olivia mae asuncionthe architectural portfolio of
university of oregon 2013-2015oliviaasuncion.me
916.479.5322
oliviaasuncion.me
https://www.linkedin.com/pub/olivia-mae-asuncion/24/240/2b4
contact information
tab
le o
f co
nte
nts
w.o.w. hall addition eugene, or
migrant worker housing yakima valley, wa
live young wellness center klamath falls, or
skinner butte live/work row housing eugene, or
senior housing community houma, la
willamette and broadway parklet eugene, or
structures, construction methods + enclosures
*Note: This collection of work does not include the comprehensive thesis project, “foodspace: affordable cohousing community.” This will be in a separate portfolio.
Location:
Fall 2014 | Brian Cavanaugh
291 W. 8th Avenue, Eugene, OR
the hidden gem
This project is an expansion to the existing historic W.O.W. Hall, to be built on the adjacent surface parking lot.
Taking into consideration what this building addition means to the W.O.W. Hall, the building needs to evoke simplicity, in form and in function, mimicking the simplicity of the original W.O.W. Hall, while also inviting the community in with a provocative building design.
w.o.w. hall addition eugene, or
West 8th Avenue
Lincoln Street
SERVICE BARSOU
ND
-PRO
OF BA
R
OPEN PLAN ORIGINAL W.O.W. HALL
SERVICE BAR
SOU
ND
-PRO
OF BA
R
OPEN PLAN Celebrating the Arts
Supporting the Cause
Serving the Community
Perfecting the Craft
ground floor parti upper floors parti section parti
From most angles, the heritage trees on the sidewalk block views of the site, but their tall growth allow for the ground floor to be visible from pedestrian level. In addition, with vehicle and pedestrian traffic heading west on 8th Avenue and north on Lincoln, the design of the ground floor of the southwest corner of the site becomes crucial.
Creating a corner experience in a hidden, non-corner site.
N-S section
west elevation
Light moving through the vertical aluminum slat facade create special experiences for
the users of W.O.W. Hall.
basement floor plan ground floor plan
N
Entrance lobby
second floor plan third floor plan
Dance studio
Location:
Summer 2014 | Juli Brode
Green Valley RoadMabton, WA
what’s in a wall?
A single, thick CMU wall acts as the main structure, daylighting strategy, stack ventilation core and water collection storage for this migrant worker housing unit. The light wood-framed exterior walls that enclose the actual living spaces are allowed to deteriorate and replaced as needed. Far into the future, the full deterioration of the wood will leave the CMU wall as a commemorative symbol for the migrant workforce.
This design is intended to work for any site condition.
migrant worker housingyakima valley, wa
unit floor plan
N
exploded axonometric
CMU wall goes deep into the ground, acting as main structure
Affordable wooden slats as exterior siding
Light wood-framed structure for all other walls
wood deterioration over time
puterbaugh farms | washington
king estate | oregon windrose farms | california
BREAKTHROUGH WALLLocation:
Winter 2014 | Kyuho Ahn
South 11 StreetKlamath Falls, OR
take charge
Taking over an existing retail building in Downtown Klamath Falls, Sky Lakes Medical Center plans to open a health and wellness center for bariatric patients.
The Live Young Wellness Center is a place for patients to feel motivated to take charge of their minds, of their bodies, and of their lives. The building itself takes its main users, the patients, through a journey that begins as one enters the space.
BREAKTHROUGH WALL
live young wellness centerklamath falls, or
Be in control of the self
BreakthroughSharing experience
N
Glazed rooms as invitation to the curious
Tall and open Breakthrough Lobby
Human-scaled house within a house
The different zones of the building act as metaphorical stepping stones for the users:
demo plan
reflected ceiling plan
ground floor plan
Teaching kitchen
BREAKTHROUGH WALL
Group/Community Rooms
Sta� Break Room
Fitness Room
Entrance
Breakthrough Lobby
Teaching Kitchen
O�cesEntrance
Lobby facing private office waiting room and reception area showing the Wave ceiling system
NW-SE section
BREAKTHROUGH WALL
Lobby facing building main entrance with dry-erase
Breakthrough Wall on the left
Location:
Fall 2013 | Virginia Cartwright
Shelton McMurphy Blvd.Eugene, OR
ramp houses
The site of this project is in the quieter area of Downtown Eugene on the side of a hill near Skinner Butte.
