxes •Central garbage room•Intercom per unit connected to the Security/Reception counter•Balconies at selected units•Building Administration Office located at Tower 1•Fire Exits
PROJECT DETAILS
Floor Use
49th to 50th Penthouse
32th to 48th 2BR Zone
3rd to 31th 1BR Zone
2nd Garden Units
Upper Ground Amenities & Commercial
Lower Ground Driveway & Commercial
Basement 1 - 5 Parking
Tower 2 - Floor Per Zone
TYPICAL UNIT FLOOR PLAN
ROOM AREA (in sq.m.)
Living/Dining 15.65 sqm
Kitchen 5.90 sqm
Master’s T & B 5.75 sqm
Total Approximate Floor Area (in sq.m)
38.10
ONE BEDROOM UNITArea Dimensions
TYPICAL UNIT FLOOR PLAN
SPACEAREA (in
sq.m.)
Living/Dining 18.70 sqm
Kitchen 6.00 sqm
Master’s Bedroom 13.85 sqm
Bedroom 2 9.90 sqm
Master’s T & B 6.15 sqm
Common T & B 5.15 sqm
Utility Room 5.35 sqm
Hallway/Foyer 11.10 sqm
TWO BEDROOM UNITArea Dimensions
UNIT DELIVERABLES
Living / Dining Kitchen BR Toilet Balcony*
Flooring Homogeneous TilesLaminated
Wood FinishCeramic Tiles Ceramic Tiles
Wall Painted Cement Finish
Combination of ceramic tiles and painted plastered
cement
metal railing
Ceiling Painted Cement FinishPainted gypsum
board n/a
Others
Granite Finish countertop,
overhead and undercounter
cabinets
Closet for all bedrooms
UNIT FEATURES
• Entrance panel door with viewer
• Cable TV line
• Telephone line per unit
• Intercom per unit connected to the Security/ Reception counter
• Window-type air conditioner openings
• Automatic smoke detectors and fire alarm with sprinkler system
• Hot water supply line (excluding water heater) for toilet
• Ventilation for kitchen and toilets
• Individual electric and water meter
TOWER 1
Indoor amenities•Lobby/ Reception area
•Lounge•Game room
•Aerobic studio•Fitness center•Boxing area
•Function Room
Outdoor amenities•Adult/Kiddie pool•Kid’s play area
•Outdoor fitness area
RESIDENTIAL AMENITIESTower 1
RESIDENTIAL AMENITIESTower 2
TOWER 2Indoor amenities•Lobby/ Reception area
•Lounge•Indoor Kid’s play area
•Children’s nook•Cyber hub
•Private theater•Videoke room
Outdoor amenities•Lap pool
•Jogging path•Meditation garden
•Reading nook
PRICE RANGE(as of April 16, 2013)
Unit Type Price Range
1 Bedroom P4.2 Million
2 Bedroom P7 Million
3 Bedroom P13.4 Million
Podium Level Price of Slot Rights
Podium Level 1 950,000.00
Podium Level 2 925,000.00
Podium Level 3 900,000.00
Podium Level 4 875,000.00
PAYMENT & DISCOUNT SCHEMES(effective January 2013 )
Payments CASH 00/20(42)/80
-Amount
-Payable
-Amount n/a
-Payable n/a
-Amount n/a 20%
-Payable n/a over 42 months
-Amount TCP less RF 80%
-Payable 30 days after
Reservation
on the 43rd month
-1BR 10% of TCP Php25,000
-2BR/EXEC. 2BR 10% of TCP Php37,500
-3BR 10% of TCP Php50,000
Reservation Fee (RF)
REBATES
Php 50,000.00 (all unit types)
Upon Reservation
Downpayment
Monthly Installment
Balance
CONSTRUCTION MILESTONESTower 2
VIEW FACING TOWER-1
32nd Floor Level (Area-2)
THE TRION TOWERS (PHASE-2)
PROGRESS PHOTOS AS OF 01 JUNE 2013
CONSTRUCTION MILESTONESTower 2
32nd Floor Level 32nd Floor Level
Concreted Slab, Beams and Girder
Area-1
On-going Erection of Table Forms
Area-2
CONSTRUCTION MILESTONESTower 2
28th Floor Level
Concreted Zocalo
Area-1
27th Floor Level
On-going CHB Laying
Area-2
CONSTRUCTION MILESTONESTower 2
26th Floor Level
On-going CHB Laying at Hallway
Area-1
10th Floor Level
Installation of Wall & Bulkhead Framing
Residential Units
CONSTRUCTION MILESTONESTower 2
9th Floor Level
Application of Skimcoat at Hallway
Area-1&2
EASEMENT AREA
Topping Works and On-going
Flood Test
CONSTRUCTION MILESTONESTower 2
Exterior Works
On-going Application of Skimcoat
Along 8th Avenue from 2nd to 9th Floor
Facing Tower-1 from 2nd to 9th Floor
Exterior Works
On-going Application of Skimcoat
Along ABM Side from 2nd to 9th Floor