![Page 1: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/1.jpg)
AS 4654 -2
The External WaterproofingMembranes
Standard
![Page 2: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/2.jpg)
This external waterproofing standard containssolutions for problems which have not beenaddressed in other countries.
NOTE
![Page 3: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/3.jpg)
• Any material used for external waterproofing systemsshall comply with AS 4654.1.
• In the past membranes which have passed tests inother countries have been found unsuitable for use inAustralia.
CONFORMANCE CONDITIONSAS 4654-2, Page 6, Para 1.6
![Page 4: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/4.jpg)
Table 2.1Requirements – Fully Bonded Membranes
![Page 5: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/5.jpg)
• No up stand for membrane.
• No fall in deck to shed water to wastes.
WATER PENETRATION AT SLIDING DOORS
![Page 6: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/6.jpg)
• All falls shall ensure that water drains to outlet/s orgutters.
• Water shall not pond on the finished surface.
• Falls shall be in the structural substrate or as analternative the fall can be formed by a screed (NOT AMORTAR BED).
FALLS TO WASTESAS 4654-2, Page 8, Para 2.5.2
![Page 7: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/7.jpg)
Concrete surfaces must be primed to resist “gassing” which can damage membranes
![Page 8: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/8.jpg)
• The surface of the substrate shall be clean and dry.
• Moisture content of concrete screed shall not exceed7%.
• To aid adhesion on concrete surfaces smoothnessshould be the same as wood float or rough power toolfinish.
SUBSTRATES FULLY BONDED OR LIQUID APPLIED
AS 4654-2, Page 9, Para 2.5.3.1
![Page 9: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/9.jpg)
The common problems
UPSTANDS
![Page 10: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/10.jpg)
Deck set higher than internal flooring – no water stop fitted
![Page 11: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/11.jpg)
Tile bed higher than waterproofing upstand ……a very common problem
![Page 12: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/12.jpg)
• The height of the up stands are related to the degree ofrisk involved. In cyclone areas and exposed positionsup stands must be higher than buildings which are insheltered positions
• The higher the building the higher the upstand (e.g.the upstand would be 40mm higher in a building whichis above 15 metres).
TABLE ONE: RATIONALE
![Page 13: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/13.jpg)
• This enables the sill to be tanked and will not delayconstruction as the remainder of the waterproofing canbe installed at a later date.
DOORS & WINDOWS MUST BE REMOVED PRIOR TO
WATERPROOFINGAS 4654-2, Page 17, Para 2.8.3.(A)
![Page 14: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/14.jpg)
Figure 2.8 (in part)Typical Detail of Membrane Termination at External
Opening Doors
![Page 15: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/15.jpg)
• Many manufactures now produce suitablesliding doors for level entry decks.
LEVEL ENTRY DECKS
![Page 16: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/16.jpg)
WATERPROOFING FOR DECKS THAT REQUIRE LEVEL ENTRY
![Page 17: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/17.jpg)
PARAPET PROTECTION
![Page 18: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/18.jpg)
Common problems are:
• Upstanding angles at edge of decks.
• Angles that allow storm rain to penetrate asvertical leg is too short.
• High front gutters.
GUTTERS
![Page 19: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/19.jpg)
Water retained by steel extrusion – tile bed became saturated & water leaked through sheet joints & fasteners
![Page 20: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/20.jpg)
• The vertical leg of the angle must be a minimum of35mm.
• Sheet membranes must terminate on a horizontalsurface.
• Liquid membranes must terminate on a verticalsurface.
GUTTER TERMINATIONS
![Page 21: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/21.jpg)
TYPICAL GUTTER TERMINATION DETAIL
![Page 22: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/22.jpg)
• Planter boxes shall be drained with a vertical riser.
• The finished base of the planter box shall be graded tothe outlet.
• The membrane shall be sealed to a drainage flange,and shall continue to the top of the box and over theedge of the planter box.
• Where a wall is adjacent to the box it shall beoverflashed or sealed to the planter box.
PLANTER BOXES(Key Requirements)
![Page 23: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/23.jpg)
TYPICAL PLANTER BOX CONSTRUCTION
![Page 24: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/24.jpg)
• Timber posts should be installed in saddles (so thatposts can be replaced without damaging thewaterproofing).
• On concrete decks post bolts penetrations should betreated with epoxy.
POST AND POST SUPPORTS
![Page 25: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/25.jpg)
TYPICAL DETAIL OF METAL POST SUPPORT –PRIOR TO MEMBRANE INSTALLATION
![Page 26: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/26.jpg)
Posts that are fitted after waterproofing has beencompleted shall be sealed.
POST SEALINGAS 4654-2, Page 20, Para 2.8.4
![Page 27: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/27.jpg)
• Building coatings must be waterproof, and I draw yourattention to the “leaky building” syndrome in NewZealand. In many cases water penetrated into thebuilding envelope because the coatings were notflexible enough to withstand quite minor buildingmovements.
WATERPROOFING ABOVE TERMINATIONSAS 4654-2, 2.5.1.4
![Page 28: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/28.jpg)
The finished floor level shall not reduce the design flowof the outlet, and the outlet pipe should be the samediameter as the risers that drain the roof/balcony.
OVERFLOW PIPESAS 4654-2, Page 27, Para 2.1.1
![Page 29: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/29.jpg)
Drainage holes are too small & are set up from the surface of the deck
![Page 30: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/30.jpg)
Entry to drain 50% blocked by finished tile surfaceAS 4654-2, Page 29, Fig. 2.8 (C)
![Page 31: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/31.jpg)
TYPICAL DETAIL OF OVERFLOW PIPE
![Page 32: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/32.jpg)
Upward termination of the membrane is to be inaccordance with Table A1 appendix A (e.g. above thefinished surface of the roof).
SKYLIGHTS
![Page 33: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/33.jpg)
Movement joints shall be provided in the topping toaccommodate movement in the membrane.
BONDED SYSTEMS(e.g. TILES)
![Page 34: The External Waterproofing Membranes Standardwet-seal.com.au/wp-content/uploads/2013/11/AS-4654...• Buildingcoatingsmustbewaterproof,andIdrawyour attentiontothe“leakybuilding”syndromeinNew](https://reader031.vdocuments.us/reader031/viewer/2022021917/5e533d5a8943e06e9d016c7f/html5/thumbnails/34.jpg)
For other than loose laid materials, movement joints mustbe carried through to and into the surface finish.