1. 1st Workshop Overview ( Feb. 1 to Feb. 5 )
Meetings
Equipment Introduction
Field Trip
2. Settlement Summary
Categories MOPDC Baghdad Univ. Univ of Tech
1. Design NO ChangeModified Floor Plan byFeb. 10 to KOICA
NO Change
2. Altered Equipments Beam Projector Beam Projector Beam Projector
3. Additional Requirements
Security SystemDigital Frame
Security SystemTV Monitor(2)Digital Frame
Security SystemTV Monitor(2)Digital Frame
4. Role & Responsibility
Transporting 1. KOICA: Korea to Umqasir port in Iraq2. Iraq: Unloading, Inland Transportation, and Tax procedures from the
Port to Sites in Iraq
3. Project Schedule
Category Description Date Notice
1st Remote Workshop
Equipment design and the final settlement Trainee Qualification
Feb.1 ~ Feb.5,2010
Complete
Trainee Selection Send copy of the Trainee list and passport Until Feb.28
To KOICA
Equipment Selection/Support
Select Equipments Suppliers
March. thru April.2010
Training Systematic installation & operation of the
equipments for 3 weeksApril, 2010
Delivery & Installation
All Equipment Shipped Installation on Site (UB, UOT, MOPDC)
May, 2010August, 2010
2nd Remote Workshop
Monitoring Operation status of the Equipments and Installations
Early Sept.