The aim is to theorize solutions for creating accessible housing units on a steep site. By developing strategies for ramp systems, while maintaining the majesty of the steep grade, each unit can be accessed with minimal use of mechanical systems, like elevators.
skinner butte live/work row housingeugene, or
understanding the grade
PROGRAM:
20 live/work unitsAll living units are 1,000 sq. ft.Work units are broken down into the following: 5 250 sq. ft. units 10 500 sq. ft. units 5 1,000 sq. ft. units
site plan
N
stacked units
1000 sq. ft. housing with 500 sq. ft. work unit
1000 sq. ft. housing with 250 sq. ft. work unit
upper unit: 1000 sq. ft. housing with 500 sq. ft. work unit
lower unit: 1000 sq. ft. housing with 1000 sq. ft. work unit
Separating living and working areas using ramps
Ramps used as morethan circulation
exploring options for vertical circulation
site section
Proposed Residential ComplexTypical Residential Floor Plan
1 One Bedroom Units
2 Two Bedroom Units
3 Community Kitchen and Dining
4 Community Living Room
5 Area of Refuge / Outdoor Terrace
6 Laundry
Legend
1 1
1 1 1
1 2
2
6
5
5
1
11
1 1 1
1 2
6
5
1
11
1 1 1 1
1 1 2
26
51
11 1
1 1
1
1
3
3
3
4
4
2
5111
1 1
1
1
11
1
2
51 1
1 1
1
1
11
1
ELEV: Sea Level
17
18
Site Plan Legend
1 Administrative Offices
2 Prayer / Chapel
3 Storage
4 Mechanical
5 Medical Examination Room
6 Reception
7 Physical Therapy
8 Fitness
9 Mail Room
10 Meeting Room
11 Electrical
12 Janitorial
13 Restroom
14 Library / Business Center
15 Cafe / Deli
16 Children's Playground
17 Boules Court
18 Raised Garden Planters
19 Parking
1
1 1
4
4
13 13
3
1211
456
7
8
10
10 14
16
9
513 131211
4
13 13 31211
4
4
9
9
6
6
6
2
19
19
19
15
Location: 7491 Park AvenueHouma, LA
HUD competition entry
Collaborating with fellow graduate students Spencer Anderson, Patrick Reinhard, John Tushinski and James Voelckers, we developed a comprehensive proposal for a 270-unit senior housing community for the HUD Innovation in Affordable Housing Student Design + Planning Competition 2015.
The challenge is to design a healthy living environment that promotes community and sustainability, while being economically viable.
Winter 2015 | Adviser Peter Keyes
Proposed Residential ComplexTypical Residential Floor Plan
1 One Bedroom Units
2 Two Bedroom Units
3 Community Kitchen and Dining
4 Community Living Room
5 Area of Refuge / Outdoor Terrace
6 Laundry
Legend
1 1
1 1 1
1 2
2
6
5
5
1
11
1 1 1
1 2
6
5
1
11
1 1 1 1
1 1 2
26
51
11 1
1 1
1
1
3
3
3
4
4
2
5111
1 1
1
1
11
1
2
51 1
1 1
1
1
11
1
ELEV: Sea Level
17
18
Site Plan Legend
1 Administrative Offices
2 Prayer / Chapel
3 Storage
4 Mechanical
5 Medical Examination Room
6 Reception
7 Physical Therapy
8 Fitness
9 Mail Room
10 Meeting Room
11 Electrical
12 Janitorial
13 Restroom
14 Library / Business Center
15 Cafe / Deli
16 Children's Playground
17 Boules Court
18 Raised Garden Planters
19 Parking
1
1 1
4
4
13 13
3
1211
456
7
8
10
10 14
16
9
513 131211
4
13 13 31211
4
4
9
9
6
6
6
2
19
19
19
15
senior housing communityhouma, la
1
56
7
8
15
1012
13
14
3
2
4
4
9
Excessive Solar Gain
Inefficient Site Design Minimal Daylighting Walk-ability
Concrete Island Lack of Street PresenceExcessive solar gainon east and west wallsthroughout the day, creatinglarge cooling loads in a mostlyhot and humid climate
The large amount of pavingand hardscape creates a“concrete island” that disconnects the building and its residents fromnatural landscapes and the public park adjacent to the site.
The 11 story building results from not utilizing the site properly which causes a monumentalstructure that towers over the surrounding single story residences.
