1 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

The Global Electricity Network

CIGRE Feasibility study Gérald Sanchis

Secretary of CIGRE C1.35

Berlin – 24 October 2017

Page 2: The Global Electricity Network CIGRE Feasibility study

2 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Renewable Energy Sources in the World

2015 23950 TWh

5700 GW

Page 3: The Global Electricity Network CIGRE Feasibility study

3 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Location of the demand

2015 23950 TWh

5700 GW

2015

600M

400M 1200M

700M

4500M

Page 4: The Global Electricity Network CIGRE Feasibility study

4 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Opportunity for interconnections ?

Page 5: The Global Electricity Network CIGRE Feasibility study

5 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

In 2016, CIGRE (International Council on Large Electric Systems) launched a WG to carry out the first known feasibility study by grid experts from countries of all continents, on the technical challenges, potential benefits, economic viability, fit with global energy policies and environmental impact for the concept of a global electricity network.

The WG should adopt one reference long term scenario for consumption and supply volumes, which shall be credible, prudent, consistent with the global climate protection goals of 2 ton CO2

equivalent emissions per person and per year.

The WG C1.35 should use as much as possible available data from past international studies.

Opportunity for interconnections ?

Page 6: The Global Electricity Network CIGRE Feasibility study

6 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Why a global grid ?

To take advantage of the diversity of consumption load patterns: – Due to the different time zones, – Due to the different seasons.

To take advantage of the high potential RES basins in the

world – Due to the location. – Due to the generation capacity of PV according to the time of the day.

To decrease the reserve capacity in each region by pooling reserves across regions.

Page 7: The Global Electricity Network CIGRE Feasibility study

7 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Summer

Winter

0

200

400

600

800

0200

0

200

400

600

800

1000

0

200

400

600

Present 2050 GW

GW

GW

GW

To take advantage of the diversity of consumption load patterns: – Due to the different seasons. – Due to the different time zones,

Why a global grid ?

Page 8: The Global Electricity Network CIGRE Feasibility study

8 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Season demand: now

0100200300400500600700

0

200

0100200300400500600700800900

1000

0

100

0500

100200300400500

summer

winter

Page 9: The Global Electricity Network CIGRE Feasibility study

9 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Season demand: 2050

summer

winter

0100200300400500600700800900

1000

0100200300400500600

0

500

1000

1500

2000

2500

0100200300400500600700800

Page 10: The Global Electricity Network CIGRE Feasibility study

10 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Europe USA

Similar load patterns but with a time shift of 6-8 hours.

The demand variation with time zones

Page 11: The Global Electricity Network CIGRE Feasibility study

11 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

1184

1628

1184

1628

578 560 560

420

613 595 560

420

1050

744 648

1050

805

2794 2878 2914

2824 3003

2617

2829 2794 2878 2914

400

900

1400

1900

2400

2900

19 20 21 22 23 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4

Summer day (GMT) load patterns (GW) for East Asia+Europe+AdN

4, East Asia 9, Europe 1, North America global

925

1369

925

1369

578

805

788

823

578 788

858

700

858

788

858

2483

2578

2737

3032 2997

2535 2488

2737

400

900

1400

1900

2400

2900

3400

19 20 21 22 23 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4

Winter day (GMT) load patterns (GW) for East Asia+Europe+AdN

4, East Asia 9, Europe 1, North America global

2050 load patterns in Europe, North America, East Asia and the addition.

The demand variation with time zones

Page 12: The Global Electricity Network CIGRE Feasibility study

12 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Why a global grid ?

To take advantage of the diversity of consumption load patterns: – Due to the different time zones, – Due to the different seasons.

To take advantage of the high potential RES basins in the

world – Due to the location. – Due to the generation capacity of PV according to the time of the day.

To decrease the reserve capacity in each region by pooling reserves across regions.

Page 13: The Global Electricity Network CIGRE Feasibility study

13 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Wind potential worldwide

Annual potential per country.

On-shore Off-shore

Page 14: The Global Electricity Network CIGRE Feasibility study

14 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Annual potential

Daily effect

Solar potential worldwide

Page 15: The Global Electricity Network CIGRE Feasibility study

15 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Tasks of the WG CIGRE C1.35

Data gathering and adjustment of input data – Hypothesis: by 2050, adequacy of each zone/continent (no needs for interconnections) – Use of energy data coming from WEC study (World Energy scenarios 2050).

Ajustment necessary for adequacy.

Load flow simulation with investment loop

– The feasibility study should demonstrate an increase of the net social welfare from the interconnectors, by replacement of generation capacities.

List of profitable interconnections between zones/continents.

Page 16: The Global Electricity Network CIGRE Feasibility study

16 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Tasks of the WG CIGRE C1.35 example of simulation in Europe (Antares tool)

Page 17: The Global Electricity Network CIGRE Feasibility study

17 Global Electricity Network | 7th Solar Integration Workshop | Berlin | 24 October 2017

Regions used by CIGRE C1.35

Achievement by end of 2018.