![Page 1: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/1.jpg)
![Page 2: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/2.jpg)
The Problem
2
![Page 3: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/3.jpg)
Solutions
Problem needs a cocktail of responses :
- Road infrastructure Improvement
- Full cost of transport (environmental taxes)
- Higher urban density (resulting in higher use of public transport)
- Performant public transport
- Modal shift
- Train
- Waterborne transport
3
![Page 4: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/4.jpg)
Modal Shift : Pallet Shuttle Barge
Logistic System for Goods on Pallet or in Big Bag
with Flexible & Specialised inland barges
4
![Page 5: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/5.jpg)
Table of Contents
Aims | Total Concept
Part 1 | Pallet Shuttle Barge
- Concept
- Technical
- Advantages
Part 2 | Network of regional hubs
Type good-flows
Operational
5
![Page 6: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/6.jpg)
Aims
Implementation innovative multimodal total-concept for
door-to-door logistics of goods on pallets or in big bags,
structured on a new type of small barge, active on short &
medium distances, in complement to road transport
A price competitive logistic solution making use of the
inland waterway system in Belgium, the Netherlands and
Northern France
An integrated network of bi- & trimodal logistic hubs with
regional coverage
A combination of ecology, safety, quality and flexibility
6
![Page 7: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/7.jpg)
Traditional Inland Waterway
Transport
Traditional Inland waterway transport cannot offer a
response to shippers for
- Efficient
- Qualitative
- Safe
transport of goods on pallets or in big bags
Existing solutions raise a number of specific problems
- Need for large loads and limited types of goods
- Not a one-stop solution, needing extra administration &
management
- A large amount of manipulations of pool- or one-way pallets
resulting in high incidence of damages
7
![Page 8: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/8.jpg)
Base concept
8
HUB HUB
A B
![Page 9: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/9.jpg)
Base concept
9
![Page 10: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/10.jpg)
Innovative concept
Fleet & Hubs
10
![Page 11: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/11.jpg)
Pallet Shuttle Barge (PSB 1.0)
Basic lay-out
11
![Page 12: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/12.jpg)
Pallet Shuttle Barge
Basic lay-out
12
![Page 13: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/13.jpg)
Pallet Shuttle Barge
Technical
Construction
- Steel
- Modular
- Length 50 m, width 6,6 m, draught maximum of 2,20 m
- Production in large quantities, with standard dimensions
- Design focused on simple & fast maintenance or part replacement
Dedicated versions
- Possible for specific loads
- Specific handling equipment
Crew
- 1 FTE
- No living quarters/accommodation
13
![Page 14: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/14.jpg)
Pallet Shuttle Barge
Technical
Load
- platform 210 m2 on 4 meter height (due to height restrictions)
- 198 EuroPallets on one layer
- Maximum Tonnage 300 ton
Motorisation & Propulsion
- Diesel or other hybride propulsion, driving hydraulic power
- 1 shottle motor (250 HP)
- 2 horizontal bowthrusters
Weather protection
- Hood
14
![Page 15: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/15.jpg)
Pallet Shuttle Barge
Technical
Crane
- PSB has on-board crane to load/unload independently
- Capacity 2 ton at 12 meter
- Radio controlled operation
Reduced need for Quayside equipment
- PSB can berth unassisted
- PSB has spud-poles
- Fork-lift sized cargo
Control & Steering
- Joystick, automatic pilot, AIS en/of GPS
- Radar (optional) and depth control
- Use of bar-coding, RFID, …
15
![Page 16: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/16.jpg)
Starboard Fore View
16
![Page 17: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/17.jpg)
Starboard Aft View
17
![Page 18: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/18.jpg)
Pallet Shuttle Barge
Containers
18
![Page 19: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/19.jpg)
In Operation
19
![Page 20: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/20.jpg)
In Operation
20
![Page 21: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/21.jpg)
In Operation
21
Schoten
Rumst
![Page 22: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/22.jpg)
In Operation
22
![Page 23: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/23.jpg)
Pallet Shuttle Barge
Advantages
Lower investment
Single crew
Active positioning through 1 shottle aft &
bow-thrusters fore, possibility for GPS-navigation
Compact diesel motorization due to low weight catamaran
resulting in lower fuel consumption
Ecological transport mode, with possible transition to LNG
/CNG/H2
Possibility for remote control
23
![Page 24: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/24.jpg)
Pallet Shuttle Barge
Advantages
Stocking of goods on deck resulting in easier and faster
loading/unloading in a safer and more qualitative manner
Carrying capacity responding to shippers’ needs (size,
type of goods, frequency)
Dependable service, in combination of fixed routes and
flexible route-planning for complete loads as well as
groupage
Activity independent of quay infrastructure
Unlimited operational times ( 24H possibility)
24
![Page 25: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/25.jpg)
Pallet Shuttle Barge
Cost PSB versus Road Haulage
- Rule PSB is competitive if first//last mile is limited to
max 10-15% of total distance
- Cost PSB less influenced by fuel prices
- Cost PSB independent of road taxes and other levies
25
![Page 26: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/26.jpg)
Network of regional hubs
for transshipment & distribution
Setup of network of hubs (terminals),
with bi- of tri-modal functions
Hubs also to be used as warehouse and distribution
center
Hubs situated with shippers or on dedicated sites
Hubs specialized in goods on pallets or in big bags
“All weather” hubs
26
![Page 27: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/27.jpg)
Network of
regional hubs
27
![Page 28: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/28.jpg)
Network van regional hubs
Extensive network
- Belgium
- Large cities : Antwerpen, Brussel, Charleroi, Gent, Hasselt,
Kortrijk, Luik, , Mons, Namen,)
- Regional Hubs (Aalst, Andenne, Brugge,, Genk, La
Louvière, Leuven, Oostende, Rumst, Tessenderlo, Tournai,
Vilvoorde, Wevelgem, Wielsbeke, Zeebrugge, …)
- Netherlands
- Amsterdam-Zaanstad ( Aalsmeer, Aklmaar,Beverwijk,Den
Helder, Greenport, Hoorn, Ijmuiden, Purmerend) , Breda,
Bergen op Zoom, Hengelo, Kampen,, Nijmegen, Rotterdam,
, Venlo, Utrecht,…
- Northern-France
- Lille, Valenciennes, …
Short & medium distance routes
28
![Page 29: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/29.jpg)
Goods
Goods on pallet or in big bags
- Building materials
- FMCG (drinks,, …)
- Semi finished products
- Packaging
- …
City distribution
- All types
- Specific containers
- Small scale distribution
Projects
- Large building sites & infrastructure works
29
![Page 30: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/30.jpg)
Planning operations
Planning & real-time follow-up of
- Barges
- Crew
- Loads
Software (routing, track & trace) for
- Simulations
- Routing software
- Routes
- Pallet Management
30
![Page 31: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/31.jpg)
Present Situation
ZULU 01 is operational
ZULU 02 to be launched before end of January
Review of design : optimisation
ZULU 03 & 04 expected in 2015.
More ZULU’s ………
31
![Page 32: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/32.jpg)
ZULU ?
32
![Page 33: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/33.jpg)
Contact
Management
- Antoon Van Coillie
- Jan D’Haeyer
- Johan Overmeer
33
www.bluelinelogistics.eu
![Page 34: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside](https://reader034.vdocuments.us/reader034/viewer/2022052013/602977d3b3b875782a374cf0/html5/thumbnails/34.jpg)