North-south orientation of the building diminishes the opportunity for daylight to enter the long corridors.
There is very limited pedestrian walkways leading outside of the site to the surrounding neighborhood.
The orientation of the buildingleads to an unwelcoming entry sequence for residents and visitors.
Site Context and Amenities: 1/4 Mile Radius From Site
Community
Building Morphology
Natural Surroundings
Northern Park
St. Louis Canal
Bayou Terrebonne
1
3
2
Dularge Community Baptist Church
Surrounding Single Family Residential
8
9
Commercial Goods
Family Dollar
Direct Auto Insurance
South Louisiana Seed
Kayu Furniture Imports
Westpoint Market & Deli
Rent-a-Center
10
12
13
14
15
11
4
Infrastructure
State HWY 24
5
7
6
Food + Drink
Phase 1
B&B Wings
Ray’s Seafood
Note:
Terrebonne General Medical Center < 1 Mile
Current Building and Site Constraints
Site Analysis Site and Program Solution
Residential
Circulation and Egress
Parking, Public, Commercial
Group Kitchen andCommunity Spaces
Original Building Massing
Break up buildingand distribute across site
Connect separatespaces with spine
Push, pull, and rotatecreating externalcourtyard spaces and to optimize views
Proposed Site Programming
1
56
7
8
15
1012
13
14
3
2
4
4
9
Excessive Solar Gain
Inefficient Site Design Minimal Daylighting Walk-ability
Concrete Island Lack of Street PresenceExcessive solar gainon east and west wallsthroughout the day, creatinglarge cooling loads in a mostlyhot and humid climate
The large amount of pavingand hardscape creates a“concrete island” that disconnects the building and its residents fromnatural landscapes and the public park adjacent to the site.
The 11 story building results from not utilizing the site properly which causes a monumentalstructure that towers over the surrounding single story residences.
North-south orientation of the building diminishes the opportunity for daylight to enter the long corridors.
There is very limited pedestrian walkways leading outside of the site to the surrounding neighborhood.
The orientation of the buildingleads to an unwelcoming entry sequence for residents and visitors.
Site Context and Amenities: 1/4 Mile Radius From Site
Community
Building Morphology
Natural Surroundings
Northern Park
St. Louis Canal
Bayou Terrebonne
1
3
2
Dularge Community Baptist Church
Surrounding Single Family Residential
8
9
Commercial Goods
Family Dollar
Direct Auto Insurance
South Louisiana Seed
Kayu Furniture Imports
Westpoint Market & Deli
Rent-a-Center
10
12
13
14
15
11
4
Infrastructure
State HWY 24
5
7
6
Food + Drink
Phase 1
B&B Wings
Ray’s Seafood
Note:
Terrebonne General Medical Center < 1 Mile
Current Building and Site Constraints
Site Analysis Site and Program Solution
Residential
Circulation and Egress
Parking, Public, Commercial
Group Kitchen andCommunity Spaces
Original Building Massing
Break up buildingand distribute across site
Connect separatespaces with spine
Push, pull, and rotatecreating externalcourtyard spaces and to optimize views
Proposed Site Programming
PRO FORMA
Rental Income
COMMERCIAL UNITSSq. Ft. Per Sq. Ft. Monthly Income First Year
Available Café Space 2444 2.08$ 5,092$ 61,100$ COMMERCIAL UNITS TOTAL 5,092$ 61,100$
RESIDENTIAL UNITSNo. of Units 270
Bedroom Size # of Units Lease per mo Monthly Income First Year 1-bedroom 235 547$ 128,545$ 1,542,540$ 2-bedroom 35 740$ 25,900$ 310,800$
SUB-TOTAL 154,445$ 1,853,340$
Surcharges 7,191$ 86,291$
Vacancy Rate 5% 8,082-$ 96,982-$ Bad Debt Allowance 2% 3,232.72-$ 38,792.62-$
RESIDENTIAL UNITS TOTAL 150,321$ 1,803,857$
TOTAL INCOME 155,413$ 1,864,957$
Operating Costs (Per Year)Maintenance Costs 10% Annual Rental Income 186,495.68$ Utilities 7% Annual Rental Income 126,817.06$ Management Fees 5% Per Unit Per Month 93,247.84$ Taxes 0.00% Building Value $14,584,000.00 -$ Insurance 1% Building Value $14,584,000.00 145,840.00$
TOTAL OPERATING COSTS 552,400.57$
NET OPERATING INCOME 1,312,556.18$
Debt ServiceAnnual Mortgage Payments 232,997.37$
ANNUAL PROFIT 1,079,558.81$
!"#$%&'()*+,&
%-./+0)12-.&!-3.&3.4&5-0+6367&
#-)/*.6&$0)/+&8).4/&
9'"$&:30+.70/;*<&LIHTC Equity
86%
Leverage Loans5%
Housing Trust Funds6%
REIT Partnership4%
Funding Sources
SOURCES AND USES
Project Costs
Hard CostsConcrete Podium Ground Floor $200 per sq. ft. 4,116,000.00$ Wood-Framed Upper Floors $150 per sq. ft. 36,901,500.00$ Landscaping + Hardscaping $15 per sq. ft. 1,336,185.00$ Structured Parking $75 per sq. ft. 1,777,500.00$ Surface Parking $30 per sq. ft. 226,620.00$ Construction Contingency 10% of hard costs 4,435,780.50$
TOTAL HARD COSTS 48,793,585.50$
Soft CostsPre-Development Consultants 0.5% of hard costs 243,967.93$ Architect/Engineer 5% of hard costs 2,439,679.28$ Development Fees 4% of hard costs 1,951,743.42$ Permit Fees 7% of hard costs 3,415,550.99$ Legal & Accounting 0.2% of hard costs 97,587.17$ Closing 2.5% of hard costs 1,219,839.64$ Soft Cost Contingency 10% of soft costs 936,836.84$
TOTAL SOFT COSTS 10,305,205.26$
TOTAL PROJECT COSTS 59,098,790.76$
Financing
LIHTC (9% Eligibility)Total Development Cost 59,098,790.76$ Less: Non-eligible costs (land, permanent financing costs) 0Eligible Basis 59,098,790.76$
Applicable Fraction (% of low-income units) 100% 59,098,790.76$ Tax Credit Percentage 9% 5,318,891.17$ Tax Credit Period 10 years 53,188,911.68$ LIHTC EQUITY 0.95 on the dollar 50,529,466.10$
Leverage LoanNet Operating Income 1,312,556.18$ DSCR 1.5 :1 875,037.46$ Annual Debt Service
PRINCIPAL 2,891,274.00$ Interest Rate 7.00% rateYears to Pay off Mortgage 30 yearsAnnual Mortgage Payment per year 232,997.37$
Gap FinancingLOUISIANA HOUSING TRUST FUNDS 60% 3,406,830.40$ REIT PARTNERSHIP 40% 2,271,220.26$
TOTAL AMOUNT FINANCED 59,098,790.76$
HOUMA-TERREBONNEHOUSING AUTHORITY
(Owner)
Tax Credit Investor(Primary Funding Source)
LIH
TC 9
%: $
53,1
88,9
11.6
8
LIH
TC E
quity
: $50
,529
,466
.10
Lenders(Maximum MarketRate Mortgage)
Loan: $2,891,274.00
7%, 30 YearsAmortization
Louisiana HousingTrust Fund
(Grant)
Grant: $3,406,830.40
Real EstateInvestment Trust(Private Partnership
/Minority Stakeholder)
Inve
stm
ent:
$2,2
71,2
20.2
6
Proposed Residential ComplexTypical Residential Floor Plan
1 One Bedroom Units
2 Two Bedroom Units
3 Community Kitchen and Dining
4 Community Living Room
5 Area of Refuge / Outdoor Terrace
6 Laundry
Legend
1 1
1 1 1
1 2
2
6
5
5
1
11
1 1 1
1 2
6
5
1
11
1 1 1 1
1 1 2
26
51
11 1
1 1
1
1
3
3
3
4
4
2
5111
1 1
1
1
11
1
2
51 1
1 1
1
1
11
1
ELEV: Sea Level
17
18
Site Plan Legend
1 Administrative Offices
2 Prayer / Chapel
3 Storage
4 Mechanical
5 Medical Examination Room
6 Reception
7 Physical Therapy
8 Fitness
9 Mail Room
10 Meeting Room
11 Electrical
12 Janitorial
13 Restroom
14 Library / Business Center
15 Cafe / Deli
16 Children's Playground
17 Boules Court
18 Raised Garden Planters
19 Parking
1
1 1
4
4
13 13
3
1211
456
7
8
10
10 14
16
9
513 131211
4
13 13 31211
4
4
9
9
6
6
6
2
19
19
19
15
Proposed Residential ComplexTypical Residential Floor Plan
1 One Bedroom Units
2 Two Bedroom Units
3 Community Kitchen and Dining
4 Community Living Room
5 Area of Refuge / Outdoor Terrace
6 Laundry
Legend
1 1
1 1 1
1 2
2
6
5
5
1
11
1 1 1
1 2
6
5
1
11
1 1 1 1
1 1 2
26
51
11 1
1 1
1
1
3
3
3
4
4
2
5111
1 1
1
1
11
1
2
51 1
1 1
1
1
11
1
ELEV: Sea Level
17
18
Site Plan Legend
1 Administrative Offices
2 Prayer / Chapel
3 Storage
4 Mechanical
5 Medical Examination Room
6 Reception
7 Physical Therapy
8 Fitness
9 Mail Room
10 Meeting Room
11 Electrical
12 Janitorial
13 Restroom
14 Library / Business Center
15 Cafe / Deli
16 Children's Playground
17 Boules Court
18 Raised Garden Planters
19 Parking
1
1 1
4
4
13 13
3
1211
456
7
8
10
10 14
16
9
513 131211
4
13 13 31211
4
4
9
9
6
6
6
2
19
19
19
15
Location:
Spring 2015
41 W. BroadwayEugene, OR
urban oasis
WIth team members Aruna Bolisetty, Alyssa Franco and Lauren Strauss, this design was entered in the AIAS Parklet Design Competition at the University of Oregon that was held as part of the HOPES 21 Conference.
The goal is to create an urban oasis in the center of downtown, integrating the following features into the design: social zones, accessibility, “green” buffer and context response through color.
willamette + broadway parkleteugene, or
5 ft.
green buffer
private zone
5-foot turning diameter foldable seat accessible bar height
social zone
floor plan
Plants will be planted in separate containers for easy installation and removal.
Flooring is wood decking to provide drainage, but still maintain accessibility.
“Dead” corners become usable by making them serve as both planters and platforms to hold drinks
Angled seating to make spaces more inviting, and provide more options.
Pallets are used as both protectionfrom the street, but also as plantersand bar support.
Bar height platform encourage social interaction on the sidewalk. Lower platform for kids and wheelchair users.
Foldable seating tomake room for wheelchairs and strollers.
Fall 2013 | Moore + OtaWinter 2014 |Donofrio + DuffFall 2014 | Corner + Rowell
technical knowledge
These are a collection of projects from various technical classes offered at the University of Oregon, taken in the order listed below:
Arch 570 | Building ConstructionArch 562 | Wood, Steel + Concrete SystemsArch 571 | Building Enclosures
structures, construction methods + enclosures projects
Joists to GirdersJoists to Girders
Girders to Columns
Girders to Columns
Position of theBucket of Sand
first failure at the joist parallel to the girders
second failure at the column to girder
connection
scoliosis deckin collaboration with lisa hartanov
75.312 lbs./ft.75.312 lbs./ft.75.312 lbs./ft.75.312 lbs./ft.
37.656 lbs./ft.
37.656 lbs./ft.
6x6 Wood Beam
8x10 Wood Girder
8x12 Wood Column
Girder: Max Moment: 167,412 lb*in
Beam: Max Moment: 41,748 lb*in
Column: Max Moment: 152,400 lb*in
Girder: Max Tensile Force: 5,319 lbs
Beam: Max Tensile Force: 398 lbs
Column: Max Compressive Force: 12,347 lbs
Beam: Max Compressive Force: 465 lbs
Girder: Max Compressive Force: 3 lbs
structural analysis via Multiframe
wood + cloth canopy
SECTION AT AUDITORIUM BAY: 1/2” = 1’-0”
OLIVIA MAE ASUNCION | ARCH 571 | FALL 2014
WATER BARRIER/AIR BARRIER/
VAPOR BARRIER (IN ORDER FROM
EXTERIOR TO INTERIOR)
HSS 2 X 2 FRAMING FOR WINDOW SEAT
GYPSUM WALL BOARD
2 X 6 WOOD DECKING
4” CONCRETE
T&G HARDWOOD FLOOR
6” 20 GAUGE METAL STUD WALL
WAUSAU
SU PERWALL SSG
PRE-CAST CONCRETE HEADER
3” RIGID INSU LATION
USG DENSGLASS EXTERIOR
GYPSUM SHEATING
“Z” CHANNEL FURRING
1” INSU LATED METAL PANEL
WAUSAU SU PERWALL SSG - FRITTED
WAUSAU SU PERWALL SSG
METAL PARAPET CAP
BLOW N-IN CELLU LOSE INSU LATION
6” 20 GAUGE METAL STUD WALL
HSS 8 X 20
METAL DECKING
SHEATHING
RIGID INSU LATION
COVER BOARD
EPDM
HSS 2 X 2 FOR SOFFIT FRAMING
GYPSUM WALL BOARD
“Z” CHANNEL FURRING
“T” STEEL PURLINS
HSS 2 X 1 WITH NOTCH FOR GLASS
FLASHING
1/2” GLASS CANOPY (FROSTED)
GUTTER
HSS 8 X 10
“C” CHANNEL SU PPORTS
BLOW N-IN CELLU LOSE INSU LATION
USG DENSGLASS EXTERIOR
GYPSUM SHEATING
1” INSU LATED METAL PANEL
TAPERED “T” STEEL MEMBER
W ELDED AND BOLTED
WAUSAU SU PERWALL SSG
(FIXED LITES)
PRE-CAST CONCRETE HEADER
WATER BARRIER/AIR BARRIER/
VAPOR BARRIER (IN ORDER FROM
EXTERIOR TO INTERIOR)
SHELF ANGLE
“Z” CHANNEL FURRING
3” RIGID INSU LATION
USG DENSGLASS EXTERIOR
GYPSUM SHEATING
HSS 8 X 20
GYPSUM WALL BOARD
2 X 6 T&G WOOD DECKING
4” POURED-IN CONCRETE
HARDWOOD FLOOR FINISH
6” 20 GAUGE METAL STUD WALL
BRICK & MORTAR
FLASHING
AXONOMETRIC DRAWING @ CANOPY AND TRANSOM: 1/2” = 1’-0”
OLIVIA MAE ASUNCION | ARCH 571 | FALL 2014
EMU renovation detailing
PARAPET & ROOF DETAIL AT AUDITORIUM BAY: 3” = 1’-0”
OLIVIA MAE ASUNCION | ARCH 571 | FALL 2014
METAL COPING
WOOD FIBER ROOF COVER BOARD
1” METAL PANEL
3” RIGID INSU LATION
USG DENSGLASS EXTERIOR
GYPSUM SHEATING
WATER BARRIER/AIR BARRIER/
VAPOR BARRIER (IN ORDER FROM
EXTERIOR TO INTERIOR)
METAL DECKING
RIGID INSU LATION CUT TO FILL
6” 20 GAUGE METAL STUD WALL
2X COPING SU PPORT
BLOW N-IN CELLU LOSE INSU LATION
HSS 8 X 20
CLEAT
EPDM
“C” CHANNEL SU PPORT
TAPERED “T” STEEL MEMBER
SU PPORT FOR CANOPY
W ELDED AND BOLTED
RIGID INSU LATION
1” INSU LATED METAL PANEL
“T” STEEL PURLINS
HSS 2 X 1
1/2” GLASS CANOPY - FROSTED
FLASHING
GUTTER
WAUSAU
SU PERWALL SSG
PRE-CAST CONCRETE HEADER
SHELF ANGLE
BRICK TIES
BRICK
3” RIGID INSU LATION
USG DENSGLASS EXTERIOR
GYPSUM SHEATING
WATER BARRIER/AIR BARRIER/
VAPOR BARRIER (IN ORDER FROM
EXTERIOR TO INTERIOR)
HSS ##X##
“Z” CHANNEL FURRING
GYPSUM WALL BOARD
2 X 6 WOOD DECKING
4” CONCRETE
T&G HARDWOOD FLOOR
6” 20 GAUGE METAL STUD WALL
INSU LATED
METAL PANELS
WAUSAU
SU PERWALL SSG
- FRITTED
WAUSAU
SU PERWALL SSG
BRICK
PRE-CAST
CONCRETE
WAUSAU 4250I
ZERO SIGHTLINE
STEEL AND GLASS
CANOPY
METAL INFILL
PANELS
U T
thank you